Date |
Report No. |
Title |
Date March 30, 2006 |
Report No. GAO-06-591T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 9:30 a.m. EST Thursday, March 30, 2006 Statement for the Record to the Permanent Subcommittee on Investigations, Committee on Homeland Security and Governmental Affairs, U.S. Senate CARGO CONTAINER INSPECTIONS Preliminary Observations on the Status of Efforts to Improve the Automated Targeting System
Statement f... |
Date March 28, 2006 |
Report No. GAO-06-558T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 9:30 a.m. EST Tuesday, March 28, 2006 Testimony Before the Permanent Subcommittee on Investigations, Committee on Homeland Security and Governmental Affairs, U.S. Senate COMBATING NUCLEAR SMUGGLING Challenges Facing U.S. Efforts to Deploy Radiation Detection Equipment in Other Countries and in the United States
... |
Date March 22, 2006 |
Report No. GAO-06-389 |
Title
United States Government Accountability Office GAO
March 2006 Report to Congressional Requesters COMBATING NUCLEAR SMUGGLING DHS Has Made Progress Deploying Radiation Detection Equipment at U.S. Ports-of-Entry, but Concerns Remain GAO-06-389 a March 2006 COMBATING NUCLEAR SMUGGLING Highlights
Highlights of GAO-06-389, a report to congressional requesters Accountability Integrity Reliability DHS Ha... |
Date March 15, 2006 |
Report No. GAO-06-356 |
Title
United States Government Accountability Office GAO
March 2006 Report to Congressional Committees JOINT STRIKE FIGHTER DOD Plans to Enter Production before Testing Demonstrates Acceptable Performance GAO-06-356 March 2006 JOINT STRIKE FIGHTER Highlights
Highlights of GAO-06-356, a report to congressional committees Accountability Integrity Reliability DOD Plans to Enter Production before Testing De... |
Date March 1, 2006 |
Report No. GAO-06-465T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 10:00 a.m. EST Wednesday, March 1, 2006 Testimony Before the Subcommittee on Federalism and the Census, Committee on Government Reform, House of Representatives 2010 CENSUS Planning and Testing Activities Are Making Progress
Statement of Brenda S. Farrell Acting Director Strategic Issues GAO-06-465T March 1, 200... |
Date Feb. 14, 2006 |
Report No. GAO-06-296 |
Title
United States Government Accountability Office GAO
February 2006 Report to Congressional Requesters HOMELAND SECURITY Recommendations to Improve Management of Key Border Security Program Need to Be Implemented GAO-06-296 a February 2006 HOMELAND SECURITY Highlights
Highlights of GAO-06-296, a report to congressional requesters Accountability Integrity Reliability Recommendations to Improve Managem... |
Date Feb. 9, 2006 |
Report No. GAO-06-374T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 10:00 a.m. EST Thursday, February 9, 2006 Testimony before the Committee on Commerce, Science, and Transportation, U.S. Senate AVIATION SECURITY Significant Management Challenges May Adversely Affect Implementation of the Transportation Security Administration’s Secure Flight Program
Statement of Cathleen A. B... |
Date Jan. 18, 2006 |
Report No. GAO-06-18 |
Title
United States Government Accountability Office GAO
January 2006 Report to Congressional Addressees DOD BUSINESS TRANSFORMATION Defense Travel System Continues to Face Implementation Challenges GAO-06-18 a January 2006 DOD BUSINESS TRANSFORMATION Highlights
Highlights of GAO-06-18, a report to congressional addressees Accountability Integrity Reliability Defense Travel System Continues to Face Impl... |
Date Dec. 13, 2005 |
Report No. GAO-06-49 |
Title
United States Government Accountability Office GAO
December 2005 Report to the Subcommittee on Tactical Air and Land Forces, Committee on Armed Services, House of Representatives UNMANNED AIRCRAFT SYSTEMS DOD Needs to More Effectively Promote Interoperability and Improve Performance Assessments GAO-06-49 a December 2005 Highlights
Highlights of GAO-06-49, a report to the Subcommittee on Tactical A... |
Date July 22, 2005 |
Report No. GAO-05-864R |
Title
United States Government Accountability Office Washington, DC 20548 July 22, 2005 Congressional Committees Subject: Aviation Security: Transportation Security Administration Did Not Fully Disclose Uses of Personal Information during Secure Flight Program Testing in Initial Privacy Notices, but Has Recently Taken Steps to More Fully Inform the Public As you know, we have been reviewing the Departme... |
Date June 14, 2005 |
Report No. GAO-05-752R |
Title
United States Government Accountability Office Washington, DC 20548 June 14, 2005 The Honorable James M. Talent Chairman The Honorable Edward M. Kennedy Ranking Minority Member Subcommittee on Seapower Committee on Armed Services United States Senate The Honorable Roscoe G. Bartlett Chairman The Honorable Gene Taylor Ranking Minority Member Subcommittee on Projection Forces Committee on Armed Serv... |
Date May 31, 2005 |
Report No. GAO-05-612 |
Title
United States Government Accountability Office GAO
May 2005 Report to Congressional Requesters CLEAN AIR ACT Emerging Mercury Control Technologies Have Shown Promising Results, but Data on Long-Term Performance Are Limited GAO-05-612 a May 2005 CLEAN AIR ACT Highlights
Highlights of GAO-05-612, a report to congressional requesters Accountability Integrity Reliability Emerging Mercury Control Techn... |
Date March 31, 2005 |
Report No. GAO-05-243 |
Title
United States Government Accountability Office GAO
March 2005 Report to Congressional Committees DEFENSE ACQUISITIONS Status of Ballistic Missile Defense Program in 2004 GAO-05-243 March 2005 DEFENSE ACQUISITIONS Highlights
Highlights of GAO-05-243, a report to Congressional Committees Accountability Integrity Reliability Status of Ballistic Missile Defense Program in 2004 Why GAO Did This Study
S... |
Date March 28, 2005 |
Report No. GAO-05-356 |
Title
United States Government Accountability Office GAO
March 2005 Report to Congressional Committees AVIATION SECURITY Secure Flight Development and Testing Under Way, but Risks Should Be Managed as System Is Further Developed GAO-05-356 March 2005 AVIATION SECURITY Highlights
Highlights of GAO-05-356, a report to congressional committees Accountability Integrity Reliability Secure Flight Development ... |
Date March 15, 2005 |
Report No. GAO-05-304 |
Title
United States Government Accountability Office GAO
March 2005 Report to Congressional Committees TACTICAL AIRCRAFT Air Force Still Needs Business Case to Support F/A-22 Quantities and Increased Capabilities GAO-05-304 a March 2005 TACTICAL AIRCRAFT Highlights
Highlights of GAO-05-304, a report to congressional committees Accountability Integrity Reliability Air Force Still Needs Business Case to S... |
Date March 15, 2005 |
Report No. GAO-05-273 |
Title
United States Government Accountability Office GAO
March 2005 Report to the Chairman, Subcommittee on Tactical Air and Land Forces, Committee on Armed Services, House of Representatives DEFENSE ACQUISITIONS Changes in E-10A Acquisition Strategy Needed before Development Starts GAO-05-273 a March 2005 DEFENSE ACQUISITIONS Highlights
Highlights of GAO-05-273, a report to the Chairman, Subcommittee o... |
Date March 3, 2005 |
Report No. GAO-05-390T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 9:00 a.m. EST Thursday, March 3, 2005 Testimony Before the Subcommittee on Tactical Air and Land Forces, Committee on Armed Services, House of Representatives TACTICAL AIRCRAFT Status of the F/A-22 and JSF Acquisition Programs and Implications for Tactical Aircraft Modernization Statement of Michael Sullivan and... |
Date March 1, 2005 |
Report No. GAO-05-255 |
Title
United States Government Accountability Office GAO
March 2005 Report to Congressional Committees DEFENSE ACQUISITIONS Plans Need to Allow Enough Time to Demonstrate Capability of First Littoral Combat Ships GAO-05-255 March 2005 DEFENSE ACQUISITIONS Highlights
Highlights of GAO-05-255, a report to congressional committees Accountability Integrity Reliability Plans Need to Allow Enough Time to Demo... |
Date Feb. 23, 2005 |
Report No. GAO-05-324 |
Title
United States Government Accountability Office GAO
February 2005 Report to Congressional Committees AVIATION SECURITY Measures for Testing the Impact of Using Commercial Data for the Secure Flight Program GAO-05-324 Contents Letter Appendix I Briefing Slides 1 7 Appendix II Comments from the Department of Homeland Security 25 Abbreviations DHS GAO TSA Department of Homeland Security Government Acc... |
Date Jan. 12, 2005 |
Report No. GAO-05-9 |
Title
United States Government Accountability Office GAO
January 2005 Report to Congressional Requesters 2010 CENSUS Basic Design Has Potential, but Remaining Challenges Need Prompt Resolution GAO-05-9 a January 2005 2010 CENSUS Highlights
Highlights of GAO-05-9, a report to congressional requesters Accountability Integrity Reliability Basic Design Has Potential, but Remaining Challenges Need Prompt Res... |
Date Oct. 7, 2004 |
Report No. GAO-05-82 |
Title
United States Government Accountability Office GAO
October 2004 Congressional Requesters AMERICAN COMMUNITY SURVEY Key Unresolved Issues GAO-05-82 October 2004 AMERICAN COMMUNITY SURVEY Key Unresolved Issues
Highlights of GAO-05-82, a report to congressional requesters The Congress asked GAO to review operational and programmatic aspects of the Census Bureau’s ACS that will affect the reliabilit... |
Date Aug. 12, 2004 |
Report No. GAO-04-925 |
Title
United States Government Accountability Office GAO
August 2004 Report to Congressional Requesters MILITARY TRANSFORMATION Fielding of Army’s Stryker Vehicles Is Well Under Way, but Expectations for Their Transportability by C-130 Aircraft Need to Be Clarified GAO-04-925 a August 2004 MILITARY TRANSFORMATION Fielding of Army’s Stryker Vehicles Is Well Under Way, but Expectations for Their Trans... |
Date May 28, 2004 |
Report No. GAO-04-601 |
Title
United States General Accounting Office GAO
May 2004 Report to Congressional Requesters DOD OPERATIONAL RANGES More Reliable Cleanup Cost Estimates and a Proactive Approach to Identifying Contamination Are Needed GAO-04-601 a May 2004 DOD OPERATIONAL RANGES More Reliable Cleanup Cost Estimates and a Proactive Approach to Identifying Contamination Are Needed Highlights of GAO-04-601, a report to co... |
Date April 23, 2004 |
Report No. GAO-04-409 |
Title
United States General Accounting Office GAO
April 2004 Report to Congressional Committees MISSILE DEFENSE Actions Are Needed to Enhance Testing and Accountability GAO-04-409 a April 2004 MISSILE DEFENSE Actions Are Needed to Enhance Testing and Accountability Highlights of GAO-04-409, a report to congressional committees The Department of Defense (DOD) has treated ballistic missile defense as a pr... |
Date April 22, 2004 |
Report No. GAO-04-505T |
Title
United States General Accounting Office GAO
For Release on Delivery Expected at 10:00 a.m. EDT Thursday, April 22, 2004 Testimony Before the Subcommittee on Aviation, Committee on Transportation and Infrastructure, House of Representatives AVIATION SECURITY Private Screening Contractors Have Little Flexibility to Implement Innovative Approaches
Statement of Norman J. Rabkin, Managing Director, Hom... |
Date March 25, 2004 |
Report No. GAO-04-597T |
Title
United States General Accounting Office GAO
For Release on Delivery Expected at 9:00 a.m. EST Thursday, March 25, 2004 Testimony Before the Subcommittee on Tactical Air and Land Forces, Committee on Armed Services, House of Representatives TACTICAL AIRCRAFT Status of the F/A-22 and Joint Strike Fighter Programs
Statement of Allen Li, Director, Acquisition and Sourcing Management GAO-04-597T March ... |
Date March 15, 2004 |
Report No. GAO-04-391 |
Title
United States General Accounting Office GAO
March 2004 Report to Congressional Committees TACTICAL AIRCRAFT Changing Conditions Drive Need for New F/A-22 Business Case GAO-04-391 March 2004 TACTICAL AIRCRAFT Changing Conditions Drive Need for New F/A-22 Business Case Highlights of GAO-04-391, a report to congressional committees Following a history of increasing cost estimates to complete F/A-22 d... |
Date Sept. 30, 2003 |
Report No. GAO-03-1111 |
Title
United States General Accounting Office GAO September 2003 Report to the Subcommittee on Coast Guard and Maritime Transportation, Committee on Transportation and Infrastructure, House of Representatives COAST GUARD New Communication System to Support Search and Rescue Faces Challenges GAO-03-1111 a September 2003 COAST GUARD
Highlights of GAO-03-1111, a report to the Subcommittee on Coast Guard an... |
Date Aug. 21, 2003 |
Report No. GAO-03-600 |
Title
United States General Accounting Office GAO
August 2003 Report to the Ranking Minority Member, Subcommittee on Financial Management, the Budget, and International Security, Committee on Governmental Affairs, U.S. Senate MISSILE DEFENSE Additional Knowledge Needed in Developing System for Intercepting Long-Range Missiles GAO-03-600 August 2003 MISSILE DEFENSE Additional Knowledge Needed in Developi... |
Date July 24, 2003 |
Report No. GAO-03-984T |
Title
United States General Accounting Office GAO
For Release on Delivery Expected at 10:00 a.m. EDT Thursday, July 24, 2003 Testimony Before the Subcommittee on Social Security, Committee on Ways and Means, House of Representatives ELECTRONIC DISABILITY CLAIMS PROCESSING Social Security Administration’s Accelerated Strategy Faces Significant Risks
Statement of Linda D. Koontz, Director Information Ma... |
Date April 2, 2003 |
Report No. GAO-03-603T |
Title
United States General Accounting Office GAO
For Release on Delivery Expected at 2:00 p.m. EST Wednesday, April 2, 2003 Testimony Before the Subcommittee on Tactical Air and Land Forces, Committee on Armed Services, House of Representatives TACTICAL AIRCRAFT Status of the F/A-22 Program
Statement of Allen Li, Director Acquisition and Sourcing Management GAO-03-603T April 2, 2003 TACTICAL AIRCRAFT S... |
Date March 31, 2003 |
Report No. GAO-03-442 |
Title
United States General Accounting Office GAO
March 2003 Report to the Committee on Armed Services, U.S. Senate DEFENSE ACQUISITIONS Advanced SEAL Delivery System Program Needs Increased Oversight GAO-03-442 March 2003 DEFENSE ACQUISITIONS Advanced SEAL Delivery System Program Needs Increased Oversight Highlights of GAO-03-442, a report to the Committee on Armed Services, U.S. Senate The Advanced SE... |
Date March 25, 2003 |
Report No. GAO-03-484R |
Title
United States General Accounting Office Washington, DC 20548 March 28, 2003 The Honorable Donald H. Rumsfeld Secretary of Defense Subject: Army Stryker Brigades: Assessment of External Logistics Support Should Be Documented for the Congressionally Mandated Review of the Army’s Operational Evaluation Plan Dear Mr. Secretary: We are reviewing the Army’s plans for deploying and sustaining Stryker... |
Date March 14, 2003 |
Report No. GAO-03-431 |
Title
United States General Accounting Office GAO
March 2003 Report to Congressional Committees TACTICAL AIRCRAFT DOD Should Reconsider Decision to Increase F/A-22 Production Rates While Development Risks Continue GAO-03-431 March 2003 TACTICAL AIRCRAFT DOD Should Reconsider Decision to Increase F/A-22 Production Rates While Development Risks Continue Highlights of GAO-03-431, a report to Congressional ... |
Date Dec. 2, 2002 |
Report No. GAO-03-52 |
Title
United States General Accounting Office GAO
December 2002 Report to the Subcommittee on Readiness and Management Support, Committee on Armed Services, U.S. Senate DEFENSE ACQUISITIONS Factors Affecting Outcomes of Advanced Concept Technology Demonstrations GAO-03-52 December 2002 DEFENSE ACQUISITIONS Factors Affecting Outcomes of Advanced Concept Technology Demonstrations Highlights of GAO-03-52, ... |
Date Sept. 17, 2002 |
Report No. GAO-02-1071 |
Title
United States General Accounting Office GAO
September 2002 Report to Congressional Requesters NATIONAL AIRSPACE SYSTEM Status of FAA’s Standard Terminal Automation Replacement System GAO-02-1071 a Contents Letter
Results in Brief Background Major STARS Project Changes Make Comparisons of Costs and Schedules Difficult FAA Has Changed Its Official Estimates Twice FAA Officials Said They Plan to Fo... |
Date July 24, 2002 |
Report No. GAO-02-898R |
Title
United States General Accounting Office Washington, DC 20548 July 24, 2002 The Honorable Tom Harkin The Honorable Charles E. Grassley The Honorable Peter G. Fitzgerald The Honorable Richard Durbin United States Senate The Honorable Lane Evans The Honorable James A. Leach The Honorable Jim Nussle House of Representatives Subject: 2002 Update of the 155 mm Lightweight Howitzer In July 2000 and April... |
Date June 10, 2002 |
Report No. GAO-02-692 |
Title
United States General Accounting Office GAO
June 2002 Report to the Honorable Patsy Mink, House of Representatives DEFENSE ACQUISITIONS Testing Needed to Prove SURTASS/LFA Effectiveness in Littoral Waters GAO-02-692 United States General Accounting Office Washington, DC 20548 June 10, 2002 The Honorable Patsy Mink House of Representatives Dear Ms. Mink: For decades, the Navy has been striving to i... |
Date March 5, 2002 |
Report No. GAO-02-298 |
Title
United States General Accounting Office GAO
March 2002 Report to Congressional Committees TACTICAL AIRCRAFT F-22 Delays Indicate Initial Production Rates Should Be Lower to Reduce Risks GAO-02-298 Contents Letter
Results in Brief Background F-22 Development Program Continues to Experience Delays and Risks in Meeting Key Schedule Goals F-22 Development Costs Likely to Increase More Testing Needed t... |
Date Oct. 24, 2001 |
Report No. A02633 |
Title
JFMIP White Paper: Parallel Operation of Software
Is it a Desirable Software Transition Technique? f I Parallel Operation of Software: Is it a Desirable Transition Technique? : FOREWORD
The JFMIP White Paper, “Parallel Operation of Software: Is It A Desirable Software System Transition Technique?” is intended to assist agencies when developing appropriate risk mitigation strategies when transi... |
Date Aug. 7, 2001 |
Report No. GAO-01-735 |
Title
United States General Accounting Office GAO
August 2001 Report to the Secretary of the Navy DEFENSE ACQUISITIONS Actions to Improve Navy SPAWAR Low-Rate Initial Production Decisions GAO-01-735 United States General Accounting Office Washington, DC 20548 August 7, 2001 The Honorable Gordon R. England The Secretary of the Navy Dear Mr. Secretary: During our review of the Navy’s Space and Naval War... |
Date June 7, 2001 |
Report No. GAO-01-450 |
Title
United States General Accounting Office GAO
June 2001 Report to the Honorable Peter A. DeFazio, House of Representatives DEFENSE ACQUISITION Comanche Program Objectives Need to Be Revised to More Achievable Levels GAO-01-450 Contents Letter
Results in Brief Background The Comanche Program Continues to Experience Cost Increases, Schedule Delays, and Performance Shortfalls The Army Plans to Begin Co... |
Date March 15, 2001 |
Report No. GAO-01-310 |
Title
United States General Accounting Office GAO
March 2001 Report to Congressional Committees TACTICAL AIRCRAFT F-22 Development and Testing Delays Indicate Need for Limit on Low-Rate Production GAO-01-310 Contents Letter Appendixes
Appendix I: Air Force Assessment of Development and Test Criteria Required to Proceed to Low-Rate Initial Production 3 34 35 36 37 39 40 Appendix II: Comparison of Schedul... |
Date Feb. 20, 2001 |
Report No. GAO-01-369R |
Title
United States General Accounting Office Washington, DC 20548 February 20, 2001 The Honorable Donald H. Rumsfeld The Secretary of Defense Subject: Defense Acquisitions: Readiness of the Marine Corps’ V-22 Aircraft for Full-Rate Production Dear Mr. Secretary: In a letter to Secretary of Defense Cohen, dated December 15, 2000, we stated that the Marine Corps’ V-22 aircraft1 was not ready for full... |
Date Sept. 29, 2000 |
Report No. GGD-00-201 |
Title
United States General Accounting Office GAO
September 2000 Report to the Honorable Duncan Hunter House of Representatives BORDER PATROL Procurement of MD 600N Helicopters Should Be Reassessed GAO/GGD-00-201 United States General Accounting Office Washington, D.C. 20548 General Government Division B-284951 September 29, 2000 The Honorable Duncan Hunter House of Representatives Dear Mr. Hunter: The ... |
Date Sept. 26, 2000 |
Report No. NSIAD-00-204 |
Title
United States General Accounting Office GAO
September 2000 Report to the Chairman, Subcommittee on Military Research and Development, Committee on Armed Services, House of Representatives UNMANNED AERIAL VEHICLES Questionable Basis for Revisions to Shadow 200 Acquisition Strategy GAO/NSIAD-00-204 Contents Letter Appendixes
Appendix I: The Army Is Incorporating Lessons Learned From Previous Experie... |
Date July 31, 2000 |
Report No. NSIAD-00-199 |
Title
United States General Accounting Office GAO
July 2000 Report to the Chairman and Ranking Minority Member, Subcommittee on Readiness and Management Support, Committee on Armed Services, U.S. Senate BEST PRACTICES A More Constructive Test Approach Is Key to Better Weapon System Outcomes GAO/NSIAD-00-199 Contents Letter Executive Summary Chapter 1 Introduction
The Role of Testing and Evaluation in Pr... |
Date July 28, 2000 |
Report No. NSIAD-00-182 |
Title
United States General Accounting Office GAO
July 2000 Report to Congressional Requesters DEFENSE ACQUISITIONS Howitzer Program Experiencing Cost Increases and Schedule Delays GAO/NSIAD-00-182 Contents Letter Appendixes
Appendix I: Lightweight Howitzer Fiscal Year 2001 Budget Request 3 24 27 8 9 Appendix II: Comments From the Department of Defense Tables Table 1: Key Program Events Table 2: Changes... |
Date July 25, 2000 |
Report No. NSIAD-00-167 |
Title
United States General Accounting Office GAO
July 2000 Report to the Chairman Subcommittee on Defense Committee on Appropriations House of Representatives BATTLEFIELD AUTOMATION Army Needs to Update Fielding Plan for First Digitized Corps GAO/NSIAD-00-167 Contents Letter Appendixes
Appendix I: Fiscal Years 2001 and 2002 Funding Estimates for Category 2 Systems 3 20 36 6 8 9 11 12 15 Appendix II: Co... |
Date May 31, 2000 |
Report No. NSIAD-00-121 |
Title
United States General Accounting Office GAO
May 2000 Report to Congressional Requesters MISSILE DEFENSE Schedule for Navy Theater Wide Program Should Be Revised to Reduce Risk GAO/NSIAD-00-121 Contents Letter Apendixes
Appendix I: Description of Block II Technologies for Navy Theater Wide Program 3 24 Appendix II: Research, Development, Test, and Evaluation Funds Budgeted and Allocated for Navy Th... |