Date May 5, 1997 |
Report No. NSIAD-97-108 |
Title
United States General Accounting Office GAO
May 1997 Report to the Subcommittee on Acquisition and Technology, Committee on Armed Services, U.S. Senate MAJOR ACQUISITIONS Significant Changes Underway in DOD’s Earned Value Management Process GAO/NSIAD-97-108 GAO United States General Accounting Office Washington, D.C. 20548 National Security and International Affairs Division B-276406 May 5, 1997... |
Date March 14, 1997 |
Report No. RCED-97-63 |
Title
United States General Accounting Office GAO
March 1997 Report to Congressional Requesters DEPARTMENT OF ENERGY Management and Oversight of Cleanup Activities at Fernald GAO/RCED-97-63 GAO United States General Accounting Office Washington, D.C. 20548 Resources, Community, and Economic Development Division B-276108 March 14, 1997 Congressional Requesters Over 50 articles containing allegations of m... |
Date March 6, 1997 |
Report No. T-RCED-97-92 |
Title
United States General Accounting Office GAO
For Release on Delivery Expected at 10:00 a.m. EST Thursday March 6, 1997 Testimony
Before the Subcommittee on Energy and Environment, Committee on Science, House of Representatives DEPARTMENT OF ENERGY Improving Management of Major System Acquisitions
Statement by Victor S. Rezendes, Director, Energy, Resources, and Science Issues, Resources, Community,... |
Date March 4, 1997 |
Report No. RCED-97-85R |
Title
GAO United States General Accounting Office Washington, D.C. 20548 Resources, Community, Economic Development and Division B-276266 March 4, 1997 The Honorable John R. Kasich Chairman, Committee on the Budget House of Representatives Subject: Department of Energv: Maior Svstem Acquisitions From 1980 Through 1996 Dear Mr. Chairman: As requested, we are providing you with a listing of the major syst... |
Date Feb. 28, 1997 |
Report No. NSIAD-97-100R |
Title
National Security and International Affairs Division B-272637 February 28, 1997 The Honorable William S. Cohen The Secretary of Defense Dear Mr. Secretary: We are terminating our assignment regarding the Air Force’ F-22 advanced s tactical fighter program in view of the Air Force’ December 1996 decision to s restructure the F-22 program. That decision rendered moot many of the issues on which ... |
Date Jan. 27, 1997 |
Report No. NSIAD-97-79R |
Title
GAO United States General Accounting Qffice Washington, D.C. 20548 National Security and International AfTairs Division B-275846 January 27, 1997 The Honorable William S. Cohen The Secretary of Defense Dear Mr. Secretary: During our ongoing review of the Army’ Longbow Apache modification s program located at the U. S. Army’ Aviation and Troop Command, we s developed information that raises con... |
Date Nov. 26, 1996 |
Report No. RCED-97-17 |
Title
United States General Accounting Office GAO
November 1996 Report to the Chairman, Committee on Governmental Affairs, U.S. Senate DEPARTMENT OF ENERGY Opportunity to Improve Management of Major System Acquisitions G A O years
1921 - 1996 GAO/RCED-97-17 GAO United States General Accounting Office Washington, D.C. 20548 Resources, Community, and Economic Development Division B-274876 November 26, 199... |
Date Aug. 26, 1996 |
Report No. NSIAD-96-162 |
Title
United States General Accounting Office GAO
August 1996 Report to the Subcommittee on Acquisition and Technology, Committee on Armed Services, U. S. Senate BEST PRACTICES Commercial Quality Assurance Practices Offer Improvements for DOD G A O years
1921 - 1996 GAO/NSIAD-96-162 GAO United States General Accounting Office Washington, D.C. 20548 National Security and International Affairs Division B-... |
Date Aug. 8, 1996 |
Report No. RCED-96-208R |
Title
GAO United States General Accounting Office Washington, D.C. 20548 Resources, Community, Economic Development and Division B-272441 August 8, 1996 Mr. Donald W. Pearman Acting Chief F’ inancial Officer Department of Energy Dear Mr. Pearman: In each of the last several years, we have reviewed the unobligated and uncosted funds within the Department of Energy (DOE) that may be available to reduce ... |
Date July 25, 1996 |
Report No. NSIAD-96-204BR |
Title
United States General Accounting Office GAO
July 1996 Briefing Report to Congressional Requesters BOSNIA Costs Are Exceeding DOD’s Estimate G A O years
1921 - 1996 GAO/NSIAD-96-204BR GAO United States General Accounting Office Washington, D.C. 20548 National Security and International Affairs Division B-272434 July 25, 1996 Congressional Requesters The Department of Defense (DOD) had deployed ab... |
Date July 24, 1996 |
Report No. T-NSIAD-96-210 |
Title
United States General Accounting Office GAO
For Release on Delivery Expected at 9:30 am, EDT Wednesday, July 24, 1996 Testimony
Before the Subcommittee on Science, Technology, and Space, Committee on Commerce, Science and Transportation, United States Senate SPACE STATION Cost Control Difficulties Continue
Statement of Thomas J. Schulz, Associate Director, Defense Acquisitions Issues, National Sec... |
Date July 17, 1996 |
Report No. NSIAD-96-135 |
Title
United States General Accounting Office GAO
July 1996 Report to the Ranking Minority Member, Committee on Commerce House of Representatives SPACE STATION Cost Control Difficulties Continue G A O years
1921 - 1996 GAO/NSIAD-96-135 GAO United States General Accounting Office Washington, D.C. 20548 National Security and International Affairs Division B-271491 July 17, 1996 The Honorable John D. Dinge... |
Date July 9, 1996 |
Report No. NSIAD-96-136 |
Title
United States General Accounting Office GAO
July 1996 Report to Congressional Committees BALLISTIC MISSILE DEFENSE Issues Concerning Acquisition of THAAD Prototype System G A O years
1921 - 1996 GAO/NSIAD-96-136 GAO United States General Accounting Office Washington, D.C. 20548 National Security and International Affairs Division B-271560 July 9, 1996 Congressional Committees The Ballistic Missile... |
Date May 14, 1996 |
Report No. RCED-96-147 |
Title
United States General Accounting Office GAO
May 1996 Report to the Chairman, Subcommittee on Transportation and Related Agencies, Committee on Appropriations, House of Representatives LOS ANGELES RED LINE Financing Decisions Could Affect This and Other Los Angeles County Rail Capital Projects G A O years
1921 - 1996 GAO/RCED-96-147 GAO United States General Accounting Office Washington, D.C. 20548... |
Date April 11, 1996 |
Report No. GGD-96-7R |
Title
GAO United States General Accounting Office Washington, D.C. 20648 General Government Division B-266153 April 11, 1996 The Honorable Doug Bereuter House of Representatives Dear Congressman Bereuter: This letter provides information on several factors that contributed to the government's costs to construct a small Federal Aviation Administration (FAA) office building at the NE, airport. We develope... |
Date March 15, 1996 |
Report No. NSIAD-96-121BR |
Title
United States General Accounting Office GAO
March 1996 Briefing Report to Congressional Requesters CONTINGENCY OPERATIONS Defense Cost and Funding Issues G A O years
1921 - 1996 GAO/NSIAD-96-121BR GAO United States General Accounting Office Washington, D.C. 20548 National Security and International Affairs Division B-271388 March 15, 1996 The Honorable Strom Thurmond Chairman Committee on Armed Se... |
Date March 14, 1996 |
Report No. NSIAD-96-120BR |
Title
United States General Accounting Office GAO
March 1996 Briefing Report to Congressional Requesters BOSNIA Costs Are Uncertain but Seem Likely to Exceed DOD’s Estimate G A O years
1921 - 1996 GAO/NSIAD-96-120BR GAO United States General Accounting Office Washington, D.C. 20548 National Security and International Affairs Division B-271377 March 14, 1996 The Honorable Robert Dole Majority Leader Un... |
Date Sept. 18, 1995 |
Report No. AIMD-95-230 |
Title
United States General Accounting Office GAO
September 1995 Report to the Honorable Hank Brown, U.S. Senate DENVER INTERNATIONAL AIRPORT Information on Selected Financial Issues GAO/AIMD-95-230 GAO United States General Accounting Office Washington, D.C. 20548 Accounting and Information Management Division B-260619 September 20, 1995 The Honorable Hank Brown United States Senate Dear Senator Brown:... |
Date Aug. 31, 1995 |
Report No. AIMD-95-180 |
Title
United States General Accounting Office GAO
August 1995 Report to the Chairman and Ranking Minority Member, Subcommittee on Interior and Related Agencies, Committee on Appropriations, House of Representatives LAND MANAGEMENT SYSTEMS Progress and Risks in Developing BLM’s Land and Mineral Record System GAO/AIMD-95-180 GAO United States General Accounting Office Washington, D.C. 20548 Accounting a... |
Date July 13, 1995 |
Report No. T-NSIAD-95-185 |
Title
United States General Accounting Office GAO
For Releaseon Delivery Expected at 9:30 a.m. EDT Thursday, July 13, 1995 Testimony
Before the Subcommittee on Military Procurement, Committee on National Security, House of Representatives CHEMICAL WEAF’ONS DISPOSAL IssuesRelatedto DO@ \ Management
Statement of David R. Wan-en, Director, Defense Management and NASA Issues, National Security and Interna... |
Date June 12, 1995 |
Report No. NSIAD-95-163 |
Title
GAO Report tci CongressionaI Requesters , United States General Accounting Office Washington, D.C. 20548 National Security and International Affairs Division B-261547 June 12,1995 The Honorable Dale Bumpers United States Senate The Honorable Dick Zimmer The Honorable Gerald Solomon House of Representatives As you requested, we have reviewed the current estimated costs of the National Aeronautics a... |
Date May 26, 1995 |
Report No. RCED-95-175FS |
Title
May 1995 J!QR’ TRAJgq(-J CONTROL GAO/RCED-95-176FS GAO United States General Accounting Office Washington, D.C. 20548 Resources, Community, Economic Development and Division B-260347 l&y 24, 1995 The Honorable Mark 0. Hatfield Chairman The Honorable Frank R. Lautenberg Ranking Minority Member Subcommittee on Transportation and Related Agencies Committee on Appropriations United States Senate The... |
Date March 10, 1995 |
Report No. AIMD-95-106R |
Title
GAO United States General Accounting Office Washington, D.C. 20548 Accounting and Information Management Division B-260707 March 10, 1995 The Honorable Dana Rohrabacher Chairman, Subcommittee on Energy and Environment Committee on Science House of Representatives Dear Mr. Chairman: In response to your February 24, 1995, letter, we are providing the enclosed responses to questions that were submitt... |
Date Jan. 20, 1995 |
Report No. NSIAD-95-46 |
Title
United States General Accounting Office GAO
January1995 Report to Congressional Committees MISSILE DEWLOPMENT .,Statusand Issues at the ‘Time of the TSSAJM Termination Decision GAO/NSIAD-96-46 United States General Accounting Office Waaington, D.C. 20648 National Security and International Affairs Division B-259275 January 20,1995
Congressional Committees In May 1994, the Department of Defense (... |
Date Jan. 19, 1995 |
Report No. T-NSIAD-95-83 |
Title
United States General Accounting Ofice GAO
For Release on Delivery Expected at 1O:Ml a.m., EDT, Thursday, January 19,1995 Testimony
Before the National Security Committee,Houseof Representatives 1 FUTURE YEARS DEFENSE PROGRAM Optimistic EstimatesLead to Billions in Overprogramming
Statementof Henry L. Hinton, Jr., AssistantComptroller General,National Security and International Affairs Division i ... |
Date Oct. 20, 1994 |
Report No. NSIAD-95-4 |
Title
United States General Accounting Office GAO
October 1994 Report to Congressional Requesters NAVY SHIPS Lessons of Prior Programs May Reduce New Attack Submarine Cost Increases and Delays GAO/NSIAD-95-4 GAO United States General Accounting Office Washington, D.C. 20548 National Security and International Affairs Division B-257866 October 20, 1994 The Honorable Edward M. Kennedy Chairman, Subcommitt... |
Date Oct. 18, 1994 |
Report No. GGD-95-16 |
Title
United States General Accounting Office GAO
October 1994 Report to the Chairman, Committee on Appropriations, U.S. Senate POSTAL SERVICE Service and Cost Aspects of the Dakota Central Area Mail Processing Center GAO/GGD-95-16 GAO United States General Accounting Office Washington, D.C. 20548 General Government Division B-251104.2 October 18, 1994 The Honorable Robert C. Byrd Chairman, Committee on... |
Date Oct. 12, 1994 |
Report No. T-OSI-95-3 |
Title
United States General Accounting OffIce GAO
For Releaseon Delivery Expectedat 9:30 a.m. EDT Wednesday October 12, 1994 Testimony
Before the Subcommittee on Oversight of Government Management, Committee on Governmental Affairs U.S. Senate MILITARY SEALIFT COMMAND CONTRACTS Contract Abuses Resulted in Poorly Maintained Ships, Unqualified Crews, and Increased Cost to Government
Statement by Richard C... |
Date Sept. 1, 1994 |
Report No. AIMD-94-175 |
Title
United States GeneraJ Accounting Office GAO ..
September 1994 Report to the Chairman, Subcommittee on Defense, Committee on Appropriations, House of ,Repiegentatives AlTACK WARNING. ’Program - GAO/AIMD-94-175 ” . GAO United States General Accounting Office Washington, D.C. 20548 Accounting and Information Management Division B-257932 September 1,1994 The Honorable John P. Murtha Chairman, Subc... |
Date July 29, 1994 |
Report No. NSIAD-94-210 |
Title
United States General Accounting Office GAO
July 1994 Report to Congressional Requesters I$? 2-v FUTURE YIWRS DEFENSE PROGRAM Optimistic Estimates Lead to Billions in Over-programming GAONXAD-94-2 10 Notice: This is a reprint of a GAO report. United States General Accounting OfEce Washington, DE. 20548 National Security and International Affairs Division B-238512
July 29,1994 The Honorable Charles... |
Date June 30, 1994 |
Report No. NSIAD-94-201BR |
Title
vnited States General Accounting OfTice GAO
June 1994 Briefing Report to Congressional Requesters NAn SHIPS .’ Sea~olf’Cost Increases I,‘ .” ,. : .md Schedule Delays Continue GAO/lWLAD-94-201BR GAO United States General Accounting Office Washington, D.C. 20548 National. Security and International Affairs Division B-250714 June 30, 1994 The Honorable Edward M. Kennedy Subcommittee on Region... |
Date June 27, 1994 |
Report No. GGD-94-145 |
Title
United General Accounting Office GAO
June 1994 Report to the Administrator, General Services Administration ~%EMERAL ,%EMERALSERVICES ~JQI~NIS~~TI(-JN Ovehght Needed to Improve Construction Management c GAWGGD-94-146’ GAO United States Office D,C. 20548 General Accounting
Washington, General Government Division B-25629 1 June 27,1994 The Honorable Roger W. Johnson Administrator General Services ... |
Date May 31, 1994 |
Report No. NSIAD-94-145 |
Title
United States General Accounting Office Report to Congressional Requesters /rS/8fu
May 1994 STRATEGIC MISSILES Issues Regarding Advanced Cruise Missile Program Restructuring
! GAOINSIAD-94-145 Notice: This is a reprint of a GAO report. GAO United States General Accounting Office Washington, D.C. 20548 National Security and International Affairs Division B-256757 May31,1994 The Honorable John Conye... |
Date April 15, 1994 |
Report No. NSIAD-94-141 |
Title
United States General Accounting Offke GAO
April 1994 Report to Congressional Committees MILITARY AIRLIFT C-17 Settlement Is Not a Good Deal GAO United States General Accounting Office Washington, D.C. 20548 National Security and
International Affairs Division B-25672 1 April 15,1994 The Honorable Sam Nunn Chairman, Committee on Armed Services United States Senate The Honorable Ronald V. Dellums C... |
Date March 9, 1994 |
Report No. NSIAD-94-122BR |
Title
‘I .: I GAO United States General Accounting Offke Washington, D.C. 20548 National Security and International Affairs Division /5'/071 B-250141 March 9, 1994 The Honorable Ronald V. Dellums Chairman, Committee on Armed Services House of Representatives Dear Mr. Chairman: The Army plans to make a low-rate initial production decision for its Javelin antitank weapon system in April As requested, we... |
Date Jan. 13, 1994 |
Report No. NSIAD-94-44 |
Title
United States General Accounting Office GAO
January 1994 Report to the Chairman, Committee on Armed Services, House of Representatives NAVY AVllATION V-22 Development Schedule Extended, Performance Reduced, and Costs Increased GAO United States General Accounting Office Washington, D.C. 20548 National Security and International AfWrs Division B-240825 January 13, 1994 The Honorable Ronald V. Dellu... |
Date Oct. 8, 1993 |
Report No. NSIAD-94-52 |
Title
Unitecj States General Accounting Office GAO
October 1993 ~ Report to Congressional Committees ‘ ,TSSAMProduction . ;, Should Not Be Started I- as Planned . GAO/NSIAD-9442 ’ ;, .I GAO United States General Accounting Office Washington, D.C. 20648 National Security and International Affairs Division B-245324 October 8,1993 The Honorable Sam Nunn Chairman, Committee on Armed Services United Stat... |
Date Sept. 24, 1993 |
Report No. NSIAD-93-301R |
Title
\so(i’ q ” ‘ ,GAO United States General Accounting Office Washington, D.C. 20548 National Security and International Af’ fairs Division B-254942 September 24, 1993 The Honorable Norman Sisisky Subcommittee on Oversight Chairman, and Investigations Committee on Armed Services House of Representatives Dear Mr. Chairman: This report responds to your request for information on the estimated co... |
Date Aug. 4, 1993 |
Report No. NSIAD-93-171 |
Title
IJnited States General Accouuting Office GAO
August 1993 Report to Congressional Requesters NAVY SHIPS Problems Continue to ue the Seawolf Submarine Program GAO/NSIAD-W-171 GAO United States General Accounting Office Washington, D.C. 20648 National Security aud International Affairs Division B-250714 August 4,1993 The Honorable Edward M. Kennedy Chairman, Subcommittee on Regional Defense and Conti... |
Date June 30, 1993 |
Report No. T-RCED-93-57 |
Title
United States General Accounting Office L .I g--q?;! ‘C. c m 1 T FZ - 91, GAO
For Releaseon Delivery Expectedat 10:30a.m., EDT Wednesday June 30,1993 Testimony MLpqb Before the Subcommitteeon Oversight and Investigations, Committee on Energy and Commerce House of Representatives FEDERAL RESEARCH Superconducting Super Collider’s Total Estimated Cost Will Exceed $11 Billion
Statementof Victor S.... |
Date May 26, 1993 |
Report No. T-RCED-93-47 |
Title
l4qz87 1 “% United States General Accounting Office GAO
For Release on Delivery Expected at 10:00 a.m., EDT Wednesday May 26, 1993 Testimony
Before the Committee on Science,Space,and Technology, House of Representatives FEDERAL RESEARCH Superconducting Super Collider Cost and Schedule
Statementof Victor S. Rezendes,Director, Energy and Science Issues,Resources,Community, and Economic Development... |
Date May 18, 1993 |
Report No. NSIAD-93-187 |
Title
IJnit.c:tl St.at.cs Gc?ncbral Accounting Of’ ficc: GAO
Mily Report to the Honorable Tim Roerner, House of Representatives 1!)!):3 SPACE STATION Program Instability and Cost Growth Continue Pending Redesign (;A(MNSlAI)-!):I- 187 II_ -,--.,, _.“I “,., ,. II “” ~ “I .“..“.” l..l.. .I... . . . .._l..” “--.l.. l.“__l~lll-.l_--.--.-..-l------ -- GAO United States General Accounti... |
Date May 14, 1993 |
Report No. RCED-93-158 |
Title
GAO Report to the Honorable hhrr W. Warner, LJ.S. Senate FEDERAL RESEARCH Super Collider National Security Benefits, Similar Projects, and Cost GAO United States General Accounting Offlce Wa&ington, D.C. 20648 Besources, Community, and Economic Development Division I%227296 May 14,1993 The Honorable John W. Warner united states senate Dear Senator Warner: The Department of Energy’ (DOE) Supercon... |
Date May 5, 1993 |
Report No. T-RCED-93-36 |
Title
\44(*q ‘* 7. r United States General Accounting Office GAO
For Release on Delivery Expected at 2:00 p.m. EDT Wednesday May 5. 1’)93 Testimony
E&fore the Subcommittee on Transportation and Related Agencies, Committee on Appropriations, U.S. Senate AIR TRAFFIC CONTROL Improvements Needed In FAA’s Management of Acquisitions
Statement of Allen Li, Associate Director, Transportation Issues, Resou... |
Date April 19, 1993 |
Report No. T-RCED-93-30 |
Title
United States General Accounting Office vt~y~mw Testimony
Before the Subcommitteeon Transportation and Related Agencies, Committee on Appropriations, House of Representatives For Release
on Delivery Expected at 11:OO EDT am. Monday, April 19.1993 AIR TFWFFIC CONTROL Uncertainties and Challenges Face FAA’s Advanced Automated System
Statementof Kenneth M. Mead, Director, Transportation Issues Reso... |
Date April 7, 1993 |
Report No. RCED-93-111 |
Title
April i i)!U ENERGY MANAGEMENT DOE Has Improved Oversight of Its Work for Others Program GAO United States General Accounting OfYice Washington, D.C. 20548 Resources, Community, and Economic Development Division B-252012 April 7, 1993 The Honorable James A. Hayes Chairman, Subcommittee on Investigations and Oversight Committee on Science, Space, and Technology House of Representatives Dear Mr. Cha... |
Date March 10, 1993 |
Report No. T-NSIAD-93-6 |
Title
United States General Accounting Off’ice vierlf GAO
For Rclcascon Delivery Expectedat 1O:OO EST, a.m., Wednesday, March lo,1993 Testimony
Beforethe Subcommittees Military Acquisition andon on OversightandInvestigations, Committee& Armed Services, Houseof Representatives MILITARY AtRLIFr’ Statusof the C-17 DevelopmentProgram
Statement FrankC. Conahan, of AssistantComptrollerGeneral, NationalSec... |
Date March 5, 1993 |
Report No. NSIAD-93-135 |
Title
I Jttit,etl Sl~att~s Ckneral Accounting OfTic:e GAO Report to Congressional Requesters Efforts to Address Engine Recuperator Problems IllIIII
148531 GAO Uuited States General Accounting Office Waahington, D.C. 20648 National Security and International Affairs Division B-261740 March 5, 1993 The Honorable Randy Cunningham The Honorable Duncan Hunter House of Representatives In response to your requ... |
Date Feb. 12, 1993 |
Report No. RCED-93-87 |
Title
lJuitec1 St.at.c*s Gctned Accounting Office GAO
1~‘ el,r11ary 1 993 Report to Congressional Requesters i 48550 III FEDERALRESEARCH
Super Collider Is Over Budget and Behind Schedule RESTRICTED--Not to be released outside the General Accounting Office unless specifically approved by the Office of Con essional Relations. +,3y EELEASED GAO United States General Accounting Of‘ flce Washington, D.C.... |
Date Jan. 28, 1993 |
Report No. NSIAD-93-115 |
Title
SPACE TRANSPORTATION The Content and TJses of Shuttle Cost Estimates RESTRICTED--Not to be released outside the General Accounting Office unless specifically approved by the Office of Congre ,Relations. 5% 335 (;;\O,INSIAJ)-!):~-I lr, GAO United States General Accounting Office Washington, D.C. 20548 National Security and International Affairs Division B-251737 January 28, 1993 The Honorable James... |