Date Report No. Title
Date Oct. 23, 2009 Report No. GAO-10-60 Title

Centers for Medicare and Medicaid Services: Deficiencies in Contract Management Internal Control Are Pervasive

United States Government Accountability Office GAO October 2009 Report to Congressional Requesters CENTERS FOR MEDICARE AND MEDICAID SERVICES Deficiencies in Contract Management Internal Control Are Pervasive GAO-10-60 October 2009 Highlights Highlights of GAO-10-60, a report to congressional requesters Accountability Integrity Reliability CENTERS FOR MEDICARE AND MEDICAID SERVICES Deficiencies in...
Date Oct. 15, 2009 Report No. GAO-10-163T Title

Defense Management: Widespread DCAA Audit Problems Leave Billions of Taxpayer Dollars Vulnerable to Fraud, Waste, Abuse, and Mismanagement

United States Government Accountability Office GAO For Release on Delivery Expected at 8:00 a.m. EDT Thursday, October 15, 2009 Testimony Before the Panel on Defense Acquisition Reform, Committee on Armed Services, House of Representatives DEFENSE MANAGEMENT Widespread DCAA Audit Problems Leave Billions of Taxpayer Dollars Vulnerable to Fraud, Waste, Abuse, and Mismanagement Statement of Gregory D...
Date Oct. 8, 2009 Report No. GAO-10-24SP Title

Troubled Asset Relief Program: Capital Purchase Program Transactions for October 28, 2008, through September 25, 2009, and Information on Financial Agency Agreements, Contracts, Blanket Purchase Agreements, and Interagency Agreements Awarded as of September 18, 2009 (GAO-10-24SP, October 2009), an e-supplement to GAO-10-16

Date Oct. 8, 2009 Report No. GAO-10-16 Title

Troubled Asset Relief Program: One Year Later, Actions Are Needed to Address Remaining Transparency and Accountability Challenges

United States Government Accountability Office GAO October 2009 Report to Congressional Committees TROUBLED ASSET RELIEF PROGRAM One Year Later, Actions Are Needed to Address Remaining Transparency and Accountability Challenges GAO-10-16 October 2009 TROUBLED ASSET RELIEF PROGRAM Highlights Highlights of GAO-10-16, a report to congressional committees Accountability Integrity Reliability One Year ...
Date Sept. 24, 2009 Report No. GAO-09-1040T Title

Defense Acquisitions: Sound Practices Critical to Ensuring Value for the Defense Logistics Agency's Acquisitions

United States Government Accountability Office GAO For Release on Delivery Expected at 9:30 a.m. EDT Thursday, September 24, 2009 Testimony Before the Defense Acquisition Reform Panel, Committee on Armed Services, House of Representatives DEFENSE ACQUISITIONS Sound Practices Critical to Ensuring Value for the Defense Logistics Agency’s Acquisitions Statement of William M. Solis, Director Defense...
Date Sept. 23, 2009 Report No. GAO-09-468 Title

DCAA Audits: Widespread Problems with Audit Quality Require Significant Reform

United States Government Accountability Office GAO September 2009 Report to the Committee on Homeland Security and Governmental Affairs, U.S. Senate DCAA AUDITS Widespread Problems with Audit Quality Require Significant Reform GAO-09-468 September 2009 DCAA AUDITS Highlights Highlights of GAO-09-468, a report to the Committee on Homeland Security and Governmental Affairs, U.S. Senate Accountabilit...
Date Sept. 23, 2009 Report No. GAO-09-1009T Title

DCAA Audits: Widespread Problems with Audit Quality Require Significant Reform

United States Government Accountability Office GAO For Release on Delivery Expected at 10:00 a.m. EDT Wednesday, September 23, 2009 Testimony Before the Committee on Homeland Security and Governmental Affairs, U.S. Senate DCAA AUDITS Widespread Problems with Audit Quality Require Significant Reform Statement of Gregory D. Kutz, Managing Director Forensic Audits and Special Investigations Gayle L. ...
Date Sept. 22, 2009 Report No. GAO-09-591 Title

Defense Contracting Integrity: Opportunities Exist to Improve DOD's Oversight of Contractor Ethics Programs

United States Government Accountability Office GAO September 2009 Report to Congressional Committees DEFENSE CONTRACTING INTEGRITY Opportunities Exist to Improve DOD’s Oversight of Contractor Ethics Programs GAO-09-591 September 2009 DEFENSE CONTRACTING INTEGRITY Highlights Highlights of GAO-09-591, a report to congressional committees Accountability Integrity Reliability Opportunities Exist to ...
Date Sept. 22, 2009 Report No. GAO-09-646SP Title

Defense Contracting Integrity: Survey on Contractor Ethics Programs (GAO-09-646SP, September 2009), an E-supplement to GAO-09-591

Date Sept. 15, 2009 Report No. GAO-09-1002T Title

Homeland Security: Despite Progress, DHS Continues to Be Challenged in Managing Its Multi-Billion Dollar Annual Investment in Large-Scale Information Technology Systems

United States Government Accountability Office GAO For Release on Delivery Expected at 9:30 a.m. EDT Tuesday, September 15, 2009 Testimony Before the Subcommittee on Government Management, Organization, and Procurement, House Committee on Oversight and Government Reform HOMELAND SECURITY Despite Progress, DHS Continues to Be Challenged in Managing Its Multi-Billion Dollar Annual Investment in Larg...
Date July 31, 2009 Report No. GAO-09-351 Title

Contingency Contract Management: DOD Needs to Develop and Finalize Background Screening and Other Standards for Private Security Contractors

United States Government Accountability Office GAO July 2009 Report to Congressional Committees CONTINGENCY CONTRACT MANAGEMENT DOD Needs to Develop and Finalize Background Screening and Other Standards for Private Security Contractors GAO-09-351 July 2009 CONTINGENCY CONTRACT MANAGEMENT Highlights Highlights of GAO-09-351, a report to congressional committees Accountability Integrity Reliability ...
Date June 17, 2009 Report No. GAO-09-758T Title

Broadcasting to Cuba: Observations Regarding TV Marti's Strategy and Operations

United States Government Accountability Office GAO For Release on Delivery Expected at 10:00 a.m. EST Wednesday, June 17, 2009 Testimony Before the Subcommittee on International Organizations, Human Rights, and Oversight, Committee on Foreign Affairs, House of Representatives BROADCASTING TO CUBA Observations Regarding TV Martí’s Strategy and Operations Statement of Jess T. Ford, Director Inter...
Date April 30, 2009 Report No. GAO-09-325 Title

Global Positioning System: Significant Challenges in Sustaining and Upgrading Widely Used Capabilities

United States Government Accountability Office GAO April 2009 Report to the Subcommittee on National Security and Foreign Affairs, Committee on Oversight and Government Reform, House of Representatives GLOBAL POSITIONING SYSTEM Significant Challenges in Sustaining and Upgrading Widely Used Capabilities GAO-09-325 April 2009 GLOBAL POSITIONING SYSTEM Highlights Highlights of GAO-09-325, a report to...
Date April 28, 2009 Report No. GAO-09-587T Title

Fiscal Year 2010 Budget Request: U.S. Government Accountability Office

United States Government Accountability Office GAO For Release on Delivery Expected at 1:00 p.m. EDT Tuesday, April 28, 2009 Testimony Before the Subcommittee on the Legislative Branch, Committee on Appropriations, House of Representatives FISCAL YEAR 2010 BUDGET REQUEST U.S. Government Accountability Office Statement of Gene L. Dodaro Acting Comptroller General of the United States GAO-09-587T Ma...
Date April 23, 2009 Report No. GAO-09-643T Title

Defense Acquisitions: Actions Needed to Ensure Value for Service Contracts

United States Government Accountability Office GAO For Release on Delivery Expected at 8:00 a.m. EDT Thursday, April 23, 2009 Testimony Before the Defense Acquisition Reform Panel, Committee on Armed Services, U.S. House of Representatives DEFENSE ACQUISITIONS Actions Needed to Ensure Value for Service Contracts Statement of John Hutton, Director, Acquisition and Sourcing Management and William So...
Date April 1, 2009 Report No. GAO-09-538T Title

Contingency Contracting: DOD, State, and USAID Are Taking Actions to Track Contracts and Contractor Personnel in Iraq and Afghanistan

United States Government Accountability Office GAO For Release on Delivery Expected at 1:00 p.m. EDT Wednesday, April 1, 2009 Testimony Before the Subcommittee on Oversight and Investigations, Committee on Armed Services, House of Representatives CONTINGENCY CONTRACTING DOD, State, and USAID Are Taking Actions to Track Contracts and Contractor Personnel in Iraq and Afghanistan Statement of John P....
Date March 24, 2009 Report No. GAO-09-462T Title

Coast Guard: Observations on Changes to Management and Oversight of the Deepwater Program

United States Government Accountability Office GAO For Release on Delivery Expected at 10:00 a.m. EDT Tuesday, March 24, 2009 Testimony Before the Subcommittee on Coast Guard and Maritime Transportation, Committee on Transportation and Infrastructure, House of Representatives COAST GUARD Observations on Changes to Management and Oversight of the Deepwater Program Statement of John P. Hutton, Direc...
Date March 19, 2009 Report No. GAO-09-484T Title

Troubled Asset Relief Program: Status of Efforts to Address Transparency and Accountability Issues

United States Government Accountability Office GAO For Release on Delivery Expected at 10:00 a.m. EST Thursday, March 19, 2009 Testimony Before the Subcommittee on Oversight, Committee on Ways and Means, House of Representatives TROUBLED ASSET RELIEF PROGRAM Status of Efforts to Address Transparency and Accountability Issues Statement of Gene L. Dodaro Acting Comptroller General of the United Stat...
Date March 11, 2009 Report No. GAO-09-474T Title

Troubled Asset Relief Program: Status of Efforts to Address Transparency and Accountability Issues

United States Government Accountability Office GAO For Release on Delivery Expected at 10:00 A.M. EDT Wednesday, March 11, 2009 Testimony Before the Subcommittee on Domestic Policy, Committee on Oversight and Government Reform, House of Representatives TROUBLED ASSET RELIEF PROGRAM Status of Efforts to Address Transparency and Accountability Issues Statement of Richard J. Hillman, Managing Directo...
Date March 5, 2009 Report No. GAO-09-436T Title

NASA: Projects Need More Disciplined Oversight and Management to Address Key Challenges

United States Government Accountability Office GAO For Release on Delivery Expected at 10:00 a.m. EST Thursday, March 5, 2009 Testimony Before the Subcommittee on Space and Aeronautics, Committee on Science and Technology, House of Representatives NASA Projects Need More Disciplined Oversight and Management to Address Key Challenges Statement of Cristina Chaplain, Director Acquisition and Sourcing...
Date March 4, 2009 Report No. GAO-09-406T Title

Department of Energy: Contract and Project Management Concerns at the National Nuclear Security Administration and Office Of Environmental Management

United States Government Accountability Office GAO For Release on Delivery Expected at 2:00 p.m. EST Wednesday, March 4, 2009 Testimony Before the Subcommittee on Energy and Water Development, Committee on Appropriations, House of Representatives DEPARTMENT OF ENERGY Contract and Project Management Concerns at the National Nuclear Security Administration and Office of Environmental Management Stat...
Date Feb. 25, 2009 Report No. GAO-09-277 Title

Federal Land Management: Additional Documentation of Agency Experiences with Good Neighbor Authority Could Enhance Its Future Use

United States Government Accountability Office GAO February 2009 Report to the Chairman, Committee on Energy and Natural Resources, U.S. Senate FEDERAL LAND MANAGEMENT Additional Documentation of Agency Experiences with Good Neighbor Authority Could Enhance Its Future Use GAO-09-277 February 2009 FEDERAL LAND MANAGEMENT Highlights Highlights of GAO-09-277, a report to the Chairman, Committee on En...
Date Feb. 24, 2009 Report No. GAO-09-417T Title

Troubled Asset Relief Program: Status of Efforts to Address Transparency and Accountability Issues

United States Government Accountability Office GAO For Release on Delivery Expected at 2:00 p.m. EST Tuesday, February 24, 2009 Testimony Before the Subcommittee on Oversight and Investigations, Committee on Financial Services, House of Representatives TROUBLED ASSET RELIEF PROGRAM Status of Efforts to Address Transparency and Accountability Issues Statement of Gene L. Dodaro Acting Comptroller Ge...
Date Feb. 19, 2009 Report No. GAO-09-383CG Title

Government Operations: Challenges Facing the New Administration and the 111th Congress

CHALLENGES FACING THE NEW ADMINISTRATION AND THE 111TH CONGRESS Before the AGA 2009 Leadership Conference Washington, DC February 19, 2009 By Gene L. Dodaro Acting Comptroller General GAO-09-383CG Transition: Assisting The New Administration & The New Congress 2 GAO-09-383CG GAO-09-383CG GAO-09-383CG Financial Institutions and Markets • Financial Regulatory System • GAO Role in Financial Rescu...
Date Feb. 12, 2009 Report No. GAO-09-380T Title

Iraq and Afghanistan: Availability of Forces, Equipment, and Infrastructure Should Be Considered in Developing U.S. Strategy and Plans

United States Government Accountability Office GAO For Release on Delivery Expected at 10:00 a.m. EST Thursday, February 12, 2009 Testimony Before the Subcommittee on National Security and Foreign Affairs, Committee on Oversight and Government Reform, House of Representatives AFGHANISTAN SECURITY Corrective Actions Are Needed to Address Serious Accountability Concerns about Weapons Provided to Afg...
Date Feb. 11, 2009 Report No. GAO-09-362T Title

Defense Management: Actions Needed to Overcome Long-standing Challenges with Weapon Systems Acquisition and Service Contract Management

United States Government Accountability Office GAO For Release on Delivery Expected at 10:30 a.m. EST Thursday, February 12, 2009 Testimony before the Committee on Armed Services, House of Representatives IRAQ AND AFGHANISTAN Availability of Forces, Equipment, and Infrastructure Should Be Considered in Developing U.S. Strategy and Plans Statement of Janet St. Laurent, Managing Director Defense Cap...
Date Jan. 30, 2009 Report No. GAO-09-296 Title

Troubled Asset Relief Program: Status of Efforts to Address Transparency and Accountability Issues

United States Government Accountability Office GAO January 2009 Report to Congressional Committees TROUBLED ASSET RELIEF PROGRAM Status of Efforts to Address Transparency and Accountability Issues GAO-09-296 January 2009 TROUBLED ASSET RELIEF PROGRAM Highlights Highlights of GAO-09-296, a report to congressional committees Accountability Integrity Reliability Status of Efforts to Address Transpare...
Date Jan. 22, 2009 Report No. GAO-09-271 Title

High-Risk Series: An Update

United States Government Accountability Office GAO January 2009 Report to the Congress HIGH-RISK SERIES An Update GAO-09-271 January 2009 HIGH-RISK SERIES Highlights Highlights of GAO-09-271, a report to Congress on GAO’s High-Risk Series Accountability Integrity Reliability An Update Why GAO Did This Report The federal government is the world’s largest and most complex entity, with about $3 t...
Date Nov. 21, 2008 Report No. GAO-09-14 Title

Department of Labor: Better Cost Assessments and Departmentwide Performance Tracking Are Needed to Effectively Manage Competitive Sourcing Program

United States Government Accountability Office GAO November 2008 Report to Congressional Committees DEPARTMENT OF LABOR Better Cost Assessments and Departmentwide Performance Tracking Are Needed to Effectively Manage Competitive Sourcing Program GAO-09-14 November 2008 DEPARTMENT OF LABOR Highlights Highlights of GAO-09-14, a report to congressional committees Accountability Integrity Reliability ...
Date Oct. 8, 2008 Report No. GAO-09-15 Title

Federal Research: Opportunities Exist to Improve the Management and Oversight of Federally Funded Research and Development Centers

United States Government Accountability Office GAO October 2008 Report to Congressional Committees FEDERAL RESEARCH Opportunities Exist to Improve the Management and Oversight of Federally Funded Research and Development Centers GAO-09-15 October 2008 FEDERAL RESEARCH Highlights Highlights of GAO-09-15, a report to congressional committees Accountability Integrity Reliability Opportunities Exist t...
Date Oct. 1, 2008 Report No. GAO-09-19 Title

Contingency Contracting: DOD, State, and USAID Contracts and Contractor Personnel in Iraq and Afghanistan

United States Government Accountability Office GAO October 2008 Report to Congressional Committees CONTINGENCY CONTRACTING DOD, State, and USAID Contracts and Contractor Personnel in Iraq and Afghanistan GAO-09-19 October 2008 CONTINGENCY CONTRACTING Highlights Highlights of GAO-09-19, a report to congressional committees. Accountability Integrity Reliability DOD, State, and USAID Contracts and Co...
Date Sept. 26, 2008 Report No. GAO-08-1087 Title

Military Operations: DOD Needs to Address Contract Oversight and Quality Assurance Issues for Contracts Used to Support Contingency Operations

United States Government Accountability Office GAO September 2008 Report to Congressional Committees MILITARY OPERATIONS DOD Needs to Address Contract Oversight and Quality Assurance Issues for Contracts Used to Support Contingency Operations GAO-08-1087 September 2008 MILITARY OPERATIONS Highlights Highlights of GAO-08-1087, a report to congressional committees Accountability Integrity Reliabilit...
Date Sept. 26, 2008 Report No. GAO-08-1039 Title

Space Acquisitions: Uncertainties in the Evolved Expendable Launch Vehicle Program Pose Management and Oversight Challenges

United States Government Accountability Office GAO September 2008 Report to the Subcommittee on Defense, Committee on Appropriations, House of Representatives SPACE ACQUISITIONS Uncertainties in the Evolved Expendable Launch Vehicle Program Pose Management and Oversight Challenges GAO-08-1039 September 2008 SPACE ACQUISITIONS Highlights Highlights of GAO-08-1039, a report to the Subcommittee on De...
Date Sept. 17, 2008 Report No. GAO-08-1151T Title

Transportation Security: Transportation Worker Identification Credential: A Status Update

United States Government Accountability Office GAO For Release on Delivery Expected at 10:00 a.m. EDT Wednesday, September 17, 2008 Testimony Before the Subcommittee on Border, Maritime and Global Counterterrorism, Committee on Homeland Security, House of Representatives TRANSPORTATION SECURITY Transportation Worker Identification Credential: A Status Update Statement of Stephen M. Lord, Acting Di...
Date Sept. 10, 2008 Report No. GAO-08-993T Title

DCAA Audits: Allegations That Certain Audits at Three Locations Did Not Meet Professional Standards Were Substantiated

United States Government Accountability Office GAO For Release on Delivery Expected at 10:00 a.m. EDT Wednesday, September 10, 2008 Testimony Before the Committee on Homeland Security and Governmental Affairs, U.S. Senate DCAA AUDITS Allegations That Certain Audits at Three Locations Did Not Meet Professional Standards Were Substantiated Statement of Gregory D. Kutz, Managing Director Forensic Aud...
Date Aug. 18, 2008 Report No. GAO-08-871 Title

Pension Benefit Guaranty Corporation: Some Steps Have Been Taken to Improve Contracting, but a More Strategic Approach is Needed

United States Government Accountability Office GAO August 2008 Report to Congressional Requesters PENSION BENEFIT GUARANTY CORPORATION Some Steps Have Been Taken to Improve Contracting, but a More Strategic Approach Is Needed GAO-08-871 August 2008 Highlights Highlights of GAO-08-871, a report to congressional requesters Accountability Integrity Reliability PENSION BENEFIT GUARANTY CORPORATION Som...
Date July 31, 2008 Report No. GAO-08-966 Title

Rebuilding Iraq: DOD and State Department Have Improved Oversight and Coordination of Private Security Contractors in Iraq, but Further Actions Are Needed to Sustain Improvements

United States Government Accountability Office GAO July 2008 Report to Congressional Committees REBUILDING IRAQ DOD and State Department Have Improved Oversight and Coordination of Private Security Contractors in Iraq, but Further Actions Are Needed to Sustain Improvements This report was revised on August 1, 2008 to reflect a change to the text on page 2, in line 11 of the second paragraph, “pr...
Date July 22, 2008 Report No. GAO-08-857 Title

DCAA Audits: Allegations That Certain Audits at Three Locations Did Not Meet Professional Standards Were Substantiated

United States Government Accountability Office GAO July 2008 Report to Congressional Addressees DCAA AUDITS Allegations That Certain Audits at Three Locations Did Not Meet Professional Standards Were Substantiated GAO-08-857 July 2008 DCAA AUDITS Highlights Highlights of GAO-08-857, a report to congressional addressees Accountability Integrity Reliability Allegations That Certain Audits at Three L...
Date July 18, 2008 Report No. GAO-08-756 Title

Air Traffic Control: FAA Uses Earned Value Techniques to Help Manage Information Technology Acquisitions, but Needs to Clarify Policy and Strengthen Oversight

United States Government Accountability Office GAO July 2008 Report to Congressional Requesters AIR TRAFFIC CONTROL FAA Uses Earned Value Techniques to Help Manage Information Technology Acquisitions, but Needs to Clarify Policy and Strengthen Oversight GAO-08-756 a July 2008 AIR TRAFFIC CONTROL Highlights Highlights of GAO-08-756, a report to congressional requesters Accountability Integrity Reli...
Date July 11, 2008 Report No. GAO-08-764 Title

Broadcasting to Cuba: Weaknesses in Contracting Practices Reduced Visibility into Selected Award Decisions

United States Government Accountability Office GAO July 2008 Report to the Chairman, Subcommittee on International Organizations, Human Rights, and Oversight, Committee on Foreign Affairs, House of Representatives BROADCASTING TO CUBA Weaknesses in Contracting Practices Reduced Visibility into Selected Award Decisions GAO-08-764 July 2008 BROADCASTING TO CUBA Highlights Highlights of GAO-08-764, a...
Date July 1, 2008 Report No. GAO-08-902R Title

Depot Maintenance: DOD's Report to Congress on Its Public-Private Partnerships at Its Centers of Industrial and Technical Excellence (CITEs) Is Not Complete and Additional Information Would Be Useful

United States Government Accountability Office Washington, DC 20548 July 1, 2008 The Honorable Carl Levin Chairman The Honorable John McCain Ranking Member Committee on Armed Services United States Senate The Honorable Ike Skelton Chairman The Honorable Duncan L. Hunter Ranking Member Committee on Armed Services House of Representatives Subject: Depot Maintenance: DOD’s Report to Congress on Its...
Date June 24, 2008 Report No. GAO-08-745 Title

Coast Guard: Change in Course Improves Deepwater Management and Oversight, but Outcome Still Uncertain

United States Government Accountability Office GAO June 2008 Report to Congressional Committees COAST GUARD Change in Course Improves Deepwater Management and Oversight, but Outcome Still Uncertain GAO-08-745 June 2008 COAST GUARD Highlights Highlights of GAO-08-745, a report to congressional committees Accountability Integrity Reliability Change in Course Improves Deepwater Management and Oversig...
Date June 19, 2008 Report No. GAO-08-642R Title

Department of Energy: Information on Its Management of Costs and Liabilities for Contractors' Pension and Postretirement Benefit Plans

United States Government Accountability Office Washington, DC 20548 June 19, 2008 The Honorable Byron L. Dorgan Chairman The Honorable Pete V. Domenici Ranking Member Subcommittee on Energy and Water Development Committee on Appropriations United States Senate The Honorable Peter J. Visclosky Chairman The Honorable David L. Hobson Ranking Member Subcommittee on Energy and Water Development Committ...
Date June 16, 2008 Report No. GAO-08-437 Title

National Flood Insurance Program: Financial Challenges Underscore Need for Improved Oversight of Mitigation Programs and Key Contracts

United States Government Accountability Office GAO June 2008 Report to the Ranking Member, Committee on Banking, Housing, and Urban Affairs, U.S. Senate NATIONAL FLOOD INSURANCE PROGRAM Financial Challenges Underscore Need for Improved Oversight of Mitigation Programs and Key Contracts GAO-08-437 June 2008 NATIONAL FLOOD INSURANCE PROGRAM Highlights Highlights of GAO-08-437, a report to the Rankin...
Date June 11, 2008 Report No. GAO-08-886T Title

2010 Census: Plans for Decennial Census Operations and Technology Have Progressed, But Much Uncertainty Remains

United States Government Accountability Office GAO For Release on Delivery Expected at 10:00 a.m. EDT Wednesday, June 11, 2008 Testimony before the Committee on Oversight and Government Reform and the Subcommittee on Information Policy, Census, and National Archives, House of Representatives 2010 CENSUS Plans for Decennial Census Operations and Technology Have Progressed, But Much Uncertainty Rema...
Date June 4, 2008 Report No. GAO-08-368R Title

Management Report: Improvements Needed in IRS's Internal Controls

United States Government Accountability Office Washington, DC 20548 June 4, 2008 The Honorable Douglas H. Shulman Commissioner of Internal Revenue Subject: Management Report: Improvements Needed in IRS’s Internal Controls Dear Mr. Shulman: In November 2007, we issued our report on the results of our audit of the Internal Revenue Service’s (IRS) financial statements as of, and for the fiscal ye...
Date May 28, 2008 Report No. GAO-08-582 Title

Centers for Disease Control and Prevention: Human Capital Planning Has Improved, but Strategic View of Contractor Workforce Is Needed

United States Government Accountability Office GAO May 2008 Report to Congressional Requesters CENTERS FOR DISEASE CONTROL AND PREVENTION Human Capital Planning Has Improved, but Strategic View of Contractor Workforce Is Needed GAO-08-582 May 2008 Highlights Highlights of GAO-08-582, a report to congressional requesters Accountability Integrity Reliability CENTERS FOR DISEASE CONTROL AND PREVENTIO...
Date May 21, 2008 Report No. GAO-08-485 Title

Defense Contracting: Post-Government Employment of Former DOD Officials Needs Greater Transparency

United States Government Accountability Office GAO May 2008 Report to Congressional Committees DEFENSE CONTRACTING Post-Government Employment of Former DOD Officials Needs Greater Transparency GAO-08-485 May 2008 DEFENSE CONTRACTING Highlights Highlights of GAO-08-485, a report to congressional committees Accountability Integrity Reliability Post-Government Employment of Former DOD Officials Needs...
Date May 8, 2008 Report No. GAO-08-765T Title

Department of Homeland Security: Better Planning and Oversight Needed to Improve Complex Service Acquisition Outcomes

United States Government Accountability Office GAO For Release on Delivery Expected at 10:00 a.m. EDT Thursday, May 8, 2008 Testimony Before the Committee on Homeland Security, House of Representatives DEPARTMENT OF HOMELAND SECURITY Better Planning and Oversight Needed to Improve Complex Service Acquisition Outcomes Statement of John P. Hutton, Director Acquisition and Sourcing Management GAO-08-...
Date May 8, 2008 Report No. GAO-08-578 Title

Interagency Contracting: Need for Improved Information and Policy Implementation at the Department of State

United States Government Accountability Office GAO May 2008 Report to Congressional Committees INTERAGENCY CONTRACTING Need for Improved Information and Policy Implementation at the Department of State GAO-08-578 May 2008 INTERAGENCY CONTRACTING Highlights Highlights of GAO-08-578, a report to congressional committees Accountability Integrity Reliability Need for Improved Information and Policy Im...