Date Nov. 16, 2011 |
Report No. GAO-12-232T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 1:30 p.m. EST Wednesday, November 16, 2011 Testimony
Before the Subcommittee on Technology, Information Policy, Intergovernmental Relations and Procurement Reform, Committee on Oversight and Government Reform, House of Representatives ACQUISITION WORKFORCE DOD’s Efforts to Rebuild Capacity Have Shown Some Prog... |
Date Nov. 16, 2011 |
Report No. GAO-12-245T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 9:00 a.m. EST Wednesday, November 16, 2011 Testimony Before the Committee on Homeland Security and Governmental Affairs, U.S. Senate SUSPENSION AND DEBARMENT Some Agency Programs Need Greater Attention, and Governmentwide Oversight Could Be Improved
Statement of William T. Woods, Director Acquisition and Sourcin... |
Date Oct. 18, 2011 |
Report No. GAO-12-102R |
Title
 United States Government Accountability Office  Washington, DC 20548 October 18, 2011 The Honorable Joseph I. Lieberman Chairman Committee on Homeland Security and Governmental Affairs United States Senate The Honorable Jon Tester Committee on Homeland Security and Governmental Affairs United States Senate Subject: Prior Experience and Past Performance as Evaluation Criteria in the Award of F... |
Date Oct. 6, 2011 |
Report No. GAO-12-127T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 9:30 a.m. EDT Thursday, October 6, 2011 Testimony Before the Subcommittee on Technology, Information Policy, Intergovernmental Relations and Procurement Reform, Committee on Oversight and Government Reform, House of Representatives SUSPENSION AND DEBARMENT Some Agency Programs Need Greater Attention, and Governm... |
Date July 12, 2011 |
Report No. GAO-11-609R |
Title
United States Government Accountability Office Washington, DC 20548 July 12, 2011 The Honorable Kay Bailey Hutchison Ranking Member Committee on Commerce, Science, and Transportation United States Senate The Honorable Ralph M. Hall Chairman The Honorable Eddie Bernice Johnson Ranking Member Committee on Science, Space, and Technology House of Representatives The Honorable Bill Nelson Chairman Subc... |
Date April 25, 2011 |
Report No. GAO-11-580 |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 9:30 a.m. EDT Monday, April 25, 2011 Statement before the Commission on Wartime Contracting in Iraq and Afghanistan CONTINGENCY CONTRACTING Observations on Actions Needed to Address Systemic Challenges
Statement of Paul L. Francis, Managing Director Acquisition and Sourcing Management GAO-11-580 April 25, 2011 C... |
Date Jan. 14, 2011 |
Report No. GAO-11-192 |
Title
United States Government Accountability Office GAO
January 2011 Report to Congressional Committees DEFENSE ACQUISITIONS Further Action Needed to Better Implement Requirements for Conducting Inventory of Service Contract Activities GAO-11-192 January 2011 DEFENSE ACQUISITIONS
Accountability • Integrity • Reliability Further Action Needed to Better Implement Requirements for Conducting Inventory... |
Date Jan. 13, 2011 |
Report No. GAO-11-86 |
Title
United States Government Accountability Office GAO
January 2011 Report to Congressional Requesters ELECTRONIC RECORDS ARCHIVE National Archives Needs to Strengthen Its Capacity to Use Earned Value Techniques to Manage and Oversee Development GAO-11-86 January 2011 Accountability • Integrity • Reliability ELECTRONIC RECORDS ARCHIVE
National Archives Needs to Strengthen Its Capacity to Use Earne... |
Date Oct. 28, 2010 |
Report No. GAO-11-61R |
Title
United States Government Accountability Office Washington, DC 20548 October 28, 2010 The Honorable Carl Levin Chairman The Honorable John McCain Ranking Member Committee on Armed Services United States Senate The Honorable Ike Skelton Chairman The Honorable Howard P. McKeon Ranking Member Committee on Armed Services House of Representatives Subject: DEFENSE ACQUISITIONS: Additional Guidance Needed... |
Date Oct. 18, 2010 |
Report No. GAO-11-6 |
Title
United States Government Accountability Office GAO
October 2010 Report to Congressional Requesters SECURE BORDER INITIATIVE DHS Needs to Strengthen Management and Oversight of Its Prime Contractor GAO-11-6 October 2010 SECURE BORDER INITIATIVE
Accountability • Integrity • Reliability DHS Needs to Strengthen Management and Oversight of Its Prime Contractor
Highlights of GAO-11-6, a report to co... |
Date Sept. 14, 2010 |
Report No. GAO-10-816 |
Title
United States Government Accountability Office GAO
September 2010 Report to the Subcommittee on Energy and Water Development, Committee on Appropriations, House of Representatives NUCLEAR WASTE Actions Needed to Address Persistent Concerns with Efforts to Close Underground Radioactive Waste Tanks at DOE’s Savannah River Site GAO-10-816 September 2010 NUCLEAR WASTE
Accountability • Integrity â€... |
Date Sept. 14, 2010 |
Report No. GAO-10-909 |
Title
United States Government Accountability Office GAO
September 2010 Report to Congressional Committees PUBLIC TRANSPORTATION Use of Contractors is Generally Enhancing Transit Project Oversight, and FTA is Taking Actions to Address Some Stakeholder Concerns GAO-10-909 September 2010 PUBLIC TRANSPORTATION
Accountability • Integrity • Reliability Use of Contractors is Generally Enhancing Transit Pr... |
Date Sept. 10, 2010 |
Report No. GAO-10-693 |
Title
United States Government Accountability Office GAO
September 2010 Report to the Chairman, Subcommittee on Federal Financial Management, Government Information, Federal Services, and International Security, Committee on Homeland Security and Governmental Affairs, U.S. Senate CONTRACTOR INTEGRITY Stronger Safeguards Needed for Contractor Access to Sensitive Information GAO-10-693 September 2010 CONT... |
Date July 28, 2010 |
Report No. GAO-10-920T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 1:00 p.m. EDT Wednesday, July 28, 2010 Testimony Before the Committee on Small Business, House of Representatives SMALL BUSINESS ADMINISTRATION Undercover Tests Show HUBZone Program Remains Vulnerable to Fraud and Abuse
Statement of Gregory Kutz, Managing Director Forensic Audits and Special Investigations GAO-1... |
Date July 14, 2010 |
Report No. GAO-10-676 |
Title
United States Government Accountability Office GAO
July 2010 Report to Congressional Committees DEFENSE ACQUISITIONS Missile Defense Program Instability Affects Reliability of Earned Value Management Data GAO-10-676 July 2010 DEFENSE ACQUISITIONS Highlights
Highlights of GAO-10-676, a report to congressional committees Accountability Integrity Reliability Missile Defense Program Instability Affect... |
Date June 29, 2010 |
Report No. GAO-10-829T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 10:00 a.m. EDT Tuesday, June 29, 2010 Testimony Before the Subcommittee on National Security and Foreign Affairs, Committee on Oversight and Government Reform, House of Representatives WARFIGHTER SUPPORT Cultural Change Needed to Improve How DOD Plans for and Manages Operational Contract Support
Statement of Wil... |
Date June 25, 2010 |
Report No. GAO-10-759 |
Title
United States Government Accountability Office GAO
June 2010 Report to the Chairwoman, Committee on Small Business, House of Representatives SMALL BUSINESS ADMINISTRATION Undercover Tests Show HUBZone Program Remains Vulnerable to Fraud and Abuse GAO-10-759 June 2010 SMALL BUSINESS ADMINISTRATION Highlights
Highlights of GAO-10-759, a report to the Chairwoman, Committee on Small Business, House of... |
Date May 27, 2010 |
Report No. GAO-10-566R |
Title
United States Government Accountability Office Washington, DC 20548 May 27, 2010 The Honorable Ike Skelton Chairman The Honorable Howard P. McKeon Ranking Member Committee on Armed Services United States House of Representatives Subject: Defense Management: DOD Needs to Assess Effectiveness and Determine Future Direction for Its High Performing Organizations Initiative The Department of Defense (D... |
Date May 20, 2010 |
Report No. GAO-10-744T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 2:30 p.m. EDT Thursday, May 20, 2010 Testimony before the Subcommittee on Oversight of Government Management, the Federal Workforce, and the District of Columbia, Committee on Homeland Security and Governmental Affairs, U.S. Senate SOURCING POLICY Initial Agency Efforts to Balance the Government to Contractor Mi... |
Date April 14, 2010 |
Report No. GAO-10-614T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 10:00 a.m. EDT Wednesday, April 14, 2010 Testimony Before the Committee on Homeland Security, House of Representatives HOMELAND SECURITY Federal Protective Service’s Use of Contract Guards Requires Reassessment and More Oversight
Statement of Mark L. Goldstein, Director Physical Infrastructure Issues GAO-10-61... |
Date April 13, 2010 |
Report No. GAO-10-341 |
Title
United States Government Accountability Office GAO
April 2010 Report to Congressional Requesters HOMELAND SECURITY Federal Protective Service’s Contract Guard Program Requires More Oversight and Reassessment of Use of Contract Guards GAO-10-341 April 2010 HOMELAND SECURITY Highlights
Highlights of GAO-10-341, a report to congressional requesters Accountability Integrity Reliability Federal Prote... |
Date April 12, 2010 |
Report No. GAO-10-357 |
Title
United States Government Accountability Office GAO
April 2010 Report to Congressional Committees CONTINGENCY CONTRACTING Improvements Needed in Management of Contractors Supporting Contract and Grant Administration in Iraq and Afghanistan GAO-10-357 April 2010 CONTINGENCY CONTRACTING Highlights
Highlights of GAO-10-357, a report to congressional committees Accountability Integrity Reliability Impr... |
Date March 17, 2010 |
Report No. GAO-10-551T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 1:30 p.m. EDT Wednesday, March 17, 2010 Testimony Before the Subcommittee on Defense, Committee on Appropriations, House of Representatives WARFIGHTER SUPPORT Continued Actions Needed by DOD to Improve and Institutionalize Contractor Support in Contingency Operations
Statement of William M. Solis, Director Defen... |
Date Jan. 29, 2010 |
Report No. GAO-10-350R |
Title
United States Government Accountability Office Washington, DC 20548 January 29, 2010 Congressional Committees Subject: Defense Acquisitions: Observations on the Department of Defense Service Contract Inventories for Fiscal Year 2008
The Department of Defense (DOD) is the federal government’s largest purchaser of contractor-provided services and relies on contractors to support its varied mission... |
Date Nov. 30, 2009 |
Report No. GAO-10-216R |
Title
United States Government Accountability Office Washington, DC 20548 November 30, 2009 The Honorable Mitch McConnell Republican Leader United States Senate Subject: Recovery Act: Contract Oversight Activities of the Recovery Accountability and Transparency Board and Observations on Contract Spending in Selected States The American Recovery and Reinvestment Act of 2009 (Recovery Act) was enacted on ... |
Date Nov. 20, 2009 |
Report No. GAO-10-39 |
Title
United States Government Accountability Office GAO
November 2009 Report to Congressional Requesters DEFENSE ACQUISITIONS Further Actions Needed to Address Weaknesses in DOD’s Management of Professional and Management Support Contracts GAO-10-39 November 2009 DEFENSE ACQUISITIONS Highlights
Highlights of GAO-10-39, a report to congressional requesters Accountability Integrity Reliability Further ... |
Date Nov. 2, 2009 |
Report No. GAO-10-187 |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 9:30 a.m. EST Monday, November 2, 2009 Statement Before the Commission on Wartime Contracting in Iraq and Afghanistan CONTINGENCY CONTRACTING Further Improvements Needed in Agency Tracking of Contractor Personnel and Contracts in Iraq and Afghanistan
Statement of John P. Hutton, Director Acquisition and Sourcing... |
Date Oct. 1, 2009 |
Report No. GAO-10-1 |
Title
United States Government Accountability Office GAO
October 2009 Report to Congressional Committees CONTINGENCY CONTRACTING DOD, State, and USAID Continue to Face Challenges in Tracking Contractor Personnel and Contracts in Iraq and Afghanistan GAO-10-1 October 2009 CONTINGENCY CONTRACTING Highlights
Highlights of GAO-10-1, a report to congressional committees Accountability Integrity Reliability D... |
Date Sept. 29, 2009 |
Report No. GAO-09-1032T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 10:00 a.m. EDT Tuesday, September 29, 2009 Testimony Before the Subcommittee on Contracting Oversight, Committee on Homeland Security and Governmental Affairs, U.S. Senate FEDERAL CONTRACTING Observations on the Government’s Contracting Data Systems
Statement of William T. Woods, Director Acquisition and Sourc... |
Date Sept. 24, 2009 |
Report No. GAO-09-1040T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 9:30 a.m. EDT Thursday, September 24, 2009 Testimony Before the Defense Acquisition Reform Panel, Committee on Armed Services, House of Representatives DEFENSE ACQUISITIONS Sound Practices Critical to Ensuring Value for the Defense Logistics Agency’s Acquisitions
Statement of William M. Solis, Director Defense... |
Date Aug. 3, 2009 |
Report No. GAO-09-839T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 3:00 p.m. EDT Monday, August 3, 2009 Testimony
Before the Subcommittee on Federal Financial Management, Government Information, Federal Services, and International Security, Committee on Homeland Security and Governmental Affairs, U.S. Senate FEDERAL CONTRACTING Application of OMB Guidance Can Improve Use of Awa... |
Date June 17, 2009 |
Report No. GAO-09-758T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 10:00 a.m. EST Wednesday, June 17, 2009 Testimony Before the Subcommittee on International Organizations, Human Rights, and Oversight, Committee on Foreign Affairs, House of Representatives BROADCASTING TO CUBA Observations Regarding TV Mart۪̉s Strategy and Operations
Statement of Jess T. Ford, Director Inter... |
Date May 29, 2009 |
Report No. GAO-09-630 |
Title
United States Government Accountability Office GAO
May 2009 Report to Congressional Requesters FEDERAL CONTRACTING Guidance on Award Fees Has Led to Better Practices but Is Not Consistently Applied GAO-09-630 May 2009 FEDERAL CONTRACTING Highlights
Highlights of GAO-09-630, a report to Congressional Requesters Accountability Integrity Reliability Guidance on Award Fees Has Led to Better Practices ... |
Date April 28, 2009 |
Report No. GAO-09-616T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 10:00 a.m. EDT Tuesday, April 28, 2009 Testimony Before the Oversight and Investigations Subcommittee, Committee on Armed Services, House of Representatives ACQUISITION WORKFORCE DOD Can Improve Its Management and Oversight by Tracking Data on Contractor Personnel and Taking Additional Actions
Statement of John ... |
Date April 23, 2009 |
Report No. GAO-09-643T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 8:00 a.m. EDT Thursday, April 23, 2009 Testimony Before the Defense Acquisition Reform Panel, Committee on Armed Services, U.S. House of Representatives DEFENSE ACQUISITIONS Actions Needed to Ensure Value for Service Contracts
Statement of John Hutton, Director, Acquisition and Sourcing Management and William So... |
Date April 23, 2009 |
Report No. GAO-09-374 |
Title
United States Government Accountability Office GAO
April 2009 Report to Congressional Requesters FEDERAL CONTRACTORS Better Performance Information Needed to Support Agency Contract Award Decisions GAO-09-374 April 2009 FEDERAL CONTRACTORS Highlights
Highlights of GAO-09-374, a report to congressional requesters Accountability Integrity Reliability Better Performance Information Needed to Support ... |
Date April 1, 2009 |
Report No. GAO-09-538T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 1:00 p.m. EDT Wednesday, April 1, 2009 Testimony Before the Subcommittee on Oversight and Investigations, Committee on Armed Services, House of Representatives CONTINGENCY CONTRACTING DOD, State, and USAID Are Taking Actions to Track Contracts and Contractor Personnel in Iraq and Afghanistan
Statement of John P.... |
Date March 25, 2009 |
Report No. GAO-09-342 |
Title
United States Government Accountability Office GAO
March 2009 Report to Congressional Requesters DEPARTMENT OF DEFENSE Additional Actions and Data Are Needed to Effectively Manage and Oversee DOD’s Acquisition Workforce GAO-09-342 March 2009 DEPARTMENT OF DEFENSE Highlights
Highlights of GAO-09-342, a report to congressional requesters Accountability Integrity Reliability Additional Actions and ... |
Date March 24, 2009 |
Report No. GAO-09-462T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 10:00 a.m. EDT Tuesday, March 24, 2009 Testimony Before the Subcommittee on Coast Guard and Maritime Transportation, Committee on Transportation and Infrastructure, House of Representatives COAST GUARD Observations on Changes to Management and Oversight of the Deepwater Program
Statement of John P. Hutton, Direc... |
Date Dec. 29, 2008 |
Report No. GAO-09-104 |
Title
United States Government Accountability Office GAO
December 2008 Report to the Chairman, Subcommittee on Health, Committee on Ways and Means, House of Representatives MEDICARE Callers Can Access 1-800-MEDICARE Services, but Responsibility within CMS for Limited English Proficiency Plan Unclear GAO-09-104 December 2008 MEDICARE Highlights
Highlights of GAO-09-104, a report to the Chairman, Subcommi... |
Date Oct. 1, 2008 |
Report No. GAO-09-19 |
Title
United States Government Accountability Office GAO
October 2008 Report to Congressional Committees CONTINGENCY CONTRACTING DOD, State, and USAID Contracts and Contractor Personnel in Iraq and Afghanistan GAO-09-19 October 2008 CONTINGENCY CONTRACTING Highlights
Highlights of GAO-09-19, a report to congressional committees. Accountability Integrity Reliability DOD, State, and USAID Contracts and Co... |
Date Sept. 26, 2008 |
Report No. GAO-08-1087 |
Title
United States Government Accountability Office GAO
September 2008 Report to Congressional Committees MILITARY OPERATIONS DOD Needs to Address Contract Oversight and Quality Assurance Issues for Contracts Used to Support Contingency Operations GAO-08-1087 September 2008 MILITARY OPERATIONS Highlights
Highlights of GAO-08-1087, a report to congressional committees Accountability Integrity Reliabilit... |
Date Sept. 25, 2008 |
Report No. GAO-08-1170R |
Title
United States Government Accountability Office Washington, DC 20548 September 25, 2008 Mr. Jonathan Scharfen Acting Director U.S. Citizenship and Immigration Services Subject: Federal User Fees: Improvements Could Be Made to Performance Standards and Penalties in USCIS’s Service Center Contracts Dear Mr. Scharfen: The Department of Homeland Security’s (DHS) U.S. Citizenship and Immigration Ser... |
Date Sept. 17, 2008 |
Report No. GAO-08-1164T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 2 p.m. EST Wednesday, September 17, 2008 Testimony Before the Subcommittee on Management, Investigations, and Oversight, Committee on Homeland Security, House of Representatives DEPARTMENT OF HOMELAND SECURITY Progress and Continuing Concerns with Acquisition Management
Statement of John P. Hutton, Director Acqu... |
Date Aug. 18, 2008 |
Report No. GAO-08-871 |
Title
United States Government Accountability Office GAO
August 2008 Report to Congressional Requesters PENSION BENEFIT GUARANTY CORPORATION Some Steps Have Been Taken to Improve Contracting, but a More Strategic Approach Is Needed GAO-08-871 August 2008 Highlights
Highlights of GAO-08-871, a report to congressional requesters Accountability Integrity Reliability PENSION BENEFIT GUARANTY CORPORATION
Som... |
Date July 31, 2008 |
Report No. GAO-08-966 |
Title
United States Government Accountability Office GAO
July 2008 Report to Congressional Committees REBUILDING IRAQ DOD and State Department Have Improved Oversight and Coordination of Private Security Contractors in Iraq, but Further Actions Are Needed to Sustain Improvements
This report was revised on August 1, 2008 to reflect a change to the text on page 2, in line 11 of the second paragraph, “pr... |
Date July 11, 2008 |
Report No. GAO-08-764 |
Title
United States Government Accountability Office GAO
July 2008 Report to the Chairman, Subcommittee on International Organizations, Human Rights, and Oversight, Committee on Foreign Affairs, House of Representatives BROADCASTING TO CUBA Weaknesses in Contracting Practices Reduced Visibility into Selected Award Decisions GAO-08-764 July 2008 BROADCASTING TO CUBA Highlights
Highlights of GAO-08-764, a... |
Date June 24, 2008 |
Report No. GAO-08-745 |
Title
United States Government Accountability Office GAO
June 2008 Report to Congressional Committees COAST GUARD Change in Course Improves Deepwater Management and Oversight, but Outcome Still Uncertain GAO-08-745 June 2008 COAST GUARD Highlights
Highlights of GAO-08-745, a report to congressional committees Accountability Integrity Reliability Change in Course Improves Deepwater Management and Oversig... |
Date May 8, 2008 |
Report No. GAO-08-765T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 10:00 a.m. EDT Thursday, May 8, 2008 Testimony Before the Committee on Homeland Security, House of Representatives DEPARTMENT OF HOMELAND SECURITY Better Planning and Oversight Needed to Improve Complex Service Acquisition Outcomes
Statement of John P. Hutton, Director Acquisition and Sourcing Management GAO-08-... |
Date May 8, 2008 |
Report No. GAO-08-578 |
Title
United States Government Accountability Office GAO
May 2008 Report to Congressional Committees INTERAGENCY CONTRACTING Need for Improved Information and Policy Implementation at the Department of State GAO-08-578 May 2008 INTERAGENCY CONTRACTING Highlights
Highlights of GAO-08-578, a report to congressional committees Accountability Integrity Reliability Need for Improved Information and Policy Im... |