GAO Reports by subject "Nuclear powerplants"

Full-text search of 52,072 reports from the Government Accountability Office
From To
Reset

Search Results:

Date Report No. Title
Date Sept. 28, 1988 Report No. RCED-88-131 Title

Nuclear Waste: Fourth Annual Report on DOE's Nuclear Waste Program

United States General Accounting Office GAO September 1988 Report to the Congress NUCLEAR WASTE Fourth Annual Report on DOE’s Nuclear Wmte Program GAO/RCED-8&131 Comptroller General of the United States B-202377 September 28,1988 To the President of the Senate and the Speaker of the House of Representatives This report presents the results of our fourth annual report on the Department of Energy...
Date Sept. 21, 1988 Report No. RCED-88-222 Title

Nuclear Science: Issues Associated With Completing WNP-1 as a Defense Materials Production Reactor

United States General Accounting Office GAO ; September 1988 Report to the Honorable Brock Adams, U.S. Senate NUCLEARSCIENCE Issues Associated With Completing WNP-1 as a Defense Materials Production Reactor GAO/RCED-88-222 . 1 GAO United States General Accounting Office Washington, D.C. 20648 Resources, Community, and Economic Development Division B-231142 September 21,1988 The Honorable Brock Ada...
Date Sept. 21, 1988 Report No. RCED-88-221 Title

Nuclear Science: Questions Associated With Completing WNP-1 as a Defense Materials Production Reactor

United States General Accounting Office GAO September 1988 Report to the Honorable Sid Morrison, House of Representatives ‘. NUCLEAR SCIENCE Questions Associated With Completing WNP-1 as a Defense Materials Production Reactor 1 GAO/RCED-M-221 1 GAO United States General Accounting Office Washington, D.C. 20648 Resources, Community, Economic Development and Division B-231142 September 2 1,1988 Th...
Date July 26, 1988 Report No. T-RCED-88-55 Title

Energy: GAO Views on Monitored Retrievable Storage of Nuclear Waste

United&atesGeneralAccomlingomCe Testimony For Release on Delivery Expected at 1:30 p.m. MT Tuesday July 26, 1988 cAoViewsonMnitired Retrievable Storage of Nuclear Waste SwzelEntof Keith 0. F'ultz, Senior Associate Resources,CcnmunityandFzconanic Developrrent Division Before the Mnitored Retrievable Carmission Director Storage Review Mr. Chairman and Members of the Commission: We are pleased to be ...
Date April 8, 1988 Report No. NSIAD-88-131BR Title

Nuclear Power Safety: International Measures in Response to Chernobyl Accident

,, , i fl I United States General Accounting Office 1181 1, Briefing Report to Congressional Requesters $’ , NUCLEAR POWER SAFETY In-ternational Measures in Responseto i Chernobyl Accidbnt I~1 llllllu~u i ill 135620 , B-230418 studies and reviews, and regulation and standard-setting have been performed in the half dozen advanced member states that supply nuclear power technology to all the other...
Date March 18, 1988 Report No. RCED-88-73 Title

Nuclear Regulation: Action Needed To Ensure That Utilities Monitor and Repair Pipe Damage

b 13s4m * . United States General Aceounting~OiTice Report to the Honorable Edward J. Markey, House of Representatives ch 1988 NUCLEAR REGULATION Action Needed to Ensure That Utilities Monitor and Repair Pipe Damage United States General Accounting Office Washington, D.C. 20548 Resources, Community, and Economic Development Division B-223582 March 18, 1988 The Honorable Edward J. Markey House of R...
Date Dec. 2, 1987 Report No. RCED-88-23 Title

Nuclear Science: Challenges Facing Space Reactor Power Systems Development

United States General Accounting Of&e I ‘ GAO December 1987 ’Re@ortto CongressionalRequesters NUCLEAR SCIENCE ChallengesFacing SpaceReactor Power Systems Development . lUEF.ICTED- No: to be releasedoutside the General Aaw-ting Ofr”:ceexcept on the basis of the specsc aEProval of&maof Ga~eesiod &ktieM. Resources, Community, Economic Development and Division B-229134 December 2, 1987 The Honor...
Date Aug. 31, 1987 Report No. RCED-87-121 Title

Nuclear Waste: A Look at Current Use of Funds and Cost Estimates for the Future

. United States General Accounting Offi& &A0 August 1987 33531 y Report to Congressional Requesters NUCLEAR WASTE A Look at Current Use of Funds and Cost Estimates for the Future I I II 133814 4 Resources, C~ommuuity, Ecouomic Development and Division R-:302:3ii ALlguSt 31, 1987 J. Dexter Peach .4ssistant Cornptroller~ Genet~al Executive Summ~ Purpose Since 1983, when the Depar-tment of Energy (DO...
Date Aug. 10, 1987 Report No. RCED-87-123 Title

Nuclear Waste: Shipping Damaged Fuel From Three Mile Island to Idaho

I &A0 August 1987 . -*, : United States General Accounting Office Report to Congressional Requesters -- NUCLEAR WASTE Shipping Damaged Fuel From Thr& Mile Island to Idaho RES’ ;RICTED-- Not tc be released outside the Generu Accounting Office except on the ba,ais of specific approval by the Office ot Congressional Relations. GAO/RCED-87423 53%&Q Resources, Community, Economic Development and Divi...
Date Oct. 24, 1986 Report No. RCED-87-43BR Title

TVA Nuclear Power: Management of the Nuclear Program Through Personal Services Contracts

* . . n United . States General 1 Accounting Offike J -a 9---P- . '-GAO October 1986 ' Briefmg Report to the Chairwoman, Subcommittee on Civil Service, Committee on Post Office and Civil Service, House of Representatives 13w2$ * TVANUCLEIAR POmR Management of the Nuclear Pmgram Through Personal Services Contracts llllllllI IllI1 131474 GAO/RCED-87-43BR /3/ r7y GAO United States General Accounting ...
Date May 8, 1986 Report No. RCED-86-104FS Title

Nuclear Waste: Monitored Retrievable Storage of Spent Nuclear Fuel

. United States General Accounting Off’ice /#xw%‘i 1 -Fact Sheet for Congressional Requesters -” May .1986 NUCLEAR WASTE Monitored Retrievable Storageof Spent -NuclearFuel 129887 RESTRICTED---Not to be releasedouttide the (3lernarel Accounting Offlae except on the basis of ~peciflo approval by the Offioe of CongressionalRelations. RELEASED 5353% 6kG/RCED-86-104FS . . . UNITED STATES GENERAL ...
Date Jan. 23, 1986 Report No. RCED-86-41 Title

Nuclear Regulation: Oversight of Quality Assurance at Nuclear Power Plants Needs Improvement

.I * I II United States General Accounting Office Report to the Honorable Nunzio J. Palladino, Chairman, Nuclear Regulatory Commission January 1986 NUCLEAR REGULATION Oversight ‘of Quality Assurance at Nuclear Power Plants Needs Improvement i ll~llllllll# 128924 1 I’ QO/RCED-86-41 0343&a United States General Accounting Office Washington, D.C. 20548 Resources, Community, and Economic Developme...
Date Jan. 8, 1986 Report No. RCED-86-72FS Title

TVA Nuclear Power: Information on Certain Aspects of TVA's Nuclear Power Program

United States Gene&f Acc&nting Office GAO 0 January 1986 Fact Sheet for the Honorable Gordon J. Humphrey United States Senate J&i‘\ a%%0 I 55 TVA tiMLEAR POWER Information on Certain, Aspects of TVA’s Nuclear Power Program 1 iNI ll 1111111 128808 GAO/RCED-86-72FS UNITED STATES GENERAL WASHINGTON, ACCOUNTING D.C. 20548 OFFICE RESOURCES, COMMUNITY, AND ECONOMIC DEVELOPMENT DIVISION January 8, 19...
Date June 19, 1985 Report No. RCED-85-11 Title

Probabilistic Risk Assessment: An Emerging Aid to Nuclear Power Plant Safety Regulation

BY THEU.S.GENERALACCOUNTING OFFICE Report To The Chairman, Subcommittee On Energy Conservation And Power Committee On Energy And Commerce House Of Representatives Probabilistic Risk Assessment: An Emerging Aid To Nuclear Power Plant Safety Regulation Probabilistic risk assessment (PRA) is a method of quantifying the probabilities of potential accidents and their consequences at nuclear power plant...
Date April 24, 1985 Report No. RCED-85-5 Title

Energy: Better Inspection Management Would Improve Oversight of Operating Nuclear Plants

BY THE COMPTROLLER GE”JFRAL Report ToThe Congress Better Inspection Management Would Improve Oversight Of Operating Nuclear Plants Investigations of the March 1979 Three Mile lslan(l IIII clear power plant accident concluded, among other thrncgr;, that the Nuclear Regulatory Commission (NRC) needed 10 improve Its program for Inspecting operating nucle;lr power plants GAO evaluated NRC’s manage...
Date March 21, 1985 Report No. 126494 Title

Energy: Department of Energy Implementation of the Nuclear Waste Policy Act of 1982

UNITED STATESGENERALACCOU#t'INGOFFICE STATETJUENT OF F.KEVINE?OLAND SENIOR ASSOCIATE DIRECTOR REsouRcEs,~TYANDMx3NoMIc DEXEWE’ MENT DMSION BEFORETHE SUBCOMMITPEEON ENEFGYCONSERVATIONANDPOWER HOUSECOMMIlTEEON ENERGYANDCOMMERCE Hr. Chairman and Membersof the Sutimnittee: We appreciate the opportunity to be here today to discuss the Department of Energy's efforts to implement the Nuclear Waste Poli...
Date March 21, 1985 Report No. 126492 Title

Energy: The U.S. Uranium Enrichment Services Program

UNITED STATES GENERAL ACCOUNTING OFFICE WASHINGTON, D.C. FOR RELEASE ON DELIVERY EXPECTED AT 9:45 A.M. MARCH 21, 1985 STATEMENT OF DANIEL C. WHITE ASSOCIATE DIRECTOR, RESOURCES, COMMUNITY AND ECONOMIC DEVELOPMENTDIVISION BEFORE THE SUBCOMMITTEEON ENERGY AND THE ENVIRONMENT HOUSE COMMITTEE ON INTERIOR AND INSULAR AFFAIRS ON THE U.S. URANIUM ENRICHMENT SERVICES PROGRAM Mr. Chairman and Members of th...
Date Oct. 11, 1983 Report No. RCED-84-18 Title

Energy: Estimated Effect of Eliminating TVA Electricity Demand Charges on the Price of Enriched Uranium

October B-207463 11, 1983 RELEASED Gordon J. The Honorable Chairman, Humphrey on Reqional and Community Development Committee on Environment and Public United States Senate Subcommittee Works Dear Mr. Chairman: Subject: Estimated Effect of Eliminatinq TVA Electricity Demand Charges on the Price of Enriched Uranium (GAO/RCED-84-18) information on the Your letter of August 16, 1983, requested estima...
Date July 13, 1983 Report No. RCED-83-141 Title

Energy: Additional Improvements Needed in Physical Security at Nuclear Powerplants

. . BY THE U.S.GENERAL ACCOUNTING Report To The Chairman, Nuclear Regulatory Commission OFFICE Additional Improvements Needed In Physical Security At Nuclear Powerplants Since the middle 1970’s, the Nuclear Regulatory Commission and powerplant operators have taken measures to reduce the vulnerability of powerplants to attempted acts of sabotage. GAO’s evaluation disclosed that further improvem...
Date June 24, 1983 Report No. EMD-82-88S Title

Energy: Issues Concerning DOE Justification for Building the Gas Centrifuge Enrichment Plant

4 tsu7?sJ SUPPLEMENTTOAREPORTBYTHE Comptroller General OF THE UNITEDSTATES issues Concerning The Department Of Energy’s Justification For Building The Gas Centrifuge Enrichment Plant This supplement contains GAO’s analysis of and response to the Department of Energy’s (DOE’s) comments on GAO’s May 25, 1982, report on the same subject. In that report, GAO raised a number of questions abou...
Date May 24, 1983 Report No. RCED-83-158 Title

Energy: Response to Specific Questions on the Indian Point Probabilistic Safety Study

4 1 ‘18, Y REPORT BYTHEUs. Response To Specif iic Questions On Thie Indian Point Probabilistic Safety Study This report &scribes and summarizes how probabilistic risk assessment(PRA) is applied to nuclear powerplants, the methodSology and results of a PRA on the Indian Point plants near New York City, and peer review comments on that study. PRAs attempt to examine complex systems, such as nuclea...
Date May 12, 1983 Report No. RCED-83-151 Title

Energy: Analysis of Studies on Alternative Financing for the Clinch River Breeder Reactor

UNITED STATESGENERAL ACCOUNTINGOFFiCE WASHINGTON, D.C. 20548 RESOURCES. COMMUNITY, AND ECONOMIC DEVELOPMENT DIVISION B-104105 The Honorable John D. Dingell Chairman, Subcommittee on Oversight and Investigations Committee on Energy and Commerce House of Representatives The Honorable Richard L. Ottinger Chairman, Subcommittee on Energy Conservation and Power Committee on Energy and Commerce House of...
Date March 25, 1983 Report No. RCED-83-87 Title

Energy: Analysis of Alternative Approaches to Completing the DOE Water-Cooled Breeder Program

BY THE U.S.GENERALACCOUNTING OFFICE Report To The Subcommittee On Energy Research And Production Committee On Science And Technology House Of Representatives Analysis Of Alternative Approaches To Completing The Department Of Energy% Water-Cooled Breeder Program GAO evaluated alternative approaches to completing the Department of Energy’ water-cooled s breeder reactor program, examined the reason...
Date July 30, 1982 Report No. EMD-82-105 Title

Energy: BPA and REA Actions and Activities Affecting Utility Participation in Washington Public Power Supply System Plants 4 and 5

r I *-. REPORT THEUS. BY General Accounting Office Bonneville Power Administration ‘And Rural Electrification Administration Actions And Activiti’es Affecting Utility Participation In Washington Public Power Supply System Plants 4 And 5 Congressman George Hansen asked GAO to examine the roles of the Bonneville Power Administration and the Rural Electrification Administration in development and...
Date July 30, 1982 Report No. EMD-82-114 Title

Energy: TVA Is Justified in Deferring the Yellow Creek Unit 1 Nuclear Powerplant

RELEASED Report To The Honorable United States Senate John C. Stennis TVA Is Justified In Deferring Unit 1 Nuclear Powerplant TheYellow Creek TheTennesseeValley Authority’s December 1981 demand forecast is reasonable and supports its projection of the timing and need for the Yellow Creek Unit 1 nuclear powerplant. Moreover, the methodology, assumptions, and data TVA used to compute the benefits ...
Date July 2, 1982 Report No. EMD-82-106 Title

Energy: Financial Community's Perceived Impacts Which Could Result From Default or Successful Legal Challenge by Participants in Washington Public Power Supply System Nuclear Project Nos. 4 and 5

UNITEDSTATES GENERAL ACCOUNTING OFFICE WASHINGTON, D.C. 20548 ENERGY AND MINERALS DIVISION July 119101 2, 1982 B-208084 The Honorable Jim Weaver House of Representatives Dear Congressman Subject: Weaver: i Financial Community's Perceived Impacts Which Could Result From Default or Successfull,Legal Challenge by Participants in Washington Public Power Supply System Nuclear Project Nos. 4 and 5j(GAO/...
Date June 9, 1982 Report No. AFMD-82-24 Title

Information Management: TVA's Computer Needs Are Valid and ADP Management Is Improving

TQ &XT BYTHE @mptroller General THEUNITED TVA’s Computer Needs Are Valid And AIDP Management Is Improving Th Tennessee Valley Authority (TVA) has ma e substantial progress toward achieving6 sound management of its automatic dat processing (ADP) resources. Its requi ements analysis approach correlates A P costs with missions and objectives. Re uirements now reflect validated workloa 8, However, s...
Date May 25, 1982 Report No. EMD-82-88 Title

Energy: Issues Concerning the DOE Justification for Building the Gas Centrifuge Enrichment Plant

. RF$'ORTBY THE t Comptroller General OF THE UNITEDSTATES Is&es Concerning The Department Of Energy’s Justification For Building Ttle Gas Centrifuge Enrichment Plant The cent Port year 8 1.2 expe i total 198 epartment of Energy IS building a gas ifuge uranium enrichment plant at mouth, Ohio. By the end of this fiscal the Department will have spent about billion on the project. The Department ts ...
Date Jan. 21, 1982 Report No. 117345 Title

Environmental Protection: The Cleanup Effort at Three Mile Island

UNITEI: STATES GENERAL ACCOUNTING OFFICE KASEINGTGN, D.C. FOR RELEASE GN DELIVERY EXPECTED AT 2:00 P.M. JANUARY 21, 1982 STATEMENT GF J. DEXTER PEACH DIRECTGR, ENERGY ANC MINERALS DIVISICN EEFGRE THE SUECOMMITTEE ON ENERGY AND WATER DEVELOPMENT COMMITTEE GN APPRCPRIATICNS U. S. SENATE Mr. the the Chairman, we appreciate the aspects nuclear research oF&ortunity of the to cleanu& station testify eff...
Date Jan. 15, 1982 Report No. EMD-82-28 Title

Energy: Impact of Federal R&D Funding on Three Mile Island Cleanup Costs

REPORT THEUS. BY General Accounting Office Cleanup Costs The Chairman and the Ranking Minority Member of the House Committee on Interior and Insular Affairs requested that GAO respond to several questions concerning the administration’s proposed $123 million in Federal funding for data acquisition and research and development activities during the cleanup of the Three Mile Island nuclear reactor...
Date Oct. 14, 1981 Report No. EMD-82-B1 Title

Environmental Protection: Proposed Nuclear Insurance and Three Mile Island Cleanup Assistance Legislation

COMPTROLLER GENERAL WASHINGTON OF THE UNITED STATES - . D.C. 20!54S c B-204678 dctober 14, 1981 The Honorable William V. Roth, Jr. Chairman, Ccmmittee on Governmental Affairs United States Senate Dear Mr. Chairman: Proposed cleanup nuclear assistance insurance legislation and Three Mile (EMD-82-Bl). II 116642 Subject: Island requested our comments on Your letter of August 5, 1981, S.1226, 97th Con...
Date Aug. 26, 1981 Report No. EMD-81-106 Title

Energy: Greater Commitment Needed To Solve Continuing Problems at Three Mile Island

3 I IY THECOMPiRilLLER GENEgAL Report ToThe Congress OF THEUNITEDSTATES Greater Commitment Needed To Solve Continuing ProbllemsAt Three Mile Island The Nation’s first major accident at acommercial nuclear-powered electricity generating station occurred at Three Mile Island over 2 years ago, yet the resolution of the resultant problems is still subject to regulatory and financial uncertainty. Con...
Date May 21, 1981 Report No. 115480 Title

Energy: Implementation and Impact of the Nuclear Nonproliferation Act of 1978

UNITED STATES GENERAL ACCOUNTING OFFICE WASHINGTON, D.C. 20548 FOR RELEASE ON DELIVERY Expected 1O:OO a.m. Thursday, May 21, 1981 STATEMENT OF FRANK C. DIRECTOR, U.S. CONAHAN DIVISION OFFICE 115480 INTERNATIONAL GENERAL ACCOUNTING BEFORE THE SUBCOMMITTEE ON SECURITY AND THE AND SCIENTIFIC AFFAIRS SUBCOMMITTEE ON INTERNATIONAL ECONOMIC POLICY AND TRADE COMMITTEE ON FOREIGN AFFAIRS U.S. HOUSE OF REP...
Date May 4, 1981 Report No. EMD-81-83 Title

Energy: Response to Questions Clarifying a Previous GAO Report on the Department of Energy's Breeder Reactor Program

ENERGY AND MINERALS DIVISION MAY 4,1987 B-199272 The Honorable Claudine Schneider The Honorable George E. Brown, Jr. The Honorable Vin Weber The ilonorable Howard Wolpe House of Representatives Subject: II 115411 Illlll Response to questions clarifying a previous GAO report on the Department of Energy's breeder reactor program (&&X+81-33) 3 Enclosed are answers to the seven questions contained in ...
Date March 25, 1981 Report No. EMD-81-46 Title

Energy: The Department of Energy's Water-Cooled Breeder Program--Should It Continue?

REPORTBY THE Comptroller General OF THE UNITEDSTATES The Department Of Energy’s Water-Cooled Breeder Program-Should It Continue? GAO addressed three questions water-cooled breeder program: about the --Should it continue? GAO believes current reactor operations should be terminated in January 1982 to answer the basic question: Does the reactor breed? The Department of Energy’s position is that ...
Date March 23, 1981 Report No. EMD-81-51 Title

Energy: DOE Light Water Reactor Fuel Utilization Improvement Program

B-202377 MARCH 23,1981 The Honorable Marilyn Lloyd Bouquard Chairman, Subcommittee on Energy Research and Production Committee on Science and Technology House of Representatives Dear Madame Chairman: 115038 Light Water Department of uel Utilization Improvement Reactor Program (EMD-81-51) s On May 2, 1980, the former Subcommittee Chairman requested that we evaluate two Department of Energy nuclear ...
Date Dec. 8, 1980 Report No. EMD-81-25 Title

Energy: Electric Powerplant Cancellations and Delays

I BY THECOMPTROLLERGENERAL #eport To The Congress dF THEUNITEDSTATES Electric Powerplant @ancellations And Delays F om 1974 through 1978, the Nation’s electric u ilities canceled plans for 184electrical genera i ing units and delayed construction on most new units. Delays, particularly for nuplants, are getting longer each year. delays. Continued cancellations contribute to increased oil greater...
Date Nov. 18, 1980 Report No. EMD-81-9 Title

Energy: Evaluation of Selected Features of U.S. Nuclear Non-Proliferation Law and Policy

E/3 nw . l . . BY,THECOMPTROLLERGEklEiAL Report ToThe Congress OF THEUNITEDSTATES Evaluation Of Selected Features Of U.S.Nuclear Non-Proliferation Lbw And Policy have nation c n use nuclear fuel services to dictate a! tions to others. The United States, therefore, should avoid undue reliance am its uranium enrichment capability as a tqol to prevent the spread of nuclear wleapons. T e 1978 nuclear ...
Date Nov. 7, 1980 Report No. EMD-81-3 Title

Energy: Economic Impact of Closing the Indian Point Nuclear Facility

3 ” \13’iw REJ’O~TBY'IHE ’ (lwnptroller General RELE*~~~ OF THE UNITEDSTATES Economic Impact OfClosing The Indian Point Nuclear Facility T e close proximity of the Indian Point nucl ar plant to the heavily populated New Y :, rk City area has raised questions about the safety of its continued operations. What could be the economic impact on the utility owners and consumers if the nuclear pl...
Date Sept. 17, 1980 Report No. EMD-80-115 Title

Energy: The Nuclear Regulatory Commission's Handling of Allegations of Defective Cable

C’ ’ WASHINGTON, D.C. 20548 I .* ?‘f - 0341 - ,I UNITEDSTATES GENERAL ACCOUNTING OFFICE The Honorable Leon E. Panetta Rouse of Representatives Dear Congressman Subject: Panetta: Nuclear Regulatory andling of allegations (EMD-80-115) RELEASED llllllllll IllIll 113341 Commission’s of defective we reviewed the circumstances At your reguest, surrounding the alleged defective cable supplied by ...
Date Sept. 9, 1980 Report No. EMD-80-109 Title

Three Mile Island: The Most Studied Nuclear Accident in History

Report ToThe Congress OF THEUNITED STATES Three Mile Island: The Most Studied Nuclear Accident In History On March 28, 1979, the Federal Government and the nuclear power industry were awakened by the most serious accident in the history of U.S. commercial nuclear power. Although no one died as a result of this accident, the realization that a major accident is possible renewed the national and int...
Date Aug. 13, 1980 Report No. EMD-80-91 Title

Energy: Triennial Assessment of the Tennessee Valley Authority--Fiscal Years 1977-1979

L , ’ /yy-yg BY THECOMPTROLLERGENERAL OF THEUNITEDSTATES II2999 Report To The Congress Triennial Assessment Of The Tennessee Valley Authority--Fiscal Years 19774979 This report reviews the work done by GAO at the Tennessee Valley Authority during the past 3 years and highlights some major events that occurred which materially affected TVA but were not the subject of GAO reports. In this report G...
Date April 4, 1980 Report No. EMD-80-71 Title

Energy: Hypothetical Transfer of Construction Funds From Nuclear Powerplants to Electricity Conservation and Renewable Energies

UNITED STATES GENERAL ACCOUNTING OFFICE WASHINGTON, D.C. 20548 UWRGY AN0 DIVISION MINERALS ’ April B-198245 4, 1980 i4he Honorable James H. Weaver House of Representatives Dear Mr. Weaver: Subject: Funds from Conservation (EMD-80-71) Transfer of Construction Nuclear Powerplants to EJectricity and Renewable Energied Your recent letter requee that we conduct a brief analysis to determine how much ...
Date April 1, 1980 Report No. EMD-80-67 Title

Energy: Existing Nuclear Sites Can Be Used for New Powerplants and Nuclear Waste Storage

1IESTRICTLD cpwjific l ppra* * m ENERAL eE/:;k*' Report To The Subcommittee On Energy And Power, House Committee On Interstate And Foreign Commerce OF THE UNITED STATES Existing Nuclear Sites Can Be Used For New Powerplants And Nuclear Waste Storage Locating future nuclear powerplants at existing sites offers important advantages which warrant consrderation by the Nuclear Regulatory Commission. --...
Date March 31, 1980 Report No. EMD-80-68 Title

The Problem of Disposing of Nuclear Low-Level Waste: Where Do We Go From Here?

3 BY THE COIV&&LER /lztFM - GENERAL Report To The Congress OF THE UNITEDSTATES The Problem Of Disposing Of Nuclear LowLevel Waste: Where Do We Go From Here? / A problem has developed in nuclear waste disposal. As late as 1975, six commercial lowlevel nuclear waste burial sites were licensed to operate in the United States. Now only three sites remain--one each in Washington, Nevada, and South Caro...
Date Jan. 15, 1980 Report No. EMD-80-17 Title

The Nuclear Regulatory Commission: More Aggressive Leadership Needed

Date Jan. 2, 1980 Report No. EMD-80-35 Title

Energy: Alignment of Recommendations in EMD-79-105 With Senate Bill 885

UNITED STATES GENERAL ACCOUNTING OFFICE WASHINGTON, D.C. 20548 EIERGY AND MINMALS, DIVISION JANUARY 2, 1980 B-114858 C1 The Honorable John D. Dingell Chairman, Subcommittee on Energy and Power Committee on Interstate and Foreign Commerce House of Representatives 111183 Dear Mr. Chairman: Subject: C ignment of Recomme.pdations in EMD-79-105 (EMD-80-35) with Senate bill 88X. Your recent letter reque...
Date Oct. 2, 1979 Report No. EMD-79-103 Title

Emergency Preparedness Around the Rancho Seco Nuclear Powerplant: A Case Study

9’?EPORT THE BY Comptroller General OF THE UNITEDSTATES RELEASED a3sw3m The Ranch0 Seco Nuclear Powerplant: A Case Study At the requsst of Representative Robert T. Matsui, GAO evaluated emergency preparedness’ around the Rancho Seco nuclear powernt, located in California about halfway behen Sacramento and Stockton, and found I$‘~: State and county emergency plans have been developed based on...
Date Sept. 4, 1979 Report No. EMD-79-105 Title

Energy: Impacts and Implications of the Pacific Northwest Power Bill

REPORTBY THE 5 Comptroller General OF THE UNITEDSTATES Impacts And Implications Of The Pacific Northwest Power Bill Congressman John Dingell asked GAO to determine how the bill might impact on (1 J consumers paying for construction cost overruns on non-Federal powerplants backed by the Bonneville Power Administration, 12) Bonne ville’ direct service industrial customers, and s (3) the region’ ...
Date July 30, 1979 Report No. EMD-79-95 Title

Energy: Analysis of Estimated Cost for Three Pacific Northwest Nuclear Power Plants

REPORTBY THE ULS. This report analyzes the cost estimates for three nuclear powerplants being constructed by Washington Public Power Supply System in the Pacific Northwest and compares their estimated cost with estimates made by Ebasco, a national nuclear engineering and construction firm. The large difference between the estimates is because --differences exist in the base construction period use...