Date |
Report No. |
Title |
Date May 31, 2000 |
Report No. NSIAD-00-131 |
Title
United States General Accounting Office GAO
May 2000 Report to the Ranking Member Subcommittee on International Security, Proliferation, and Federal Services Committee on Governmental Affairs U. S. Senate MISSILE DEFENSE Status of the National Missile Defense Program GAO/NSIAD-00-131 United States General Accounting Office Washington, D.C. 20548 National Security and International Affairs Division... |
Date May 26, 2000 |
Report No. NSIAD-00-158 |
Title
United States General Accounting Office GAO
May 2000 Report to Congressional Committees DEFENSE ACQUISITIONS F/A-18E/F Aircraft Does Not Meet All Criteria for Multiyear Procurement GAO/NSIAD-00-158 Contents Letter Appendixes
Appendix I: Key Performance Parameters 3 18 20 21 22 27 28 Table 1: Objective, Threshold, and Demonstrated Performance Relative to Key Performance Parameters Table 2: Operatio... |
Date May 9, 2000 |
Report No. NSIAD-00-74 |
Title
United States General Accounting Office GAO
May 2000 Report to the Chairman, Subcommittee on National Security, Veterans’ Affairs, and International Relations, Committee on Government Reform, House of Representatives JOINT STRIKE FIGHTER ACQUISITION Development Schedule Should Be Changed to Reduce Risks GAO/NSIAD-00-74 Contents Letter Appendixes
Appendix I: International Participation in the Joi... |
Date April 25, 2000 |
Report No. NSIAD-00-78 |
Title
United States General Accounting Office GAO
April 2000 Report to Congressional Committees UNMANNED AERIAL VEHICLES Progress of the Global Hawk Advanced Concept Technology Demonstration GAO/NSIAD-00-78 United States General Accounting Office Washington, D.C. 20548 National Security and International Affairs Division B-284511 April 25, 2000 Congressional Committees The Department of Defense (DOD) ha... |
Date March 16, 2000 |
Report No. T-NSIAD-00-132 |
Title
United States General Accounting Office GAO
For Release on Delivery Expected at 1:00 p.m., Thursday March 16, 2000 Testimony
Before the Subcommittees on Military Procurement and on Military Research and Development, Committee on Armed Services, House of Representatives JOINT STRIKE FIGHTER ACQUISITION Development Schedule Should Be Changed to Reduce Risks
Statement of Louis J. Rodrigues, Director,... |
Date March 14, 2000 |
Report No. NSIAD-00-68 |
Title
United States General Accounting Office GAO
March 2000 Report to Congressional Committees F-22 AIRCRAFT Development Cost Goal Achievable If Major Problems Are Avoided GAO/NSIAD-00-68 Contents Letter Appendixes
Appendix I: Estimates of Performance for Key F-22 Parameters Appendix II: Criteria Established by the Under Secretary of Defense for Acquisition, Technology, and Logistics for the F-22 Progr... |
Date Dec. 7, 1999 |
Report No. T-NSIAD-00-58 |
Title
United States General Accounting Office GAO
For Release Expected at 10:00 a.m. EST Tuesday, December 7, 1999 Testimony
Before the Committee on Government Reform, Subcommittee on National Security, Veterans Affairs, and International Relations, House of Representatives DEFENSE ACQUISITIONS Progress in Meeting F-22 Cost and Schedule Goals
Statement for the Record by Louis J. Rodrigues, Director, Def... |
Date Aug. 30, 1999 |
Report No. NSIAD-99-33 |
Title
United States General Accounting Office GAO
August 1999 Report to the Secretary of Defense UNMANNED AERIAL VEHICLES DOD’s Demonstration Approach Has Improved Project Outcomes GAO/NSIAD-99-33 United States General Accounting Office Washington, D.C. 20548 National Security and International Affairs Division B-276812 Letter August 30, 1999 The Honorable William S. Cohen The Secretary of Defense Dea... |
Date Aug. 24, 1999 |
Report No. NSIAD-99-146 |
Title
United States General Accounting Office GAO
August 1999 Report to the Honorable Peter A. DeFazio, House of Representatives DEFENSE ACQUISITIONS Comanche Program Cost, Schedule, and Performance Status GAO/NSIAD-99-146 United States General Accounting Office Washington, D.C. 20548 National Security and International Affairs Division B-280314 Letter August 24, 1999 The Honorable Peter A. DeFazio Hous... |
Date Aug. 12, 1999 |
Report No. RCED-99-215 |
Title
United States General Accounting Office GAO
August 1999 Report to the Chairman, Subcommittee on VA, HUD, and Independent Agencies, Committee on Appropriations, House of Representatives AIR POLLUTION EPA’s Actions to Resolve Concerns With the Fine Particulate Monitoring Program GAO/RCED-99-215 GAO United States General Accounting Office Washington, D.C. 20548 Resources, Community, and Economic De... |
Date July 27, 1999 |
Report No. NSIAD-99-150 |
Title
United States General Accounting Office GAO
July 1999 Report to the Chairman, Subcommittee on Defense, Committee on Appropriations House of Representatives BATTLEFIELD AUTOMATION Performance Uncertainties Are Likely When Army Fields Its First Digitized Division GAO/NSIAD-99-150 United States General Accounting Office Washington, D.C. 20548 National Security and International Affairs Division B-282... |
Date June 30, 1999 |
Report No. NSIAD-99-142 |
Title
United States General Accounting Office GAO
June 1999 Report to the Chairman, Subcommittee on Defense, Committee on Appropriations, House of Representatives MISSILE DEFENSE THAAD Restructure Addresses Problems But Limits Early Capability GAO/NSIAD-99-142 United States General Accounting Office Washington, D.C. 20548 Lt er e National Security and International Affairs Division B-280755 Letter June ... |
Date June 15, 1999 |
Report No. NSIAD-99-127 |
Title
United States General Accounting Office GAO
June 1999 Report to Congressional Committees DEFENSE ACQUISITIONS Progress of the F/A-18E/F Engineering and Manufacturing Development Program GAO/NSIAD-99-127 United States General Accounting Office Washington, D.C. 20548 National Security and International Affairs Division B-281419 Letter June 15, 1999 Congressional Committees As required by the Nationa... |
Date June 10, 1999 |
Report No. NSIAD-99-97 |
Title
United States General Accounting Office GAO
June 1999 Report to Congressional Committees DEFENSE ACQUISITIONS Achieving B-2A Bomber Operational Requirements GAO/NSIAD-99-97 United States General Accounting Office Washington, D.C. 20548 National Security and International Affairs Division B-280223 Letter June 10, 1999 Congressional Committees The conference report on the National Defense Authorizat... |
Date April 13, 1999 |
Report No. GGD-99-54 |
Title
United States General Accounting Office GAO
April 1999 Report to the Subcommittee on Treasury and General Government, Committee on Appropriations, U.S. Senate TERRORISM AND DRUG TRAFFICKING Testing Status and Views on Operational Viability of Pulsed Fast Neutron Analysis Technology GAO/GGD-99-54 GAO United States General Accounting Office Washington, D.C. 20548 General Government Division B-281213... |
Date March 31, 1999 |
Report No. NSIAD-99-50 |
Title
United States General Accounting Office GAO
March 1999 Report to Congressional Requesters DEFENSE ACQUISITIONS DOD Efforts to Develop Laser Weapons for Theater Defense GAO/NSIAD-99-50 GAO United States General Accounting Office Washington, D.C. 20548 National Security and International Affairs Division B-279125 Le er t Le er t Letter March 31, 1999 The Honorable Owen B. Pickett Ranking Minority Me... |
Date March 17, 1999 |
Report No. T-NSIAD-99-113 |
Title
GAO
For Release of Delivery Expected at 1:30 p.m., EST Wednesday, March 17, 1999 United States General Accounting Office Testimony Before the Subcommittee on Airland Forces, Committee on Armed Services, U.S. Senate DEFENSE ACQUISITIONS Progress of the F-22 and F/A-18E/F Engineering and Manufacturing Development Programs
Statement of Louis J. Rodrigues, Director, Defense Acquisitions Issues, Nation... |
Date March 15, 1999 |
Report No. NSIAD-99-55 |
Title
United States General Accounting Office GAO
March 1999 Report to Congressional Committees F-22 AIRCRAFT Issues in Achieving Engineering and Manufacturing Development Goals GAO/NSIAD-99-55 GAO United States General Accounting Office Washington, D.C. 20548 National Security and International Affairs Division B-280222 Le er t Le er t March 15, 1999 Congressional Committees As required by the National... |
Date Jan. 28, 1999 |
Report No. NSIAD-99-43R |
Title
National Security and International Affairs Division B-280323 January 28,1999 The Honorable William S. Cohen The Secretary of Defense Subject: DEFENSE ACQUISITIONS: Testing of F-15 and F-16 Radomes Dear Mr. Secretary: During a review completed earlier this year, we received information concerning the potential for shortfalls in the performance of two radomes, one for the F-15 Eagle and one for the... |
Date Nov. 10, 1998 |
Report No. NSIAD-99-2 |
Title
United States General Accounting Office GAO
November 1998 Report to the Chairman, Subcommittee on National Security, Committee on Appropriations, House of Representatives MILITARY SATELLITE COMMUNICATIONS Concerns With Milstar’s Support to Strategic and Tactical Forces GAO/NSIAD-99-2 GAO United States General Accounting Office Washington, D.C. 20548 National Security and International Affairs Di... |
Date June 30, 1998 |
Report No. NSIAD-98-140 |
Title
United States General Accounting Office GAO
June 1998 Report to the Chairman Subcommittee on National Security Committee on Appropriations House of Representatives BATTLEFIELD AUTOMATION Acquisition Issues Facing the Army Battle Command, Brigade and Below Program GAO/NSIAD-98-140 GAO United States General Accounting Office Washington, D.C. 20548 National Security and International Affairs Division... |
Date June 23, 1998 |
Report No. NSIAD-98-153 |
Title
United States General Accounting Office GAO
June 1998 Report to Congressional Requesters NATIONAL MISSILE DEFENSE Even With Increased Funding Technical and Schedule Risks Are High GAO/NSIAD-98-153 GAO United States General Accounting Office Washington, D.C. 20548 National Security and International Affairs Division B-279053 June 23, 1998 The Honorable Carl Levin Ranking Minority Member Committee o... |
Date June 16, 1998 |
Report No. NSIAD-98-152 |
Title
United States General Accounting Office GAO
June 1998 Report to Congressional Committees B-2 BOMBER Additional Costs to Correct Deficiencies and Make Improvements GAO/NSIAD-98-152 GAO United States General Accounting Office Washington, D.C. 20548 National Security and International Affairs Division B-278432 June 16, 1998 Congressional Committees The conference report on the National Defense Author... |
Date June 10, 1998 |
Report No. NSIAD-98-135 |
Title
United States General Accounting Office GAO
June 1998 Report to the Chairman and Ranking Minority Member, Subcommittee on Military Research and Development, Committee on National Security, House of Representatives NAVY MINE WARFARE Plans to Improve Countermeasures Capabilities Unclear GAO/NSIAD-98-135 GAO United States General Accounting Office Washington, D.C. 20548 National Security and Internat... |
Date April 30, 1998 |
Report No. NSIAD-98-38 |
Title
United States General Accounting Office GAO
April 1998 Report to the Secretary of Defense NEW ATTACK SUBMARINE More Knowledge Needed to Understand Impact of Design Changes GAO/NSIAD-98-38 GAO United States General Accounting Office Washington, D.C. 20548 National Security and International Affairs Division B-277780 April 30, 1998 The Honorable William S. Cohen The Secretary of Defense Dear Mr. Sec... |
Date April 28, 1998 |
Report No. NSIAD-98-45 |
Title
United States General Accounting Office GAO
April 1998 Report to the Chairman, Subcommittee on Military Research and Development Committee on National Security, House of Representatives AIM-9X ACQUISITION Missile Risk Reduction Underway But System Production Plans Need to be Reexamined GAO/NSIAD-98-45 GAO United States General Accounting Office Washington, D.C. 20548 National Security and Internat... |
Date March 25, 1998 |
Report No. T-NSIAD-98-137 |
Title
United States General Accounting Office GAO
For Release on Delivery Expected at 10:00 a.m., EST Wednesday, March 25, 1998 Testimony
Before the Subcommittee on AirLand Forces, Committee on Armed Services, U.S. Senate F-22 AIRCRAFT Progress of the Engineering and Manufacturing Development Program
Statement of Louis J. Rodrigues, Director, Defense Acquisition Issues, National Security and Internation... |
Date March 24, 1998 |
Report No. NSIAD-98-3 |
Title
United States General Accounting Office GAO
March 1998 Report to the Secretary of Defense ELECTRONIC WARFARE Test Results Do Not Support Buying More Common Sensor Systems GAO/NSIAD-98-3 GAO United States General Accounting Office Washington, D.C. 20548 National Security and International Affairs Division B-276172 March 24, 1998 The Honorable William S. Cohen The Secretary of Defense Dear Mr. Secre... |
Date March 13, 1998 |
Report No. NSIAD-98-61 |
Title
United States General Accounting Office GAO
March 1998 Report to the Honorable Russell D. Feingold, U.S. Senate NAVY AVIATION F/A-18E/F Development and Production Issues GAO/NSIAD-98-61 GAO United States General Accounting Office Washington, D.C. 20548 National Security and International Affairs Division B-277891 March 13, 1998 The Honorable Russell D. Feingold United States Senate Dear Senator Fe... |
Date March 11, 1998 |
Report No. NSIAD-98-52 |
Title
United States General Accounting Office GAO
March 1998 Report to the Chairman and the Ranking Minority Member, Subcommittee on Science, Technology and Space, Committee on Commerce, Science and Transportation, U.S. Senate AEROSPACE TESTING Promise of Closer NASA/DOD Cooperation Remains Largely Unfulfilled GAO/NSIAD-98-52 GAO United States General Accounting Office Washington, D.C. 20548 National Se... |
Date March 10, 1998 |
Report No. NSIAD-98-67 |
Title
United States General Accounting Office GAO
March 1998 Report to Congressional Committees F-22 AIRCRAFT Progress in Achieving Engineering and Manufacturing Development Goals GAO/NSIAD-98-67 GAO United States General Accounting Office Washington, D.C. 20548 National Security and International Affairs Division B-278307 March 10, 1998 Congressional Committees As required by the National Defense Autho... |
Date June 24, 1997 |
Report No. NSIAD-97-130 |
Title
United States General Accounting Office GAO
June 1997 Report to the Chairman, Subcommittee on National Security, Committee on Appropriations, House of Representatives ACCESS TO SPACE Issues Associated With DOD’s Evolved Expendable Launch Vehicle Program GAO/NSIAD-97-130 GAO United States General Accounting Office Washington, D.C. 20548 National Security and International Affairs Division B-27265... |
Date June 6, 1997 |
Report No. NSIAD-97-121 |
Title
United States General Accounting Office GAO
June 1997 Report to the Secretary of Defense ARMY ARMORED SYSTEMS Meeting Crusader Requirements Will Be A Technical Challenge GAO/NSIAD-97-121 GAO United States General Accounting Office Washington, D.C. 20548 National Security and International Affairs Division B-276453 June 6, 1997 The Honorable William S. Cohen The Secretary of Defense Dear Mr. Secret... |
Date April 25, 1997 |
Report No. NSIAD-97-68 |
Title
United States General Accounting Office GAO
April 1997 Report to Congressional Committees TACTICAL INTELLIGENCE Joint STARS Full-Rate Production Decision Was Premature and Risky GAO/NSIAD-97-68 GAO United States General Accounting Office Washington, D.C. 20548 National Security and International Affairs Division B-275858 April 25, 1997 Congressional Committees We have reviewed the Department of De... |
Date March 27, 1997 |
Report No. NSIAD-97-137R |
Title
United States General Accounting OlYice Washington, D.C. 20548 National Security and International Affairs Division B-275876.2 March 27, 1997 Congressional Committees: Subject: Ballistic Missile Defense: Prototvoe THAAD Svstem During our ongoing review of the Army and the Ballistic Missile Defense Organization’ development of the Theater High Altitude Area Defense (THAAD) s missile program, we r... |
Date March 17, 1997 |
Report No. NSIAD-97-116R |
Title
GAFUJ _;;General United 3tates Accounting Offiee
Washington, D.C. 20658 National Security and International Affairs Division B-275841 March 17, 1997 The Honorable Sheila E. Widnall The Secretary of the Air Force Subject: Joint Direct Attack Munition: Low-Rate Initial Production Decision Dear: Mdam Secretay.W ::: :: :: During our review of the Joint Direct Attack Munition's (JDAM) readiness to begi... |
Date Sept. 26, 1996 |
Report No. NSIAD-96-199 |
Title
United States General Accounting Office GAO
September 1996 Report to Congressional Committees ARMY ACQUISITION Javelin Is Not Ready for Multiyear Procurement G A O years
1921 - 1996 GAO/NSIAD-96-199 GAO United States General Accounting Office Washington, D.C. 20548 National Security and International Affairs Division B-272415 September 26, 1996 Congressional Committees The Army is purchasing a new... |
Date Aug. 28, 1996 |
Report No. NSIAD-96-198 |
Title
United States General Accounting Office GAO
August 1996 Report to the Ranking Minority Member, House Committee on International Relations MINE DETECTION Army Detector’s Ability to Find Low-Metal Mines Not Clearly Demonstrated G A O years
1921 - 1996 GAO/NSIAD-96-198 GAO United States General Accounting Office Washington, D.C. 20548 National Security and International Affairs Division B-272391 Au... |
Date July 26, 1996 |
Report No. NSIAD-96-126 |
Title
United States General Accounting Office GAO
July 1996 Report to the Honorable Norman D. Dicks, House of Representatives C-17 AIRCRAFT RM&A Evaluation Less Demanding Than Initially Planned G A O years
1921 - 1996 GAO/NSIAD-96-126 GAO United States General Accounting Office Washington, D.C. 20548 National Security and International Affairs Division B-271484 July 26, 1996 The Honorable Norman D. Dick... |
Date July 9, 1996 |
Report No. NSIAD-96-136 |
Title
United States General Accounting Office GAO
July 1996 Report to Congressional Committees BALLISTIC MISSILE DEFENSE Issues Concerning Acquisition of THAAD Prototype System G A O years
1921 - 1996 GAO/NSIAD-96-136 GAO United States General Accounting Office Washington, D.C. 20548 National Security and International Affairs Division B-271560 July 9, 1996 Congressional Committees The Ballistic Missile... |
Date June 20, 1996 |
Report No. NSIAD-96-68 |
Title
United States General Accounting Office GAO
June 1996 Report to the Honorable William V. Roth, Jr., U.S. Senate ELECTRONIC WARFARE Navy’s New Radar Warning Receiver Needs More Testing G A O years
1921 - 1996 GAO/NSIAD-96-68 GAO United States General Accounting Office Washington, D.C. 20548 National Security and International Affairs Division B-260441 June 20, 1996 The Honorable William V. Roth, ... |
Date May 23, 1996 |
Report No. NSIAD-96-71 |
Title
United States General Accounting Office GAO
May 1996 Report to Congressional Committees TACTICAL INTELLIGENCE Accelerated Joint STARS Ground Station Acquisition Strategy Is Risky G A O years
1921 - 1996 GAO/NSIAD-96-71 GAO United States General Accounting Office Washington, D.C. 20548 National Security and International Affairs Division B-270674 May 23, 1996 Congressional Committees The Army and t... |
Date March 1, 1996 |
Report No. NSIAD-96-109R |
Title
GAO United States General Accounting Office Washington, D.C. 20548 National Security and International Affairs Division B-271211 March 1, 1996 The Honorable David Pryor United States Senate Dear Senator Pryor: This letter is to inform you that we have completed our review of the Navy’s plans for testing the Airborne Self-Protection Jammer (ASPJ) on the F-14D Aircraft. As you requested, we sought... |
Date Jan. 8, 1996 |
Report No. NSIAD-96-4 |
Title
United States General Accounting Office GAO
January 1996 Report to the Honorable William V. Roth, Jr., U.S. Senate ARMY ACQUISITION Medium Trucks Passed Key Operational and Technical Tests GAO/NSIAD-96-4 GAO United States General Accounting Office Washington, D.C. 20548 National Security and International Affairs Division B-266242 January 8, 1996 The Honorable William V. Roth, Jr. United States Se... |
Date May 26, 1995 |
Report No. NSIAD-95-172R |
Title
1 q+3&’ : 1 1 ! GAO United States General Accounting Offire Washington, DC 20548 National Security and International Affairs Division B-261 509 May 26, 1995 The Honorable William J. Perry The Secretary of Defense Dear Mr. Secretary: As a part of our on going review of the Department of Defense’ (DOD) fiscal year s 1996 budget request, we have been examining the Army’ plan to begin Low Rate s... |
Date April 19, 1995 |
Report No. NSIAD-95-59 |
Title
United States General Accounting Office GAO
April 1995 Report to Congressional Committees TACTICAL AIRCRAFT Concurrency in Development and Production of F-22 Aircraft Should Be Reduced GAO/NSIAD-95-59 GAO United States General Accounting Office Washington, D.C. 20548 National Security and International Affairs Division B-259204 April 19, 1995 Congressional Committees As called for by the Senate Ar... |
Date March 1, 1995 |
Report No. NSIAD-95-52 |
Title
United States General Accounting Office GAO
March 1995 Report to the Secretary of Defense UNMANNED AERIAL VEHICLES No More Hunter Systems Should Be Bought Until Problems Are Fixed GAO/NSIAD-95-52 GAO United States General Accounting Office Washington, D.C. 20548 National Security and International Affairs Division B-259256 March 1, 1995 The Honorable William J. Perry The Secretary of Defense Dear ... |
Date Dec. 21, 1994 |
Report No. NSIAD-95-77R |
Title
GAO United States General Accounting Office Washington, D.C. 20548 National Security and International AfTairs Division I
) d’3/q 1 B-259722 December 21, 1994 William Senate Roth: V. Roth, 3r. The Honorable United States Dear Senator During our review of the Army's testing of its Family of Medium Tactical Vehicles (FMTV) we identified an issue The Army that we believe requires immediate attentio... |
Date Nov. 21, 1994 |
Report No. NSIAD-95-18 |
Title
United States General Accounting Office GAO
November 1994 Report to Congressional Requesters WEAPONS ACQUISITION Low-Rate Initial Production Used to Buy Weapon Systems Prematurely GAO/NSIAD-95-18 GAO United States General Accounting Office Washington, D.C. 20548 National Security and International Affairs Division B-257304 November 21, 1994 The Honorable William V. Roth, Jr. The Honorable David Pr... |
Date Oct. 7, 1994 |
Report No. AIMD-95-12R |
Title
GAO United States General Accounting Office Washington, D.C. 20548 Accounting and Information Management Division B-248294 October 7, 1994 William J. of Defense Perry The Honorable The Secretary Dear Mr. Secretary: As part of our continuing examination of the Department of Defense's development and acquisition of embedded computers for major weapons systems, we have reviewed the Air Force's C-17 a... |