Date June 19, 2006 Report No. GAO-06-739R Title

Defense Management: Attention Is Needed to Improve Oversight of DLA Prime Vendor Program

United States Government Accountability Office Washington, DC 20548 June 19, 2006 The Honorable John Warner Chairman The Honorable Carl Levin Ranking Minority Member Committee on Armed Services United State Senate The Honorable Duncan L. Hunter Chairman The Honorable Ike Skelton Ranking Minority Member Committee on Armed Services House of Representatives Subject: Defense Management: Attention Is N...
Date June 9, 2006 Report No. GAO-06-404 Title

Homeland Security: Contract Management and Oversight for Visitor and Immigrant Status Program Need to Be Strengthened

United States Government Accountability Office GAO June 2006 Report to Congressional Requesters HOMELAND SECURITY Contract Management and Oversight for Visitor and Immigrant Status Program Need to Be Strengthened GAO-06-404 June 2006 HOMELAND SECURITY Highlights Highlights of GAO-06-404, a report to congressional requesters Accountability Integrity Reliability Contract Management and Oversight for...
Date June 9, 2006 Report No. GAO-06-853R Title

FBI Trilogy: Responses to Posthearing Questions

United States Government Accountability Office Washington, DC 20548 June 9, 2006 The Honorable Arlen Specter Chairman Committee on the Judiciary United States Senate Subject: FBI Trilogy: Responses to Posthearing Questions Dear Mr. Chairman: This report responds to your request for additional information related to the committee’s May 2, 2006, hearing entitled FBI Oversight. Enclosed are our res...
Date June 7, 2006 Report No. GAO-06-594 Title

NOAA: Next Steps to Strengthen Its Acquisition Function

United States Government Accountability Office GAO June 2006 Report to the Chairman, Committee on Finance, U.S. Senate NOAA Next Steps to Strengthen Its Acquisition Function GAO-06-594 June 2006 NOAA Highlights Highlights of GAO-06-594, a report to the Chairman, Committee on Finance, U.S. Senate Accountability Integrity Reliability Next Steps to Strengthen Its Acquisition Function Why GAO Did This...
Date May 31, 2006 Report No. GAO-06-547 Title

Department of Energy, Office of Worker Advocacy: Deficient Controls Led to Millions of Dollars in Improper and Questionable Payments to Contractors

United States Government Accountability Office GAO May 2006 Report to Congressional Requesters DEPARTMENT OF ENERGY, OFFICE OF WORKER ADVOCACY Deficient Controls Led to Millions of Dollars in Improper and Questionable Payments to Contractors GAO-06-547 a Ma 2006 May Highlights Highlights of GAO-06-547, a report to congressional requesters Accountability Integrity Reliability DEPARTMENT OF ENERGY, ...
Date May 31, 2006 Report No. GAO-06-623 Title

United States Coast Guard: Improvements Needed in Management and Oversight of Rescue System Acquisition

United States Government Accountability Office GAO May 2006 Report to Congressional Committees UNITED STATES COAST GUARD Improvements Needed in Management and Oversight of Rescue System Acquisition GAO-06-623 May 2006 UNITED STATES COAST GUARD Highlights Highlights of GAO-06-623, a report to congressional committees Accountability Integrity Reliability Improvements Needed in Management and Oversig...
Date May 24, 2006 Report No. GAO-06-803T Title

Capitol Visitor Center: Update on Status of Projects's Schedule and Cost As of May 24, 2006

United States Government Accountability Office GAO For Release on Delivery Expected at 10:00 a.m. EDT Wednesday, May 24, 2006 Testimony Before the Subcommittee on the Legislative Branch, Committee on Appropriations, U.S. Senate CAPITOL VISITOR CENTER Update on Status of Projects’s Schedule and Cost As of May 24, 2006 Statement of Terrell Dorn, Director Bernard L. Ungar, Director Physical Infrast...
Date May 4, 2006 Report No. GAO-06-714T Title

Hurricane Katrina: Improving Federal Contracting Practices in Disaster Recovery Operations

United States Government Accountability Office GAO For Release on Delivery Expected at 10:00 a.m. EDT Thursday, May 4, 2006 Testimony Before the Committee on Government Reform, House of Representatives HURRICANE KATRINA Improving Federal Contracting Practices in Disaster Recovery Operations Statement of William T. Woods, Director Acquisition and Sourcing Management GAO-06-714T May 4, 2006 HURRICAN...
Date May 2, 2006 Report No. GAO-06-698T Title

Federal Bureau of Investigation: Weak Controls over Trilogy Project Led to Payment of Questionable Contractor Costs and Missing Assets

United States Government Accountability Office GAO For Release on Delivery Expected at 9:30 a.m. EDT Tuesday, May 2, 2006 Testimony Before the Committee on the Judiciary, U.S. Senate FEDERAL BUREAU OF INVESTIGATION Weak Controls over Trilogy Project Led to Payment of Questionable Contractor Costs and Missing Assets Statement of Linda M. Calbom, Director Financial Management and Assurance GAO-06-69...
Date April 27, 2006 Report No. GAO-06-665T Title

Capitol Visitor Center: Update on Status of Project's Schedule and Cost as of April 27, 2006

United States Government Accountability Office GAO For Release on Delivery Expected at 10:30 a.m. EDT Thursday, April 27, 2006 Testimony Before the Subcommittee on the Legislative Branch, Committee on Appropriations, U.S. Senate CAPITOL VISITOR CENTER Update on Status of Project’s Schedule and Cost as of April 27, 2006 Statement of Terrell Dorn, Director Bernard L. Ungar, Director Physical Infra...
Date April 10, 2006 Report No. GAO-06-622T Title

Hurricane Katrina: Planning for and Management of Federal Disaster Recovery Contracts

United States Government Accountability Office GAO For Release on Delivery Expected at 11:30 a.m. CDT Monday, April 10, 2006 Testimony before the Subcommittee on Federal Financial Management, Government Information, and International Security, Committee on Homeland Security and Governmental Affairs, U.S. Senate HURRICANE KATRINA Planning for and Management of Federal Disaster Recovery Contracts St...
Date April 3, 2006 Report No. GAO-06-284 Title

Contract Security Guards: Army's Guard Program Requires Greater Oversight and Reassessment of Acquisition Approach

United States Government Accountability Office GAO April 2006 Report to Congressional Requesters CONTRACT SECURITY GUARDS Army’s Guard Program Requires Greater Oversight and Reassessment of Acquisition Approach GAO-06-284 April 2006 CONTRACT SECURITY GUARDS Highlights Highlights of GAO-06-284, a report to congressional requesters Accountability Integrity Reliability Army’s Guard Program Requir...
Date March 15, 2006 Report No. GAO-06-461R Title

Government Operations: Agency Management of Contractors Responding to Hurricanes Katrina and Rita

United States Government Accountability Office Washington, DC 20548 March 16, 2006 Congressional Committees Subject: Agency Management of Contractors Responding to Hurricanes Katrina and Rita In February 2006, we briefed the staffs of your committees on the results of our review of various contracting issues related to the Gulf Coast hurricanes. We conducted this work under the Comptroller General...
Date March 15, 2006 Report No. GAO-06-528T Title

Capitol Visitor Center: Status of Project's Schedule and Cost as of March 15, 2006

United States Government Accountability Office GAO For Release on Delivery Expected at 10:30 a.m. EST Wednesday, March 15, 2006 Testimony Before the Subcommittee on the Legislative Branch, Committee on Appropriations, U.S. Senate CAPITOL VISITOR CENTER Status of Project’s Schedule and Cost as of March 15, 2006 Statement of Bernard L. Ungar, Director Terrell Dorn Assistant Director Physical Infra...
Date Feb. 28, 2006 Report No. GAO-06-306 Title

Federal Bureau of Investigation: Weak Controls over Trilogy Project Led to Payment of Questionable Contractor Costs and Missing Assets

United States Government Accountability Office GAO February 2006 Report to Congressional Requesters FEDERAL BUREAU OF INVESTIGATION Weak Controls over Trilogy Project Led to Payment of Questionable Contractor Costs and Missing Assets GAO-06-306 a February 2006 FEDERAL BUREAU OF INVESTIGATION Highlights Highlights of GAO-06-306, a report to congressional requesters Accountability Integrity Reliabil...
Date Feb. 8, 2006 Report No. GAO-06-270 Title

Federal Contact Centers: Mechanism for Sharing Metrics and Oversight Practices along with Improved Data Needed

United States Government Accountability Office GAO February 2006 Report to Congressional Requesters FEDERAL CONTACT CENTERS Mechanism for Sharing Metrics and Oversight Practices along with Improved Data Needed GAO-06-270 February 2006 FEDERAL CONTACT CENTERS Highlights Highlights of GAO-06-270, a report to congressional requesters Accountability Integrity Reliability Mechanism for Sharing Metrics ...
Date Jan. 13, 2006 Report No. GAO-06-305 Title

Media Contracts: Activities and Financial Obligations for Seven Federal Departments

United States Government Accountability Office GAO January 2006 Report to Congressional Requesters MEDIA CONTRACTS Activities and Financial Obligations for Seven Federal Departments GAO-06-305 January 2005 MEDIA CONTRACTS Highlights Highlights of GAO-06-305, a report to congressional requesters Accountability Integrity Reliability Activities and Financial Obligations for Seven Federal Departments ...
Date Dec. 21, 2005 Report No. GAO-06-302R Title

Information Technology: Responses to Subcommittee Post-Hearing Questions Regarding the FBI's Management Practices and Acquisition of a New Investigative Case Management System

United States Government Accountability Office Washington, DC 20548 December 21, 2005 The Honorable Frank R. Wolf Chairman, Subcommittee on Science, the Departments of State, Justice, and Commerce, and Related Agencies Committee on Appropriations House of Representatives Subject: Information Technology: Responses to Subcommittee Post-hearing Questions Regarding the FBI’s Management Practices and...
Date Nov. 16, 2005 Report No. GAO-06-251T Title

Capitol Visitor Center: Update on Schedule and Cost

United States Government Accountability Office GAO For Release on Delivery Expected at 11:00 a.m. EST Wednesday, November 16, 2005 Testimony Before the Subcommittee on the Legislative Branch, Committee on Appropriations, U.S. Senate CAPITOL VISITOR CENTER Update on Schedule and Cost Statement of Bernard L. Ungar, Director Terrell Dorn, Assistant Director Physical Infrastructure Issues GAO-06-251T ...
Date Nov. 8, 2005 Report No. GAO-06-246T Title

Hurricanes Katrina and Rita: Preliminary Observations on Contracting for Response and Recovery Efforts

United States Government Accountability Office GAO For Release on Delivery Expected at 10:00 a.m. EST Tuesday, November 8, 2005 Testimony Before the Senate Committee on Small Business and Entrepreneurship HURRICANES KATRINA AND RITA Preliminary Observations on Contracting for Response and Recovery Efforts Statement of David E. Cooper, Director Acquisition and Sourcing Management GAO-06-246T Novemb...
Date Nov. 2, 2005 Report No. GAO-06-235T Title

Hurricanes Katrina and Rita: Contracting for Response and Recovery Efforts

United States Government Accountability Office GAO For Release on Delivery Expected at 1:00 p.m. EST Wednesday, November 2, 2005 Testimony Before the House Select Bipartisan Committee to Investigate the Preparation for and Response to Hurricane Katrina HURRICANES KATRINA AND RITA Contracting for Response and Recovery Efforts Statement of David E. Cooper, Director, Acquisition and Sourcing Manageme...
Date Oct. 18, 2005 Report No. GAO-06-180T Title

Capitol Visitor Center: Status of Schedule, Fire Protection, Cost, and Related Issues

United States Government Accountability Office GAO For Release on Delivery Expected at 10:30 a.m. EDT Tuesday, October 18, 2005 Testimony Before the Subcommittee on the Legislative Branch, Committee on Appropriations, U.S. Senate CAPITOL VISITOR CENTER Status of Schedule, Fire Protection, Cost, and Related Issues Statement of Bernard L. Ungar, Director Terrell Dorn, Assistant Director Physical Inf...
Date Sept. 15, 2005 Report No. GAO-05-1037T Title

Capitol Visitor Center: Schedule Delays Continue; Reassessment Underway

United States Government Accountability Office GAO For Release on Delivery Expected at 10:30 a.m. EDT Thursday, September 15, 2005 Testimony Before the Subcommittee on the Legislative Branch, Committee on Appropriations, U.S. Senate CAPITOL VISITOR CENTER Schedule Delays Continue; Reassessment Underway Statement of Bernard L. Ungar, Director Terrell Dorn, Assistant Director Physical Infrastructure...
Date Sept. 9, 2005 Report No. GAO-05-363 Title

Information Technology: FBI Is Taking Steps to Develop an Enterprise Architecture, but Much Remains to Be Accomplished

United States Government Accountability Office GAO September 2005 Report to Congressional Committees INFORMATION TECHNOLOGY FBI Is Taking Steps to Develop an Enterprise Architecture, but Much Remains to Be Accomplished GAO-05-363 a September 2005 INFORMATION TECHNOLOGY Highlights Highlights of GAO-05-363, a report to congressional requesters Accountability Integrity Reliability FBI Is Taking Steps...
Date Aug. 17, 2005 Report No. GAO-05-873 Title

Medicare Contracting Reform: CMS's Plan Has Gaps and Its Anticipated Savings Are Uncertain

United States Government Accountability Office GAO August 2005 Report to Congressional Committees MEDICARE CONTRACTING REFORM CMS’s Plan Has Gaps and Its Anticipated Savings Are Uncertain GAO-05-873 August 2005 MEDICARE CONTRACTING REFORM Highlights Highlights of GAO-05-873, a report to congressional committees Accountability Integrity Reliability CMS’s Plan Has Gaps and Its Anticipated Saving...
Date July 29, 2005 Report No. GAO-05-479 Title

Federal Procurement: Additional Data Reporting Could Improve the Suspension and Debarment Process

United States Government Accountability Office GAO July 2005 Report to Congressional Committees FEDERAL PROCUREMENT Additional Data Reporting Could Improve the Suspension and Debarment Process GAO-05-479 July 2005 FEDERAL PROCUREMENT Highlights Highlights of GAO-05-479, a report to congressional committees Accountability Integrity Reliability Additional Data Reporting Could Improve the Suspension ...
Date July 15, 2005 Report No. GAO-05-681 Title

Industrial Security: DOD Cannot Ensure Its Oversight of Contractors under Foreign Influence Is Sufficient

United States Government Accountability Office GAO July 2005 Report to the Committee on Armed Services, U.S. Senate INDUSTRIAL SECURITY DOD Cannot Ensure Its Oversight of Contractors under Foreign Influence Is Sufficient GAO-05-681 July 2005 INDUSTRIAL SECURITY Highlights Highlights of GAO-05-681, a report to Committee on Armed Services, U.S. Senate Accountability Integrity Reliability DOD Cannot ...
Date July 14, 2005 Report No. GAO-05-910T Title

Capitol Visitor Center: Update on Status of Project's Schedule and Costs

United States Government Accountability Office GAO For Release on Delivery Expected at 10:30 a.m. EDT Thursday, July 14, 2005 Testimony Before the Subcommittee on the Legislative Branch, Committee on Appropriations, U.S. Senate CAPITOL VISITOR CENTER Update on Status of Project’s Schedule and Costs Statement of Bernard L. Ungar, Director Terrell Dorn, Assistant Director Physical Infrastructure I...
Date June 14, 2005 Report No. GAO-05-811T Title

Capitol Visitor Center: Effective Schedule Management and Updated Cost Information Are Needed

United States Government Accountability Office GAO For Release on Delivery Expected at 10:30 a.m. EDT Tuesday, June 14, 2005 Testimony Before the Subcommittee on the Legislative Branch, Committee on Appropriations, U.S. Senate CAPITOL VISITOR CENTER Effective Schedule Management and Updated Cost Information Are Needed Statement of Bernard L. Ungar, Director Terrell Dorn, Assistant Director Physica...
Date June 3, 2005 Report No. GAO-05-580R Title

Fair Labor Standards Act: Labor Made Key Decisions in Studies of Updated Overtime Rule and Contractor Provided Support

United States Government Accountability Office Washington, DC 20548 June 3, 2005 The Honorable George Miller Ranking Minority Member Committee on Education and the Workforce House of Representatives Subject: Fair Labor Standards Act: Labor Made Key Decisions in Studies of Updated Overtime Rule and Contractor Provided Support Dear Mr. Miller: In 2004, the Department of Labor (Labor) updated the rul...
Date May 17, 2005 Report No. GAO-05-714T Title

Capitol Visitor Center: Priority Attention Needed to Manage Schedules and Contracts

United States Government Accountability Office GAO For Release on Delivery Expected at 10:30 a.m. EDT Tuesday, May 17, 2005 Testimony Before the Subcommittee on the Legislative Branch, Committee on Appropriations, U.S. Senate CAPITOL VISITOR CENTER Priority Attention Needed to Manage Schedules and Contracts Statement of David M. Walker Comptroller General of the United States GAO-05-714T Mr. Chair...
Date May 13, 2005 Report No. GAO-05-459 Title

Department of Energy: Improved Oversight Could Better Ensure Opportunities for Small Business Subcontracting

United States Government Accountability Office GAO May 2005 Report to Congressional Committees DEPARTMENT OF ENERGY Improved Oversight Could Better Ensure Opportunities for Small Business Subcontracting GAO-05-459 May 2005 DEPARTMENT OF ENERGY Highlights Highlights of GAO-05-459, a report to congressional committees Accountability Integrity Reliability Improved Oversight Could Better Ensure Opport...
Date May 12, 2005 Report No. GAO-05-433 Title

Defense Infrastructure: Management Issue Requiring Attention in Utility Privatization

United States Government Accountability Office GAO May 2005 Report to the Subcommittee on Readiness, Committee on Armed Services, House of Representatives DEFENSE INFRASTRUCTURE Management Issues Requiring Attention in Utility Privatization GAO-05-433 a May 2005 DEFENSE INFRASTRUCTURE Highlights Highlights of GAO-05-433, a report to the Subcommittee on Readiness, Committee on Armed Services, House...
Date April 22, 2005 Report No. GAO-05-362 Title

Information Security: Improving Oversight of Access to Federal Systems and Data by Contractors Can Reduce Risk

United States Government Accountability Office GAO April 2005 Report to Congressional Requesters INFORMATION SECURITY Improving Oversight of Access to Federal Systems and Data by Contractors Can Reduce Risk GAO-05-362 a Contents Letter Results in Brief Background Federal Agencies Face a Range of Risks from Contractors and Other Users of Federal Data and Systems Agencies Use Various Methods for Ove...
Date March 21, 2005 Report No. GAO-05-328 Title

Defense Logistics: High-Level DOD Coordination Is Needed to Further Improve the Management of the Army's LOGCAP Contract

United States Government Accountability Office GAO March 2005 Report to the Secretary of Defense DEFENSE LOGISTICS High-Level DOD Coordination Is Needed to Further Improve the Management of the Army’s LOGCAP Contract GAO-05-328 a March 2005 DEFENSE LOGISTICS Highlights Highlights of GAO-05-328, a report to the Secretary of Defense Accountability Integrity Reliability High-Level DOD Coordination ...
Date March 18, 2005 Report No. GAO-05-123 Title

Department of Energy: Further Actions Are Needed to Strengthen Contract Management for Major Projects

United States Government Accountability Office GAO March 2005 Report to the Committee on Government Reform, House of Representatives DEPARTMENT OF ENERGY Further Actions Are Needed to Strengthen Contract Management for Major Projects GAO-05-123 a March 2005 DEPARTMENT OF ENERGY Further Actions Are Needed to Strengthen Contract Management for Major Projects Highlights of GAO-05-123, a report to the...
Date March 17, 2005 Report No. GAO-05-274 Title

Contract Management: Opportunities to Improve Surveillance on Department of Defense Service Contracts

United States Government Accountability Office GAO March 2005 Report to the Secretary of Defense CONTRACT MANAGEMENT Opportunities to Improve Surveillance on Department of Defense Service Contracts GAO-05-274 a March 2005 CONTRACT MANAGEMENT Highlights Highlights of GAO-05-274, a report to the Secretary of Defense Accountability Integrity Reliability Opportunities to Improve Surveillance on Depart...
Date Dec. 20, 2004 Report No. GAO-05-73 Title

Defense Inventory: DOD and Prime Contractors Adhered to Requirements in Selected Contracts for Overseeing Spare Parts Quality

United States Government Accountability Office GAO December 2004 Report to the Senate and House Subcommittees on Defense, Committees on Appropriations DEFENSE INVENTORY DOD and Prime Contractors Adhered to Requirements in Selected Contracts for Overseeing Spare Parts Quality GAO-05-73 a December 2004 DEFENSE INVENTORY Highlights Highlights of GAO-05-73, a report to the Senate and House Subcommitte...
Date July 23, 2004 Report No. GAO-04-779 Title

Defense Inventory: Navy Needs to Improve the Management Over Government-Furnished Material Shipped to Its Repair Contractors

United States Government Accountability Office GAO July 2004 Report to Congressional Requesters DEFENSE INVENTORY Navy Needs to Improve the Management Over GovernmentFurnished Material Shipped to Its Repair Contractors GAO-04-779 a July 2004 DEFENSE INVENTORY Navy Needs to Improve the Management Over Government-Furnished Material Shipped to Its Repair Contractors Highlights of GAO-04-779, a report...
Date July 19, 2004 Report No. GAO-04-854 Title

Military Operations: DOD's Extensive Use of Logistics Support Contracts Requires Strengthened Oversight

United States Government Accountability Office GAO July 2004 Report to Congressional Requesters MILITARY OPERATIONS DOD’s Extensive Use of Logistics Support Contracts Requires Strengthened Oversight GAO-04-854 July 2004 MILITARY OPERATIONS DOD's Extensive Use of Logistics Support Contracts Requires Strengthened Oversight Highlights of GAO-04-854, a report to the Ranking Minority Member, House Co...
Date June 30, 2004 Report No. GAO-04-750 Title

District of Columbia Jail: Medical Services Generally Met Requirements and Costs Decreased, but Oversight Is Incomplete

United States General Accounting Office GAO June 2004 Report to the Chairman, Committee on Government Reform, House of Representatives DISTRICT OF COLUMBIA JAIL Medical Services Generally Met Requirements and Costs Decreased, but Oversight Is Incomplete GAO-04-750 June 2004 DISTRICT OF COLUMBIA JAIL Medical Services Generally Met Requirements and Costs Decreased, but Oversight Is Incomplete Highli...
Date June 25, 2004 Report No. GAO-04-545 Title

National Nuclear Security Administration: Key Management Structure and Workforce Planning Issues Remain As NNSA Conducts Downsizing

United States General Accounting Office GAO June 2004 Report to the Chairman, Subcommittee on Strategic Forces, Committee on Armed Services, U.S. Senate NATIONAL NUCLEAR SECURITY ADMINISTRATION Key Management Structure and Workforce Planning Issues Remain As NNSA Conducts Downsizing GAO-04-545 a June 2004 NATIONAL NUCLEAR SECURITY ADMINISTRATION Highlights of GAO-04-545, a report to the Chairman, ...
Date June 22, 2004 Report No. GAO-04-718 Title

Contract Management: Further Efforts Needed to Sustain VA's Progress in Purchasing Medical Products and Services

United States General Accounting Office GAO June 2004 Report to the Committee on Government Reform, House of Representatives CONTRACT MANAGEMENT Further Efforts Needed to Sustain VA’s Progress in Purchasing Medical Products and Services GAO-04-718 a June 2004 CONTRACT MANAGEMENT Further Efforts Needed to Sustain VA’s Progress in Purchasing Medical Products and Services Highlights of GAO-04-718...
Date June 15, 2004 Report No. GAO-04-869T Title

Contract Management: Contracting for Iraq Reconstruction and for Global Logistics Support

United States General Accounting Office GAO For Release on Delivery Expected at 11:00 a.m. EDT June 15, 2004 Testimony Before the Committee on Government Reform, House of Representatives CONTRACT MANAGEMENT Contracting for Iraq Reconstruction and for Global Logistics Support Statement of David M. Walker Comptroller General of the United States GAO-04-869T Chairman Davis, Ranking Member Waxman, and...
Date June 9, 2004 Report No. GAO-04-611 Title

Nuclear Waste: Absence of Key Management Reforms on Hanford's Cleanup Project Adds to Challenges of Achieving Cost and Schedule Goals

United States General Accounting Office GAO June 2004 Report to the Committee on Government Reform, House of Representatives NUCLEAR WASTE Absence of Key Management Reforms on Hanford’s Cleanup Project Adds to Challenges of Achieving Cost and Schedule Goals GAO-04-611 a June 2004 NUCLEAR WASTE Absence of Key Management Reforms on Hanford's Cleanup Project Adds to Challenges of Achieving Cost and...
Date April 5, 2004 Report No. GAO-04-381 Title

Contract Management: DOD Needs Measures for Small Business Subcontracting Program and Better Data on Foreign Subcontracts

United States General Accounting Office GAO April 2004 Report to the Committee on Small Business, House of Representatives CONTRACT MANAGEMENT DOD Needs Measures for Small Business Subcontracting Program and Better Data on Foreign Subcontracts GAO-04-381 April 2004 CONTRACT MANAGEMENT DOD Needs Measures for Small Business Subcontracting Program and Better Data on Foreign Subcontracts Highlights of...
Date March 9, 2004 Report No. GAO-04-380 Title

Contract Management: Coast Guard's Deepwater Program Needs Increased Attention to Management and Contractor Oversight

United States General Accounting Office GAO March 2004 Report to the Ranking Minority Member, Committee on Commerce, Science, and Transportation, U.S. Senate CONTRACT MANAGEMENT Coast Guard’s Deepwater Program Needs Increased Attention to Management and Contractor Oversight GAO-04-380 March 2004 CONTRACT MANAGEMENT Coast Guard's Deepwater Program Needs Increased Attention to Management and Contr...
Date Oct. 3, 2003 Report No. GAO-04-155R Title

Government Operations: Questions for Competitive Sourcing Hearing Record

Comptroller General of the United States United States General Accounting Office Washington, DC 20548 October 3, 2003 The Honorable George V. Voinovich Chairman The Honorable Richard J. Durbin Ranking Member Subcommittee on Oversight of Government Management, the Federal Workforce, and the District of Columbia Committee on Governmental Affairs United States Senate Subject: Questions for Competitiv...
Date July 10, 2003 Report No. GAO-03-932T Title

Contract Reform: DOE's Policies and Practices in Competing Research Laboratory Contracts

United States General Accounting Office GAO For Release on Delivery Expected at 10:00 a.m. EDT Thursday, July 10, 2003 Testimony Before the Subcommittee on Energy, Committee on Science, House of Representatives CONTRACT REFORM DOE’s Policies and Practices in Competing Research Laboratory Contracts Statement of Robin M. Nazzaro, Director, Natural Resources and Environment GAO-03-932T July 10, 200...
Date July 10, 2003 Report No. GAO-03-832R Title

National Science Foundation: Status of the Business Analysis Plan Contract

Enclosure United States General Accounting Office Washington, DC 20548 July 10, 2003 The Honorable Christopher S. Bond Chairman, Subcommittee on VA, HUD, and Independent Agencies Committee on Appropriations United States Senate Subject: National Science Foundation: Status of the Business Analysis Plan Contract Dear Mr. Chairman: In June 2002, the National Science Foundation (NSF) awarded a 3-year,...