Date Report No. Title
Date Dec. 8, 2011 Report No. GAO-12-192R Title

Homeland Security: Transportation Security Infrastructure Modernization May Enhance DHS Screening Capabilities, but It Is Too Early to Assess Results

United States Government Accountability Office Washington, DC 20548 December 8, 2011 The Honorable John D. Rockefeller, IV Chairman Committee on Commerce, Science, and Transportation United States Senate Subject: Transportation Security Infrastructure Modernization May Enhance DHS Screening Capabilities, but It Is Too Early to Assess Results Dear Mr. Chairman: Securing transportation systems and f...
Date Nov. 22, 2011 Report No. GAO-12-66 Title

Immigration Benefits: Consistent Adherence to DHS's Acquisition Policy Could Help Improve Transformation Program Outcomes

GAO November 2011 United States Government Accountability Office Report to Congressional Requesters IMMIGRATION BENEFITS Consistent Adherence to DHS’s Acquisition Policy Could Help Improve Transformation Program Outcomes GAO-12-66 November 2011 IMMIGRATION BENEFITS Consistent Adherence to DHS’s Acquisition Policy Could Help Improve Transformation Program Outcomes Highlights of GAO-12-66, a rep...
Date Oct. 6, 2011 Report No. GAO-12-127T Title

Suspension and Debarment: Some Agency Programs Need Greater Attention, and Governmentwide Oversight Could Be Improved

United States Government Accountability Office GAO For Release on Delivery Expected at 9:30 a.m. EDT Thursday, October 6, 2011 Testimony Before the Subcommittee on Technology, Information Policy, Intergovernmental Relations and Procurement Reform, Committee on Oversight and Government Reform, House of Representatives SUSPENSION AND DEBARMENT Some Agency Programs Need Greater Attention, and Governm...
Date Sept. 28, 2011 Report No. GAO-11-892 Title

Defense Acquisition Workforce: Better Identification, Development, and Oversight Needed for Personnel Involved in Acquiring Services

United States Government Accountability Office GAO September 2011 Report to Congressional Committees DEFENSE ACQUISITION WORKFORCE Better Identification, Development, and Oversight Needed for Personnel Involved in Acquiring Services GAO-11-892 September 2011 DEFENSE ACQUISITION WORKFORCE Better Identification, Development, and Oversight Needed for Personnel Involved in Acquiring Services Highlight...
Date Sept. 6, 2011 Report No. GAO-11-794 Title

Federal Bureau of Investigation: Actions Taken to Address Most Procurement Recommendations

United States Government Accountability Office GAO September 2011 Report to the Ranking Member, Committee on the Judiciary, U.S. Senate FEDERAL BUREAU OF INVESTIGATION Actions Taken to Address Most Procurement Recommendations GAO-11-794 September 2011 FEDERAL BUREAU OF INVESTIGATION Actions Taken to Address Most Procurement Recommendations Highlights of GAO-11-794, a report to the Ranking Member, ...
Date July 28, 2011 Report No. GAO-11-581 Title

Information Technology: DHS Needs to Improve Its Independent Acquisition Reviews

United States Government Accountability Office GAO July 2011 Report to Congressional Committees INFORMATION TECHNOLOGY DHS Needs to Improve Its Independent Acquisition Reviews GAO-11-581 July 2011 INFORMATION TECHNOLOGY DHS Needs to Improve Its Independent Acquisition Reviews Highlights of GAO-11-581, a report to congressional committees Why GAO Did This Study Since its creation in 2003, the Depar...
Date July 7, 2011 Report No. GAO-11-640 Title

Defense Acquisitions: DOD Can Improve Its Management of Configuration Steering Boards

United States Government Accountability Office GAO July 2011 Report to the Committee on Armed Services, U.S. Senate DEFENSE ACQUISITIONS DOD Can Improve Its Management of Configuration Steering Boards GAO-11-640 July 2011 DEFENSE ACQUISITIONS DOD Can Improve Its Management of Configuration Steering Boards Highlights of GAO-11-640, a report to the Committee on Armed Services, U.S. Senate Why GAO Di...
Date June 30, 2011 Report No. GAO-11-682R Title

Military Uniforms: Issues Related to the Supply of Flame Resistant Fibers for the Production of Military Uniforms

United States Government Accountability Office Washington, DC 20548 June 30, 2011 The Honorable Carl Levin Chairman The Honorable John McCain Ranking Member Committee on Armed Services United States Senate The Honorable Buck McKeon Chairman The Honorable Adam Smith Ranking Member Committee on Armed Services House of Representatives Subject: Military Uniforms: Issues Related to the Supply of Flame ...
Date June 30, 2011 Report No. GAO-11-706R Title

International Affairs: The U.S. Government Is Establishing Procedures for a Procurement Ban against Firms that Sell Iran Technology to Disrupt Communications but Has Not Identified Any Firms

United States Government Accountability Office Washington, DC 20548 June 30, 2011 Congressional Committees: Subject: The U.S. Government Is Establishing Procedures for a Procurement Ban against Firms that Sell Iran Technology to Disrupt Communications but Has Not Identified Any Firms The U.S. Congress has found that the Iranian government continues to engage in systematic and ongoing violations of...
Date June 13, 2011 Report No. GAO-11-717R Title

National Defense: Legislative Restrictions on Contractor Use of Mandatory Arbitration Agreements Have Had No Reported Impacts on National Security

United States Government Accountability Office Washington, DC 20548 June 13, 2011 Congressional Committees Subject: Legislative Restrictions on Contractor Use of Mandatory Arbitration Agreements Have Had No Reported Impacts on National Security Section 8102 of the Department of Defense (DOD) and Full-Year Continuing Appropriations Act for fiscal year 2011 directed us to evaluate the effect on nati...
Date May 11, 2011 Report No. GAO-11-469 Title

Defense Acquisition: DOD Should Clarify Requirements for Assessing and Documenting Technical-Data Needs

United States Government Accountability Office GAO May 2011 Report to the Subcommittee on Oversight and Investigations, Committee on Armed Services, House of Representatives DEFENSE ACQUISITION DOD Should Clarify Requirements for Assessing and Documenting Technical-Data Needs GAO-11-469 May 2011 DEFENSE ACQUISITION Accountability • Integrity • Reliability DOD Should Clarify Requirements for As...
Date March 25, 2011 Report No. GAO-11-380R Title

Defense Acquisitions: Application of Lessons Learned and Best Practices in the Presidential Helicopter Program

United States Government Accountability Office Washington, DC 20548 March 25, 2011 Congressional Committees Subject: Defense Acquisitions: Application of Lessons Learned and Best Practices in the Presidential Helicopter Program In June 2009, following the expenditure of close to $3 billion and a critical Nunn1 McCurdy breach of the cost growth threshold, the Department of Defense (DOD) 2 terminate...
Date Jan. 7, 2011 Report No. GAO-11-240R Title

National Defense: DOD's 2010 Comprehensive Inventory Management Improvement Plan Addressed Statutory Requirements, But Faces Implementation Challenges

United States Government Accountability Office Washington, DC 20548 January 7, 2011 Congressional Committees Subject: DOD’s 2010 Comprehensive Inventory Management Improvement Plan Addressed Statutory Requirements, But Faces Implementation Challenges The Department of Defense (DOD) spends billions of dollars to purchase, manage, store, track, and deliver spare parts and other supplies needed to ...
Date Dec. 21, 2010 Report No. GAO-11-179R Title

Missile Defense: European Phased Adaptive Approach Acquisitions Face Synchronization, Transparency, and Accountability Challenges

United States Government Accountability Office Washington, DC 20548 December 21, 2010 The Honorable James R. Langevin Chairman The Honorable Michael R. Turner Ranking Member Subcommittee on Strategic Forces Committee on Armed Services House of Representatives Subject: Missile Defense: European Phased Adaptive Approach Acquisitions Face Synchronization, Transparency, and Accountability Challenges T...
Date Sept. 30, 2010 Report No. GAO-10-911T Title

Department of Homeland Security: Progress Made in Implementation and Transformation of Management Functions, but More Work Remains

United States Government Accountability Office GAO For Release on Delivery Expected at 2:30 p.m. EST Thursday, September 30, 2010 Testimony Before the Subcommittee on Oversight of Government Management, the Federal Workforce, and the District of Columbia, Committee on Homeland Security and Governmental Affairs, U.S. Senate DEPARTMENT OF HOMELAND SECURITY Progress Made in Implementation and Transfo...
Date July 27, 2010 Report No. GAO-10-790 Title

Coast Guard: Deepwater Requirements, Quantities, and Cost Require Revalidation to Reflect Knowledge Gained

United States Government Accountability Office GAO July 2010 Report to Congressional Committees COAST GUARD Deepwater Requirements, Quantities, and Cost Require Revalidation to Reflect Knowledge Gained GAO-10-790 July 2010 COAST GUARD Highlights Highlights of GAO-10-790, a report to congressional committees Accountability Integrity Reliability Deepwater Requirements, Quantities, and Cost Require R...
Date July 26, 2010 Report No. GAO-10-833 Title

Federal Contracting: Opportunities Exist to Increase Competition and Assess Reasons When Only One Offer Is Received

United States Government Accountability Office GAO July 2010 Report to the Committee on Oversight and Government Reform, House of Representatives FEDERAL CONTRACTING Opportunities Exist to Increase Competition and Assess Reasons When Only One Offer Is Received GAO-10-833 July 2010 FEDERAL CONTRACTING Highlights Highlights of GAO-10-833, a report to the Committee on Oversight and Government Reform,...
Date June 30, 2010 Report No. GAO-10-862T Title

Contracting Strategies: Better Data and Management Needed to Leverage Value of Interagency and Enterprisewide Contracts

United States Government Accountability Office GAO For Release on Delivery Expected at 2:30 p.m. EDT Wednesday, June 30, 2010 Testimony Before the Subcommittee on Contracting Oversight, Committee on Homeland Security and Governmental Affairs, U.S. Senate CONTRACTING STRATEGIES Better Data and Management Needed to Leverage Value of Interagency and Enterprisewide Contracts Statement of John K. Needh...
Date April 29, 2010 Report No. GAO-10-367 Title

Contracting Strategies: Data and Oversight Problems Hamper Opportunities to Leverage Value of Interagency and Enterprisewide Contracts

United States Government Accountability Office GAO April 2010 Report to Congressional Requesters CONTRACTING STRATEGIES Data and Oversight Problems Hamper Opportunities to Leverage Value of Interagency and Enterprisewide Contracts GAO-10-367 April 2010 CONTRACTING STRATEGIES Highlights Highlights of GAO-10-367, a report to congressional requesters Accountability Integrity Reliability Data and Over...
Date March 10, 2010 Report No. GAO-10-493T Title

Defense Acquisitions: Opportunities for the Army to Position Its Ground Force Modernization Efforts for Success

United States Government Accountability Office GAO For Release on Delivery Expected at 2:00 p.m. EDT Wednesday, March 10, 2010 Testimony Before the Subcommittee on Air and Land Forces, Committee on Armed Services, House of Representatives DEFENSE ACQUISITIONS Opportunities for the Army to Position Its Ground Force Modernization Efforts for Success Statement of Michael J. Sullivan, Director Acquisi...
Date Dec. 10, 2009 Report No. GAO-10-297T Title

Smithsonian Institution: Governance and Facilities Reforms Progressing, but Work Remains

United States Government Accountability Office GAO For Release on Delivery Expected at 10:00 a.m. EST December 10, 2009 Testimony Before the Subcommittee on Interior, Environment, and Related Agencies, Committee on Appropriations, House of Representatives SMITHSONIAN INSTITUTION Governance and Facilities Reforms Progressing, but Work Remains Statement of Mark L. Goldstein, Director Physical Infras...
Date Dec. 10, 2009 Report No. GAO-10-190R Title

Smithsonian Institution: Implementation of Governance Reforms is Progressing, but Work Remains

United States Government Accountability Office GAO December 2009 Report to Congressional Committees SMITHSONIAN INSTITUTION Implementation of Governance Reforms Is Progressing, but Work Remains GAO-10-190R December 2009 SMITHSONIAN INSTITUTION Highlights Highlights of GAO-10-190R, a report to congressional committees Accountability Integrity Reliability Implementation of Governance Reforms Is Prog...
Date Nov. 6, 2009 Report No. GAO-10-52 Title

Millennium Challenge Corporation: MCC Has Addressed a Number of Implementation Challenges, but Needs to Improve Financial Controls and Infrastructure Planning

United States Government Accountability Office GAO November 2009 Report to Congressional Committees MILLENNIUM CHALLENGE CORPORATION MCC Has Addressed a Number of Implementation Challenges, but Needs to Improve Financial Controls and Infrastructure Planning GAO-10-52 November 2009 MILLENNIUM CHALLENGE CORPORATION Highlights Highlights of GAO-10-52, a report to congressional committees Accountabili...
Date Sept. 24, 2009 Report No. GAO-09-665 Title

Defense Acquisitions: Many Analyses of Alternatives Have Not Provided a Robust Assessment of Weapon System Options

United States Government Accountability Office GAO September 2009 Report to the Chairman, Subcommittee on National Security and Foreign Affairs, Committee on Oversight and Government Reform, House of Representatives DEFENSE ACQUISITIONS Many Analyses of Alternatives Have Not Provided a Robust Assessment of Weapon System Options GAO-09-665 September 2009 DEFENSE ACQUISITIONS Highlights Highlights o...
Date Sept. 15, 2009 Report No. GAO-09-1002T Title

Homeland Security: Despite Progress, DHS Continues to Be Challenged in Managing Its Multi-Billion Dollar Annual Investment in Large-Scale Information Technology Systems

United States Government Accountability Office GAO For Release on Delivery Expected at 9:30 a.m. EDT Tuesday, September 15, 2009 Testimony Before the Subcommittee on Government Management, Organization, and Procurement, House Committee on Oversight and Government Reform HOMELAND SECURITY Despite Progress, DHS Continues to Be Challenged in Managing Its Multi-Billion Dollar Annual Investment in Larg...
Date June 24, 2009 Report No. GAO-09-579 Title

Contract Management: Minimal Compliance with New Safeguards for Time-and-Materials Contracts for Commercial Services and Safeguards Have Not Been Applied to GSA Schedules Program

United States Government Accountability Office GAO June 2009 Report to Congressional Committees CONTRACT MANAGEMENT Minimal Compliance with New Safeguards for Time-andMaterials Contracts for Commercial Services and Safeguards Have Not Been Applied to GSA Schedules Program GAO-09-579 June 2009 CONTRACT MANAGEMENT Highlights Highlights of GAO-09-579, a report to congressional committees Accountabili...
Date June 17, 2009 Report No. GAO-09-758T Title

Broadcasting to Cuba: Observations Regarding TV Marti's Strategy and Operations

United States Government Accountability Office GAO For Release on Delivery Expected at 10:00 a.m. EST Wednesday, June 17, 2009 Testimony Before the Subcommittee on International Organizations, Human Rights, and Oversight, Committee on Foreign Affairs, House of Representatives BROADCASTING TO CUBA Observations Regarding TV Martí’s Strategy and Operations Statement of Jess T. Ford, Director Inter...
Date April 30, 2009 Report No. GAO-09-663T Title

Defense Acquisitions: Charting a Course for Lasting Reform

United States Government Accountability Office GAO For Release on Delivery Expected at 10:00 a.m. EDT Thursday, April 30, 2009 Testimony Before the Committee on Armed Services, House of Representatives DEFENSE ACQUISITIONS Charting a Course for Lasting Reform Statement of Paul Francis, Managing Director Acquisition and Sourcing Management GAO-09-663T April 30, 2009 DEFENSE ACQUISITIONS Highlights ...
Date April 23, 2009 Report No. GAO-09-374 Title

Federal Contractors: Better Performance Information Needed to Support Agency Contract Award Decisions

United States Government Accountability Office GAO April 2009 Report to Congressional Requesters FEDERAL CONTRACTORS Better Performance Information Needed to Support Agency Contract Award Decisions GAO-09-374 April 2009 FEDERAL CONTRACTORS Highlights Highlights of GAO-09-374, a report to congressional requesters Accountability Integrity Reliability Better Performance Information Needed to Support ...
Date March 18, 2009 Report No. GAO-09-501T Title

Defense Acquisitions: DOD Must Prioritize Its Weapon System Acquisitions and Balance Them with Available Resources

United States Government Accountability Office GAO For Release on Delivery Expected at 10:00 a.m. EDT Wednesday, March 18, 2000 Testimony Before the Committee on the Budget, House of Representatives DEFENSE ACQUISITIONS DOD Must Prioritize Its Weapon System Acquisitions and Balance Them with Available Resources Statement of Statement of Michael J. Sullivan, Director Acquisition and Sourcing Manage...
Date March 5, 2009 Report No. GAO-09-436T Title

NASA: Projects Need More Disciplined Oversight and Management to Address Key Challenges

United States Government Accountability Office GAO For Release on Delivery Expected at 10:00 a.m. EST Thursday, March 5, 2009 Testimony Before the Subcommittee on Space and Aeronautics, Committee on Science and Technology, House of Representatives NASA Projects Need More Disciplined Oversight and Management to Address Key Challenges Statement of Cristina Chaplain, Director Acquisition and Sourcing...
Date March 3, 2009 Report No. GAO-09-431T Title

Defense Acquisitions: DOD Must Balance Its Needs with Available Resources and Follow an Incremental Approach to Acquiring Weapon Systems

United States Government Accountability Office GAO For Release on Delivery Expected at 9:30 a.m. EST Tuesday, March 3, 2009 Testimony Before the Committee on Armed Services, U.S. Senate DEFENSE ACQUISITIONS DOD Must Balance Its Needs with Available Resources and Follow an Incremental Approach to Acquiring Weapon Systems Statement of Michael J. Sullivan, Director Acquisition and Sourcing Management...
Date Feb. 26, 2009 Report No. GAO-09-419T Title

Excluded Parties List System: Suspended and Debarred Businesses and Individuals Improperly Receive Federal Funds

United States Government Accountability Office GAO For Release on Delivery Expected at 10:00 a.m. EST Thursday, February 26, 2009 Testimony Before the Committee on Oversight and Government Reform, House of Representatives EXCLUDED PARTIES LIST SYSTEM Suspended and Debarred Businesses and Individuals Improperly Receive Federal Funds Statement of Gregory D. Kutz, Managing Director Forensic Audits an...
Date Feb. 25, 2009 Report No. GAO-09-174 Title

Excluded Parties List System: Suspended and Debarred Businesses and Individuals Improperly Receive Federal Funds

United States Government Accountability Office GAO February 2009 Report to Congressional Requesters EXCLUDED PARTIES LIST SYSTEM Suspended and Debarred Businesses and Individuals Improperly Receive Federal Funds GAO-09-174 February 2009 EXCLUDED PARTIES LIST SYSTEM Highlights Highlights of GAO-09-174, a report to congressional requesters Accountability Integrity Reliability Suspended and Debarred ...
Date Nov. 21, 2008 Report No. GAO-09-16 Title

Small Business Administration: Agency Should Assess Resources Devoted to Contracting and Improve Several Processes in the 8(a) Program

United States Government Accountability Office GAO November 2008 Report to Congressional Requesters SMALL BUSINESS ADMINISTRATION Agency Should Assess Resources Devoted to Contracting and Improve Several Processes in the 8(a) Program GAO-09-16 November 2008 SMALL BUSINESS ADMINISTRATION Highlights Highlights of GAO-09-16, a report to congressional requesters Accountability Integrity Reliability Ag...
Date Nov. 20, 2008 Report No. GAO-09-114R Title

Contract Management: DOD Developed Draft Guidance for Operational Contract Support but Has Not Met All Legislative Requirements

United States Government Accountability Office Washington, DC 20548 November 20, 2008 The Honorable Carl Levin Chairman The Honorable John McCain Ranking Member Committee on Armed Services United States Senate The Honorable Ike Skelton Chairman The Honorable Duncan L. Hunter Ranking Member Committee on Armed Services House of Representatives Subject: Contract Management: DOD Developed Draft Guidan...
Date Nov. 19, 2008 Report No. GAO-09-30 Title

Department of Homeland Security: A Strategic Approach Is Needed to Better Ensure the Acquisition Workforce Can Meet Mission Needs

United States Government Accountability Office GAO November 2008 Report to Congressional Requesters DEPARTMENT OF HOMELAND SECURITY A Strategic Approach Is Needed to Better Ensure the Acquisition Workforce Can Meet Mission Needs GAO-09-30 November 2008 DEPARTMENT OF HOMELAND SECURITY Highlights Highlights of GAO-09-30, a report to congressional requesters Accountability Integrity Reliability A Str...
Date Sept. 23, 2008 Report No. GAO-08-1088 Title

Department of Homeland Security: Improvements Could Further Enhance Ability to Acquire Innovative Technologies Using Other Transaction Authority

United States Government Accountability Office GAO September 2008 Report to Congressional Committees DEPARTMENT OF HOMELAND SECURITY Improvements Could Further Enhance Ability to Acquire Innovative Technologies Using Other Transaction Authority GAO-08-1088 September 2008 DEPARTMENT OF HOMELAND SECURITY Highlights Highlights of GAO-08-1088, a report to congressional committees Accountability Integr...
Date Sept. 17, 2008 Report No. GAO-08-1164T Title

Department of Homeland Security: Progress and Continuing Concerns with Acquisition Management

United States Government Accountability Office GAO For Release on Delivery Expected at 2 p.m. EST Wednesday, September 17, 2008 Testimony Before the Subcommittee on Management, Investigations, and Oversight, Committee on Homeland Security, House of Representatives DEPARTMENT OF HOMELAND SECURITY Progress and Continuing Concerns with Acquisition Management Statement of John P. Hutton, Director Acqu...
Date July 31, 2008 Report No. GAO-08-1056T Title

Veterans Health Administration: Improvements Needed in Design of Controls over Miscellaneous Obligations

United States Government Accountability Office GAO For Release on Delivery Expected at 10:00 a.m. EDT Thursday, July 31, 2008 Testimony Before the Subcommittee on Oversight and Investigations, Committee on Veterans’ Affairs, House of Representatives VETERANS HEALTH ADMINISTRATION Improvements Needed in Design of Controls over Miscellaneous Obligations Statement of Kay L. Daly, Acting Director Fi...
Date July 18, 2008 Report No. GAO-08-756 Title

Air Traffic Control: FAA Uses Earned Value Techniques to Help Manage Information Technology Acquisitions, but Needs to Clarify Policy and Strengthen Oversight

United States Government Accountability Office GAO July 2008 Report to Congressional Requesters AIR TRAFFIC CONTROL FAA Uses Earned Value Techniques to Help Manage Information Technology Acquisitions, but Needs to Clarify Policy and Strengthen Oversight GAO-08-756 a July 2008 AIR TRAFFIC CONTROL Highlights Highlights of GAO-08-756, a report to congressional requesters Accountability Integrity Reli...
Date July 11, 2008 Report No. GAO-08-764 Title

Broadcasting to Cuba: Weaknesses in Contracting Practices Reduced Visibility into Selected Award Decisions

United States Government Accountability Office GAO July 2008 Report to the Chairman, Subcommittee on International Organizations, Human Rights, and Oversight, Committee on Foreign Affairs, House of Representatives BROADCASTING TO CUBA Weaknesses in Contracting Practices Reduced Visibility into Selected Award Decisions GAO-08-764 July 2008 BROADCASTING TO CUBA Highlights Highlights of GAO-08-764, a...
Date July 2, 2008 Report No. GAO-08-619 Title

Defense Acquisitions: A Knowledge-Based Funding Approach Could Improve Major Weapon System Program Outcomes

United States Government Accountability Office GAO July 2008 Report to the Committee on Armed Services, U.S. Senate DEFENSE ACQUISITIONS A Knowledge-Based Funding Approach Could Improve Major Weapon System Program Outcomes GAO-08-619 July 2008 DEFENSE ACQUISITIONS Highlights Highlights of GAO-08-619, a report to the Committee on Armed Services, U.S. Senate Accountability Integrity Reliability A Kn...
Date June 16, 2008 Report No. GAO-08-437 Title

National Flood Insurance Program: Financial Challenges Underscore Need for Improved Oversight of Mitigation Programs and Key Contracts

United States Government Accountability Office GAO June 2008 Report to the Ranking Member, Committee on Banking, Housing, and Urban Affairs, U.S. Senate NATIONAL FLOOD INSURANCE PROGRAM Financial Challenges Underscore Need for Improved Oversight of Mitigation Programs and Key Contracts GAO-08-437 June 2008 NATIONAL FLOOD INSURANCE PROGRAM Highlights Highlights of GAO-08-437, a report to the Rankin...
Date June 3, 2008 Report No. GAO-08-782T Title

Defense Acquisitions: Better Weapon Program Outcomes Require Discipline, Accountability, and Fundamental Changes in the Acquisition Environment

United States Government Accountability Office GAO For Release on Delivery Expected at 9:30 a.m. EDT Tuesday, June 3, 2008 Testimony Before the Committee on Armed Services, U.S. Senate DEFENSE ACQUISITIONS Better Weapon Program Outcomes Require Discipline, Accountability, and Fundamental Changes in the Acquisition Environment Statement of Katherine V. Schinasi, Managing Director Acquisition and So...
Date June 3, 2008 Report No. GAO-08-599 Title

U.S. Postal Service: Mail-Related Recycling Initiatives and Possible Opportunities for Improvement

United States Government Accountability Office GAO June 2008 Report to Congressional Committees U.S. POSTAL SERVICE Mail-Related Recycling Initiatives and Possible Opportunities for Improvement GAO-08-599 June 2008 U.S. POSTAL SERVICE Highlights Highlights of GAO-08-599, a report to congressional committees Accountability Integrity Reliability Mail-Related Recycling Initiatives and Possible Opport...
Date May 29, 2008 Report No. GAO-08-753R Title

National Defense: Department of Defense Pilot Authority for Acquiring Information Technology Services under OMB Circular A-76

United States Government Accountability Office Washington, DC 20548 May 29, 2008 Congressional Committees Subject: Department of Defense Pilot Authority for Acquiring Information Technology Services under OMB Circular A-76 Section 336 of the National Defense Authorization Act for Fiscal Year 2004, Pub. L. No. 108-136, authorized the Department of Defense (DOD) to conduct a pilot program to use bes...
Date May 15, 2008 Report No. GAO-08-632 Title

Smithsonian Institution: Board of Regents Has Implemented Many Governance Reforms, but Ensuring Accountability and Oversight Will Require Ongoing Action

United States Government Accountability Office GAO May 2008 Report to the Chairman, Committee on Rules and Administration, U.S. Senate SMITHSONIAN INSTITUTION Board of Regents Has Implemented Many Governance Reforms, but Ensuring Accountability and Oversight Will Require Ongoing Action GAO-08-632 May 2008 SMITHSONIAN INSTITUTION Highlights Highlights of GAO-08-632, a report to the Chairman, Commit...
Date May 8, 2008 Report No. GAO-08-765T Title

Department of Homeland Security: Better Planning and Oversight Needed to Improve Complex Service Acquisition Outcomes

United States Government Accountability Office GAO For Release on Delivery Expected at 10:00 a.m. EDT Thursday, May 8, 2008 Testimony Before the Committee on Homeland Security, House of Representatives DEPARTMENT OF HOMELAND SECURITY Better Planning and Oversight Needed to Improve Complex Service Acquisition Outcomes Statement of John P. Hutton, Director Acquisition and Sourcing Management GAO-08-...
Date May 8, 2008 Report No. GAO-08-578 Title

Interagency Contracting: Need for Improved Information and Policy Implementation at the Department of State

United States Government Accountability Office GAO May 2008 Report to Congressional Committees INTERAGENCY CONTRACTING Need for Improved Information and Policy Implementation at the Department of State GAO-08-578 May 2008 INTERAGENCY CONTRACTING Highlights Highlights of GAO-08-578, a report to congressional committees Accountability Integrity Reliability Need for Improved Information and Policy Im...