Date |
Report No. |
Title |
Date Oct. 18, 2010 |
Report No. GAO-11-6 |
Title
United States Government Accountability Office GAO
October 2010 Report to Congressional Requesters SECURE BORDER INITIATIVE DHS Needs to Strengthen Management and Oversight of Its Prime Contractor GAO-11-6 October 2010 SECURE BORDER INITIATIVE
Accountability • Integrity • Reliability DHS Needs to Strengthen Management and Oversight of Its Prime Contractor
Highlights of GAO-11-6, a report to co... |
Date April 14, 2010 |
Report No. GAO-10-614T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 10:00 a.m. EDT Wednesday, April 14, 2010 Testimony Before the Committee on Homeland Security, House of Representatives HOMELAND SECURITY Federal Protective Service’s Use of Contract Guards Requires Reassessment and More Oversight
Statement of Mark L. Goldstein, Director Physical Infrastructure Issues GAO-10-61... |
Date April 13, 2010 |
Report No. GAO-10-341 |
Title
United States Government Accountability Office GAO
April 2010 Report to Congressional Requesters HOMELAND SECURITY Federal Protective Service’s Contract Guard Program Requires More Oversight and Reassessment of Use of Contract Guards GAO-10-341 April 2010 HOMELAND SECURITY Highlights
Highlights of GAO-10-341, a report to congressional requesters Accountability Integrity Reliability Federal Prote... |
Date March 4, 2010 |
Report No. GAO-10-266R |
Title
United States Government Accountability Office Washington, DC 20548 March 4, 2010 Congressional Committees Warfighter Support: A Cost Comparison of Using State Department Employees versus Contractors for Security Services in Iraq The U.S. government’s reliance on contractors, including the State Department’s and Department of Defense’s (DOD) use of private security contractors in Iraq, has b... |
Date Nov. 10, 2009 |
Report No. GAO-10-34 |
Title
United States Government Accountability Office GAO
November 2009 Report to Congressional Requesters TELECOMMUNICATIONS FCC Needs to Improve Oversight of Wireless Phone Service GAO-10-34 November 2009 TELECOMMUNICATIONS Highlights
Highlights of GAO-10-34, a report to congressional requesters Accountability Integrity Reliability FCC Needs to Improve Oversight of Wireless Phone Service Why GAO Did Th... |
Date Nov. 10, 2009 |
Report No. GAO-10-35SP |
Title
|
Date June 22, 2009 |
Report No. GAO-09-552 |
Title
United States Government Accountability Office GAO
June 2009 Report to Congressional Committees ARMY CORPS OF ENGINEERS Recent Changes Have Reduced the Use of Continuing Contracts, but Management Processes Need to Be Improved GAO-09-552 June 2009 ARMY CORPS OF ENGINEERS Highlights
Highlights of GAO-09-552, a report to congressional committees Accountability Integrity Reliability Recent Changes Hav... |
Date June 17, 2009 |
Report No. GAO-09-800T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 2:30 a.m. EDT Wednesday, June 17, 2009 Testimony Before the Committee on Commerce, Science, and Transportation, United States Senate TELECOMMUNICATIONS Preliminary Observations about Consumer Satisfaction and Problems with Wireless Phone Service and FCC’s Efforts to Assist Consumers with Complaints
Statement o... |
Date May 13, 2009 |
Report No. GAO-09-322 |
Title
United States Government Accountability Office GAO
May 2009 Report to Congressional Committees BEST PRACTICES High Levels of Knowledge at Key Points Differentiate Commercial Shipbuilding from Navy Shipbuilding GAO-09-322 May 2009 BEST PRACTICES Highlights
Highlights of GAO-09-322, a report to congressional committees Accountability Integrity Reliability High Levels of Knowledge at Key Points Diffe... |
Date Nov. 19, 2008 |
Report No. GAO-09-113R |
Title
United States Government Accountability Office Washington, DC 20548 November 19, 2008 Congressional Committees Subject: Mandate on the Department of Defense’s Contract Award Procedures for Directed Spending Items Section 830 of the National Defense Authorization Act for Fiscal Year 20081 directed GAO to compare procedures used for awarding noncompetitive defense contracts for new projects pursua... |
Date Dec. 15, 2006 |
Report No. GAO-07-275 |
Title
United States Government Accountability Office GAO
December 2006 Report to the Subcommittee on Interior, Environment, and Related Agencies, Committee on Appropriations, House of Representatives SMITHSONIAN INSTITUTION Additional Information Should Be Developed and Provided to Filmmakers on the Impact of the Showtime Contract GAO-07-275 December 2006 SMITHSONIAN INSTITUTION Highlights
Highlights of... |
Date Feb. 8, 2006 |
Report No. GAO-06-270 |
Title
United States Government Accountability Office GAO
February 2006 Report to Congressional Requesters FEDERAL CONTACT CENTERS Mechanism for Sharing Metrics and Oversight Practices along with Improved Data Needed GAO-06-270 February 2006 FEDERAL CONTACT CENTERS Highlights
Highlights of GAO-06-270, a report to congressional requesters Accountability Integrity Reliability Mechanism for Sharing Metrics ... |
Date March 3, 2005 |
Report No. GAO-05-361T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 10 a.m. EST March 3, 2005 Testimony Before the Committee on Government Reform, House of Representatives TELECOMMUNICATIONS GSA Has Made Progress Planning for a New Governmentwide Program, But Critical Issues Remain
Statement of Linda D. Koontz, Director Information Management Issues GAO-05-361T March 3, 2005 TEL... |
Date June 1, 2004 |
Report No. GAO-04-605 |
Title
United States General Accounting Office GAO
June 2004 Report to Congressional Committees REBUILDING IRAQ Fiscal Year 2003 Contract Award Procedures and Management Challenges GAO-04-605 a June 2004 REBUILDING IRAQ Fiscal Year 2003 Contract Award Procedures and Management Challenges Highlights of GAO-04-605, a report to congressional committees. Congress has appropriated more than $20 billion since ... |
Date Aug. 29, 2003 |
Report No. GAO-03-983 |
Title
United States General Accounting Office GAO
August 2003 Report to Congressional Committees CONTRACT MANAGEMENT Civilian Agency Compliance with Revised Task and Delivery Order Regulations GAO-03-983 a August 2003 CONTRACT MANAGEMENT Civilian Agency Compliance with Revised Task and Delivery Order Regulations Highlights of GAO-03-983, a report to Congressional Committees Multiple-award task and deliv... |
Date April 4, 2003 |
Report No. GAO-03-369 |
Title
United States General Accounting Office GAO
April 2003 Report to the Chairman, Committee on Government Reform, House of Representatives TELECOMMUNICATIONS GSA Needs to Improve Process for Awarding Task Orders for Local Service GAO-03-369 a April 2003 TELECOMMUNICATIONS GSA Needs to Improve Process for Awarding Task Orders for Local Services Highlights of GAO-03-369, a report to the Chairman, Commi... |
Date March 31, 2003 |
Report No. GAO-03-504SP |
Title
United States General Accounting Office Washington, DC 20548 March 31, 2003 Subject: Catalogue of GAO and Inspectors General Reports on Contracting Issues for Fiscal Years 1997 through 2002 Dear User: The federal government spent more than $230 billion through contracts with private industry in fiscal year 2001. Ten Executive Branch agencies1 account for almost 95 percent of this spending. Past re... |
Date Jan. 17, 2003 |
Report No. GAO-03-230 |
Title
United States General Accounting Office GAO
January 2003 Report to the Chairman and Ranking Member, Committee on Small Business, House of Representatives CONTRACT MANAGEMENT Postal Service’s National Office Supply Contract Has Not Been Effectively Implemented GAO-03-230 January 2003 CONTRACT MANAGEMENT Postal Service’s National Office Supply Contract Has Not Been Effectively Implemented Highli... |
Date March 1, 2002 |
Report No. GAO-02-36 |
Title
United States General Accounting Office GAO
March 2002 Report to Congressional Committees METROPOLITAN WASHINGTON AIRPORTS AUTHORITY Contracting Practices Do Not Always Comply with Airport Lease Requirements GAO-02-36 Contents Letter Results in Brief Background MWAA Has Not Satisfied Its Obligation to Publish the Procedures It Uses to Award Contracts Competitively MWAA Has Not Always Satisfied Its... |
Date April 14, 2000 |
Report No. T-NSIAD-00-140 |
Title
United States General Accounting Office GAO
For Release on Delivery Expected at 1:00 p.m., CDT Friday, April 14, 2000 Testimony
Before the Subcommittee on Personnel, Committee on Armed Services, U.S. Senate CONTRACT MANAGEMENT DOD’s Anthrax Vaccine Manufacturer Will Continue to Need Financial Assistance
Statement of David E. Cooper, Associate Director Defense Acquisition Issues National Security... |
Date May 7, 1999 |
Report No. RCED-99-141 |
Title
United States General Accounting Office GAO
May 1999 Report to the Committee on Science, House of Representatives NATIONAL LABORATORIES DOE Needs to Assess the Impact of Using Performance-Based Contracts GAO/RCED-99-141 GAO United States General Accounting Office Washington, D.C. 20548 Resources, Community, and Economic Development Division B-282356 May 7, 1999 The Honorable F. James Sensenbrenner... |
Date Oct. 8, 1998 |
Report No. RCED-99-13 |
Title
United States General Accounting Office GAO
October 1998 Report to Congressional Requesters NUCLEAR WASTE Department of Energy’s Hanford Tank Waste Project— Schedule, Cost, and Management Issues GAO/RCED-99-13 GAO United States General Accounting Office Washington, D.C. 20548 Resources, Community, and Economic Development Division B-281093 October 8, 1998 The Honorable Thomas J. Bliley, Jr. Ch... |
Date Oct. 8, 1998 |
Report No. T-RCED-99-21 |
Title
United States General Accounting Office GAO
For Release on Delivery Expected at 10:00 a.m. EDT Thursday October 8, 1998 Testimony
Before the Subcommittee on Oversight and Investigations, Committee on Commerce, House of Representatives NUCLEAR WASTE Schedule, Cost, and Management Issues at DOE’s Hanford Tank Waste Project
Statement of Ms. Gary L. Jones, Associate Director, Energy, Resources, and ... |
Date Dec. 12, 1997 |
Report No. NSIAD-98-20 |
Title
United States General Accounting Office GAO
December 1997 Report to the Secretary of Defense DEFENSE ACQUISITION Guidance Is Needed on Payments for Conditionally Accepted Items GAO/NSIAD-98-20 GAO United States General Accounting Office Washington, D.C. 20548 National Security and International Affairs Division B-278211 December 12, 1997 The Honorable William S. Cohen The Secretary of Defense Dear... |
Date Nov. 4, 1997 |
Report No. T-HEHS-98-22 |
Title
United States General Accounting Office GAO
For Release on Delivery Expected at 2 p.m. Tuesday, November 4, 1997 Testimony
Before the Subcommittee on Human Resources and Intergovernmental Relations, Committee on Government Reform and Oversight, House of Representatives CHILD SUPPORT ENFORCEMENT PRIVATIZATION Challenges in Ensuring Accountability for Program Results
Statement of Mark V. Nadel, Asso... |
Date Aug. 29, 1997 |
Report No. HEHS-97-175 |
Title
United States General Accounting Office GAO
August 1997 Report to Congressional Requesters MANAGED CARE Explicit Gag Clauses Not Found in HMO Contracts, But Physician Concerns Remain GAO/HEHS-97-175 GAO United States General Accounting Office Washington, D.C. 20548 Health, Education, and Human Services Division B-276001 August 29, 1997 The Honorable Trent Lott The Honorable Don Nickles The Honorab... |
Date Aug. 26, 1996 |
Report No. RCED-96-217 |
Title
United States General Accounting Office GAO
August 1996 Report to Congressional Committees SCHOOL LUNCH PROGRAM Role and Impacts of Private Food Service Companies G A O years
1921 - 1996 GAO/RCED-96-217 GAO United States General Accounting Office Washington, D.C. 20548 Resources, Community, and Economic Development Division B-272507 August 26, 1996 Congressional Committees In the Healthy Meals for... |
Date July 26, 1996 |
Report No. NSIAD-96-126 |
Title
United States General Accounting Office GAO
July 1996 Report to the Honorable Norman D. Dicks, House of Representatives C-17 AIRCRAFT RM&A Evaluation Less Demanding Than Initially Planned G A O years
1921 - 1996 GAO/NSIAD-96-126 GAO United States General Accounting Office Washington, D.C. 20548 National Security and International Affairs Division B-271484 July 26, 1996 The Honorable Norman D. Dick... |
Date Nov. 29, 1995 |
Report No. T-RCED-96-38 |
Title
United States General Accounting Testimony Office Before the Subcommittee on Forests and Public Lands Management, Committee on Energy and Natural Resources United States Senate and the Timber Salvage Task Force, Resources Committee, Mouse of Representatives
For Release on Delivery Expected at 9:30 a.m. EDT Wednesday November 29, I995 James K. Meissner, Associate Director Natural Resources Manageme... |
Date Aug. 25, 1994 |
Report No. RCED-94-202 |
Title
Resources, Community, and Economic Development Division B-246522 August 25,1994 The Honorable John D. Dingell Chairman, Subcommittee on Oversight and Investigations Committee on Energy and Commerce House of Representatives Dear Mr. Chairman: As you requested, this report provides information on the &year contracts that went into effect in 1992 between the Department of Energy (DOE) and the Univer... |
Date July 19, 1994 |
Report No. NSIAD-94-173 |
Title
United States General Accounting Offhx GAO
July 1994 Report to the Chairman,’ Legislation and: National Security Subcommittee, Committee on Government Operations, House of j3epresetitAives ,Pm?NERSHIPS :
“. .. ” Customer-Supplier Relationships Cm Be Improved Through ‘ Partnering I - GAO United States General Accounting Office D.C. 20648 Washington, National Security and International AfTai... |
Date July 11, 1994 |
Report No. RCED-94-249R |
Title
GAO United States General Accounting Office Washington, D.C. 20648 Resources, Community, Economic Development and Division B-257581 July 11, 1994 Mr. Donald W. Pearman, Jr. Acting Associate Deputy Secretary for Field Management Department of Energy Dear Mr. Pearman: We recently examined the Department of Energy's (DOE) property management activities at its S,avannah River Site in South Carolina an... |
Date June 9, 1994 |
Report No. AIMD-94-142R |
Title
GAO United States General Accounting OMce Washington, D.C. 20548 Accounting and Information Management Division /s/34:, B-257520
June 9, 1994 The Honorable The Secretary Hazel R. O'Leary of Energy Dear Madam Secretary: The purpose of this letter is to inform you of our concerns subcontract regarding a Lawrence Livermore National Laboratory in support of the Department of Energy's International Nuc... |
Date April 19, 1994 |
Report No. T-NSIAD-94-166 |
Title
United States General Accounting Office GAO
For Release Delivery on Expectedat IO:00 am., EDT,
Tuesday April 19. 1994 Testimony
Before the Subcommittee RegionalDefenseand on ContingencyForces,Committeeon Armed Services, United StatesSenate MILITARY AIRLIFT The C-17 Program Update and ProposedSettlementStatement Frank C. Conahan,AssistantComptroller General, of National Securityand InternationalAff... |
Date Jan. 24, 1994 |
Report No. NSIAD-94-90R |
Title
I GAO United States General Accounting OffIce Washington, D.C. 20648 1 L
/ /50 a39 j 1 r National Security and International Affairs Division B-256000 January 24, 1994 The Honorable John Conyers, Jr. Chairman, Committee on Government Operations House of Representatives Dear Mr. Chairman: As you know, a number of efforts are underway to reform the Department of Defense (DOD), and overall federal, p... |
Date April 10, 1992 |
Report No. RCED-92-101 |
Title
Zlrri t,ecl Stattw C~JM+ Accounting - .._....-._. -...-___^. __.-. ..._... Offke _--. ._.-.-_----. _.._ -.-...-__- . ib Report to the Chairman, Subcommittee on Investigations and Oversighk, Committee on Science, Space, and Technology, House of Representatives : ENERGY MANAGEMENT Vulnerability of DOE’ s Contracting to Waste, Fraud, Abuse, and Mismanagement
--.-... ^^ ~.. - _.._..^ .._.. __ “ll.... |
Date April 2, 1992 |
Report No. NSIAD-92-15 |
Title
United States General Accounting Office GAO
April 1992 Report to the Honorable IVillim V. Roth, Jr., U.S. Senate DEFENSE PROCUREMENT DOD Should Assess Cost Impact of Contractor Teaming Arrangements GAO United States General Accounting Office Washington, D.C. 20648 National Security and International Affairs Division B-239843 April 2, 1992 The Honorable William V. Roth, Jr. United States Senate Dea... |
Date Feb. 24, 1992 |
Report No. NSIAD-92-145R |
Title
‘< ,*“a [4 s q 3 6
United S ta te s G e n e r a l A c c o u n tin g O fRce W w h i n g to n , D ,C. 2 0 5 4 1 1 N a tio n a l Security a n d In te r n a tio n a l Nairs Division GAO B -246524
February 24, 1992 T h e H o n o r a b l e L e s A spin C h a irm a n , C o m m itte e o n A r m e d S e rvices H o u s e o f R e p r e s e n ta tive s D e a r M r. C h a irm a n : w e a r e providing you ... |
Date Dec. 31, 1991 |
Report No. RCED-92-67 |
Title
U@WR Stat&s General Accaunthg Office GAO
December 1991 Report to the Congressional Committees : _., ! ‘ , &gj gg;{y%tgfice , -a
Resources, Community, Economic Development and Division B-243558 December 31,199l Congressional Recipients This report, mandated by Section 1173(f) of the Food, Agriculture, Conservation, and Trade Act of 1990 (P.L. lOf-624), discusses the processing of commodities dona... |
Date Sept. 17, 1991 |
Report No. RCED-91-1 |
Title
/‘ I _---- I;rrit,tvl _----__-.-“.._ll,I..-_ -_-----l_._-___.-..--ll States (kneral Acwmnting Office / GAO Report, to-?& Chairman, Subcommittee “” ! on M ineral Resources Development and Production Committee on Energy and Natural Rekurces, U.S. Senak M INERAL RESOURCES Interior’ Use of Oil s and Gas Development Contracts llllllll RR llll
i 145032 -- GAO United States General Accounting O... |
Date April 11, 1991 |
Report No. T-NSIAD-91-15 |
Title
United States General Accounting Office / L1/3 -5_A gf GAO Testimony III II llllll
143589 For Release on Delivery Expected at 1O:OO a.m. EDT, Thursday, April 11, 1991 Information on the A-12 Default Termination Joint Statement of Paul F. Math, Director, Research, Development, Acquisition, and Procurement Issues Director, Navy Issues Brad Hathaway, Associate National Security and International Affa... |
Date March 14, 1991 |
Report No. AFMD-91-39 |
Title
--Alit tx*II; IO07 I * ~-_----- LEASE REFINANCING A DOD-Wide Program Is Not Currently Feasible 1; 1 -. .._.._. -..-.-_._ .._-I_._ -----_-.---..- _-_--.-_-_.-___ Accounting and Financial Management Division H-235188 March 14,1991 The Honorable John Conyers, Jr. Chairman, Committee on Government Operations House of Representatives Dear Mr. Chairman: In response to your request, we evaluated the feas... |
Date Sept. 28, 1990 |
Report No. NSIAD-90-276 |
Title
i United States General Accounting Office ; “A0 a
September 1990 Report to the Chairman, Subcommittee on Readiness, Committee on Armed Services, Ho&e 1 of Representatives ’ ‘. DOD PROCUREMENT Cost-Per-CopyService Can ReduceCopying costs I i RESTRICTED --Not to be released outside the General Accounting Offlce nnless specifically approved by the OiPlce of Congressional Relations. GAO/NSIAD-SO... |
Date Aug. 17, 1990 |
Report No. NSIAD-90-230FS |
Title
I : .‘i - . United States General Accounting Office GAO
August 1990 Fact Sheet for the Chairman, Committee on Armed Services, House of Representatives B-2 BOMBER Contract Structure and Selected Provisions GAO,‘NSIAD90-230FS c GAO United States General Accounting Office Washington, D.C. 20548 National Security and International Affairs Division B-224698 August 17,199O The Honorable Les Aspin Ch... |
Date Sept. 27, 1989 |
Report No. NSIAD-89-57 |
Title
- United States General Accounting Office - GAO
September 1989 Report to the Secretary of Defense DOD WARRANTIES Effective Adrninistration Systems Are Needed to Implement Warranties GAO,‘NSIAD-89-57 .; 7 ; National Security and International Affairs Division B-218845 September 27, 1989 The Honorable Richard B. Cheney The Secretary of Defense Dear Mr. Secretary: This report assesses the Departmen... |
Date Sept. 25, 1989 |
Report No. GGD-89-117BR |
Title
svpt t’llllwl’ I!#!) TENNESSEE VALLEY AUTHORITY Special Air Transportation Services Provided to Manager of Nuclear Power . .I. _--..” _-..- _.^I.. _ - - - .._- -._. -.... - -._. -- .__....I__.._ ._._ _.--_. II__ _I ._.-_ _._.” . . .._. _.... -- ___.. I: GAO General united states
Accounting Of&e WaeNngton, D.C. 20548 Division General Government B-231245.4 September26,1989 The Honorable Mike... |
Date Sept. 5, 1989 |
Report No. GGD-89-109 |
Title
0 United States General Accounting Office GAO
September 1989 Report to the Chairman, Legislation and National Security Subcommittee, Committee on Government Operations, House of Representatives CIVILIAN AGENCY PROCUREMENT Improvements Needed in Contracting and Contract Administration General Government Division B-232888 September 5, 1989 The Honorable John Conyers, Jr. Chairman, Legislation and Na... |
Date Aug. 9, 1989 |
Report No. RCED-89-183 |
Title
_~I( SCHOOL LUNC PROGRAM Buy American Procedures at Schools With Cash or Credit in Lieu of Food United States General Accounting Office Washington, D.C. 20648 Resources, Community, and Economic Development Division B-222207 August 9,1989 The Honorable Tom Harkin Chairman, Subcommittee on Nutrition and Investigations Committee on Agriculture, Nutrition and Forestry United States Senate The Honorabl... |
Date July 13, 1989 |
Report No. NSIAD-89-127 |
Title
; f United States General Accounting Office GAO
July 1989 Report to the Chairman, Legislation and National Security Subcommittee, Committee on Government Operations, House of Representatives TEST AND EVALUATION Reducing Risks to Military Aircraft From Bird Collisions GAO united states
General Accounting Office Washington, D.C. 20648 National Security and International Affairs Division B-222886 Jul... |
Date Jan. 26, 1989 |
Report No. GGD-89-32 |
Title
United States GenerafAccaknting Office GAO
January 1989 Report to the Chairman, Committee on Small Business, House of Representatives PROCUREMENT Public Utilities’ Compliance With Subcontracting Plan Requirements About Our New Cover... The new color of our report covers represents the latest step in GAO'S efforts to improve the presentation of our reports. United States General Accounting Office... |