Menu Search Account

LegiStorm

Get LegiStorm App Visit Product Demo Website
» Get LegiStorm App
» Get LegiStorm Pro Free Demo

GAO Reports by subject "Powerplants"

Full-text search of 51,950 reports from the Government Accountability Office
From To
Reset

Search Results:

Date Report No. Title
Date June 16, 2010 Report No. GAO-10-675 Title

Coal Power Plants: Opportunities Exist for DOE to Provide Better Information on the Maturity of Key Technologies to Reduce Carbon Dioxide Emissions

United States Government Accountability Office GAO June 2010 Report to Congressional Requesters COAL POWER PLANTS Opportunities Exist for DOE to Provide Better Information on the Maturity of Key Technologies to Reduce Carbon Dioxide Emissions GAO-10-675 June 2010 COAL POWER PLANTS Highlights Highlights of GAO-10-675, a report to congressional requesters Accountability Integrity Reliability Opportu...
Date Oct. 8, 2009 Report No. GAO-10-47 Title

Clean Air Act: Mercury Control Technologies at Coal-Fired Power Plants Have Achieved Substantial Emissions Reductions

United States Government Accountability Office GAO October 2009 Report to the Chairman, Subcommittee on Clean Air and Nuclear Safety, Committee on Environment and Public Works, U.S. Senate CLEAN AIR ACT Mercury Control Technologies at Coal-Fired Power Plants Have Achieved Substantial Emissions Reductions GAO-10-47 October 2009 CLEAN AIR ACT Highlights Highlights of GAO-10-47, a report to the Chair...
Date July 27, 2009 Report No. GAO-09-788R Title

Air Pollution: Air Quality, Visibility, and the Potential Impacts of Coal-Fired Power Plants on Great Basin National Park, Nevada

United States Government Accountability Office Washington, DC 20548 July 27, 2009 Congressional Addressees Subject: Air Pollution: Air Quality, Visibility, and the Potential Impacts of CoalFired Power Plants on Great Basin National Park, Nevada Great Basin National Park encompasses over 77,000 acres of White Pine County in east-central Nevada and is home to diverse geologic, topographic, and wildl...
Date July 9, 2009 Report No. GAO-09-860T Title

Clean Air Act: Preliminary Observations on the Effectiveness and Costs of Mercury Control Technologies at Coal-Fired Power Plants

United States Government Accountability Office GAO For Release on Delivery Expected at 10:00 a.m. EDT Thursday, July 9, 2009 Testimony Before the Subcommittee on Clean Air and Nuclear Safety, Committee on Environment and Public Works, U.S. Senate CLEAN AIR ACT Preliminary Observations on the Effectiveness and Costs of Mercury Control Technologies at Coal-Fired Power Plants Statement of John B. Ste...
Date July 9, 2009 Report No. GAO-09-862T Title

Energy and Water: Preliminary Observations on the Links between Water and Biofuels and Electricity Production

United States Government Accountability Office GAO For Release on Delivery Expected at 10:00 a.m. EDT Thursday, July 9, 2009 Testimony Before the Subcommittee on Energy and Environment, Committee on Science and Technology, House of Representatives ENERGY AND WATER Preliminary Observations on the Links between Water and Biofuels and Electricity Production Statement of Anu Mittal, Director Natural R...
Date Sept. 30, 2008 Report No. GAO-08-1080 Title

Climate Change: Federal Actions Will Greatly Affect the Viability of Carbon Capture and Storage As a Key Mitigation Option

United States Government Accountability Office GAO September 2008 Report to the Chairman of the Select Committee on Energy Independence and Global Warming, House of Representatives CLIMATE CHANGE Federal Actions Will Greatly Affect the Viability of Carbon Capture and Storage As a Key Mitigation Option GAO-08-1080 September 2008 CLIMATE CHANGE Highlights Highlights of GAO-08-1080, a report to the C...
Date Jan. 31, 2008 Report No. GAO-08-382R Title

Government Operations: Feasibility of Outsourcing the Management and Operation of the Capitol Power Plant

United States Government Accountability Office Washington, DC 20548 January 31, 2008 Congressional Addressees Subject: Feasibility of Outsourcing the Management and Operation of the Capitol Power Plant The Capitol Power Plant (CPP), managed by the Architect of the Capitol (AOC), provides heating and cooling for the U.S. Capitol and surrounding facilities. This plant, which provides steam and chill...
Date Feb. 10, 2006 Report No. GAO-06-321R Title

Architect of the Capitol: Addressing Staffing and Training Issues Is Important for Efficient and Safe West Refrigeration Plant Operations

United States Government Accountability Office Washington, DC 20548 February 10, 2006 The Honorable Wayne Allard Chairman Subcommittee on the Legislative Branch Committee on Appropriations United States Senate The Honorable Jerry Lewis Chairman Committee on Appropriations House of Representatives Subject: Architect of the Capitol: Addressing Staffing and Training Issues Is Important for Efficient ...
Date Feb. 28, 2005 Report No. GAO-05-252 Title

Clean Air Act: Observations on EPA's Cost-Benefit Analysis of Its Mercury Control Options

United States Government Accountability Office GAO February 2005 Report to Congressional Requesters CLEAN AIR ACT Observations on EPA’s Cost-Benefit Analysis of Its Mercury Control Options GAO-05-252 a February 2005 CLEAN AIR ACT Highlights Highlights of GAO-05-252, a report to congressional requesters Accountability Integrity Reliability Observations on EPA’s Cost-Benefit Analysis of Its Merc...
Date July 2, 2004 Report No. GAO-04-692 Title

Uranium Enrichment: Decontamination and Decommissioning Fund Is Insufficient to Cover Cleanup Costs

United States General Accounting Office GAO July 2004 Report to Congressional Committees URANIUM ENRICHMENT Decontamination and Decommissioning Fund Is Insufficient to Cover Cleanup Costs GAO-04-692 a July 2004 URANIUM ENRICHMENT Decontamination and Decommissioning Fund Is Insufficient to Cover Cleanup Costs Highlights of GAO-04-692, a report to congressional committees Decontaminating and decommi...
Date June 4, 2004 Report No. GAO-04-662 Title

Nuclear Nonproliferation: DOE's Effort to Close Russia's Plutonium Production Reactors Faces Challenges, and Final Shutdown Is Uncertain

United States General Accounting Office GAO June 2004 Report to the Chairman, Subcommittee on Emerging Threats and Capabilities, Committee on Armed Services, U.S. Senate NUCLEAR NONPROLIFERATION DOE’s Effort to Close Russia’s Plutonium Production Reactors Faces Challenges, and Final Shutdown Is Uncertain GAO-04-662 a June 2004 NUCLEAR NONPROLIFERATION Highlights of GAO-04-662, a report to the ...
Date Oct. 27, 1999 Report No. T-RCED-00-20 Title

Nuclear Nonproliferation: Heavy Fuel Oil Delivered to North Korea Under the Agreed Framework

United States General Accounting Office GAO For Release on Delivery Expected at 10 a.m. EDT Wednesday October 27, 1999 Testimony Before the Committee on International Relations, House of Representatives NUCLEAR NONPROLIFERATION Heavy Fuel Oil Delivered to North Korea Under the Agreed Framework Statement of Ms. Gary L. Jones, Associate Director, Resources, Community, and Economic Development Divisi...
Date Sept. 30, 1999 Report No. RCED-99-276 Title

Nuclear Nonproliferation: Status of Heavy Fuel Oil Delivered to North Korea Under the Agreed Framework

United States General Accounting Office GAO September 1999 Report to the Chairman, Committee on International Relations, House of Representatives NUCLEAR NONPROLIFERATION Status of Heavy Fuel Oil Delivered to North Korea Under the Agreed Framework GAO/RCED-99-276 GAO United States General Accounting Office Washington, D.C. 20548 Resources, Community, and Economic Development Division B-283603 Sept...
Date Jan. 27, 1998 Report No. RCED-98-28 Title

Air Pollution: Estimated Benefits and Costs of the Navajo Generating Station's Emissions Limit

United States General Accounting Office GAO January 1998 Report to the Chairman, Subcommittee on Water and Power Resources, Committee on Resources, House of Representatives AIR POLLUTION Estimated Benefits and Costs of the Navajo Generating Station’s Emissions Limit GAO/RCED-98-28 GAO United States General Accounting Office Washington, D.C. 20548 Resources, Community, and Economic Development Di...
Date July 29, 1993 Report No. RCED-93-174 Title

Fossil Fuels: The Department of Energy's Magnetohydrodynamics Development Program

United States General Accounting Office GAO July 1993 Report to the Chairman, Subcommittee on Energy, Committee on Science, Space, and Technology, House of Representatives FOSSIL FUELS The Department of Energy’ s Magnetohydrodynamics Development Program GAO/R(;ED-93-174 GAO United States General Accounting Office Washingtdn, D.C. 20648 Resources, Community, and Economic Development Division B-25...
Date May 22, 1991 Report No. RCED-91-155 Title

Fossil Fuels: DOE's Effort to Provide Clean Coal Technology to Poland

--“---l._l_-_l--- (inil,tvi St,at,w Grnwal Accounting Office Iieport to the Honorable Barbara A. Mikulski, U.S. Senate FOSSIL FUELS DOE’ Effort to s Provide Clean Coal Technology to Poland 1 111111111 llll 144027 --Nottobe-a-dethe RELEASED j J : ..,,. -..-_.-.- -.._ - I GAO/II(:li;I)-!)l-1~O GAO United States General Accounting Office Washington, D.C. 20648 Resources, Community, and Economic D...
Date Sept. 22, 1988 Report No. NSIAD-88-217 Title

Toxic Substances: PCB Spill at the Guam Naval Power Generating Plant

t United States General Accounting Office GAO September 1988 Report to Congressional Requesters . TOXIC SUBSTANCES PCB Spill at the Guam Naval Power Generating Plant RESllC!cTED-Not ta ?mre!ad &side tbc bud Accounting Of& except on the basis of the specific m bytheOBtiebdco~&elotiona GAO/NSIAD-88-217 National Security and International Affairs Division B-213706 September 22, 1988 The Honorable Ben...
Date July 2, 1982 Report No. ID-82-28 Title

International Affairs: Navy's Transfer of Power System to Financially Troubled Guam Power Authority Has Been Delayed

F&port To The Congress OF THEUNITEDSTATES Navy’s Trans’fer Of Power System To Financially Troubled Guam Power Authority Has Been Delayed The Island-Wide Power System on Guam is jointly operated under an agreement between the U.S. Navy and the Guam Power Authority. Since 1975, the Authority has experienced financial difficulties and transfer of operational control to it has been delayed. The Go...
Date Dec. 21, 1981 Report No. EMD-82-8 Title

Electric Power: Contemporary Issues and the Federal Role in Oversight and Regulation

BY ‘ C0VlPTRkL;En GENERAL THE F$c?port The Congress To OF THEUNITEDSTATES ElkxztricPower: Contemporary Issues And The Federdl Role In Oversight bnd Regulation This report provides the Congress with a discussion of : --important issues in electric power regui lation and management, I --recent GAO reports on some of those issues, and --questions and observations about power system planning and dev...
Date Nov. 13, 1981 Report No. EMD-82-18 Title

Energy: The Federal Government Should Encourage Early Public, Regulatory, and Industry Cooperation in Siting Energy Facilities

Report To The Chairman Committee On Energy And Commerce United States Senate OF THE UNITEDSTATES The Federal Government Should Encouiage Early Public, Regulatory, And Industry C~ooperation In Siting Energy Facilitik Eff rts toexpand domestic production of coal, syn hetic fuels, and other energy sources have fall ,a behind expectations. One reason has n bee the inability to effectively identify acc...
Date Aug. 14, 1981 Report No. EMD-81-65 Title

Energy: TVA's Coal Procurement Practices--More Effective Management Needed

< . . BY THECOMPTROLLER GENERAL Report ToThe Congress OF THEUNITEDSTATES TVA’s Coal Procurement Practices--More Effective Management Needed The Tennessee Valley Authority is one of the largest coal-buying utilities in the Nation. Coal costs are a major expense to TVA and thus affect power rates. The coal purchasing program should be managed more effectively in order to keep down coal costs. TVA ...
Date April 23, 1981 Report No. 115033 Title

Energy: Implementation of Federal Coal Conversion Program

:- I 6- - WNSTEDSTATES GENERAL ACCOWNTING OFFICE 20548 ~ASHlNGTQ=UN, D.C. FOR RELEASE ON DELIVERY EXPECTED AT 1O:OO A.M. THURSDAY, APRIL 23, 1981 STATEMENTOF J. DEXTER PEACH, DIRECTOR ENERGYAND MINERALS DIVISION BEFORE THE SUB~COMMITTEE ENEkGY REGULATION ON SENATE COMMITTEE ON ENERGYAND NATURAL RESOURCES Mr. Chairman and Members of the the opportunity Subcommittee: i I appreciate our review to be ...
Date March 16, 1981 Report No. EMD-81-64 Title

Energy: Status of the Great Plains Coal Gasification Plant

REPORTBY THE US. General Accounting Office Status Of The Great Plains Coal Gasification Plant Great Plains Gasification Associates proposes to construct a coal gasification plant in North Dakota, Partiesopposing the financing arrangement approved by the Federal Energy Regulatory Commission petitioned the U.S. Court of Appeals. They opposed a surcharge to current gas customers to allow Great Plains...
Date Nov. 28, 1980 Report No. CED-81-14 Title

Financing Rural Electric Generating Facilities: A Large and Growing Activity

1 * \ I1 777 &v-7? ,’ f3YTHECOMPTROLLERGENERAL ~ReportTo The Congress ~OF UNITED THE STATES IFinancing Rural Electric Generating Facilities: ~ALarge And Growing Activity TheRural Electrification Administration is providing billions of dollars of loans and loan guarantees to finance the construction of electric generating plants and related facilities in rural areas. In fiscal year 1979 such fina...
Date Nov. 21, 1980 Report No. EMD-81-31 Title

Energy: Financial and Regulatory Aspects of Converting Oil-Fired Utility Boilers to Coal

-+?q BY,TH.E COMPTROLLER GENERAL Rdport To The Chairman, Committee On Energy And Natural Resources United States Senate OF THE UNITEDSTATES Financial And Regulatory Aspects Of Thou nds of barrels of oil a day could be saved by converting oil-fired utility boilers to coal. I” A total of 26 utilities in the northeast Unit States are now listed in the proposed “oil ackout legislation” and by pr...
Date Feb. 11, 1980 Report No. EMD-80-14 Title

Magnetohydrodynamics: A Promising Technology for Efficiently Generating Electricity From Coal

. - ..,.c WJlFQE3 BY THECOMPTROLLERGENERAL 4 , Report ToThe Congress OF THEUNITEDSTATES Magnetohydrodynamics: A Promising Technology For Efficiently Generating Electricity From Coal If technical problems can be solved, magnetohydrodynamics--which generates electricity from coal by passing heated, electrically charged gases through a magnetic field--could become an important technology for utilitie...
Date April 11, 1979 Report No. EMD-79-44 Title

Energy: TVA's Load Management Activities

UNITED STATES GENERAL &XCIUNTING OFFICE WASHINGTON, D.C. 20948 ENeRQY AND DIVISION MINERAU APRIL 11, 1979 E-114850 Mr. S. David Freeman Chairman, Board of Directors Tennessee Valley Authority Dear Mr. Chairman: began an t evaluation of the Tennessee Valley We recently Authority's m load manaqement activitieg Our primary purpose was to determine the status of various onqoing demonstration projects ...
Date Aug. 16, 1978 Report No. EMD-78-101 Title

Energy: Need for Greater Regulatory Oversight of Commercial Low-Level Radioactive Waste

DOCURENT RESUBE 06799 - (B23073651 Need for Greater Regulatory Oversight of Commercial Low-Level Radioactive Vaste. VMD-78-1C1; B-164105. August 16, 1976. 14 pp. Report to Joseph a. Hendr/i, Chairsan, Nuclear Regulatory Commission; by Sonte Cani..eld, Jr., Director, Energy and Mineral Resources Div. Issue krea: Energy: Making Nuclear Fission a Subtstantial 2nergy Source (1608). Contact: Energ! and...
Date Sept. 30, 1977 Report No. GGD-77-95 Title

Information Management: Monitoring the Development of the Federal Power Commission's Regulatory Information System

DCCUMENT RESUME 03746 - [B27940211 Monitoring the Development of the Federal Power Commission's Regulatory Informaticn System. GGD-77-95; B-180228. September 30, 1977. 6 pp. Report to Frank Horton, Chairman, Commission on Federal Paperwork; by Robert F. Keller, Acting Comptroller General. Issue Area: Statistical and Paperwocrk Implications of Non-Federal Data (3100). Contact: General Government Di...
Date Sept. 16, 1977 Report No. EMD-77-66 Title

Energy: Review of the Federal Energy Administration's Coal Conversion Program

DCCUMENT hESUME 03410 - [A26337523 [Review of the Federal Energy Administration'c Coal Conversion Program]. EMD-77-66; E-178205. September 16, 1977. 5 pp. Report to Sen. Henry M. Jackson, Chairman, Senate Committee on Energy and Natural Resources; by Elmer B. Staets, Comptroller General. Issue Area: Energy: Rcle of Fossil Fuels in Meeting Future Needs (1609). Contact: Energy and Minerals Div. Budg...
Date July 5, 1977 Report No. HRD-77-117 Title

Business, Industry, and Consumers: Exposure of Naval Regional Medical Center Personnel to Toxic Substances

DOCUMENT RESUME 02847 - [A1892948] [Exposure of Naval Regional Medical Center Personnel to Toxic Substances]. HRD-77-117; B-163375. Jujy 5, 1977. 6 pp. Report to Secretary, Department of Health, Education, and Welfare; by Gregory J. Ahart, Director, Human Resources Div. Issue Area: Consumer and Worker Protection: Standards, Laws, and Regulations Enforcement (903). Contact: Human Resources Div. Bud...
Date June 16, 1977 Report No. 102463 Title

Environmental Protection: The Problem of Cleaning Up the Remains of Nuclear Facilities

DOCUMENT RESUME 02463 A1752783] The Problem of Cleaning Up the Pemains of Nuclear FPcilities. June 16, 1977. 11 pp. Testimony before the House Committee on Science and Technology: Environment and the Atmosphere Subcommittee; by Monte Canfield, Jr., Director, Energy and Minerals Div. Issue Area: Energy: Making Nuclear Fission a Substantial Energy Source (1608). Budget Function: Natural Resources, E...
Date June 13, 1977 Report No. 102461 Title

Energy: Obstacles to Reducing Nuclear Powerplant Leadtimes

DOCUMENT SESU ME 02461 A1752770 Obstacles to 1977. 13 pp. educing N lear Powerplant Leadtimes. June 13, Testimony before te House Committee on Interior and Insular Affairs: Energy and the Environment Subcommittee; by onte Canfield, Jr., Director, Energy and Minerals Div. Issue Area: Energy: Making Nuclear Fission a Substantial Energy Souirce (1608). Contact: Energy aud inerals Div. Budget Function...
Date June 9, 1977 Report No. EMD-77-21 Title

Energy: Problems in Planning and Constructing Transmission Lines Which Interconnect Utilities

DOCUMENT RESUME 02453 - [A1712703) which Problems in Planning and Constructing TLansuission Lines 30 Interconnect Utilities. EMD-77-21; B-1C0228. June 9, 1977. pp. + 4 appendices (10 pp.). Report to Ruciard L. Dunham, Chairman, Federal Power Commission; by J. Dexter Peach (for Monte Canfield, Jr., Director, Energy and Minerals Div.). Issue Area: Energy: Pederal Role as a Proprietor of Energy Resou...
Date June 2, 1977 Report No. EMD-77-30 Title

Energy: Allegations of Poor Construction Practices on the North Anna Nuclear Powerplants

DOCUMENT RESUME 0245' - [A1672675] Allegations of Poor Construction Practices on the North Anna Nuclear Powerplants. END-71-30; B-164105. June 2, 1977. 15 pp. + 2 appendices (5 pp.). Report to Rep. John C. Dirgell, Chairman, House Committee on Interstate and Foreign Conmerce: Energy and Power Subcommittee; by Elmer B. Staats, Comptroller General. Issue Area: Energy: aking Nuclear Fission a Substan...
Date May 20, 1977 Report No. LCD-77-406 Title

Energy: Emergency Power Generators Used and Managed Inefficiently by Department of Defense

DOCUMENT RESUME 02165 A14524561 by Emergency Power Generators Used and Mana.ged Inefficiently 32 20, 1977. Department of Defense. LCD-77-406; B-133361. May PPReport to Secretary, Department of Defense; by Fred J. Shafer, Director, Logistics and Communications Div. and Issue Area: Facilities and Material Managemet:' Operation Federal Efforts to Maintenance of Facilities (708); Energy: Conserve Ener...
Date May 20, 1977 Report No. 102168 Title

Environmental Protection: Institutional and Jurisdictional Issues in Nuclear Waste Management

DOCUMENT RESUME 02168 - [A1532513] Institutional and Jurisdictional Issues in Nuclear Waste Management. May 20, 1977. 15 pp. Testimony before the House Committee on Interior and Insular Affairs: Energy and the Environment Subcommittee; by Monte Canfield, Jr., Director, Energy and Minerals Div. Issue Area: Energy: Making Nuclear Fission a Substantial Energy Source (1608). Contact: Energy and Minera...
Date May 2, 1977 Report No. 101912 Title

Energy: Nuclear Regulatory Commission Security Programs

DCCUNEiT 0191. - [A13122691 ESURIE Nuclear Regulatory Ccmnissiob Security Programs. day 2, 1977. pp. + enclosure (1 e). * 15 Testimony before the House Committee on Interstate and Foreign Commerce: Energy and Power Subcommittee; by Honte Canfield, Jr., Director, Energy and Minerals Div. Issue areas Energy (1600). CoLrta.A: Energy and Minerals Div. Budget Functicn: Natural Resources, Environment, a...
Date Feb. 7, 1977 Report No. FOD-77-1 Title

Financial Management: Examination of Financial Statements of the Tennessee Valley Authority for Fiscal Year 1976

DOCUMENT RESUSE 00171 - [A0751186] Examination of Financial Statements of the Tennessee Valley Authority for Fiscal Year 1976. POD-77-1; B-114850. February 7, 1977. 27 pp. + enclosures (20 pp.). Report to the Congress; by Elmer B. Staats, Ccmptroller General. Issue Area. Accounting and Financial Reporting (2800). Contact: Field Operations Div. Budget Function: Natural Resources, Environment, and E...
Date Sept. 1, 1976 Report No. EMD-76-8 Title

Energy: Plans for Construction of a Magnetohydrodynamics Test Facility in Montana

IllIIllIIIIlllIlllllllllIIIIIIIIIlll LM098184 Plans For Construction Of A Magnetohydrodynamics Test Facility In Montana Energy Research And Development Administration This is GAO’s analysis on matters conccrniny the ccmstrticticm md opcrntion of ;i nkqW0 hydrodyndnws test fm!tty in hlont;,na and Its concIuso9 tt:;ii thu Coil
Date Dec. 19, 1975 Report No. RED-76-57 Title

Financial Management: Statement of Assets and Liabilities of the Federal Columbia River Power System

COMPTROLEA GBt’IER4L WA5I,INQTON. OF THE D.C. 2JwJ UNltZD STATES Illlllllllllllllllllllllllllllllllllll LM096880 .3 The The Dear I iion~r dble Secretary Xr. of the Interior Secretary; ?;P here examined the statement of asset9 and liabilities of the r’ederel Columbia Xiver Power Svstem (see note 1 to the Einancial statements) as of June 30, 1975, and the related statements of revenues ant’ Cr...
Date March 28, 1975 Report No. FOD-75-11 Title

Financial Management: Examination of Financial Statements of the Tennessee Valley Authority for Fiscal Year 1974

REPQRT TO THE CONGRESS LM097068 I11111111 lllll 1111111111 Ill Ill11 Ill1 Examination Of Financial Statements Of The Tennessee Valley Authority For Fiscal Year 1974 BY THE COMPTROLLER GENERAL OF THE UNITED STATES FOD-75-1 1 COMPTROLLER GENERAL WASHINGTON. OF THE UNITED D.C. PO5448 STATES B-114850 To the President of the Senate and the c! Speaker of the House of Representatives /' This is our repor...
Date March 6, 1975 Report No. RED-75-335 Title

Financial Management: Financial Statements of the Southeastern Federal Power Program for Fiscal Year 1974

We have examined the Statement 0-F Assets and Liabilities of the Southeastern Federal Power Program (see note 1 to the financial statements) as of June 30, 1974, and the related Statements of Revenues and Expenses and of Changes in Financial Position for fiscal year 1974. We made our examination in accordance with generally accepted auditing standards and included tests of the accounting records o...
Date Jan. 7, 1975 Report No. 093201 Title

Financial Management: Fiscal Year 1974 Financial Audit of Commercial Power Operations in the Pacific Northwest Region

UNITED STATES GENERAL ACCOUNTING OFFICE REGIONAL ROOM 201 415 FIRST OFFiCE AVENUE NORTH SEATTLE, WASHINGTON 98109 ' Mr. Rodney J. Vmsxa RegIonal DIrector, Paclflc Northwest Region Bureau of Reclamation Department of the'Interlor Box 43, 550 West Fort Street Boxse, Idaho 83702 Dear Mr. Vissla. --We have completed our review of the Bureau of Reclamation proJect flnanclal statements for the fiscal ye...
Date Jan. 7, 1975 Report No. 093200 Title

Financial Management: Matters Identified During FY 1974 Financial Audit of the Federal Columbia River Power System

UNITED STATE~GENERALACCOUNTINGOFFICE REGIONAL ROOM SEATTLE, 201 415 FIRST WASHINGTON OFFICE AVENUE NORTH 98109 09320~ Mr. Donald P. Hodel, Admlnlstrator Bonneville Power Admlnlstratlon P.O. Box 3621 Portland, Oregon i7208 Dear Mr. Hodel We have completed our audzt of the Federal Columbia River Power System (FCRPS) flnanclal statements for the fiscal year ended June 30, 1974. Our review included an...
Date Oct. 18, 1974 Report No. RED-75-280 Title

Energy: How Solar Energy Was Treated in the AEC Chairman's Report, "The Nation's Energy Future"

. . C B-f7bZ05 I\ The Honorable United States Mr. James Abourezk Senate %-Dear / Abourezk: -/& ', This is our report on how solar energy was treated in "The Hation's Energy Future." We the AX Chairman's report, made our review in accordance with your reque& of April 1, 1974, as modified in subsequent meetings with your office. we (1) obtained and incorAs your office instructed, porated in the repo...
Date Feb. 1, 1974 Report No. 093568 Title

Financial Management: FY 1973 Financial Audit of Commercial Power Operations of Corps of Engineers

lk J Or General 27 chard E McConne?1 D'3v7s~on Engineer North Paclf-ic D~vls~on i.JeS Army Corps of Eng~eers 210 Custom House Portland, Oregon 97209 Dear General McConnell We have completed our rev-relnr of the accounts and account? ng procedures for the Corps of EngJneers proJects Included ?n the Federal ColumbTa Rover Power System (FCFPS) for the flscal year ended June 30, 1973 Our rev-tew, whic...
Date Jan. 22, 1973 Report No. 093933 Title

Financial Management: Matters Identified During FY 1972 Financial Audit of the Federal Columbia River Power System

3086 FEDERAL. OFFICEBUILDING 909 FIRS-I98104 AVENUE SEA~TLE,WASHINGTON Mr, Eonald P, Hodel. Admxnlstrator Bonneville Power Admrnlstratlonb&C P.0, Box 3521 Portland OR 97208 Dear Mr, Hodel. oOq&~-' We have completed our annual fznanclal audrt of the Federal Columbia Rover Power System (FCP3S) for the fxscal year ended June 30, 1972. Our revxew Included an examlnatron of the Bonneville Power Admxnls...
Date March 4, 1971 Report No. 093211 Title

Financial Management: Fiscal Year 1970 Financial Audit of Commercial Power Operations in Region I, Bureau of Reclamation

UNITED STATES GENERAL A~COIJNTING OFFICE REGIONAL SO96 FEDERAL OFFICE BUILDING OFFJCE 909 FIRST &VENUE -= SEATTLE, WASHINGTON 98104 Mr. Earold Region 1, Department P, 0. Box Boise, T. Nelson, R&final Director ti0Xl u,s. Bureau of Reel of the InteriolP 8008 Idaho 83707 Y Dear Mr. Nelson: We have completed our review of the accounts and accounting procedrsree of the power generating and related mult...
Date March 4, 1971 Report No. 093210 Title

Financial Management: Fiscal Year 1970 Financial Audit of Commercial Power Operations of Corps of Engineers

UNITED STATESGENE~ALACCOUNTINGOFFICE REGIONAL 3086 FEDERAL OFFICE BUILDING OFFICE 909 FIRST AVENUE SEATTLE. WASHINGTON 9s 104 -. Brigadier General B, s. Kelley Division Engiaeer North Pacifdc Dzivis~on U.se &my Caqxs of Engineers 210 cust6m BQWE Portfaaat, ckegon 97209 +iqu Dear Gem?E;al Kelley: We have cmpleted our review of the accounts and account%xsg procedares for the Corps of Engineers' mfti...