Date |
Report No. |
Title |
Date June 13, 2011 |
Report No. GAO-11-752T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 1:30 p.m. EDT Monday, June 13, 2011 Testimony Before the Subcommittee on Energy and Power, Committee on Energy and Commerce, House of Representatives NUCLEAR MATERIAL DOE's Depleted Uranium Tails Could Be a Source of Revenue for the Government
Statement of Gene Aloise, Director Natural Resources and Environment ... |
Date June 3, 2011 |
Report No. GAO-11-563 |
Title
United States Government Accountability Office GAO
June 2011 Report to Congressional Requesters NUCLEAR REGULATORY COMMISSION Oversight of Underground Piping Systems Commensurate with Risk, but Proactive Measures Could Help Address Future Leaks GAO-11-563 June 2011 NUCLEAR REGULATORY COMMISSION
Accountability • Integrity • Reliability Oversight of Underground Piping Systems Commensurate with R... |
Date April 29, 2010 |
Report No. GAO-10-489 |
Title
United States Government Accountability Office GAO
April 2010 Report to the Chairman, Subcommittee on Oversight of Government Management, the Federal Workforce, and the District of Columbia, Committee on Homeland Security and Governmental Affairs, U.S. Senate NUCLEAR SAFETY Convention on Nuclear Safety Is Viewed by Most Member Countries as Strengthening Safety Worldwide GAO-10-489 April 2010 NUCLE... |
Date April 29, 2010 |
Report No. GAO-10-550SP |
Title
|
Date April 3, 2008 |
Report No. GAO-08-613T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 10:00 a.m. EDT Thursday, April 3, 2008 Testimony Before the Subcommittee on Oversight and Investigations, Committee on Energy and Commerce, House of Representatives NUCLEAR MATERIAL Several Potential Options for Dealing with DOE’s Depleted Uranium Tails Could Benefit the Government
Statement of Robert A. Robin... |
Date March 31, 2008 |
Report No. GAO-08-606R |
Title
United States Government Accountability Office Washington, DC 20548 March 31, 2008 Congressional Requesters Subject: Nuclear Material: DOE Has Several Potential Options for Dealing with Depleted Uranium Tails, Each of Which Could Benefit the Government Since the 1940s, one mission of the Department of Energy (DOE) and its predecessor agencies has been processing uranium as a source of nuclear mate... |
Date Nov. 15, 2007 |
Report No. GAO-08-277T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 10:00 a.m. EST Thursday, November 15, 2007 Testimony Before the Committee on Energy and Natural Resources, U.S. Senate URANIUM ENRICHMENT Extension of Decontamination and Decommissioning Fund May Be Needed to Cover Projected Cleanup Costs
Statement of Robin M. Nazzaro, Director Natural Resources and Environment ... |
Date Jan. 17, 2007 |
Report No. GAO-07-105 |
Title
United States Government Accountability Office GAO
January 2007 Report to the Subcommittee on Oversight of Government Management, the Federal Workforce, and the District of Columbia, Committee on Homeland Security and Governmental Affairs, U.S. Senate HUMAN CAPITAL Retirements and Anticipated New Reactor Applications Will Challenge NRC’s Workforce GAO-07-105 January 2007 HUMAN CAPITAL Highlights... |
Date Sept. 27, 2006 |
Report No. GAO-06-1029 |
Title
United States Government Accountability Office GAO
September 2006 Report to Congressional Requesters NUCLEAR REGULATORY COMMISSION Oversight of Nuclear Power Plant Safety Has Improved, but Refinements Are Needed GAO-06-1029 a September 2006 NUCLEAR REGULATORY COMMISSION Highlights
Highlights of GAO-06-1029, a report to congressional requesters Accountability Integrity Reliability Oversight of Nucl... |
Date Sept. 20, 2006 |
Report No. GAO-06-1110T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 1:00 p.m. EDT Wednesday, September 20, 2006 Testimony Before the Subcommittee on Energy and Resources, Committee on Government Reform, House of Representatives NUCLEAR ENERGY DOE’s Next Generation Nuclear Plant Project Is at an Early Stage of Development
Statement of Jim Wells, Director Natural Resources and E... |
Date Sept. 20, 2006 |
Report No. GAO-06-1056 |
Title
United States Government Accountability Office GAO
September 2006 Report to the Chairman, Subcommittee on Energy and Resources, Committee on Government Reform, House of Representatives NUCLEAR ENERGY Status of DOE’s Effort to Develop the Next Generation Nuclear Plant GAO-06-1056 September 2006 NUCLEAR ENERGY Highlights
Highlights of GAO-06-1056, a report to the Chairman, Subcommittee on Energy a... |
Date June 19, 2006 |
Report No. GAO-06-888T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 4:00 p.m. EDT Monday, June 19, 2006 Testimony Before the Subcommittee on Oversight and Investigations, Committee on Energy and Commerce, U.S. House of Representatives NUCLEAR REGULATORY COMMISSION Preliminary Observations on Its Process to Oversee the Safe Operation of Nuclear Power Plants
Statement of Jim Wells... |
Date June 15, 2006 |
Report No. GAO-06-886T |
Title
United States Government Accountability Office GAO
Not to Be Released Before 9:30 a.m. EDT Thursday, June 22, 2006 Testimony Before the Subcommittee on Clean Air, Climate Change, and Nuclear Safety, Committee on Environment and Public Works, United States Senate NUCLEAR REGULATORY COMMISSION Preliminary Observations on Its Oversight to Ensure the Safe Operation of Nuclear Power Plants
Statement fo... |
Date April 4, 2006 |
Report No. GAO-06-555T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 2:00 p.m. EDT Tuesday, April 4, 2006 Testimony Before the Subcommittee on National Security, Emerging Threats, and International Relations, House Committee on Government Reform NUCLEAR POWER Plants Have Upgraded Security, but the Nuclear Regulatory Commission Needs to Improve Its Process for Revising the Design ... |
Date March 14, 2006 |
Report No. GAO-06-388 |
Title
United States Government Accountability Office GAO
March 2006 Report to the Chairman, Subcommittee on National Security, Emerging Threats, and International Relations, Committee on Government Reform, House of Representatives NUCLEAR POWER PLANTS Efforts Made to Upgrade Security, but the Nuclear Regulatory Commission’s Design Basis Threat Process Should Be Improved GAO-06-388 a March 2006 NUCLEAR... |
Date May 26, 2005 |
Report No. GAO-05-754T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 10:00 a.m. EDT Thursday, May 26, 2005 Testimony Before the Subcommittee on Clean Air, Climate Change, and Nuclear Safety, Committee on Environment and Public Works, U.S. Senate NUCLEAR REGULATORY COMMISSION Challenges Facing NRC in Effectively Carrying Out Its Mission
Statement of Jim Wells, Director Natural Res... |
Date Sept. 14, 2004 |
Report No. GAO-04-1064T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 10:00 a.m. EDT Tuesday, September 14, 2004 Testimony
Before the Subcommittee on National Security, Emerging Threats, and International Relations, Committee on Government Reform, House of Representatives NUCLEAR REGULATORY COMMISSION Preliminary Observations on Efforts to Improve Security at Nuclear Power Plants
... |
Date May 28, 2004 |
Report No. GAO-04-654 |
Title
United States General Accounting Office GAO
May 2004 Report to Congressional Requesters NUCLEAR REGULATION NRC’s Liability Insurance Requirements for Nuclear Power Plants Owned by Limited Liability Companies GAO-04-654 a May 2004 NUCLEAR REGULATION NRC’s Liability Insurance Requirements for Nuclear Power Plants Owned by Limited Liability Companies Highlights of GAO-04-654, a report to congress... |
Date May 17, 2004 |
Report No. GAO-04-415 |
Title
United States General Accounting Office GAO
May 2004 Report to Congressional Requesters NUCLEAR REGULATION NRC Needs to More Aggressively and Comprehensively Resolve Issues Related to the Davis-Besse Nuclear Power Plant’s Shutdown GAO-04-415 a May 2004 NUCLEAR REGULATION NRC Needs to More Aggressively and Comprehensively Resolve Issues Related to the Davis-Besse Nuclear Power Plant’s Shutdown ... |
Date Oct. 30, 2003 |
Report No. GAO-04-32 |
Title
United States General Accounting Office GAO
October 2003 Report to the Honorable Edward J. Markey, House of Representatives NUCLEAR REGULATION NRC Needs More Effective Analysis to Ensure Accumulation of Funds to Decommission Nuclear Power Plants GAO-04-32 a October 2003 NUCLEAR REGULATION NRC Needs More Effective Analysis to Ensure Accumulation of Funds to Decommission Nuclear Power Plants Highlig... |
Date March 10, 2003 |
Report No. GAO-03-528T |
Title
United States General Accounting Office GAO
For Release on Delivery Expected at 2.00 p.m. Monday, March 10, 2003 Testimony
Before the Subcommittee on National Security, Emerging Threats and International Relations, Committee on Government Reform, House of Representatives NUCLEAR REGULATION Emergency Preparedness Issues at the Indian Point 2 Nuclear Power Plant
Statement of Jim Wells, Director Natu... |
Date Dec. 21, 2001 |
Report No. GAO-02-191 |
Title
United States General Accounting Office GAO
December 2001 Report to Congressional Requesters NUCLEAR WASTE Technical, Schedule, and Cost Uncertainties of the Yucca Mountain Repository Project GAO-02-191 Contents Letter
Results in Brief Background It May Be Premature for DOE to Make a Site Recommendation DOE Is Unlikely to Open a Repository in 2010 as Planned Conclusions Recommendations for Executi... |
Date Dec. 3, 2001 |
Report No. GAO-02-48 |
Title
United States General Accounting Office GAO
December 2001 Report to the Honorable Edward J. Markey, House of Representatives NUCLEAR REGULATION NRC’s Assurances of Decommissioning Funding During Utility Restructuring Could Be Improved GAO-02-48 Contents Letter Executive Summary
Background Results in Brief Principal Findings Recommendations for Executive Action Agency Comments and GAO’s Evaluat... |
Date July 30, 2001 |
Report No. GAO-01-605 |
Title
United States General Accounting Office GAO
July 2001 Report to Congressional Requesters NUCLEAR REGULATION Progress Made in Emergency Preparedness at Indian Point 2, but Additional Improvements Needed GAO-01-605 Contents Letter
Results in Brief Background Consolidated Edison Has Taken Actions to Resolve Emergency Preparedness Weaknesses, but More Needs to Be Done The Four Counties Strengthened Th... |
Date Jan. 1, 2001 |
Report No. GAO-01-259 |
Title
d01259.book Page 1 Tuesday, January 16, 2001 11:39 AM United States General Accounting Office GAO
January 2001 Performance and Accountability Series Major Management Challenges and Performance Risks
Nuclear Regulatory Commission GAO-01-259 d01259.book Page 2 Tuesday, January 16, 2001 11:39 AM d01259.book Page 1 Tuesday, January 16, 2001 11:39 AM Contents Letter Overview Major Performance and Accou... |
Date March 9, 2000 |
Report No. T-RCED-00-115 |
Title
United States General Accounting Office GAO
For Release on Delivery Expected at 9 a.m. EDT Thursday, March 9, 2000 Testimony
Before the Subcommittee on Clean Air, Wetlands, Private Property, and Nuclear Safety, Committee on Environment and Public Works, U.S. Senate NUCLEAR REGULATION Regulatory and Cultural Changes Challenge NRC
Statement of Ms. Gary L. Jones, Associate Director, Energy, Resources... |
Date Jan. 19, 2000 |
Report No. RCED-00-29 |
Title
United States General Accounting Office GAO
January 2000 Report to the Chairman, Subcommittee on Clean Air, Wetlands, Private Property, and Nuclear Safety, Committee on Environment and Public Works, U.S. Senate NUCLEAR REGULATION NRC Staff Have Not Fully Accepted Planned Changes GAO/RCED-00-29 Contents Letter Appendixes
Appendix I: Results of GAO’s Survey of NRC’s Staff 3 24 44 59 Appendix II:... |
Date May 3, 1999 |
Report No. RCED-99-75 |
Title
United States General Accounting Office GAO
May 1999 Report to Congressional Requesters NUCLEAR REGULATION Better Oversight Needed to Ensure Accumulation of Funds to Decommission Nuclear Power Plants GAO/RCED-99-75 GAO United States General Accounting Office Washington, D.C. 20548 Resources, Community, and Economic Development Division B-281946 May 3, 1999 The Honorable John D. Dingell The Honorab... |
Date March 19, 1999 |
Report No. RCED-99-95 |
Title
United States General Accounting Office GAO
March 1999 Report to Congressional Requesters NUCLEAR REGULATION Strategy Needed to Regulate Safety Using Information on Risk GAO/RCED-99-95 GAO United States General Accounting Office Washington, D.C. 20548 Resources, Community, and Economic Development Division B-281928 March 19, 1999 The Honorable Joseph R. Biden, Jr. United States Senate The Honorabl... |
Date Feb. 4, 1999 |
Report No. T-RCED-99-71 |
Title
United States General Accounting Office GAO
For Release on Delivery Expected at 9 a.m. EST Thursday February 4, 1999 Testimony
Before the Subcommittee on Clean Air, Wetlands, Private Property, and Nuclear Safety, Commmittee on Environment and Public Works, U.S. Senate NUCLEAR REGULATORY COMMISSION Strategy Needed to Develop a Risk-Informed Safety Approach
Statement of Ms. Gary L. Jones, Associate ... |
Date Jan. 1, 1999 |
Report No. OCG-99-19 |
Title
United States General Accounting Office GAO Performance and Accountability Series January 1999 Major Management Challenges and Program Risks Nuclear Regulatory Commission GAO/OCG-99-19 GAO United States General Accounting Office Washington, D.C. 20548 Comptroller General of the United States January 1999 The President of the Senate The Speaker of the House of Representatives This report addresses ... |
Date Oct. 3, 1995 |
Report No. RCED-96-10 |
Title
United States General Accounting Office GAO
October 1995 Report to the Ranking Minority Member, Committee on Commerce, House of Representatives NUCLEAR REGULATION Weaknesses in NRC’s Inspection Program at a South Texas Nuclear Power Plant GAO/RCED-96-10 GAO United States General Accounting Office Washington, D.C. 20548 Resources, Community, and Economic Development Division B-262200 October 3, 1... |
Date Oct. 7, 1993 |
Report No. RCED-94-6 |
Title
United States General Accounting Office GAO
October 1993 Report to the Chairman, Subcommittee on Investigations and Oversight, Committee on Science, Space, and ?‘ echnology.House of Representatives ~T\TUCLEAR SCIENCE More Planning Needed ‘ Support Future to Needs for Electric Power in Space ‘ ,: .’ ., .., ,. ,- 1. : ._I ~ . GAO United States
General Accounting Offlce Washington, D.C. 20648... |
Date June 10, 1992 |
Report No. RCED-92-165 |
Title
IJnited GAO
_.--- _.-... . ...- States .._ . .._ _.______._____ Office General Accounting ~_.._ ~--__-_--_- ....- _.- Rep&-t to Congressional Requesters _-..._-.._ ------_-----~ .____--- June 1992 NUCLEAR WASTE Status of Actions to Improve DOE User-Fee Assessments 147072 .-.-.IC--GAOAXCED-92-166 RESTRICTED--Not to be release& outside the General Accounting Office unless specifically approved by th... |
Date March 13, 1992 |
Report No. RCED-92-56 |
Title
Report to Congressional Requesters i March 1992 NUCLEAR WASTE Development of Casks for Transporting Spent Fuel Needs Modification llllllllll Ill II
146243 ICTED--Not to be released outs1 e t e 1 Accounting Office unless specifically ved by the Office of Congressional RELE$S~D 18, ii ! .A6 .^” I,. __ _ _. ^. _ .: t _._1. -..” ..-. _. _____ -.__ -.-----~---_-1 1 GAO United States General Account... |
Date March 12, 1992 |
Report No. T-NSIAD-92-15 |
Title
United States General Accounting Office Testimony
Before the Subcommittee on Investigations and Oversight, Committee on Science, Space, and Technology, House of Representatives For Releaseon Delivery Expectedat 9:30 a.m., EST Thursday, March 12,1992 THE SP-100 NUCLEAR REACTOR PROGRAM Should It Be Continued?
Statement of Mark E. Gebicke, Director, NASA Issues National Security and International Aff... |
Date Nov. 4, 1991 |
Report No. NSIAD-92-28 |
Title
--~I_(-_ ----.__ ._.. -.--i~--_---~“.-l- Novtwh~r I !t!I 1 NUCLEAR POWER SAFETY Chernobyl Accident Prompted Worldwide Actions but Further Efforts Needed National Security and
International Affairs Division B-230418 November 4,199l The Honorable John Glenn Chairman, Committee on Governmental Affairs United States Senate Dear Mr. Chairman: As you requested, we are providing information on (1) vari... |
Date May 8, 1991 |
Report No. T-RCED-91-52 |
Title
’ , ‘ United States General Accounting OfTice / I * GAO
For Release on Delivery Expectedat 2.40 pm. EDT Wednesday May 8,1991 Testimony 143828 NUCLEAR WASTE
Changes Needed in DOE User-Fee Assessments Statement of Judy England-Joseph AssociateDirector, Energy Issues Resources,Community, and Economic Development Division
Before the Subcommitteeon Energy and Power Committee on Energy and Commerce ... |
Date April 10, 1991 |
Report No. T-RCED-91-23 |
Title
United States General Accounting Office / f’ 3 5’ 7 6 GAO
For Release on Delivery Expectedat 2p.m. EDT Wednesday April lo,1991 Testimony .
143576 URANIUM ENRICHMENT GAO’ Views on DOE’ New Laser s s Enrichment Technology--AVLIS
Statement of Victor S. Rezendes, Director Energy Issues Resources, Community, and Economic Development Division
Before the Subcommittee on Energy Research and Develo... |
Date Dec. 17, 1990 |
Report No. RCED-91-36 |
Title
-...-. -l-..----l-.--_---. --___.._ .,... “..“” ^_ _“-_. -..I” Ilr~il.t~cl St,aCt~s G$*leral “___.._ ._,__..._. __.. ..~“_ Atw~urrting .“~-- Of’f’iw ~.-~ ----.._.-_-__ -_ --___ Ihw~llll,t~r l!M) NUCLEAR REGULATION NRC’s Efforts to Ensure Effective Maintenance Are Incomplete 142846 -..--- - (;AO/‘K(:EI)-!)l-:~ri t Resources, Community, and Economic Development Division B-241... |
Date Sept. 4, 1990 |
Report No. RCED-90-208 |
Title
GAO
st~p1 t’llllwl’ l!)!N NUCLEAR RESiQiRCH AND DEVELOPMENT Shippingport DecommissioningHow Applicable Are the Lessons Learned? (;,A20 KWD-W-2i)Sf --- United States General Accounting Office Washington, D.C. 20548 Resources, Community, and Economic Development Division B-239632.2 September 4, 1990 The Honorable Robert A. Roe Chairman, Committee on Science, Space, and Technology House of Repres... |
Date June 7, 1990 |
Report No. RCED-90-65 |
Title
: : ,. a: . .I .., ., s ; :;: .‘.‘, .. .‘. ,’ .” i, /; ‘Y, ; ‘.: _,” . : GAO United States General Accounting Office Washington, D.C. 20548 Comptroller General of the United States B-202377.15 June 7,199O To the President of the Senate and the Speaker of the House of Representatives This report presents the results of our fifth annual audit of the Department of Energy’s efforts ... |
Date June 7, 1990 |
Report No. RCED-90-171 |
Title
United States General Accounting Office GAO
June 1990 Report to the Honorable Vie Fazio, House of Representatives 1 NUCLEAR R & D Usefulness of Information From Shippingport Decommissioning for Ranch0 Seco ’ GAO/RCED-90- 17 1 United States General Accounting Office Washington, D.C. 20548 Resources, Community, Economic Development and Division B-239632 June 7,199O The Honorable Vie Fazio House of... |
Date Sept. 30, 1989 |
Report No. T-RCED-89-64 |
Title
- United States General Accounting Offke &A0
For Release on Delivery Expected at 10:00 a.m. EDT Saturday September 30, 1989 Testimony Usefulness Ground-Based of Space Nuclear Power Research Systems to Reactor Statement of Keith 0. Fultz, Director, Resources, Community, and Development Division Energy Issues Economic Before the Energy Research and Development Subcommittee Committee ofi Science, Spa... |
Date Sept. 27, 1989 |
Report No. RCED-89-212 |
Title
fii V i 2 .-- f = - i , 1 P GAO United States General Accounting Office Washington, D.C. 20548 Resources, Qmununity, and Economic Development Division B-236604 September27,198Q The Honorable J. James Exon Chairman, Subcommittee on Strategic Forces and Nuclear Deterrence Committee on Armed Services United States Senate The Honorable John M. Spratt, Jr. Chairman, Department of Energy DefenseNuclear ... |
Date June 6, 1989 |
Report No. RCED-89-134BR |
Title
United States General Accounting Office GAO
June 1989 I Briefing Report to Congressional Requesters NUCLEAR SCIENCE DOE Richland Role in the Proposal to Convert Washington Nuclear Plant No. 1 GAO/RCED-89-134BR GAO United States General Accounting Office Washington, D.C.20548 Resources, Community, Economic Development and Division B-233552 June6,1989 The Honorable George Miller Subcommittee on Wate... |
Date May 4, 1989 |
Report No. RCED-89-95 |
Title
GAO May NUCLEAR l!)H!b
._._ _-._ ._ ._.I-.. _ “...l_l.l. “... --.. ..” .._._..^ -.-._” ..-... ----111 ... _.-.-- REGULATION NRC’s Restart Actions Appear Reasonalr>le-But Criteria Needed *GAO General Accounting Office Washington, D.C. 20648 Resources, Community, and Economic Development Division united states B-236146 May 4,1989 The Honorable Paul S. Sarbanes Vice Chairman, Joint Economic... |
Date April 3, 1989 |
Report No. RCED-89-90 |
Title
0 2 .3 CD cn
Tt CD ‘J a 0
5 0 Resources, Community, and Economic Development Division B-223682 April 3, 1989 The Honorable Edward J. Markey House of Representatives Dear Mr. Markey: On January 16,1987, you asked us to examine the December1986 accident at the Surry nuclear plant owned by Virginia Power and assess problems that face aging nuclear plants. On the basis of subsequent agreementswith y... |
Date Dec. 6, 1988 |
Report No. RCED-89-17 |
Title
C,m,,-,.-,, -,, -, ,,, ,,, .m I United States General AccountJng Office -, ,.I --,-,,, P& GAO
December 1980 Report to Congressional Requesters ):’’ . f- NUCLEAR SCIENCE Usefulness of Space Power Research to Ground-Based Nuclear Reactor Systems .2, ? , i ! : Resources, Community, Economic Development and Division B-229134 December 6, 1988 The Honorable Robert A. Roe Chairman, Committee on Scien... |
Date Sept. 30, 1988 |
Report No. AFMD-88-80 |
Title
United States General Aqcounting Office GAO
September 1988 Report to the Congress FINANCIAL AUDIT TennesseeValley Authority’s Financial Statements for 1987 0435*
GAO/AFMDS&8O f GAO United States General Accounting Office Washington, D.C. 20648 Comptroller General of the United States B-l 14850 September 30, 1988 To the President of the Senate and the Speaker of the House of Representatives This ... |