Date |
Report No. |
Title |
Date Nov. 3, 2011 |
Report No. GAO-12-83 |
Title
United States Government Accountability Office GAO
November 2011 Report to Congressional Requesters DEFENSE CONTRACT MANAGEMENT AGENCY Amid Ongoing Efforts to Rebuild Capacity, Several Factors Present Challenges in Meeting Its Missions GAO-12-83 November 2011 DEFENSE CONTRACT MANAGEMENT AGENCY
Amid Ongoing Efforts to Rebuild Capacity, Several Factors Present Challenges in Meeting Its Missions
High... |
Date Oct. 26, 2011 |
Report No. GAO-12-181T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 2:00 p.m. EDT Wednesday, October 26, 2011 Testimony Before the Subcommittee on Tactical Air and Land Forces, Committee on Armed Services, House of Representatives DEFENSE ACQUISITIONS Future Ground-Based Vehicles and Network Initiatives Face Development and Funding Challenges
Statement of Belva M. Martin, Direct... |
Date Sept. 27, 2011 |
Report No. GAO-11-891 |
Title
United States Government Accountability Office GAO
September 2011 Report to Congressional Addressees CONTINGENCY CONTRACTING Improved Planning and Management Oversight Needed to Address Challenges with Closing Contracts GAO-11-891 September 2011 CONTINGENCY CONTRACTING
Improved Planning and Management Oversight Needed to Address Challenges with Closing Contracts Highlights of GAO-11-891, a report ... |
Date Sept. 23, 2011 |
Report No. GAO-11-933T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 10:00 a.m. EDT Friday, September 23, 2011 Testimony
Before the Subcommittee on Government Organization, Efficiency and Financial Management, Committee on Oversight and Government Reform, House of Representatives DOD FINANCIAL MANAGEMENT Improved Controls, Processes, and Systems Are Needed for Accurate and Reliab... |
Date Sept. 14, 2011 |
Report No. GAO-11-903R |
Title
United States Government Accountability Office Washington, DC 20548 September 14, 2011 The Honorable Carl Levin Chairman Committee on Armed Services United States Senate Subject: Joint Strike Fighter: Implications of Program Restructuring and Other Recent Developments on Key Aspects of DOD’s Prior Alternate Engine Analyses Dear Mr. Chairman: After supporting a Joint Strike Fighter (JSF) acquisit... |
Date Sept. 12, 2011 |
Report No. GAO-11-856R |
Title
United States Government Accountability Office Washington, DC 20548 September 12, 2011 The Honorable Carl Levin Chairman The Honorable John McCain Ranking Member Committee on Armed Services United States Senate The Honorable Howard P. “Buck” McKeon Chairman The Honorable Adam Smith Ranking Member Committee on Armed Services House of Representatives Subject: Observations on the Costs and Benefi... |
Date July 28, 2011 |
Report No. GAO-11-864T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 8:00 a.m. EDT Thursday July 28, 2011 Testimony Before the Panel on DOD Financial Management, Committee on Armed Services, U.S. House of Representatives DOD FINANCIAL MANAGEMENT Numerous Challenges Must Be Addressed to Achieve Auditability
Statement of Asif A. Khan, Director Financial Management and Assurance GAO... |
Date July 27, 2011 |
Report No. GAO-11-835T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 2:00 p.m. EDT Wednesday, July 27, 2011 Testimony Before the Subcommittee on Readiness and Management Support, Committee on Armed Services, U.S. Senate DOD FINANCIAL MANAGEMENT Numerous Challenges Must Be Addressed to Improve Reliability of Financial Information
Statement of Asif A. Khan, Director Financial Manag... |
Date July 7, 2011 |
Report No. GAO-11-640 |
Title
United States Government Accountability Office GAO
July 2011 Report to the Committee on Armed Services, U.S. Senate DEFENSE ACQUISITIONS DOD Can Improve Its Management of Configuration Steering Boards GAO-11-640 July 2011 DEFENSE ACQUISITIONS
DOD Can Improve Its Management of Configuration Steering Boards
Highlights of GAO-11-640, a report to the Committee on Armed Services, U.S. Senate Why GAO Di... |
Date June 29, 2011 |
Report No. GAO-11-684 |
Title
United States Government Accountability Office GAO
June 2011 Report to Congressional Committees DEPARTMENT OF DEFENSE Further Actions Needed to Institutionalize Key Business System Modernization Management Controls GAO-11-684 June 2011 DEPARTMENT OF DEFENSE
Accountability • Integrity • Reliability Further Actions Needed to Institutionalize Key Business System Modernization Management Controls
... |
Date June 29, 2011 |
Report No. GAO-11-799CG |
Title
Maximizing DOD’s Potential to Achieve Greater Efficiencies and Improve Business Operations DOD Performance Symposium Lansdowne, VA June 29, 2011
Gene L. Dodaro Comptroller General of the United States U.S. Government Accountability Office 1
GAO-11-799CG Overview • • • • Long Term Fiscal Projections GPRA Modernization Act Goals Overlap, Fragmentation, and Duplication GAO’s High-Risk Lis... |
Date June 24, 2011 |
Report No. GAO-11-404 |
Title
United States Government Accountability Office GAO
June 2011 Report to the Ranking Member, Subcommittee on National Security, Homeland Defense and Foreign Operations, Committee on Oversight and Government Reform, House of Representatives SPACE AND MISSILE DEFENSE ACQUISITIONS Periodic Assessment Needed to Correct Parts Quality Problems in Major Programs GAO-11-404 June 2011 SPACE AND MISSILE DEFEN... |
Date May 27, 2011 |
Report No. GAO-11-545 |
Title
United States Government Accountability Office GAO
May 2011 Report to the Subcommittee on Strategic Forces, Committee on Armed Services, House of Representatives SPACE ACQUISITIONS Development and Oversight Challenges in Delivering Improved Space Situational Awareness Capabilities GAO-11-545 May 2011 SPACE ACQUISITIONS
Accountability • Integrity • Reliability Development and Oversight Challeng... |
Date May 25, 2011 |
Report No. GAO-11-316 |
Title
United States Government Accountability Office GAO
May 2011 Report to the Subcommittee on Military Construction, Veterans Affairs, and Related Agencies, Committee on Appropriations, U.S. Senate DEFENSE MANAGEMENT Comprehensive Cost Information and Analysis of Alternatives Needed to Assess Military Posture in Asia GAO-11-316 May 2011 DEFENSE MANAGEMENT
Accountability • Integrity • Reliability C... |
Date May 19, 2011 |
Report No. GAO-11-677T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 9:30 a.m. EDT Thursday, May 19, 2011 Testimony Before the Committee on Armed Services U.S. Senate JOINT STRIKE FIGHTER Restructuring Places Program on Firmer Footing, but Progress Is Still Lagging
Statement of Michael Sullivan, Director Acquisition and Sourcing Management GAO-11-677T May 2011 JOINT STRIKE FIGHTE... |
Date May 11, 2011 |
Report No. GAO-11-590T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 2:30 p.m. EDT Wednesday, May 11, 2011 Testimony Before the Subcommittee on Strategic Forces, Committee on Armed Services, U.S. Senate SPACE ACQUISITIONS DOD Delivering New Generations of Satellites, but Space System Acquisition Challenges Remain
Statement of Cristina T. Chaplain, Director Acquisition and Sourcin... |
Date May 11, 2011 |
Report No. GAO-11-469 |
Title
United States Government Accountability Office GAO
May 2011 Report to the Subcommittee on Oversight and Investigations, Committee on Armed Services, House of Representatives DEFENSE ACQUISITION DOD Should Clarify Requirements for Assessing and Documenting Technical-Data Needs GAO-11-469 May 2011 DEFENSE ACQUISITION
Accountability • Integrity • Reliability DOD Should Clarify Requirements for As... |
Date April 13, 2011 |
Report No. GAO-11-555T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 2:30 p.m. EDT Wednesday, April 13, 2011 Testimony Before the Subcommittee on Strategic Forces, Committee on Armed Services, U.S. Senate MISSILE DEFENSE Actions Needed to Improve Transparency and Accountability
Statement of Cristina Chaplain, Director, Acquisition and Sourcing Management GAO-11-555T April 13, 201... |
Date April 7, 2011 |
Report No. GAO-11-325 |
Title
United States Government Accountability Office GAO
April 2011 Report to Congressional Committees JOINT STRIKE FIGHTER Restructuring Places Program on Firmer Footing, but Progress Still Lags GAO-11-325 April 2011 JOINT STRIKE FIGHTER
Accountability • Integrity • Reliability Restructuring Places Program on Firmer Footing, but Progress Still Lags
Highlights of GAO-11-325, a report to congressiona... |
Date March 24, 2011 |
Report No. GAO-11-372 |
Title
United States Government Accountability Office GAO
March 2011 Report to Congressional Committees MISSILE DEFENSE Actions Needed to Improve Transparency and Accountability GAO-11-372 March 2011 MISSILE DEFENSE:
Accountability • Integrity • Reliability Actions Needed to Improve Transparency and Accountability
Highlights of GAO-11-372, a report to congressional committees Why GAO Did This Study
S... |
Date March 18, 2011 |
Report No. GAO-11-474R |
Title
United States Government Accountability Office Washington, DC 20548 March 18, 2011 Congressional Addressees: Subject: List of Selected Federal Programs That Have Similar or Overlapping Objectives, Provide Similar Services, or Are Fragmented Across Government Missions This report supplements our March 1, 2011, report Opportunities to Reduce Potential Duplication in Government Programs, Save Tax Dol... |
Date March 9, 2011 |
Report No. GAO-11-295R |
Title
United States Government Accountability Office Washington, DC 20548 March 9, 2011 The Honorable Thomas Carper Chairman Committee on Homeland Security and Governmental Affairs Subcommittee on Federal Financial Management, Government Information, Federal Services, and International Security United States Senate Subject: Trends in Nunn-McCurdy Cost Breaches for Major Defense Acquisition Programs Dear... |
Date March 3, 2011 |
Report No. GAO-11-441T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 9:30 a.m. EST Thursday, March 3, 2011 Testimony Before the House Committee on Oversight and Government Reform Opportunities to Reduce Potential Duplication in Government Programs, Save Tax Dollars, and Enhance Revenue
Statement of Gene L. Dodaro Comptroller General of the United States GAO-11-441T Mr. Chairman, ... |
Date March 1, 2011 |
Report No. GAO-11-318SP |
Title
United States Government Accountability Office GAO
March 2011 Report to Congressional Addressees Opportunities to Reduce Potential Duplication in Government Programs, Save Tax Dollars, and Enhance Revenue GAO-11-318SP Contents Letter Section I GAO Identified Areas of Potential Duplication, Overlap, and Fragmentation, Which, if Effectively Addressed, Could Provide Financial and Other Benefits 1 5 S... |
Date Feb. 3, 2011 |
Report No. GAO-11-131 |
Title
United States Government Accountability Office GAO
February 2011 Report to Congressional Requesters DEFENSE MANAGEMENT Additional Cost Information and Stakeholder Input Needed to Assess Military Posture in Europe GAO-11-131 February 2011 DEFENSE MANAGEMENT
Accountability • Integrity • Reliability Additional Cost Information and Stakeholder Input Needed to Assess Military Posture in Europe
High... |
Date Jan. 26, 2011 |
Report No. GAO-11-220 |
Title
United States Government Accountability Office GAO
January 2011 Report to Congressional Addressees BALLISTIC MISSILE DEFENSE DOD Needs to Address Planning and Implementation Challenges for Future Capabilities in Europe GAO-11-220 January 2011 BALLISTIC MISSILE DEFENSE
Accountability • Integrity • Reliability DOD Needs to Address Planning and Implementation Challenges for Future Capabilities in... |
Date Jan. 20, 2011 |
Report No. GAO-11-170 |
Title
United States Government Accountability Office GAO
January 2011 Report to the Honorable Susan A. Davis, House of Representatives MILITARY PERSONNEL Personnel and Cost Data Associated with Implementing DOD’s Homosexual Conduct Policy GAO-11-170 MILITARY PERSONNEL
Accountability • Integrity • Reliability Personnel and Cost Data Associated with Implementing DOD’s Homosexual Conduct Policy
Hig... |
Date Dec. 30, 2010 |
Report No. GAO-11-113 |
Title
United States Government Accountability Office GAO
December 2010 Report to Congressional Committees DEFENSE ACQUISITIONS Opportunities Exist to Improve DOD’s Oversight of Power Source Investments GAO-11-113 December 2010 DEFENSE ACQUISITIONS
Accountability • Integrity • Reliability Opportunities Exist to Improve DOD's Oversight of Power Source Investments
Highlights of GAO-11-113, a report t... |
Date Dec. 16, 2010 |
Report No. GAO-11-171R |
Title
United States Government Accountability Office Washington, DC 20548 December 16, 2010 Congressional Committees Subject: Defense Management: DOD Needs to Monitor and Assess Corrective Actions Resulting from Its Corrosion Study of the F-35 Joint Strike Fighter This report responds to House Report 111-166 to accompany the House bill (H.R. 2647) that 1 later became the National Defense Authorization A... |
Date Dec. 8, 2010 |
Report No. GAO-11-84 |
Title
United States Government Accountability Office GAO
December 2010 Report to the Subcommittee on Defense, Committee on Appropriations, U.S. Senate DEFENSE MANAGEMENT DOD Has a Rigorous Process to Select Corrosion Prevention Projects, but Would Benefit from Clearer Guidance and Validation of Returns on Investment GAO-11-84 December 2010 DEFENSE MANAGEMENT
Accountability • Integrity • Reliability ... |
Date Oct. 28, 2010 |
Report No. GAO-11-11 |
Title
United States Government Accountability Office GAO
October 2010 Report to Congressional Requesters TELECOMMUNICATIONS Improved Management Can Enhance FCC Decision Making for the Universal Service Fund Low-Income Program GAO-11-11 October 2010 TELECOMMUNICATIONS
Accountability • Integrity • Reliability Improved Management Can Enhance FCC Decision Making for the Universal Service Fund Low-Income... |
Date Oct. 13, 2010 |
Report No. GAO-11-112 |
Title
United States Government Accountability Office GAO
October 2010 Report to Congressional Committees DEFENSE ACQUISITIONS DOD Needs to Reassess Joint Cruise Missile Costs before Starting New Production Phase GAO-11-112 October 2010 DEFENSE ACQUISITIONS
Accountability • Integrity • Reliability DOD Needs to Reassess Joint Cruise Missile Costs before Starting New Production Phase
Highlights of GAO-... |
Date Oct. 7, 2010 |
Report No. GAO-11-53 |
Title
United States Government Accountability Office GAO
October 2010 Report to Congressional Requesters DOD BUSINESS TRANSFORMATION Improved Management Oversight of Business System Modernization Efforts Needed GAO-11-53 October 2010 DOD BUSINESS TRANSFORMATION
Accountability • Integrity • Reliability Improved Management Oversight of Business System Modernization Efforts Needed
Highlights of GAO-11-... |
Date July 27, 2010 |
Report No. GAO-10-929T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 2:30 p.m. EDT Tuesday, July 27, 2010 Testimony before the Subcommittee on Oversight of Government Management, the Federal Workforce, and the District of Columbia, Committee on Homeland Security and Governmental Affairs, U.S. Senate DOD’S HIGH-RISK AREAS Observations on DOD’s Progress and Challenges in Strate... |
Date July 26, 2010 |
Report No. GAO-10-686 |
Title
United States Government Accountability Office GAO
July 2010 Report to the Chairman, Subcommittee on Defense, Committee on Appropriations, House of Representatives DEFENSE ACQUISITIONS Guidance Needed on Navy’s Use of Investment Incentives at Private Shipyards GAO-10-686 July 2010 DEFENSE ACQUISITIONS Highlights
Highlights of GAO-10-686, a report to the Chairman, Subcommittee on Defense, Committ... |
Date July 20, 2010 |
Report No. GAO-10-717 |
Title
United States Government Accountability Office GAO
July 2010 Report to Congressional Committees DEFENSE MANAGEMENT DOD Needs Better Information and Guidance to More Effectively Manage and Reduce Operating and Support Costs of Major Weapon Systems GAO-10-717 July 2010 DEFENSE MANAGEMENT Highlights
Highlights of GAO-10-717, a report to congressional committees Accountability Integrity Reliability DO... |
Date July 14, 2010 |
Report No. GAO-10-676 |
Title
United States Government Accountability Office GAO
July 2010 Report to Congressional Committees DEFENSE ACQUISITIONS Missile Defense Program Instability Affects Reliability of Earned Value Management Data GAO-10-676 July 2010 DEFENSE ACQUISITIONS Highlights
Highlights of GAO-10-676, a report to congressional committees Accountability Integrity Reliability Missile Defense Program Instability Affect... |
Date May 27, 2010 |
Report No. GAO-10-566R |
Title
United States Government Accountability Office Washington, DC 20548 May 27, 2010 The Honorable Ike Skelton Chairman The Honorable Howard P. McKeon Ranking Member Committee on Armed Services United States House of Representatives Subject: Defense Management: DOD Needs to Assess Effectiveness and Determine Future Direction for Its High Performing Organizations Initiative The Department of Defense (D... |
Date May 27, 2010 |
Report No. GAO-10-562R |
Title
United States Government Accountability Office Washington, DC 20548 May 27, 2010 Congressional Committees Subject: Opportunities to Improve Controls over Department of Defense’s Overseas Contingency Operations Cost Reporting From September 2001 through January 2010, Congress provided about $1.023 trillion in supplemental and annual appropriations in response to Department of Defense (DOD) reques... |
Date May 24, 2010 |
Report No. GAO-10-663 |
Title
United States Government Accountability Office GAO
May 2010 Report to Congressional Committees BUSINESS SYSTEMS MODERNIZATION Scope and Content of DOD’s Congressional Report and Executive Oversight of Investments Need to Improve GAO-10-663 May 2010 BUSINESS SYSTEMS MODERNIZATION Highlights
Highlights of GAO-10-663, a report to congressional committees Accountability Integrity Reliability Scope a... |
Date May 11, 2010 |
Report No. GAO-10-469 |
Title
United States Government Accountability Office GAO
May 2010 Report to Congressional Requesters DEFENSE INVENTORY Defense Logistics Agency Needs to Expand on Efforts to More Effectively Manage Spare Parts GAO-10-469 May 2010 DEFENSE INVENTORY Highlights
Highlights of GAO-10-469, a report to congressional requesters Accountability Integrity Reliability Defense Logistics Agency Needs to Expand on Eff... |
Date April 30, 2010 |
Report No. GAO-10-436 |
Title
United States Government Accountability Office GAO
April 2010 Report to the Subcommittee on Readiness, Committee on Armed Services, House of Representatives DEFENSE INFRASTRUCTURE DOD Needs to Determine and Use the Most Economical Building Materials and Methods When Acquiring New Permanent Facilities GAO-10-436 April 2010 DEFENSE INFRASTRUCTURE Highlights
Highlights of GAO-10-436, a report to the ... |
Date April 22, 2010 |
Report No. GAO-10-439 |
Title
United States Government Accountability Office GAO
April 2010 Report to Congressional Requesters BEST PRACTICES DOD Can Achieve Better Outcomes by Standardizing the Way Manufacturing Risks Are Managed GAO-10-439 April 2010 BEST PRACTICES Highlights
Highlights of GAO-10-439, a report to congressional requesters Accountability Integrity Reliability DOD Can Achieve Better Outcomes by Standardizing th... |
Date April 15, 2010 |
Report No. GAO-10-608R |
Title
United States Government Accountability Office Washington, DC 20548 April 15, 2010 The Honorable Daniel Inouye Chairman The Honorable Thad Cochran Ranking Member Subcommittee on Defense Committee on Appropriations United States Senate Subject: Defense Management: Observations on Department of Defense and Military Service Fiscal Year 2011 Requirements for Corrosion Prevention and Control This repor... |
Date April 15, 2010 |
Report No. GAO-10-607R |
Title
United States Government Accountability Office Washington, DC 20548 April 15, 2010 Congressional Committees Subject: Defense Management: Observations on the Department of Defense’s Fiscal Year 2011 Budget Request for Corrosion Prevention and Control This report formally transmits the attached briefing (see enc. I) in response to section 2228(e) of title 10 of the United States Code. The statute ... |
Date April 15, 2010 |
Report No. GAO-10-603T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 2:00 p.m. EDT Thursday, April 15, 2010 Testimony Before the Subcommittee on Airland, Committee on Armed Services, U.S. Senate DEFENSE ACQUISITIONS Opportunities and Challenges for Army Ground Force Modernization Efforts
Statement of Michael J. Sullivan, Director Acquisition and Sourcing Management GAO-10-603T Ap... |
Date March 31, 2010 |
Report No. GAO-10-527R |
Title
United States Government Accountability Office Washington, DC 20548 March 31, 2010 Congressional Committees Subject: Defense Budget: Fourth Quarter Obligation Rates and Contract Obligations for Fiscal Years 2006-09 This letter formally transmits the enclosed briefing in response to the National Defense Authorization Act for Fiscal Year 2010 (Pub. L. No. 111-84), which requires GAO to review Depart... |
Date March 24, 2010 |
Report No. GAO-10-478T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 2:00 p.m. EDT Wednesday, March 24, 2010 Testimony Before the Subcommittees on Air and Land Forces and Seapower and Expeditionary Forces, Committee on Armed Services, House of Representatives JOINT STRIKE FIGHTER Significant Challenges and Decisions Ahead
Statement of Michael Sullivan, Director Acquisition and So... |
Date March 19, 2010 |
Report No. GAO-10-382 |
Title
United States Government Accountability Office GAO
March 2010 Congressional Committees JOINT STRIKE FIGHTER Additional Costs and Delays Risk Not Meeting Warfighter Requirements on Time GAO-10-382 March 2009 JOINT STRIKE FIGHTER Highlights
Highlights of GAO-10-382, a report to congressional committees Accountability Integrity Reliability Additional Costs and Delays Risk Not Meeting Warfighter Requi... |
Date March 15, 2010 |
Report No. GAO-10-406 |
Title
United States Government Accountability Office GAO
March 2010 Report to the Subcommittee on Air and Land Forces, Committee on Armed Services, House of Representatives DEFENSE ACQUISITIONS Opportunities Exist to Position Army’s Ground Force Modernization Efforts for Success GAO-10-406 March 2010 DEFENSE ACQUISITIONS Highlights