Date |
Report No. |
Title |
Date May 25, 2011 |
Report No. GAO-11-635T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 10:00 a.m. EDT Wednesday, May 25, 2011 Testimony Before the Committee on Homeland Security and Governmental Affairs, U.S. Senate Opportunities to Reduce Potential Duplication in Government Programs, Save Tax Dollars, and Enhance Revenue
Statement of Gene L. Dodaro Comptroller General of the United States GAO-11-... |
Date Oct. 28, 2010 |
Report No. GAO-11-8 |
Title
United States Government Accountability Office GAO
October 2010 Report to Congressional Committees DEFENSE CONTRACTING Enhanced Training Could Strengthen DOD’s Best Value Tradeoff Decisions GAO-11-8 October 2010 DEFENSE CONTRACTING
Accountability • Integrity • Reliability Enhanced Training Could Strengthen DOD’s Best Value Tradeoff Decisions
Highlights of GAO-11-8, a report to congressiona... |
Date Sept. 15, 2010 |
Report No. GAO-10-1020R |
Title
United States Government Accountability Office Washington, DC 20548 September 15, 2010 The Honorable Carl Levin Chairman Committee on Armed Services United States Senate Subject: Joint Strike Fighter: Assessment of DOD’s Funding Projection for the F136 Alternate Engine Dear Senator Levin: The Joint Strike Fighter (JSF) program began in 1996 with an acquisition strategy that called for a competit... |
Date July 26, 2010 |
Report No. GAO-10-833 |
Title
United States Government Accountability Office GAO
July 2010 Report to the Committee on Oversight and Government Reform, House of Representatives FEDERAL CONTRACTING Opportunities Exist to Increase Competition and Assess Reasons When Only One Offer Is Received GAO-10-833 July 2010 FEDERAL CONTRACTING Highlights
Highlights of GAO-10-833, a report to the Committee on Oversight and Government Reform,... |
Date July 15, 2010 |
Report No. GAO-10-809 |
Title
United States Government Accountability Office GAO
July 2010 Report to the Republican Leader, U.S. Senate RECOVERY ACT Contracting Approaches and Oversight Used by Selected Federal Agencies and States GAO-10-809 July 2010 RECOVERY ACT Highlights
Highlights of GAO-10-809, a report to the Republican Leader, U.S. Senate Accountability Integrity Reliability Contracting Approaches and Oversight Used by... |
Date Sept. 9, 2009 |
Report No. GAO-09-792 |
Title
United States Government Accountability Office GAO
September 2009 Report to the Committee on Oversight and Government Reform, House of Representatives CONTRACT MANAGEMENT Agencies Are Not Maximizing Opportunities for Competition or Savings under Blanket Purchase Agreements despite Significant Increase in Usage GAO-09-792 September 2009 CONTRACT MANAGEMENT Highlights
Highlights of GAO-09-792, a rep... |
Date March 24, 2009 |
Report No. GAO-09-462T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 10:00 a.m. EDT Tuesday, March 24, 2009 Testimony Before the Subcommittee on Coast Guard and Maritime Transportation, Committee on Transportation and Infrastructure, House of Representatives COAST GUARD Observations on Changes to Management and Oversight of the Deepwater Program
Statement of John P. Hutton, Direc... |
Date Jan. 16, 2009 |
Report No. GAO-09-48 |
Title
United States Government Accountability Office GAO
January 2009 Report to Congressional Committees EMBASSY CONSTRUCTION Additional Actions Are Needed to Address Contractor Participation GAO-09-48 January 2009 EMBASSY CONSTRUCTION Highlights
Highlights of GAO-09-48, a report to congressional committees Accountability Integrity Reliability Additional Actions Are Needed to Address Contractor Particip... |
Date Jan. 16, 2009 |
Report No. GAO-09-47SP |
Title
|
Date Nov. 21, 2008 |
Report No. GAO-09-16 |
Title
United States Government Accountability Office GAO
November 2008 Report to Congressional Requesters SMALL BUSINESS ADMINISTRATION Agency Should Assess Resources Devoted to Contracting and Improve Several Processes in the 8(a) Program GAO-09-16 November 2008 SMALL BUSINESS ADMINISTRATION Highlights
Highlights of GAO-09-16, a report to congressional requesters Accountability Integrity Reliability Ag... |
Date Nov. 21, 2008 |
Report No. GAO-09-14 |
Title
United States Government Accountability Office GAO
November 2008 Report to Congressional Committees DEPARTMENT OF LABOR Better Cost Assessments and Departmentwide Performance Tracking Are Needed to Effectively Manage Competitive Sourcing Program GAO-09-14 November 2008 DEPARTMENT OF LABOR Highlights
Highlights of GAO-09-14, a report to congressional committees Accountability Integrity Reliability ... |
Date June 24, 2008 |
Report No. GAO-08-745 |
Title
United States Government Accountability Office GAO
June 2008 Report to Congressional Committees COAST GUARD Change in Course Improves Deepwater Management and Oversight, but Outcome Still Uncertain GAO-08-745 June 2008 COAST GUARD Highlights
Highlights of GAO-08-745, a report to congressional committees Accountability Integrity Reliability Change in Course Improves Deepwater Management and Oversig... |
Date May 29, 2008 |
Report No. GAO-08-753R |
Title
United States Government Accountability Office Washington, DC 20548 May 29, 2008 Congressional Committees Subject: Department of Defense Pilot Authority for Acquiring Information Technology Services under OMB Circular A-76 Section 336 of the National Defense Authorization Act for Fiscal Year 2004, Pub. L. No. 108-136, authorized the Department of Defense (DOD) to conduct a pilot program to use bes... |
Date March 16, 2007 |
Report No. GAO-07-434R |
Title
United States Government Accountability Office Washington, DC 20548 March 16, 2007 The Honorable Bart Gordon Chairman Committee on Science and Technology House of Representatives Subject: Implementation of OMB Circular No. A-76 at Science Agencies You requested that we determine how the Department of Commerce (National Institute for Standards and Technology and the National Oceanic and Atmospheric... |
Date Jan. 19, 2007 |
Report No. GAO-07-159 |
Title
United States Government Accountability Office GAO
January 2007 Report to the Ranking Minority Member, Committee on Oversight and Government Reform, House of Representatives DISTRICT OF COLUMBIA Procurement System Needs Major Reform GAO-07-159 January 2007 DISTRICT OF COLUMBIA Highlights
Highlights of GAO-07-159, a report to the Ranking Minority Member, Committee on Oversight and Government Reform... |
Date Oct. 6, 2006 |
Report No. GAO-07-40 |
Title
United States Government Accountability Office GAO
October 2006 Report to Congressional Committees REBUILDING IRAQ Status of Competition for Iraq Reconstruction Contracts GAO-07-40 October 2006 REBUILDING IRAQ Highlights
Highlights of GAO-07-40, a report to Congressional Committees Accountability Integrity Reliability Status of Competition for Iraq Reconstruction Contracts Why GAO Did This Study
S... |
Date July 10, 2006 |
Report No. GAO-06-820R |
Title
United States Government Accountability Office Washington, DC 20548 July 10, 2006 The Honorable Richard C. Shelby Chairman Committee on Banking, Housing and Urban Affairs United States Senate Subject: Active Commuter Rail Agency Service Contracts Dear Mr. Chairman: Commuter rail is an important part of the transportation system in many cities and regions in our country, providing more than 420 mil... |
Date June 14, 2006 |
Report No. GAO-06-791R |
Title
United States Government Accountability Office Washington, DC 20548 June 14, 2006 Congressional Committees Subject: Commerce Information Technology Solutions Next Generation Governmentwide Acquisition Contract Concerns have been raised about the fairness of the “bid down” approach of the Department of Commerce’s Information Technology Solutions Next Generation (COMMITS NexGen) contract. In r... |
Date May 22, 2006 |
Report No. GAO-06-717R |
Title
United States Government Accountability Office Washington, DC 20548 May 22, 2006 The Honorable John Warner Chairman Committee on Armed Services United States Senate The Honorable Curt Weldon Chairman Subcommittee on Tactical Air and Land Forces Committee on Armed Services House of Representatives Subject: Tactical Aircraft: DOD’s Cancellation of the Joint Strike Fighter Alternate Engine Program ... |
Date Dec. 9, 2005 |
Report No. GAO-06-72 |
Title
United States Government Accountability Office GAO
December 2005 Report to Congressional Committees COMPETITIVE SOURCING Health Benefits Cost Comparison Had Minimal Impact, but DOD Needs Uniform Implementation Process GAO-06-72 December 2005 COMPETITIVE SOURCING Highlights
Highlights of GAO-06-72, a report to congressional committees Accountability Integrity Reliability Health Benefits Cost Compar... |
Date Nov. 17, 2005 |
Report No. GAO-06-87R |
Title
DRAFT
Comptroller General of the United States United States Government Accountability Office Washington, DC 20548 November 17, 2005 Congressional Committees Subject: Review of OMB Circular A-76 Health Benefit Cost Factor Needed Determining whether to obtain required services using government employees or through contracts with the private sector is an important economic and strategic decision for... |
Date Nov. 17, 2005 |
Report No. GAO-06-16 |
Title
United States Government Accountability Office GAO
November 2005 Report to Congressional Requesters U.S. OFFICE OF SPECIAL COUNSEL Selected Contracting and Human Capital Issues GAO-06-16 a November 2005 U.S. OFFICE OF SPECIAL COUNSEL Highlights
Highlights of GAO-06-16, a report to congressional requesters Accountability Integrity Reliability Selected Contracting and Human Capital Issues Why GAO Di... |
Date April 29, 2005 |
Report No. GAO-05-368 |
Title
United States Government Accountability Office GAO
April 2005 Report to Congressional Requesters CURRENCY PAPER PROCUREMENT Additional Analysis Would Help Determine Whether a Second Supplier Is Needed GAO-05-368 a April 2005 CURRENCY PAPER PROCUREMENT Highlights
Highlights of GAO-05-368, a report to congressional requesters Accountability Integrity Reliability Additional Analysis Would Help Determ... |
Date Feb. 15, 2005 |
Report No. GAO-05-169 |
Title
United States Government Accountability Office GAO
February 2005 Report to the Secretary of Defense CONTRACT MANAGEMENT The Air Force Should Improve How It Purchases AWACS Spare Parts GAO-05-169 a February 2005 CONTRACT MANAGEMENT Highlights
Highlights of GAO-05-169, a report to the Secretary of Defense Accountability Integrity Reliability The Air Force Should Improve How It Purchases AWACS Spare ... |
Date Sept. 7, 2004 |
Report No. GAO-04-765 |
Title
United States Government Accountability Office GAO
September 2004 Report to Congressional Committees MEDICARE Past Experience Can Guide Future Competitive Bidding for Medical Equipment and Supplies GAO-04-765 a September 2004 MEDICARE Past Experience Can Guide Future Competitive Bidding for Medical Equipment and Supplies Highlights of GAO-04-765, a report to congressional committees. The Medicare ... |
Date July 30, 2004 |
Report No. GAO-04-874 |
Title
United States Government Accountability Office GAO
July 2004 Report to Congressional Committees CONTRACT MANAGEMENT Guidance Needed to Promote Competition for Defense Task Orders GAO-04-874 a July 2004 CONTRACT MANAGEMENT Guidance Needed to Promote Competition for Defense Task Orders Highlights of GAO-04-874, a report to congressional committees The Department of Defense (DOD) spends billions of d... |
Date June 15, 2004 |
Report No. GAO-04-869T |
Title
United States General Accounting Office GAO
For Release on Delivery Expected at 11:00 a.m. EDT June 15, 2004 Testimony Before the Committee on Government Reform, House of Representatives CONTRACT MANAGEMENT Contracting for Iraq Reconstruction and for Global Logistics Support
Statement of David M. Walker Comptroller General of the United States GAO-04-869T Chairman Davis, Ranking Member Waxman, and... |
Date Jan. 29, 2004 |
Report No. GAO-04-379R |
Title
United States General Accounting Office Washington, DC 20548 January 29, 2004 The Honorable Wayne Allard Chairman The Honorable Bill Nelson Ranking Minority Member Subcommittee on Strategic Forces Committee on Armed Services United States Senate Subject: Defense Acquisitions: Risks Posed by DOD’s New Space Systems Acquisition Policy On November 18, 2003, we testified before the Subcommittee on t... |
Date Oct. 31, 2003 |
Report No. GAO-04-18 |
Title
United States General Accounting Office GAO
October 2003 Report to the Chairman, Subcommittee on the Constitution, Committee on the Judiciary, House of Representatives U.S. COMMISSION ON CIVIL RIGHTS More Operational and Financial Oversight Needed GAO-04-18 October 2003 U.S. COMMISSION ON CIVIL RIGHTS More Operational and Financial Oversight Needed Highlights of GAO-04-18, a report to the Chairman... |
Date Oct. 3, 2003 |
Report No. GAO-04-155R |
Title
Comptroller General of the United States United States General Accounting Office Washington, DC 20548 October 3, 2003 The Honorable George V. Voinovich Chairman The Honorable Richard J. Durbin Ranking Member Subcommittee on Oversight of Government Management, the Federal Workforce, and the District of Columbia Committee on Governmental Affairs United States Senate Subject: Questions for Competitiv... |
Date July 24, 2003 |
Report No. GAO-03-1022T |
Title
United States General Accounting Office GAO
For Release on Delivery Expected at 9:30 a.m. EDT July 24, 2003 Testimony
Before the Subcommittee on Oversight of Government Management, the Federal Workforce, and the District of Columbia, Committee on Governmental Affairs, U.S. Senate COMPETITIVE SOURCING Implementation Will Be Challenging for Federal Agencies
Statement of David M. Walker Comptroller G... |
Date June 30, 2003 |
Report No. GAO-03-579R |
Title
United States General Accounting Office Washington, DC 20548 June 30, 2003 The Honorable Lane Evans Ranking Democratic Member Committee on Veterans’ Affairs House of Representatives Subject: VA Health Care: Contract Labor Cost Analysis in RAND Study Dear Mr. Evans: The Department of Veterans Affairs (VA) spent about $23 billion to provide health care to over 4 million veterans in fiscal year 200... |
Date June 26, 2003 |
Report No. GAO-03-943T |
Title
United States General Accounting Office GAO
For Release on Delivery Expected at 10:00 a.m. EDT Thursday, June 26, 2003 Testimony Before the Committee on Government Reform, House of Representatives COMPETITIVE SOURCING Implementation Will Be Key to Success of New Circular A-76
Statement of David M. Walker Comptroller General of the United States GAO-03-943T June 26, 2003 COMPETITIVE SOURCING Implem... |
Date June 4, 2003 |
Report No. GAO-03-686 |
Title
United States General Accounting Office GAO
June 2003 Report to the Chairman, Committee on Finance, U.S. Senate CAPITOL HILL ANTHRAX INCIDENT EPA's Cleanup Was Successful; Opportunities Exist to Enhance Contract Oversight GAO-03-686 June 2003 CAPITOL HILL ANTHRAX INCIDENT EPA's Cleanup Was Successful; Opportunities Exist to Enhance Contract Oversight Highlights of GAO-03-686, a report to the Chair... |
Date May 23, 2003 |
Report No. GAO-03-771R |
Title
Comptroller General of the United States United States General Accounting Office Washington, DC 20548 May 23, 2003 The Honorable John Ensign Chairman The Honorable Daniel Akaka Ranking Minority Member Subcommittee on Readiness and Management Support Committee on Armed Services United States Senate Subject: March 19 Hearing on Sourcing and Acquisition--Questions for the Record It was a pleasure to ... |
Date April 4, 2003 |
Report No. GAO-03-369 |
Title
United States General Accounting Office GAO
April 2003 Report to the Chairman, Committee on Government Reform, House of Representatives TELECOMMUNICATIONS GSA Needs to Improve Process for Awarding Task Orders for Local Service GAO-03-369 a April 2003 TELECOMMUNICATIONS GSA Needs to Improve Process for Awarding Task Orders for Local Services Highlights of GAO-03-369, a report to the Chairman, Commi... |
Date March 26, 2003 |
Report No. GAO-03-556T |
Title
United States General Accounting Office GAO
For Release on Delivery Expected at 10:30 a.m. EST Wednesday, March 26, 2003 Testimony
Before the Subcommittee on Government Efficiency and Financial Management, Committee on Government Reform, House of Representatives MANAGEMENT REFORM Continuing Progress in Implementing Initiatives in the President’s Management Agenda
Statement of Patricia A. Dalton,... |
Date March 19, 2003 |
Report No. GAO-03-574T |
Title
United States General Accounting Office GAO
For Release on Delivery Expected at 9:30 a.m. EST Wednesday, March 19, 2003 Testimony Before the Subcommittee on Readiness and Management Support, Committee on Armed Services, United States Senate SOURCING AND ACQUISITION Challenges Facing the Department of Defense
Statement of David M. Walker Comptroller General of the United States GAO-03-574T Chairman... |
Date Jan. 31, 2003 |
Report No. GAO-03-399R |
Title
United States General Accounting Office Washington, DC 20548 January 31, 2003 Ms. Angela B. Styles Administrator Office of Federal Procurement Policy Washington, D.C. Subject: OFPP Followup to Federal Supply Schedule Recommendations Dear Ms. Styles: This report is to bring to your attention two GAO recommendations concerning the acquisition of information technology services under the Federal Supp... |
Date Jan. 27, 2003 |
Report No. GAO-03-324R |
Title
United States General Accounting Office Washington, DC 20548 January 27, 2003 The Honorable Howard L. Berman House of Representatives Subject: Missile Defense: Events Related to Contractor Selection for the Exoatmospheric Kill Vehicle Dear Mr. Berman: In February 2002, we issued a report regarding early tests of the sensors being developed for the exoatmospheric kill vehicle1 (EKV) planned for use... |
Date March 1, 2002 |
Report No. GAO-02-36 |
Title
United States General Accounting Office GAO
March 2002 Report to Congressional Committees METROPOLITAN WASHINGTON AIRPORTS AUTHORITY Contracting Practices Do Not Always Comply with Airport Lease Requirements GAO-02-36 Contents Letter Results in Brief Background MWAA Has Not Satisfied Its Obligation to Publish the Procedures It Uses to Award Contracts Competitively MWAA Has Not Always Satisfied Its... |
Date April 26, 2001 |
Report No. GAO-01-576R |
Title
United States General Accounting Office Washington, DC 20548 April 26, 2001 The Honorable John McCain Chairman The Honorable Ernest F. Hollings Ranking Member Committee on Commerce, Science, and Transportation United States Senate The Honorable Sherwood L. Boehlert Chairman The Honorable Ralph M. Hall Ranking Minority Member Committee on Science House of Representatives Subject: International Spac... |
Date Nov. 17, 2000 |
Report No. GAO-01-185R |
Title
United States General Accounting Office Washington, DC 20548 November 17, 2000 The Honorable John McCain Chairman The Honorable Ernest F. Hollings Ranking Minority Member Committee on Commerce, Science, and Transportation United States Senate The Honorable Bud Shuster Chairman The Honorable James L. Oberstar Ranking Democratic Member Committee on Transportation and Infrastructure House of Represen... |
Date Sept. 29, 2000 |
Report No. GGD/NSIAD-00-244 |
Title
United States General Accounting Office GAO
September 2000 Report to the Chairman, Subcommittee on Government Management, Information, and Technology House Committee on Government Reform COMPETITIVE CONTRACTING Agencies Upheld Few Challenges and Appeals Under the FAIR Act GAO/GGD/NSIAD-00-244 United States General Accounting Office Washington, D.C. 20548 General Government Division B-283779 Septem... |
Date April 14, 2000 |
Report No. AIMD-00-123 |
Title
United States General Accounting Office GAO
April 2000 Report to the Chairman, Committee on Government Reform, House of Representatives TELECOMMUNICATIONS GSA’s Estimates of FTS2001 Revenues Are Reasonable GAO/AIMD-00-123 United States General Accounting Office Washington, D.C. 20548 Accounting and Information Management Division B-284758 April 14, 2000 The Honorable Dan Burton Chairman Committe... |
Date April 14, 2000 |
Report No. GGD-00-88 |
Title
United States General Accounting Office GAO
April 2000 Report to the Honorable Fred Thompson, Chairman Committee on Governmental Affairs U.S. Senate GENERAL SERVICES ADMINISTRATION Leasing Practices in Selected Regions GAO/GGD-00-88 United States General Accounting Office Washington, D.C. 20548 General Government Division B-284261 April 14, 2000 The Honorable Fred Thompson Chairman, Committee on G... |
Date April 14, 2000 |
Report No. GGD-00-68 |
Title
United States General Accounting Office GAO
April 2000 Report to the Chair, Subcommittee on Oversight, Investigations, and Emergency Management House Committee on Transportation and Infrastructure COMPETITIVE CONTRACTING The Understandability of FAIR Act Inventories Was Limited GAO/GGD-00-68 United States General Accounting Office Washington, D.C. 20548 General Government Division B-283779 April 1... |
Date Sept. 13, 1999 |
Report No. NSIAD-99-235R |
Title
B-283503 September 13,1999 The Honorable Bruce F. Vent0 House of Representatives Subject: DOD Comnetitive Sourcing: Air Force Reserve Command A-76 Comnetitions Dear Mr. Vento: The Air Force Reserve Command is conducting public/private competitions for base operating support functions at its various bases under the Office of Management and Budget Circular A-76. Because of concerns about the process... |
Date April 16, 1999 |
Report No. GGD-99-46 |
Title
United States General Accounting Office GAO
April 1999 Report to the Honorable Richard H. Bryan U.S. Senate NATIONAL GAMBLING IMPACT STUDY COMMISSION Selected Operational Practices GAO/GGD-99-46 GAO United States General Accounting Office Washington, D.C. 20548 General Government Division B-281953 April 16, 1999 The Honorable Richard H. Bryan United States Senate Dear Senator Bryan: This report re... |
Date April 15, 1999 |
Report No. NSIAD-99-71 |
Title
United States General Accounting Office GAO
April 1999 Report to the Chairman, Committee on International Relations, House of Representatives UNITED NATIONS Progress of Procurement Reforms GAO/NSIAD-99-71 GAO United States General Accounting Office Washington, D.C. 20548 National Security and International Affairs Division B-281996 Le er t Letter April 15, 1999 The Honorable Benjamin A. Gilman Cha... |