June 2004 ACQUISITION/ FINANCIAL SYSTEMS INTERFACE REQUIREMENTS Checklist for Reviewing Systems under the Federal Financial Management Improvement Act GAO-04-650G a This is a work of the U.S. government and is not subject to copyright protection in the United States. It may be reproduced and distributed in its entirety without further permission from GAO... |
Date May 28, 2004 |
Report No. GAO-04-544 |
Title
United States General Accounting Office GAO
May 2004 Report to Congressional Requesters TRANSPORTATION SECURITY ADMINISTRATION High-Level Attention Needed to Strengthen Acquisition Function GAO-04-544 a May 2004 TRANSPORTATION SECURITY ADMINISTRATION
Highlights of GAO-04-544, a report to congressional requesters High-Level Attention Needed to Strengthen Acquisition Function The Transportation Secu... |
Date May 25, 2004 |
Report No. GAO-04-678 |
Title
United States General Accounting Office GAO
May 2004 Report to Congressional Requesters DEFENSE ACQUISITIONS Knowledge of Software Suppliers Needed to Manage Risks GAO-04-678 May 2004 DEFENSE ACQUISITIONS Knowledge of Software Suppliers Needed to Manage Risks Highlights of GAO-04-678, a report to congressional requesters The Department of Defense (DOD) is increasingly reliant on software and infor... |
Date May 17, 2004 |
Report No. GAO-04-540 |
Title
United States General Accounting Office GAO
May 2004 Report to the Chairman and Ranking Member, Special Panel on Postal Reform & Oversight, Committee on Government Reform, House of Representatives POSTAL SERVICE Progress in Implementing Supply Chain Management Initiatives GAO-04-540 May 2004 POSTAL SERVICE Progress in Implementing Supply Chain Management Initiatives Highlights of GAO-04-540, a rep... |
Date March 31, 2004 |
Report No. GAO-04-447R |
Title
United States General Accounting Office Washington, DC 20548 March 31, 2004 The Honorable Susan M. Collins Chairman The Honorable Joseph I. Lieberman Ranking Minority Member Committee on Governmental Affairs United States Senate The Honorable Tom Davis Chairman The Honorable Henry A. Waxman Ranking Minority Member Committee on Government Reform House of Representatives Subject: Agencies’ Use of ... |
Date March 9, 2004 |
Report No. GAO-04-380 |
Title
United States General Accounting Office GAO
March 2004 Report to the Ranking Minority Member, Committee on Commerce, Science, and Transportation, U.S. Senate CONTRACT MANAGEMENT Coast Guard’s Deepwater Program Needs Increased Attention to Management and Contractor Oversight GAO-04-380 March 2004 CONTRACT MANAGEMENT Coast Guard's Deepwater Program Needs Increased Attention to Management and Contr... |
Date March 1, 2004 |
Report No. GAO-04-393 |
Title
United States General Accounting Office GAO
March 2004 Report to the Committee on Armed Services, U.S. Senate DEFENSE ACQUISITIONS Stronger Management Practices Are Needed to Improve DOD’s Software-Intensive Weapon Acquisitions GAO-04-393 March 2004 DEFENSE ACQUISITIONS Stronger Management Practices Are Needed to Improve DOD’s Software-Intensive Weapon Acquisitions Highlights of GAO-04-393, a ... |
Date Dec. 30, 2003 |
Report No. GAO-04-295R |
Title
#100749 United States General Accounting Office Washington, DC 20548 December 30, 2003 The Honorable Joshua B. Bolten Director, Office of Management and Budget Subject: Reliability of Federal Procurement Data Dear Mr. Bolten: The purpose of this letter is to convey our serious and continuing concerns with the reliability of the data contained in the Federal Procurement Data System (FPDS) and to re... |
Date Nov. 21, 2003 |
Report No. GAO-04-43 |
Title
United States General Accounting Office GAO
November 2003 Report to Congressional Committees INFORMATION TECHNOLOGY Architecture Needed to Guide NASA’s Financial Management Modernization GAO-04-43 a November 2003 INFORMATION TECHNOLOGY Architecture Needed to Guide NASA’s Financial Management Modernization Highlights of GAO-04-43, a report to congressional committees The National Aeronautics an... |
Date Nov. 18, 2003 |
Report No. GAO-04-253T |
Title
United States General Accounting Office GAO
For Release on Delivery Expected at 2:00 p.m. EST Tuesday, November 18, 2003 Testimony Before the Subcommittee on Strategic Forces, Committee on Armed Services, U.S. Senate DEFENSE ACQUISITIONS Improvements Needed in Space Systems Acquisition Policy to Optimize Growing Investment in Space
Statement of Robert E. Levin, Director Acquisition and Sourcing Ma... |
Date Nov. 10, 2003 |
Report No. GAO-04-53 |
Title
United States General Accounting Office GAO
November 2003 Report to the Senate and House Committees on Armed Services DEFENSE ACQUISITIONS DOD’s Revised Policy Emphasizes Best Practices, but More Controls Are Needed GAO-04-53 November 2003 DEFENSE ACQUISITIONS DOD’s Revised Policy Emphasizes Best Practices, but More Controls Are Needed Highlights of GAO-04-53, a report to the Senate and House ... |
Date Oct. 3, 2003 |
Report No. GAO-04-155R |
Title
Comptroller General of the United States United States General Accounting Office Washington, DC 20548 October 3, 2003 The Honorable George V. Voinovich Chairman The Honorable Richard J. Durbin Ranking Member Subcommittee on Oversight of Government Management, the Federal Workforce, and the District of Columbia Committee on Governmental Affairs United States Senate Subject: Questions for Competitiv... |
Date Sept. 15, 2003 |
Report No. GAO-03-1073 |
Title
United States General Accounting Office GAO
September 2003 Report to the Chairman, Subcommittee on Defense, Committee on Appropriations, House of Representatives DEFENSE ACQUISITIONS Improvements Needed in Space Systems Acquisition Management Policy GAO-03-1073 September 2003 DEFENSE ACQUISITIONS Improvements Needed in Space Systems Acquisition Management Policy Highlights of GAO-03-1073, a report... |
Date July 25, 2003 |
Report No. GAO-03-799 |
Title
United States General Accounting Office GAO
July 2003 Report to the Committee on Government Reform, House of Representatives CONTRACT MANAGEMENT INS Contracting Weaknesses Need Attention from the Department of Homeland Security GAO-03-799 July 2003 CONTRACT MANAGEMENT INS Contracting Weaknesses Need Attention from the Department of Homeland Security Highlights of GAO-03-799, a report to House Gove... |
Date July 24, 2003 |
Report No. GAO-03-1022T |
Title
United States General Accounting Office GAO
For Release on Delivery Expected at 9:30 a.m. EDT July 24, 2003 Testimony
Before the Subcommittee on Oversight of Government Management, the Federal Workforce, and the District of Columbia, Committee on Governmental Affairs, U.S. Senate COMPETITIVE SOURCING Implementation Will Be Challenging for Federal Agencies
Statement of David M. Walker Comptroller G... |
Date June 24, 2003 |
Report No. GAO-03-695 |
Title
United States General Accounting Office GAO
June 2003 Report to the Subcommittee on Readiness and Management Support, Committee on Armed Services, U.S. Senate MILITARY OPERATIONS Contractors Provide Vital Services to Deployed Forces but Are Not Adequately Addressed in DOD Plans GAO-03-695 June 2003 MILITARY OPERATIONS
Highlights of GAO-03-695, a report to the Subcommittee on Readiness and Manageme... |
Date May 22, 2003 |
Report No. GAO-03-674R |
Title
United States General Accounting Office Washington, DC 20548 May 22, 2003 Congressional Committees Subject: Use of Legislative Incentive for Performance-Based Contracting Unknown The Department of Defense (DOD) spent about $93 billion in fiscal year 2002 to acquire various types of services, such as base operations, logistical support, and information technology. To achieve greater cost savings an... |
Date April 30, 2003 |
Report No. GAO-03-443 |
Title
United States General Accounting Office GAO
April 2003 Report to the Committee on Government Reform, House of Representatives, and the Committee on Governmental Affairs, U.S. Senate FEDERAL PROCUREMENT Spending and Workforce Trends GAO-03-443 a April 2003 FEDERAL PROCUREMENT Spending and Workforce Trends
Highlights of GAO-03-443, a report to the Committee on Government Reform, House of Representat... |
Date April 25, 2003 |
Report No. GAO-03-371 |
Title
United States General Accounting Office GAO
April 2003 Report to the Subcommittee on Readiness and Management Support, Committee on Armed Services, U.S. Senate INFORMATION TECHNOLOGY DOD Needs to Leverage Lessons Learned from Its Outsourcing Projects GAO-03-371 a April 2003 INFORMATION TECHNOLOGY DOD Needs to Leverage Lessons Learned from Its Outsourcing Projects Highlights of GAO-03-371, a report... |
Date Feb. 28, 2003 |
Report No. GAO-03-440 |
Title
United States General Accounting Office GAO
February 2003 Report to the Chairman and Ranking Minority Member, Committee on Armed Services, House of Representatives CONTRACT MANAGEMENT DLA Properly Implemented Best Value Contracting for Clothing and Textiles and Views the Supplier Base as Uncertain GAO-03-440 a February 2003 CONTRACT MANAGEMENT DLA Properly Implemented Best Value Contracting for Cl... |
Date April 11, 2002 |
Report No. GAO-02-560T |
Title
United States General Accounting Office GAO Testimony
Before the Subcommittee on Technology and Procurement Policy, Committee on Government Reform, House of Representatives For Release on Delivery Expected at 9:30 a.m., Thursday, April 11, 2002 CONTRACT MANAGEMENT Roles and Responsibilities of the Federal Supply Service and Federal Technology Service
Statement of David E. Cooper, Director, Acquisi... |
Date Jan. 25, 2002 |
Report No. GAO-02-75 |
Title
United States General Accounting Office GAO
January 2002 Report to Congressional Requesters DEFENSE INVENTORY Control Weaknesses Leave Restricted and Hazardous Excess Property Vulnerable to Improper Use, Loss, and Theft GAO-02-75 Contents Letter
Results in Brief Background Special Programs Obtained Property They Should Not Have Received Property Accountability Is Inadequate Conclusions Recommendat... |
Date Aug. 18, 1999 |
Report No. GGD-99-134 |
Title
United States General Accounting Office GAO
August 1999 Report to Congressional Requesters DISTRICT OF COLUMBIA Authority Needs to Improve Its Procurement Practices GAO/GGD-99-134 United States General Accounting Office Washington, D.C. 20548 General Government Division B-281962 August 18, 1999 The Honorable Ernest J. Istook, Jr. Chairman, Subcommittee on the District of Columbia Committee on Appr... |
Date Feb. 26, 1999 |
Report No. OSI-99-4R |
Title
GAO United States General Accounting Office Washington, D.C. 20548 Office of Special Investigations B-282118 February 26,1999 The Honorable Richard C. Shelby Chairman, Subcommittee on Transportation Committee on Appropriations United States Senate Subject: Amtrak: Contracting Imxxowieties bv Chief Engineer Dear Mr. Chairman: The Office of Special Investigations (OSI) received an allegation through... |
Date Oct. 8, 1998 |
Report No. T-NSIAD-99-20 |
Title
United States General Accounting Office GAO
For Release on Delivery Expected at 11:00 a.m., EDT Thursday, October 8, 1998 Testimony
Before the Subcommittees on Military Procurement and Research and Development, Committee on National Security, House of Representatives DOD BUDGET Substantial Risks in Weapons Modernization Plans
Statement of Richard Davis, Director, National Security Analysis, Nation... |
Date Oct. 29, 1997 |
Report No. NSIAD-98-6 |
Title
United States General Accounting Office GAO
October 1997 Report to the Secretary of Defense DEFENSE TRADE European Initiatives to Integrate the Defense Market GAO/NSIAD-98-6 GAO United States General Accounting Office Washington, D.C. 20548 National Security and International Affairs Division B-276450 October 29, 1997 The Honorable William S. Cohen The Secretary of Defense Dear Mr. Secretary: With... |
Date Feb. 1, 1997 |
Report No. HR-97-13 |
Title
United States General Accounting Office GAO High-Risk Series February 1997 Department of Energy Contract Management GAO/HR-97-13 GAO United States General Accounting Office Washington, D.C. 20548 Comptroller General of the United States February 1997 The President of the Senate The Speaker of the House of Representatives In 1990, the General Accounting Office began a special effort to review and r... |
Date June 28, 1996 |
Report No. NSIAD-96-53 |
Title
United States General Accounting Office GAO
June 1996 Report to Congressional Committees ACQUISITION REFORM Military-Commercial Pilot Program Offers Benefits but Faces Challenges G A O years
1921 - 1996 GAO/NSIAD-96-53 GAO United States General Accounting Office Washington, D.C. 20548 National Security and International Affairs Division B-271257 June 28, 1996 Congressional Committees Faced with su... |
Date Nov. 22, 1994 |
Report No. NSIAD-95-47 |
Title
United States General Accounting Office GAO
November 1994 Report to Congressional Requesters ELECTRONIC WARFARE Most Air Force ALQ-135 Jammers Procured Without Operational Testing GAO/NSIAD-95-47 GAO United States General Accounting Office Washington, D.C. 20548 National Security and International Affairs Division B-257415.2 November 22, 1994 The Honorable William V. Roth, Jr. Ranking Minority Mem... |
Date Aug. 25, 1994 |
Report No. NSIAD-94-207 |
Title
United States General Accounting OfEce GAO
August 1994 Report to the Chairman, Subcommittey on Readiness, Committee on Armed Services, House of Representatives ARMY INVENTORY Unfilled War Reserve Requirements Could ’ Be Met W ith Items From Other Inventory .: I :
GAO/NSIAD-94-207 GAO United States General Accounting Office Washington, D.C. 20548 National Security and International Affairs Divisi... |
Date July 27, 1994 |
Report No. T-NSIAD-94-247 |
Title
United States General Accounting Office GAO
For Rclcasc Expcctcd at 10:00 a.m., EDT Wednesday, July 27, 1994 Testimony
Before the Subcommittee on Oversight and Investigations, Committee on Armed Services, House of Representatives DEFENSE INDUSTRY CONSOLIDATION IssuesRelated to Acquisition and Merger Restructuring costs
Statement by David E. Cooper, Director, Acquisition Policy, Technology, and Com... |
Date May 16, 1994 |
Report No. GGD-94-126BR |
Title
United States General Accounting Offke I
May 1994 Briefmgj Report to the Ranking Minority Member, Subcommittee on I Investigations and Oversight, Committee on Public Works and Transportation, IH&e 6f Representatives PUBLIC-PRIVATE MIX I Extent of Contracting Out for Red Property ’ Management Serwces in GSA GAO/GGD-94-126BR United states General Accounting Offke Washington, D.C. 20548 General Gov... |
Date Feb. 23, 1994 |
Report No. RCED-94-28 |
Title
lars il ,. 1 United States General Accounting Office Washington, D.C. 20548 Resources, Community, Economic Development B-254247 February 23, 1994 The Honorable Jimmy Hayes Chairman, Subcommittee on Investigations and Oversight Committee on Science, Space, and Technology House of Representatives Dear Mr. Chairman: As of April 1992, the Department of Energy (DOE) had an estimated $1 billion worth of... |
Date Sept. 29, 1993 |
Report No. NSIAD-93-198 |
Title
United States General Accounting Office GAO
September 1993 Report to the Secretary of Defense TEST AND EVALUATION DOD Has Been Slow in Improving Testing of Software-Intensive Systems GAO/NSIAD-93-198 GAO United States General Accounting Office Washington, D.C. 20548 National Security and International Affairs Division B-253411 September 29, 1993 The Honorable Les Aspin The Secretary of Defense Dea... |
Date June 9, 1993 |
Report No. IMTEC-93-27 |
Title
SOFTWARE]TOOLS Defense Is Not Ready to Implement I-CASE Departmentwide _ -.,.,. ..-_ ._~ -..... - -__.. _---._ ..“...-.~._-l--___“_. I.-I. “---,.“_-- .-..-. ~I-- -_ _------A-- . GAO United States General Accounting Office Washington, D.C. 20648 Information Management and Technology Division B-252604 June 9,1993 The Honorable John Glenn Chairman, Committee on Governmental Affairs United Sta... |
Date April 29, 1993 |
Report No. GGD-93-79FS |
Title
GAO
I~Iwse of Representatives PROCUREMENT Information on Bid Protest Activities (;Aol’ (;(;I)-!)s-7!)I’ s ---- GAO United States General Accounting Office Washington, D.C. 20648 General Government Division B-252631 April 29, 1993 The Honorable William L. Clay Chairman, Committee on Post Office and Civil Service House of Representatives Dear Mr. Chairman: This fact sheet responds to your reques... |
Date July 30, 1992 |
Report No. NSIAD-92-260 |
Title
DRUG CONTROL Oversight Needed to Prevent Acquisition of Unnecessary Equipment
147517 lllIIIllllllllll .----I_- RESTRICTED--Not to be released outside the General Accounting Office unless specifically approved by the Office of Congressional Relations. : ?5mb RELE,lRjJj -. (;AO/NSIAI)-Sil-2fiO GAO Uuited States General Accounting OfFice Washington, D.C. 20548 National Security and International Affa... |
Date June 29, 1992 |
Report No. GGD-92-102 |
Title
-.. United States General -- Accounting Offlce GAO Report to the Chairman, Subcommittee on Financial Institutions Supervision, Regulation and Insurance, Committee on Banking, Finance and Urban Affairs, House of Representatives
.- I.._. . *-__--- _ : ; EXECUTIVE FURNITURE Financial Regulatory Agencies’Procurement Policies
147130 GAO/GGD-92-102 GAO United Statee General Accounting Office Wahington... |
Date Sept. 18, 1991 |
Report No. NSIAD-91-270 |
Title
I-----.-.---- I_--- - ..-. -- --.. _---“.-“- -_-.” _“““““,_-._ ._..I - --.._ -_~ St~ptt~mht~r 1!I!! 1 ARMY MAINTENANCE More Effec tive Implementation of Maintenance Expenditure Limits Needed II* 144837 I GAO/NSIAI)-!I l-270 .“I __. . . . . . .. -.. ..-.. ._.. .-.._..,....“. _ . .._- _. -._...-_._.___......_-___- -_-----^. .- .._ -- __-_ _________-_-~___ GAO
\ United States Gene... |
Date Sept. 13, 1991 |
Report No. NSIAD-91-313 |
Title
_ ...I..,^..__..^........._ .^_.,_“..._”._.____ -__- ~I ..__^..-._..._” . .- 11ttitvd St.at.w (kttt~txl __.. -... - _._- Awotttttittg Of’ iw L’ ----- GAO
Sq,r (‘ 11lh~1’ l!VIl kport to the Chairman, Sukwmmittee on Invctstigations, Committee on Armed Services, House of Representatives DEFENSE PROCUREMENT
Acquiring Technical Data for Spare Parts Reprocurement -(;AI()/NSIAI)-!II-.~1:~ -... |
Date Aug. 6, 1991 |
Report No. GGD-91-103 |
Title
-- I.Jnited States General Accounting Office GAO
- _---*_--_ -_.August I 99 1 Report to the Chairman, Committee on Post Ol’ ice and Civil Service, House of f’ ~Cey>resentatives i: PROCUREMENT REFORM New Concepts Being Cautiously Applied at the Postal Service #I ll lllllllllll
144558 i _----._ ..I---.. .._I-..- -- United States General Accounting Office Washington, D.C. 20648 General Government... |
Date March 14, 1991 |
Report No. NSIAD-91-126 |
Title
United States General Accounting Office - GAO
1 Repcwt to the Honorable Don Nickles, U.S.Senate March 1991 INTER-AMERICAN DEVELOPMENTBANK Efforts to Improve Procurement Procedures GAO United States General Accounting Office Washington, D.C. 20548 National Security and International Affairs Division R-242692 March 14,1991 The Honorable Don Nickles United States Senate Dear Senator Nicklcs: As you r... |
Date Dec. 17, 1990 |
Report No. NSIAD-91-13 |
Title
.I -- ..” .__ _. . ..^. “_ _... . .._.- __ _.. ..” _....-^. I -..... .I .._ ._...” ^..-.....-......” .--.---- -I_-.-.-~~-.-_.- GAO United States
General Accounting OfYice Washington, D.C. 20648 National Security and International Affairs Division B-239622 December 17, I.990 The Honorable John R. Kasich House of Representatives Dear Mr. Kasich: In response to your request we examined the... |
Date Nov. 1, 1989 |
Report No. NSIAD-90-21 |
Title
United States General Accounting Office GAO
November 1989 Report to the Honorable William V. Roth, Jr., U. S. Senate DOD’s Efforts to Streamline Its Acquisition System md Reduce Personnel National Security and International Affairs Division B-221205 November 1, 1989 The Honorable William V. Roth, Jr. United States Senate Dear Senator Roth: This report was prepared in response to your March 21, 1... |
Date Sept. 27, 1989 |
Report No. T-NSIAD-89-50 |
Title
United States General Accounting Office / 3 ‘ 6 x d i’ GAO
For Release on Delivery Expected at 10:00 a.m. Wednesday September 27, 1989 Teitimony Ill11111 II
139628 International Procurement Government Issues Statement of Allan I, FttPndelowi3r, Director Trade, Energy and Finance Issues National Security and International Affairs Division Security Before the Subcommittee on Legislation and Nati... |
Date June 1, 1989 |
Report No. NSIAD-89-70 |
Title
Report to the Chairman, Subcommittee on ” Investigations, Committee on Armed Services, House of Representatives June 1989 AC UISITION RE% RM Military Departments’ Responseto the Reorganization Act I GAO/NS-79 National Security and International Affairs Division B-233688 June 1,1989 The Honorable Nicholas Mavroules Chairman, Subcommittee on Investigations Committee on Armed Services House of Re... |
Date May 17, 1989 |
Report No. NSIAD-89-121 |
Title
United States General Accounting Office GAO
Hay 1989 Report to the Honorable Charles E. Bennett, House of Representatives GOVERNMENT CONTRACTING Effect of Changes in Procurement and Tax Policy on the Defense Industry _GAO/NSIAD-89-121 GAO United States General Accounting Office Washington, D.C. 20548 National Security and International Affairs Division B-159896 May 17,1989 The Honorable Charles E.... |
Date Dec. 2, 1988 |
Report No. NSIAD-89-18 |
Title
11L&l, U~bUl&~II b h tMllh~~ ii,,& 1 Report to the Honorable Barbara Boxer, House of’ Representatives MAINTENANCE Implementing the Commercial Industrial Services Program at San Diego , WI II Ill 111111
137448 About Our New Gowar. . GAO United States General Accounting Office Washington, D.C. 20648 National Security and International Affairs Division B-23 1303 December 2, 1988 The Honorable Barba... |
Date Aug. 24, 1988 |
Report No. B-232071 |
Title
GAO
* United States
General Accounting Office Washington, D.C. 20548 Office of the General Counsel B-23207 1 August 24, 1988 Margaret A. Willis FAR Secretariat General Services Administration Dear Ms. Willis: This responds to your request for our comments on a proposal to amend Federal Acquisition Regulation FAR Part 15 with respect to subcontractor cost or pricing data. This is FAR Case No. 88-26... |
Date June 13, 1988 |
Report No. T-GGD-88-39 |
Title
United States General Accounting Office ‘ GAO Testimony For Release on Delivery Expected at 10:00 A.K. E.D.T. Monday June 13, 1988 Federal Government’ s Use of Consulting Services Statement of Bernard L. Ungar Associate Director General Government Di.vision Before the Subcommittee on Federal Services, Post Office, and Civil Service Committee on Governmental Affairs United States Senate 136040 ... |