Date |
Report No. |
Title |
Date April 22, 2008 |
Report No. GAO-08-263 |
Title
United States Government Accountability Office GAO
April 2008 Report to Congressional Requesters DEPARTMENT OF HOMELAND SECURITY
Better Planning and Assessment Needed to Improve Outcomes for Complex Service Acquisitions GAO-08-263 April 2008 DEPARTMENT OF HOMELAND SECURITY Highlights
Highlights of GAO-08-263, a report to congressional requesters Accountability Integrity Reliability Better Planning... |
Date March 11, 2008 |
Report No. GAO-08-568T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 10:30 a.m. EDT Tuesday, March 11, 2008 Testimony Before the Committee on Appropriations U.S. Senate STABILIZING AND REBUILDING IRAQ Actions Needed to Address Inadequate Accountability over U.S. Efforts and Investments
Statement of David M. Walker Comptroller General of the United States GAO-08-568T March 11, 200... |
Date March 11, 2008 |
Report No. GAO-08-270R |
Title
United States Government Accountability Office Washington, DC 20548 March 11, 2008 The Honorable Maria Cantwell Chair Subcommittee on Oceans, Atmosphere, Fisheries, and Coast Guard Committee on Commerce, Science and Transportation United States Senate The Honorable Olympia J. Snowe Ranking Member Subcommittee on Oceans, Atmosphere, Fisheries, and Coast Guard Committee on Commerce, Science and Tran... |
Date Feb. 1, 2008 |
Report No. GAO-08-294 |
Title
United States Government Accountability Office GAO
February 2008 Report to Congressional Committees BEST PRACTICES Increased Focus on Requirements and Oversight Needed to Improve DOD’s Acquisition Environment and Weapon System Quality GAO-08-294 February 2008 BEST PRACTICES Highlights
Highlights of GAO-08-294, a report to congressional committees Accountability Integrity Reliability Increased Fo... |
Date Jan. 22, 2008 |
Report No. GAO-08-316R |
Title
United States Government Accountability Office Washington, DC 20548 January 22, 2008 Congressional Committees Subject: Defense Logistics: The Army Needs to Implement an Effective Management and Oversight Plan for the Equipment Maintenance Contract in Kuwait The Department of Defense (DOD) relies on contractors to perform many of the functions needed to support troops in deployed locations. For exa... |
Date Nov. 15, 2007 |
Report No. GAO-08-60 |
Title
|
Date Nov. 15, 2007 |
Report No. GAO-08-54 |
Title
|
Date July 31, 2007 |
Report No. GAO-07-912 |
Title
United States Government Accountability Office GAO
July 2007 Report to Congressional Requesters INFORMATION TECHNOLOGY FBI Following a Number of Key Acquisition Practices on New Case Management System, but Improvements Still Needed GAO-07-912 July 2007 INFORMATION TECHNOLOGY Highlights
Highlights of GAO-07-912, a report to congressional requesters Accountability Integrity Reliability FBI Following... |
Date July 20, 2007 |
Report No. GAO-07-691 |
Title
United States Government Accountability Office GAO
July 2007 Report to Congressional Requesters BUSINESS MODERNIZATION NASA Must Consider Agencywide Needs to Reap the Full Benefits of Its Enterprise Management System Modernization Effort GAO-07-691 July 2007 BUSINESS MODERNIZATION Highlights
Highlights of GAO-07-691, a report to congressional requesters Accountability Integrity Reliability NASA Mu... |
Date July 18, 2007 |
Report No. GAO-07-1111T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 2:00 p.m. EDT Wednesday, July 18, 2007 Testimony before the Subcommittee on Government Management, Organization, and Procurement, Committee on Oversight and Government Reform, House of Representatives FEDERAL CONTRACTING Use of Contractor Performance Information
Statement of William T. Woods, Director Acquisitio... |
Date June 29, 2007 |
Report No. GAO-07-273 |
Title
United States Government Accountability Office GAO
June 2007 Report to the Committee on Armed Services, U.S. Senate DEFENSE CONTRACTING Improved Insight and Controls Needed over DOD’s Time-andMaterials Contracts GAO-07-273 June 2007 DEFENSE CONTRACTING Highlights
Highlights of GAO-07-273, a report to the Committee on Armed Services, U.S. Senate Accountability Integrity Reliability Improved Insig... |
Date June 28, 2007 |
Report No. GAO-07-1039T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 10:00 a.m. EDT Thursday, June 28, 2007 Testimony Before the Committee on Oversight and Government Reform, House of Representatives MILITARY CONSTRUCTION Observations on Mismanagement of the Kaiserslautern Military Community Center
Statement of Gregory D. Kutz, Managing Director Forensic Audits and Special Invest... |
Date May 24, 2007 |
Report No. GAO-07-745 |
Title
United States Government Accountability Office GAO
May 2007 Report to the Subcommittee on Emerging Threats and Capabilities, Committee on Armed Services, U.S. Senate DEFENSE ACQUISITIONS Success of Advanced SEAL Delivery System Hinges on Establishing a Sound Contracting Strategy and Performance Criteria GAO-07-745 May 2007 DEFENSE ACQUISITIONS Highlights
Highlights of GAO-07-745, a report to the S... |
Date May 18, 2007 |
Report No. GAO-07-631 |
Title
United States Government Accountability Office GAO
May 2007 Report to Congressional Committees DEFENSE BUDGET Trends in Operation and Maintenance Costs and Support Services Contracting GAO-07-631 May 2007 DEFENSE BUDGET Highlights
Highlights of GAO-07-631, a report to congressional committees Accountability Integrity Reliability Trends in Operation and Maintenance Costs and Support Services Contra... |
Date Jan. 17, 2007 |
Report No. GAO-07-58 |
Title
United States Government Accountability Office GAO
January 2007 Report to the Chairman, Committee on Science, House of Representatives NASA PROCUREMENT Use of Award Fees for Achieving Program Outcomes Should Be Improved GAO-07-58 January 2007 NASA PROCUREMENT Highlights
Highlights of GAO-07-58, a report to the Chairman, Committee on Science, House of Representatives Accountability Integrity Reliab... |
Date Dec. 18, 2006 |
Report No. GAO-07-145 |
Title
United States Government Accountability Office GAO
December 2006 Report to Congressional Committees MILITARY OPERATIONS High-Level DOD Action Needed to Address Long-standing Problems with Management and Oversight of Contractors Supporting Deployed Forces
This report was revised on December 21, 2006, to reflect a change to the text on page 5, in line 12 in the second bulleted paragraph, “training... |
Date Aug. 2, 2006 |
Report No. GAO-06-828T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 10:30 a.m. EDT Wednesday, August 2, 2006 Testimony Before the Subcommittee on the Legislative Branch, Committee on Appropriations, U.S. Senate CAPITOL VISITOR CENTER Update on Status of Project’s Schedule and Cost As of August 2, 2006
Statement of Terrell Dorn, Director Bernard L. Ungar, Director Physical Infr... |
Date July 31, 2006 |
Report No. GAO-06-795 |
Title
United States Government Accountability Office GAO
July 2006 Report to Congressional Committees TRANSPORTATION SECURITY ADMINISTRATION Oversight of Explosive Detection Systems Maintenance Contracts Can Be Strengthened GAO-06-795 July 2006 Highlights
Highlights of GAO-06-795, a report to Congressional Committees Accountability Integrity Reliability TRANSPORTATION SECURITY ADMINISTRATION Oversight o... |
Date July 10, 2006 |
Report No. GAO-06-352 |
Title
United States Government Accountability Office GAO
July 2006 Report to Congressional Requesters NUCLEAR CLEANUP OF ROCKY FLATS DOE Can Use Lessons Learned to Improve Oversight of Other Sites’ Cleanup Activities GAO-06-352 a July 2006 NUCLEAR CLEANUP OF ROCKY FLATS Highlights
Highlights of GAO-06-352, a report to congressional requesters Accountability Integrity Reliability DOE Can Use Lessons Le... |
Date June 28, 2006 |
Report No. GAO-06-827T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 10:30 a.m. EDT Wednesday, June 28, 2006 Testimony Before the Subcommittee on the Legislative Branch, Committee on Appropriations, U.S. Senate CAPITOL VISITOR CENTER Update on Status of Project’s Schedule and Cost As of June 28, 2006
Statement of Terrell Dorn, Director Bernard L. Ungar, Director Physical Infras... |
Date June 13, 2006 |
Report No. GAO-06-865T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 2:00 p.m. EDT Tuesday, June 13, 2006 Testimony Before the Subcommittee on National Security, Emerging Threats, and International Relations, Committee on Government Reform REBUILDING IRAQ Actions Still Needed to Improve the Use of Private Security Providers
Statement of William Solis, Director Defense Capabilitie... |
Date June 9, 2006 |
Report No. GAO-06-404 |
Title
United States Government Accountability Office GAO
June 2006 Report to Congressional Requesters HOMELAND SECURITY Contract Management and Oversight for Visitor and Immigrant Status Program Need to Be Strengthened GAO-06-404 June 2006 HOMELAND SECURITY Highlights
Highlights of GAO-06-404, a report to congressional requesters Accountability Integrity Reliability Contract Management and Oversight for... |
Date May 24, 2006 |
Report No. GAO-06-803T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 10:00 a.m. EDT Wednesday, May 24, 2006 Testimony Before the Subcommittee on the Legislative Branch, Committee on Appropriations, U.S. Senate CAPITOL VISITOR CENTER Update on Status of Projects’s Schedule and Cost As of May 24, 2006
Statement of Terrell Dorn, Director Bernard L. Ungar, Director Physical Infrast... |
Date April 27, 2006 |
Report No. GAO-06-665T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 10:30 a.m. EDT Thursday, April 27, 2006 Testimony Before the Subcommittee on the Legislative Branch, Committee on Appropriations, U.S. Senate CAPITOL VISITOR CENTER Update on Status of Project’s Schedule and Cost as of April 27, 2006
Statement of Terrell Dorn, Director Bernard L. Ungar, Director Physical Infra... |
Date April 10, 2006 |
Report No. GAO-06-622T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 11:30 a.m. CDT Monday, April 10, 2006 Testimony before the Subcommittee on Federal Financial Management, Government Information, and International Security, Committee on Homeland Security and Governmental Affairs, U.S. Senate HURRICANE KATRINA Planning for and Management of Federal Disaster Recovery Contracts
St... |
Date April 6, 2006 |
Report No. GAO-06-602T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 10:00 a.m. EDT Thursday, April 6, 2006 Testimony Before the Subcommittee on Energy and Water Development and Related Agencies, Committee on Appropriations, House of Representatives HANFORD WASTE TREATMENT PLANT Contractor and DOE Management Problems Have Led to Higher Costs, Construction Delays, and Safety Conce... |
Date April 5, 2006 |
Report No. GAO-06-409T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 3:00 p.m. EDT Wednesday April 5, 2006 Testimony Before the Subcommittee on Readiness and Management Support, Committee on Armed Services, U.S. Senate DEFENSE ACQUISITIONS DOD Wastes Billions of Dollars through Poorly Structured Incentives
Statement of David M. Walker Comptroller General of the United States GAO-... |
Date April 3, 2006 |
Report No. GAO-06-284 |
Title
United States Government Accountability Office GAO
April 2006 Report to Congressional Requesters CONTRACT SECURITY GUARDS Army’s Guard Program Requires Greater Oversight and Reassessment of Acquisition Approach GAO-06-284 April 2006 CONTRACT SECURITY GUARDS Highlights
Highlights of GAO-06-284, a report to congressional requesters Accountability Integrity Reliability Army’s Guard Program Requir... |
Date March 15, 2006 |
Report No. GAO-06-528T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 10:30 a.m. EST Wednesday, March 15, 2006 Testimony Before the Subcommittee on the Legislative Branch, Committee on Appropriations, U.S. Senate CAPITOL VISITOR CENTER Status of Project’s Schedule and Cost as of March 15, 2006
Statement of Bernard L. Ungar, Director Terrell Dorn Assistant Director Physical Infra... |
Date Dec. 21, 2005 |
Report No. GAO-06-302R |
Title
United States Government Accountability Office Washington, DC 20548 December 21, 2005 The Honorable Frank R. Wolf Chairman, Subcommittee on Science, the Departments of State, Justice, and Commerce, and Related Agencies Committee on Appropriations House of Representatives Subject: Information Technology: Responses to Subcommittee Post-hearing Questions Regarding the FBI’s Management Practices and... |
Date Dec. 19, 2005 |
Report No. GAO-06-66 |
Title
United States Government Accountability Office GAO
December 2005 Report to the Subcommittee on Readiness and Management Support, Committee on Armed Services, U.S. Senate DEFENSE ACQUISITIONS DOD Has Paid Billions in Award and Incentive Fees Regardless of Acquisition Outcomes GAO-06-66 December 2005 DEFENSE ACQUISITIONS Highlights
Highlights of GAO-06-66, a report to the Subcommittee on Readiness a... |
Date Nov. 16, 2005 |
Report No. GAO-06-251T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 11:00 a.m. EST Wednesday, November 16, 2005 Testimony Before the Subcommittee on the Legislative Branch, Committee on Appropriations, U.S. Senate CAPITOL VISITOR CENTER Update on Schedule and Cost
Statement of Bernard L. Ungar, Director Terrell Dorn, Assistant Director Physical Infrastructure Issues GAO-06-251T ... |
Date Nov. 8, 2005 |
Report No. GAO-06-246T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 10:00 a.m. EST Tuesday, November 8, 2005 Testimony Before the Senate Committee on Small Business and Entrepreneurship HURRICANES KATRINA AND RITA Preliminary Observations on Contracting for Response and Recovery Efforts
Statement of David E. Cooper, Director Acquisition and Sourcing Management GAO-06-246T Novemb... |
Date Nov. 2, 2005 |
Report No. GAO-06-235T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 1:00 p.m. EST Wednesday, November 2, 2005 Testimony Before the House Select Bipartisan Committee to Investigate the Preparation for and Response to Hurricane Katrina HURRICANES KATRINA AND RITA Contracting for Response and Recovery Efforts
Statement of David E. Cooper, Director, Acquisition and Sourcing Manageme... |
Date Sept. 9, 2005 |
Report No. GAO-05-966 |
Title
United States Government Accountability Office GAO
September 2005 Report to the Subcommittee on Readiness and Management Support, Committee on Armed Services, U.S. Senate DEFENSE MANAGEMENT DOD Needs to Demonstrate That Performance-Based Logistics Contracts Are Achieving Expected Benefits GAO-05-966 a September 2005 DEFENSE MANAGEMENT Highlights
Highlights of GAO-05-966, a report to the Subcommitt... |
Date July 29, 2005 |
Report No. GAO-05-479 |
Title
United States Government Accountability Office GAO
July 2005 Report to Congressional Committees FEDERAL PROCUREMENT Additional Data Reporting Could Improve the Suspension and Debarment Process GAO-05-479 July 2005 FEDERAL PROCUREMENT Highlights
Highlights of GAO-05-479, a report to congressional committees Accountability Integrity Reliability Additional Data Reporting Could Improve the Suspension ... |
Date July 29, 2005 |
Report No. GAO-05-456 |
Title
United States Government Accountability Office GAO
July 2005 Report to Congressional Committees INTERAGENCY CONTRACTING Franchise Funds Provide Convenience, but Value to DOD is Not Demonstrated GAO-05-456 July 2005 INTERAGENCY CONTRACTING Highlights
Highlights of GAO-05-456, a report to congressional committees Accountability Integrity Reliability Franchise Funds Provide Convenience, but Value to ... |
Date July 28, 2005 |
Report No. GAO-05-737 |
Title
United States Government Accountability Office GAO
July 2005 Report to Congressional Committees REBUILDING IRAQ Actions Needed to Improve Use of Private Security Providers
On August 5, 2005, the PDF file was revised to correct the graphic in Figure 7 of the report. The right-most bar was increased to represent 4 contracts instead of 3 contracts. GAO-05-737 a July 2005 REBUILDING IRAQ Highlights
Hi... |
Date July 27, 2005 |
Report No. GAO-05-773 |
Title
United States Government Accountability Office GAO
July 2005 Report to the Committees on Armed Services, U.S. Senate and House of Representatives DEFENSE HEALTH CARE Implementation Issues for New TRICARE Contracts and Regional Structure GAO-05-773 July 2005 DEFENSE HEALTH CARE Highlights
Highlights of GAO-05-773, a report to Committees on Armed Services, U.S. Senate and House of Representatives Ac... |
Date July 26, 2005 |
Report No. GAO-05-736 |
Title
United States Government Accountability Office GAO
July 2005 Report to Congressional Committees FEDERAL CONTRACTING Share-in-Savings Initiative Not Yet Tested GAO-05-736 July 2005 FEDERAL CONTRACTING Highlights
Highlights of GAO-05-736, a report to congressional committees Accountability Integrity Reliability Share-in-Savings Initiative Not Yet Tested Why GAO Did This Study
Federal agencies spend ... |
Date July 14, 2005 |
Report No. GAO-05-910T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 10:30 a.m. EDT Thursday, July 14, 2005 Testimony Before the Subcommittee on the Legislative Branch, Committee on Appropriations, U.S. Senate CAPITOL VISITOR CENTER Update on Status of Project’s Schedule and Costs
Statement of Bernard L. Ungar, Director Terrell Dorn, Assistant Director Physical Infrastructure I... |
Date June 30, 2005 |
Report No. GAO-05-526 |
Title
United States Government Accountability Office GAO
June 2005 Report to Congressional Requesters IMMIGRATION SERVICES Better Contracting Practices Needed at Call Centers GAO-05-526 June 2005 IMMIGRATION SERVICES Highlights
Highlights of GAO-05-526, a report to congressional requesters Accountability Integrity Reliability Better Contracting Practices Needed at Call Centers Why GAO Did This Study
The... |
Date June 14, 2005 |
Report No. GAO-05-811T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 10:30 a.m. EDT Tuesday, June 14, 2005 Testimony Before the Subcommittee on the Legislative Branch, Committee on Appropriations, U.S. Senate CAPITOL VISITOR CENTER Effective Schedule Management and Updated Cost Information Are Needed
Statement of Bernard L. Ungar, Director Terrell Dorn, Assistant Director Physica... |
Date June 3, 2005 |
Report No. GAO-05-580R |
Title
United States Government Accountability Office Washington, DC 20548 June 3, 2005 The Honorable George Miller Ranking Minority Member Committee on Education and the Workforce House of Representatives Subject: Fair Labor Standards Act: Labor Made Key Decisions in Studies of Updated Overtime Rule and Contractor Provided Support Dear Mr. Miller: In 2004, the Department of Labor (Labor) updated the rul... |
Date May 13, 2005 |
Report No. GAO-05-459 |
Title
United States Government Accountability Office GAO
May 2005 Report to Congressional Committees DEPARTMENT OF ENERGY Improved Oversight Could Better Ensure Opportunities for Small Business Subcontracting GAO-05-459 May 2005 DEPARTMENT OF ENERGY Highlights
Highlights of GAO-05-459, a report to congressional committees Accountability Integrity Reliability Improved Oversight Could Better Ensure Opport... |
Date May 11, 2005 |
Report No. GAO-05-698T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 10:00 a.m. EDT Wednesday, May 11, 2005 Testimony Before the Subcommittee on Railroads, Committee on Transportation and Infrastructure, House of Representatives AMTRAK Acela’s Continued Problems Underscore the Importance of Meeting Broader Challenges in Managing Large-Scale Projects
Statement of JayEtta Hecker,... |
Date April 29, 2005 |
Report No. GAO-05-201 |
Title
United States Government Accountability Office GAO
April 2005 Report to Congressional Committees INTERAGENCY CONTRACTING Problems with DOD’s and Interior’s Orders to Support Military Operations GAO-05-201 April 2005 INTERAGENCY CONTRACTING Highlights
Highlights of GAO-05-201, a report to congressional committees Accountability Integrity Reliability Problems with DOD’s and Interior’s Orders... |
Date March 18, 2005 |
Report No. GAO-05-123 |
Title
United States Government Accountability Office GAO
March 2005 Report to the Committee on Government Reform, House of Representatives DEPARTMENT OF ENERGY Further Actions Are Needed to Strengthen Contract Management for Major Projects GAO-05-123 a March 2005 DEPARTMENT OF ENERGY Further Actions Are Needed to Strengthen Contract Management for Major Projects Highlights of GAO-05-123, a report to the... |
Date March 17, 2005 |
Report No. GAO-05-274 |
Title
United States Government Accountability Office GAO
March 2005 Report to the Secretary of Defense CONTRACT MANAGEMENT Opportunities to Improve Surveillance on Department of Defense Service Contracts GAO-05-274 a March 2005 CONTRACT MANAGEMENT Highlights
Highlights of GAO-05-274, a report to the Secretary of Defense Accountability Integrity Reliability Opportunities to Improve Surveillance on Depart... |
Date Nov. 19, 2004 |
Report No. GAO-05-126 |
Title
United States Government Accountability Office GAO
November 2004 Report to the Chairman, Subcommittee on Aviation, Committee on Transportation and Infrastructure, House of Representatives AVIATION SECURITY Preliminary Observations on TSA's Progress to Allow Airports to Use Private Passenger and Baggage Screening Services GAO-05-126 November 2004 AVIATION SECURITY Highlights
Highlights of GAO-05-12... |