Date |
Report No. |
Title |
Date Dec. 8, 2011 |
Report No. GAO-12-88 |
Title
GAO
December 2011 United States Government Accountability Office Report to the Committee on Armed Services, U.S. Senate DEFENSE CONTRACT AUDITS Actions Needed to Improve DCAA's Access to and Use of Defense Company Internal Audit Reports GAO-12-88 December 2011 DEFENSE CONTRACT AUDITS
Actions Needed to Improve DCAA’s Access to and Use of Defense Company Internal Audit Reports
Highlights of GAO-12... |
Date Nov. 16, 2011 |
Report No. GAO-12-232T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 1:30 p.m. EST Wednesday, November 16, 2011 Testimony
Before the Subcommittee on Technology, Information Policy, Intergovernmental Relations and Procurement Reform, Committee on Oversight and Government Reform, House of Representatives ACQUISITION WORKFORCE DOD’s Efforts to Rebuild Capacity Have Shown Some Prog... |
Date Nov. 3, 2011 |
Report No. GAO-12-83 |
Title
United States Government Accountability Office GAO
November 2011 Report to Congressional Requesters DEFENSE CONTRACT MANAGEMENT AGENCY Amid Ongoing Efforts to Rebuild Capacity, Several Factors Present Challenges in Meeting Its Missions GAO-12-83 November 2011 DEFENSE CONTRACT MANAGEMENT AGENCY
Amid Ongoing Efforts to Rebuild Capacity, Several Factors Present Challenges in Meeting Its Missions
High... |
Date Oct. 13, 2011 |
Report No. GAO-12-78 |
Title
United States Government Accountability Office GAO
October 2011 Report to the Ranking Member, Subcommittee on Highways and Transit, Committee on Transportation and Infrastructure, House of Representatives DISADVANTAGED BUSINESS ENTERPRISE PROGRAM Assessing Use of Proxy Data Would Enhance Ability to Know If States Are Meeting Their Goals GAO-12-78 October 2011 DISADVANTAGED BUSINESS ENTERPRISE PROG... |
Date Sept. 27, 2011 |
Report No. GAO-11-891 |
Title
United States Government Accountability Office GAO
September 2011 Report to Congressional Addressees CONTINGENCY CONTRACTING Improved Planning and Management Oversight Needed to Address Challenges with Closing Contracts GAO-11-891 September 2011 CONTINGENCY CONTRACTING
Improved Planning and Management Oversight Needed to Address Challenges with Closing Contracts Highlights of GAO-11-891, a report ... |
Date Sept. 16, 2011 |
Report No. GAO-11-774 |
Title
United States Government Accountability Office GAO
September 2011 Report to Congressional Addressees IRAQ DRAWDOWN Opportunities Exist to Improve Equipment Visibility, Contractor Demobilization, and Clarity of Post-2011 DOD Role GAO-11-774 September 2011 IRAQ DRAWDOWN
Opportunities Exist to Improve Equipment Visibility, Contractor Demobilization, and Clarity of Post-2011 DOD Role Highlights of GAO... |
Date Sept. 15, 2011 |
Report No. GAO-11-886 |
Title
United States Government Accountability Office GAO
September 2011 Report to Congressional Committees IRAQ AND AFGHANISTAN DOD, State, and USAID Cannot Fully Account for Contracts, Assistance Instruments, and Associated Personnel GAO-11-886 September 2011 IRAQ AND AFGHANISTAN
DOD, State, and USAID Cannot Fully Account for Contracts, Assistance Instruments, and Associated Personnel Highlights of GAO... |
Date Aug. 9, 2011 |
Report No. GAO-11-672 |
Title
United States Government Accountability Office GAO
August 2011 Report to the Committee on Homeland Security and Governmental Affairs, U.S. Senate ACQUISITION PLANNING Opportunities to Build Strong Foundations for Better Services Contracts GAO-11-672 August 2011 ACQUISITION PLANNING
Opportunities to Build Strong Foundations for Better Services Contracts
Highlights of GAO-11-672, a report to the Com... |
Date July 28, 2011 |
Report No. GAO-11-842T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 10:00 a.m. EDT Thursday, July 28, 2011 Testimony before the Subcommittee on Government Organization, Efficiency and Financial Management, Committee on Oversight and Government Reform, House of Representatives IMPROPER PAYMENTS Reported Medicare Estimates and Key Remediation Strategies
Statement of Kay L. Daly
Di... |
Date July 13, 2011 |
Report No. GAO-11-813T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 10:00 a.m. ET Wednesday, July 13, 2011 Testimony Before the Subcommittees of the House Committee on Homeland Security HOMELAND SECURITY Protecting Federal Facilities Remains a Challenge for the Department of Homeland Security's Federal Protective Service
Statement of Mark L. Goldstein, Director Physical Infrastr... |
Date June 30, 2011 |
Report No. GAO-11-771T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 10:00 a.m. EDT Thursday, June 30, 2011 Testimony Before the Subcommittee on Contracting Oversight, Committee on Homeland Security and Governmental Affairs, U.S. Senate OPERATIONAL CONTRACT SUPPORT Actions Needed to Address Contract Oversight and Vetting of Non-U.S. Vendors in Afghanistan
Statement of William M. ... |
Date June 29, 2011 |
Report No. GAO-11-588 |
Title
United States Government Accountability Office GAO
June 2011 Report to the Ranking Member, Committee on the Judiciary, U.S. Senate PENSION BENEFIT GUARANTY CORPORATION More Strategic Approach to Contracting Still Needed GAO-11-588 June 2011 Accountability • Integrity • Reliability PENSION BENEFIT GUARANTY CORPORATION
More Strategic Approach to Contracting Still Needed Highlights of GAO-11-588,... |
Date June 8, 2011 |
Report No. GAO-11-355 |
Title
United States Government Accountability Office GAO
June 2011 Report to Congressional Addressees AFGHANISTAN U.S. Efforts to Vet Non-U.S. Vendors Need Improvement GAO-11-355 June 2011 AFGHANISTAN
Accountability • Integrity • Reliability U.S. Efforts to Vet Non-U.S. Vendors Need Improvement
Highlights of GAO-11-355, a report to congressional addressees Why GAO Did This Study
The Departments of D... |
Date May 25, 2011 |
Report No. GAO-11-68 |
Title
United States Government Accountability Office GAO
May 2011 Report to Congressional Requesters SECURE BORDER INITIATIVE Controls over Contractor Payments for the Technology Component Need Improvement GAO-11-68 May 2011
Accountability • Integrity • Reliability SECURE BORDER INITIATIVE
Controls over Contractor Payments for the Technology Component Need Improvement Highlights of GAO-11-68, a repo... |
Date April 29, 2011 |
Report No. GAO-11-378 |
Title
United States Government Accountability Office GAO
April 2011 Report to the Ranking Member, Subcommittee on Energy and Water Development, Committee on Appropriations, U.S. Senate DEPARTMENT OF ENERGY Progress Made Overseeing the Costs of Contractor Postretirement Benefits, but Additional Actions Could Help Address Challenges GAO-11-378 April 2011 DEPARTMENT OF ENERGY
Accountability • Integrity â... |
Date April 25, 2011 |
Report No. GAO-11-580 |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 9:30 a.m. EDT Monday, April 25, 2011 Statement before the Commission on Wartime Contracting in Iraq and Afghanistan CONTINGENCY CONTRACTING Observations on Actions Needed to Address Systemic Challenges
Statement of Paul L. Francis, Managing Director Acquisition and Sourcing Management GAO-11-580 April 25, 2011 C... |
Date March 9, 2011 |
Report No. GAO-11-409T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 2:30 p.m. EST Wednesday, March 9, 2011 Testimony
Before the Subcommittee on Federal Financial Management, Government Information, Federal Services, and International Security, Committee on Homeland Security and Governmental Affairs, U.S. Senate MEDICARE AND MEDICAID FRAUD, WASTE, AND ABUSE Effective Implementati... |
Date March 3, 2011 |
Report No. GAO-11-419T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 1:00 p.m. EST Thursday, March 3, 2011 Testimony Before the Subcommittee on State, Foreign Operations, and Related Programs, Committee on Appropriations, House of Representatives FOREIGN OPERATIONS Key Issues for Congressional Oversight
Statement of Jacquelyn Williams-Bridgers, Managing Director, International Af... |
Date March 2, 2011 |
Report No. GAO-11-430T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 10:00 a.m. EST Wednesday, March 2, 2011 Testimony Before the Subcommittee on Oversight and Investigations, Committee on Energy and Commerce, House of Representatives MEDICARE Program Remains at High Risk Because of Continuing Management Challenges
Statement of Kathleen King Director, Health Care GAO-11-430T Marc... |
Date Feb. 17, 2011 |
Report No. GAO-11-394T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 9:30 a.m. EST Thursday, February 17, 2011 Testimony Before the House Committee on Oversight and Government Reform GAO’S 2011 HIGH-RISK SERIES An Update
Statement of Gene L. Dodaro Comptroller General of the United States GAO-11-394T February 17, 2011 GAO’S 2011 HIGH-RISK SERIES
Accountability • Integrity â... |
Date Feb. 16, 2011 |
Report No. GAO-11-278 |
Title
United States Government Accountability Office GAO
February 2011 Report to Congressional Committees HIGH-RISK SERIES An Update GAO-11-278 February 2011 HIGH-RISK SERIES
Accountability • Integrity • Reliability An Update
Highlights of GAO-11-278, a report to congressional committees on GAO's HighRisk Series Why GAO Did This Study
The federal government is the world’s largest and most complex ... |
Date Feb. 10, 2011 |
Report No. GAO-11-194 |
Title
United States Government Accountability Office GAO
February 2011 Report to the Ranking Member, Committee on Education and the Workforce, House of Representatives DEPARTMENT OF EDUCATION Improved Oversight and Controls Could Help Education Better Respond to Evolving Priorities GAO-11-194 February 2011 DEPARTMENT OF EDUCATION
Accountability • Integrity • Reliability Improved Oversight and Contro... |
Date Feb. 1, 2011 |
Report No. GAO-11-331T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 2:30 p.m. EST Tuesday, February 1, 2011 Testimony before the Subcommittee on Contracting Oversight, Committee on Homeland Security and Governmental Affairs, U.S. Senate CONTRACT AUDITS Role in Helping Ensure Effective Oversight and Reducing Improper Payments
Statement of Jeanette M. Franzel Managing Director Acc... |
Date Jan. 14, 2011 |
Report No. GAO-11-192 |
Title
United States Government Accountability Office GAO
January 2011 Report to Congressional Committees DEFENSE ACQUISITIONS Further Action Needed to Better Implement Requirements for Conducting Inventory of Service Contract Activities GAO-11-192 January 2011 DEFENSE ACQUISITIONS
Accountability • Integrity • Reliability Further Action Needed to Better Implement Requirements for Conducting Inventory... |
Date Oct. 28, 2010 |
Report No. GAO-11-61R |
Title
United States Government Accountability Office Washington, DC 20548 October 28, 2010 The Honorable Carl Levin Chairman The Honorable John McCain Ranking Member Committee on Armed Services United States Senate The Honorable Ike Skelton Chairman The Honorable Howard P. McKeon Ranking Member Committee on Armed Services House of Representatives Subject: DEFENSE ACQUISITIONS: Additional Guidance Needed... |
Date Oct. 18, 2010 |
Report No. GAO-11-6 |
Title
United States Government Accountability Office GAO
October 2010 Report to Congressional Requesters SECURE BORDER INITIATIVE DHS Needs to Strengthen Management and Oversight of Its Prime Contractor GAO-11-6 October 2010 SECURE BORDER INITIATIVE
Accountability • Integrity • Reliability DHS Needs to Strengthen Management and Oversight of Its Prime Contractor
Highlights of GAO-11-6, a report to co... |
Date Sept. 22, 2010 |
Report No. GAO-10-1063T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 2:00 p.m. EDT Wednesday, September 22, 2010 Testimony Before the Committee on Banking, Housing, and Urban Affairs, U.S. Senate NATIONAL FLOOD INSURANCE PROGRAM Continued Actions Needed to Address Financial and Operational Issues
Statement of Orice Williams Brown, Director Financial Markets and Community Investme... |
Date Sept. 15, 2010 |
Report No. GAO-10-1041T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 10:00 a.m. EDT Wednesday, September 15, 2010 Statement for the Record To the Committee on Homeland Security and Governmental Affairs, U.S. Senate COMBATING NUCLEAR SMUGGLING Inadequate Communication and Oversight Hampered DHS Efforts to Develop an Advanced Radiography System to Detect Nuclear Materials
Statement... |
Date Sept. 14, 2010 |
Report No. GAO-10-909 |
Title
United States Government Accountability Office GAO
September 2010 Report to Congressional Committees PUBLIC TRANSPORTATION Use of Contractors is Generally Enhancing Transit Project Oversight, and FTA is Taking Actions to Address Some Stakeholder Concerns GAO-10-909 September 2010 PUBLIC TRANSPORTATION
Accountability • Integrity • Reliability Use of Contractors is Generally Enhancing Transit Pr... |
Date Aug. 5, 2010 |
Report No. GAO-10-901 |
Title
United States Government Accountability Office GAO
August 2010 Report to Congressional Requesters HOMELAND SECURITY Addressing Weaknesses with Facility Security Committees Would Enhance Protection of Federal Facilities GAO-10-901 August 2010 Highlights
Highlights of GAO-10-901, a report to congressional requesters Accountability Integrity Reliability HOMELAND SECURITY
Addressing Weaknesses with Fa... |
Date July 27, 2010 |
Report No. GAO-10-790 |
Title
United States Government Accountability Office GAO
July 2010 Report to Congressional Committees COAST GUARD Deepwater Requirements, Quantities, and Cost Require Revalidation to Reflect Knowledge Gained GAO-10-790 July 2010 COAST GUARD Highlights
Highlights of GAO-10-790, a report to congressional committees Accountability Integrity Reliability Deepwater Requirements, Quantities, and Cost Require R... |
Date July 26, 2010 |
Report No. GAO-10-833 |
Title
United States Government Accountability Office GAO
July 2010 Report to the Committee on Oversight and Government Reform, House of Representatives FEDERAL CONTRACTING Opportunities Exist to Increase Competition and Assess Reasons When Only One Offer Is Received GAO-10-833 July 2010 FEDERAL CONTRACTING Highlights
Highlights of GAO-10-833, a report to the Committee on Oversight and Government Reform,... |
Date July 21, 2010 |
Report No. GAO-10-933T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 10:00 a.m. EDT Wednesday, July 21, 2010 Testimony Before the Committee on Finance, U.S. Senate TROUBLED ASSET RELIEF PROGRAM Continued Attention Needed to Ensure the Transparency and Accountability of Ongoing Programs
Statement of Richard J. Hillman, Managing Director Financial Markets and Community Investment G... |
Date July 15, 2010 |
Report No. GAO-10-809 |
Title
United States Government Accountability Office GAO
July 2010 Report to the Republican Leader, U.S. Senate RECOVERY ACT Contracting Approaches and Oversight Used by Selected Federal Agencies and States GAO-10-809 July 2010 RECOVERY ACT Highlights
Highlights of GAO-10-809, a report to the Republican Leader, U.S. Senate Accountability Integrity Reliability Contracting Approaches and Oversight Used by... |
Date July 15, 2010 |
Report No. GAO-10-864T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 10:00 a.m. EDT Thursday, July 15, 2010 Testimony
Before the Subcommittee on Federal Financial Management, Government Information, Federal Services, and International Security, Homeland Security and Governmental Affairs Committee, U.S. Senate MEDICARE RECOVERY AUDIT CONTRACTING Lessons Learned to Address Improper... |
Date June 30, 2010 |
Report No. GAO-10-862T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 2:30 p.m. EDT Wednesday, June 30, 2010 Testimony Before the Subcommittee on Contracting Oversight, Committee on Homeland Security and Governmental Affairs, U.S. Senate CONTRACTING STRATEGIES Better Data and Management Needed to Leverage Value of Interagency and Enterprisewide Contracts
Statement of John K. Needh... |
Date June 29, 2010 |
Report No. GAO-10-829T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 10:00 a.m. EDT Tuesday, June 29, 2010 Testimony Before the Subcommittee on National Security and Foreign Affairs, Committee on Oversight and Government Reform, House of Representatives WARFIGHTER SUPPORT Cultural Change Needed to Improve How DOD Plans for and Manages Operational Contract Support
Statement of Wil... |
Date April 29, 2010 |
Report No. GAO-10-367 |
Title
United States Government Accountability Office GAO
April 2010 Report to Congressional Requesters CONTRACTING STRATEGIES
Data and Oversight Problems Hamper Opportunities to Leverage Value of Interagency and Enterprisewide Contracts GAO-10-367 April 2010 CONTRACTING STRATEGIES Highlights
Highlights of GAO-10-367, a report to congressional requesters Accountability Integrity Reliability Data and Over... |
Date April 28, 2010 |
Report No. GAO-10-637T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 2:30 p.m. EDT Wednesday, April 28, 2010 Testimony Before the Ad Hoc Subcommittee on Contracting Oversight, Committee on Homeland Security and Governmental Affairs, U.S. Senate CENTERS FOR MEDICARE AND MEDICAID SERVICES Pervasive Internal Control Weaknesses Hindered Effective Contract Management
Statement of Kay ... |
Date April 21, 2010 |
Report No. GAO-10-631T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 2:00 p.m. EDT Wednesday, April 21, 2010 Testimony Before the Subcommittee on Housing and Community Opportunity, Committee on Financial Services, House of Representatives NATIONAL FLOOD INSURANCE PROGRAM Continued Actions Needed to Address Financial and Operational Issues
Statement of Orice Williams Brown, Direct... |
Date April 14, 2010 |
Report No. GAO-10-614T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 10:00 a.m. EDT Wednesday, April 14, 2010 Testimony Before the Committee on Homeland Security, House of Representatives HOMELAND SECURITY Federal Protective Service’s Use of Contract Guards Requires Reassessment and More Oversight
Statement of Mark L. Goldstein, Director Physical Infrastructure Issues GAO-10-61... |
Date April 13, 2010 |
Report No. GAO-10-341 |
Title
United States Government Accountability Office GAO
April 2010 Report to Congressional Requesters HOMELAND SECURITY Federal Protective Service’s Contract Guard Program Requires More Oversight and Reassessment of Use of Contract Guards GAO-10-341 April 2010 HOMELAND SECURITY Highlights
Highlights of GAO-10-341, a report to congressional requesters Accountability Integrity Reliability Federal Prote... |
Date April 12, 2010 |
Report No. GAO-10-357 |
Title
United States Government Accountability Office GAO
April 2010 Report to Congressional Committees CONTINGENCY CONTRACTING Improvements Needed in Management of Contractors Supporting Contract and Grant Administration in Iraq and Afghanistan GAO-10-357 April 2010 CONTINGENCY CONTRACTING Highlights
Highlights of GAO-10-357, a report to congressional committees Accountability Integrity Reliability Impr... |
Date March 31, 2010 |
Report No. GAO-10-143 |
Title
United States Government Accountability Office GAO
March 2010 Report to Congressional Requesters MEDICARE RECOVERY AUDIT CONTRACTING Weaknesses Remain in Addressing Vulnerabilities to Improper Payments, Although Improvements Made to Contractor Oversight GAO-10-143 March 2010 MEDICARE RECOVERY AUDIT CONTRACTING Highlights
Highlights of GAO-10-143, a report to congressional requesters Accountability... |
Date March 30, 2010 |
Report No. GAO-10-472 |
Title
United States Government Accountability Office GAO
March 2010 Report to Congressional Committees WARFIGHTER SUPPORT DOD Needs to Improve Its Planning for Using Contractors to Support Future Military Operations GAO-10-472 March 2010 WARFIGHTER SUPPORT Highlights
Highlights of GAO-10-472, a report to congressional committees Accountability Integrity Reliability DOD Needs to Improve Its Planning for ... |
Date March 17, 2010 |
Report No. GAO-10-551T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 1:30 p.m. EDT Wednesday, March 17, 2010 Testimony Before the Subcommittee on Defense, Committee on Appropriations, House of Representatives WARFIGHTER SUPPORT Continued Actions Needed by DOD to Improve and Institutionalize Contractor Support in Contingency Operations
Statement of William M. Solis, Director Defen... |
Date March 4, 2010 |
Report No. GAO-10-266R |
Title
United States Government Accountability Office Washington, DC 20548 March 4, 2010 Congressional Committees Warfighter Support: A Cost Comparison of Using State Department Employees versus Contractors for Security Services in Iraq The U.S. government’s reliance on contractors, including the State Department’s and Department of Defense’s (DOD) use of private security contractors in Iraq, has b... |
Date Nov. 30, 2009 |
Report No. GAO-10-216R |
Title
United States Government Accountability Office Washington, DC 20548 November 30, 2009 The Honorable Mitch McConnell Republican Leader United States Senate Subject: Recovery Act: Contract Oversight Activities of the Recovery Accountability and Transparency Board and Observations on Contract Spending in Selected States The American Recovery and Reinvestment Act of 2009 (Recovery Act) was enacted on ... |
Date Nov. 20, 2009 |
Report No. GAO-10-39 |
Title
United States Government Accountability Office GAO
November 2009 Report to Congressional Requesters DEFENSE ACQUISITIONS Further Actions Needed to Address Weaknesses in DOD’s Management of Professional and Management Support Contracts GAO-10-39 November 2009 DEFENSE ACQUISITIONS Highlights
Highlights of GAO-10-39, a report to congressional requesters Accountability Integrity Reliability Further ... |
Date Nov. 2, 2009 |
Report No. GAO-10-179 |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 9:30 a.m. EST November 2, 2009 Statement Before the Commission on Wartime Contracting in Iraq and Afghanistan OPERATION IRAQI FREEDOM Preliminary Observations on DOD Planning for the Drawdown of U.S. Forces from Iraq
Statement of William M. Solis, Director Defense Capabilities and Management GAO-10-179 November ... |