Date |
Report No. |
Title |
Date March 11, 2010 |
Report No. GAO-10-520T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 10:00 a.m. EST Thursday, March 11, 2010 Testimony Before the Committee on Armed Services, U.S. Senate JOINT STRIKE FIGHTER Significant Challenges Remain as DOD Restructures Program
Statement of Michael Sullivan, Director Acquisition and Sourcing Management GAO-10-520T Mr. Chairman and Members of the Committee: T... |
Date March 10, 2010 |
Report No. GAO-10-447T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 2:30 p.m. EST Wednesday, March 10, 2010 Testimony Before the Subcommittee on Strategic Forces, Committee on Armed Services, U.S. Senate SPACE ACQUISITIONS DOD Poised to Enhance Space Capabilities, but Persistent Challenges Remain in Developing Space Systems
Statement of Cristina T. Chaplain, Director Acquisition... |
Date Feb. 25, 2010 |
Report No. GAO-10-311 |
Title
United States Government Accountability Office GAO
February 2010 Report to Congressional Committees DEFENSE ACQUISITIONS Missile Defense Transition Provides Opportunity to Strengthen Acquisition Approach GAO-10-311 February 2010 DEFENSE ACQUISITIONS Highlights
Highlights of GAO-10-311, a report to congressional committees Accountability Integrity Reliability Missile Defense Transition Provides Opp... |
Date Jan. 20, 2010 |
Report No. GAO-10-374T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 1:30 p.m. EST Wednesday, January 20, 2010 Testimony Before the Subcommittee on Defense, Committee on Appropriations, House of Representatives DEFENSE ACQUISITIONS Managing Risk to Achieve Better Outcomes
Statement of Paul Francis, Managing Director Acquisition and Sourcing Management Michael Golden, Managing Ass... |
Date Jan. 14, 2010 |
Report No. GAO-10-315R |
Title
United States Government Accountability Office Washington, DC 20548 January 14, 2010 The Honorable John Murtha Chairman Subcommittee on Defense Committee on Appropriations House of Representatives Subject: Briefing on Commercial and Department of Defense Space System Requirements and Acquisition Practices Dear Mr. Chairman: The Department of Defense (DOD) has had long-standing difficulties develop... |
Date Oct. 29, 2009 |
Report No. GAO-10-55 |
Title
United States Government Accountability Office GAO
October 2009 Report to the Chairman, Subcommittee on Defense, Committee on Appropriations, House of Representatives DEFENSE ACQUISITIONS Challenges in Aligning Space System Components GAO-10-55 October 2009 DEFENSE ACQUISITIONS Highlights
Highlights of GAO-10-55, a report to the Chairman, Subcommittee on Defense, Committee on Appropriations, House... |
Date Oct. 14, 2009 |
Report No. GAO-10-184CG |
Title
Maximizing DOD's Untapped Potential to Improve Business Performance
DOD Performance Breakthrough Convention Lansdowne, VA October 14, 2009 Gene L. Dodaro, Acting Comptroller General of the United States It is a pleasure to be here today to discuss business operations at the Department of Defense (DOD). The Deputy Secretary and other conference organizers are to be commended for bringing together s... |
Date Sept. 25, 2009 |
Report No. GAO-09-1022R |
Title
United States Government Accountability Office Washington, DC 20548 September 25, 2009 Congressional Committees Subject: Overseas Contingency Operations: Reported Obligations for the Department of Defense Since 2001, Congress has provided the Department of Defense (DOD) with $893 billion in supplemental and annual appropriations, as of June 2009, primarily for Overseas 1 2 Contingency Operations (... |
Date Sept. 24, 2009 |
Report No. GAO-09-665 |
Title
United States Government Accountability Office GAO
September 2009 Report to the Chairman, Subcommittee on National Security and Foreign Affairs, Committee on Oversight and Government Reform, House of Representatives DEFENSE ACQUISITIONS Many Analyses of Alternatives Have Not Provided a Robust Assessment of Weapon System Options GAO-09-665 September 2009 DEFENSE ACQUISITIONS Highlights
Highlights o... |
Date Sept. 18, 2009 |
Report No. GAO-09-828 |
Title
United States Government Accountability Office GAO
September 2009 Report to Congressional Requesters HOMELAND DEFENSE Greater Focus on Analysis of Alternatives and Threats Needed to Improve DOD’s Strategic Nuclear Weapons Security GAO-09-828 September 2009 HOMELAND DEFENSE Highlights
Highlights of GAO-09-828, a report to Congressional Requesters Accountability Integrity Reliability Greater Focus... |
Date Sept. 15, 2009 |
Report No. GAO-09-841 |
Title
United States Government Accountability Office GAO
September 2009 Report to Congressional Requesters DOD BUSINESS SYSTEMS MODERNIZATION Navy Implementing a Number of Key Management Controls on Enterprise Resource Planning System, but Improvements Still Needed GAO-09-841 September 2009 DOD BUSINESS SYSTEMS MODERNIZATION Highlights
Highlights of GAO-09-841, a report to congressional requesters Accou... |
Date Aug. 6, 2009 |
Report No. GAO-09-771 |
Title
United States Government Accountability Office GAO
August 2009 Report to Congressional Requesters BALLISTIC MISSILE DEFENSE Actions Needed to Improve Planning and Information on Construction and Support Costs for Proposed European Sites GAO-09-771 August 2009 BALLISTIC MISSILE DEFENSE Highlights
Highlights of GAO-09-771, a report to congressional requesters Accountability Integrity Reliability Act... |
Date July 10, 2009 |
Report No. GAO-09-791R |
Title
United States Government Accountability Office Washington, DC 20548 July 10, 2009 Congressional Committees Subject: Overseas Contingency Operations: Reported Obligations for the Department of Defense Since 2001, Congress has provided the Department of Defense (DOD) with $888 billion in supplemental and annual appropriations, as of June 2009, primarily for Overseas 1 2 Contingency Operations (OCO).... |
Date July 9, 2009 |
Report No. GAO-09-703 |
Title
United States Government Accountability Office GAO
July 2009 Report to Congressional Committees MILITARY BASE REALIGNMENTS AND CLOSURES
DOD Needs to Update Savings Estimates and Continue to Address Challenges in Consolidating SupplyRelated Functions at Depot Maintenance Locations GAO-09-703 July 2009 Highlights
Highlights of GAO-09-703, a report to congressional committees Accountability Integrity... |
Date July 2, 2009 |
Report No. GAO-09-706R |
Title
July 2, 2009 The Honorable Tim Johnson Chairman The Honorable Kay Bailey Hutchison Ranking Member Subcommittee on Military Construction, Veterans’ Affairs, and Related Agencies Committee on Appropriations United States Senate The Honorable Chet Edwards Chairman The Honorable Zach Wamp Ranking Member Subcommittee on Military Construction, Veterans’ Affairs, and Related Agencies Committee on App... |
Date June 30, 2009 |
Report No. GAO-09-577 |
Title
United States Government Accountability Office GAO
June 2009 Report to Congressional Requesters DEFENSE TRAVEL SYSTEM Implementation Challenges Remain GAO-09-577 June 2009 DEFENSE TRAVEL SYSTEM Highlights
Highlights of GAO-09-577, a report to congressional requesters Accountability Integrity Reliability Implementation Challenges Remain Why GAO Did This Study
In 1995, the Department of Defense (DOD... |
Date June 23, 2009 |
Report No. GAO-09-692T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 2:00 p.m. EDT Tuesday, June 23, 2009 Testimony Before the Committee on Oversight and Government Reform, House of Representatives V-22 OSPREY AIRCRAFT Assessments Needed to Address Operational and Cost Concerns to Define Future Investments
Statement of Michael J. Sullivan, Director Acquisition and Sourcing Manage... |
Date June 1, 2009 |
Report No. GAO-09-732R |
Title
United States Government Accountability Office Washington, DC 20548 June 1, 2009 Congressional Committees Subject: Defense Management: Observations on DOD’s Fiscal Year 2010 Budget Request for Corrosion Prevention and Control This report formally transmits the attached briefing in response to section 2228(e) of title 10 of the United States Code (see enclosure I). The statute requires the Comptr... |
Date May 20, 2009 |
Report No. GAO-09-705T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 2:00 p.m. EDT Wednesday, May 20, 2009 Testimony Before the Subcommittee on Strategic Forces, Committee on Armed Services, U.S. Senate SPACE ACQUISITIONS DOD Faces Substantial Challenges in Developing New Space Systems
Statement of Cristina T. Chaplain, Director Acquisition and Sourcing Management GAO-09-705T May... |
Date May 20, 2009 |
Report No. GAO-09-454 |
Title
United States Government Accountability Office GAO
May 2009 Report to the Committee on Foreign Affairs, House of Representatives DEFENSE EXPORTS Foreign Military Sales Program Needs Better Controls for Exported Items and Information for Oversight GAO-09-454 May 2009 DEFENSE EXPORTS Highlights
Highlights of GAO-09-454, a report to the Committee on Foreign Affairs, House of Representatives Accountab... |
Date May 20, 2009 |
Report No. GAO-09-711T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 2::30 p.m. EDT Wednesday, May 20, 2009 Testimony Before the Subcommittee on Air and Land Forces, Committee on Armed Services, House of Representatives JOINT STRIKE FIGHTER Strong Risk Management Essential as Program Enters Most Challenging Phase
Statement of Michael Sullivan, Director Acquisition and Sourcing Ma... |
Date May 11, 2009 |
Report No. GAO-09-482 |
Title
United States Government Accountability Office GAO
May 2009 Report to Congressional Requesters DEFENSE ACQUISITIONS Assessments Needed to Address V-22 Aircraft Operational and Cost Concerns to Define Future Investments GAO-09-482 May 2009 DEFENSE ACQUISITIONS Highlights
Highlights of GAO-09-482, a report to congressional requesters Accountability Integrity Reliability Assessments Needed to Address... |
Date May 7, 2009 |
Report No. GAO-09-670T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 10:00 a.m. EDT Thursday, May 7, 2009 Testimony Before the Subcommittee on National Security and Foreign Affairs, Committee on Oversight and Government Reform, House of Representatives GLOBAL POSITIONING SYSTEM Significant Challenges in Sustaining and Upgrading Widely Used Capabilities
Statement of Cristina T. Ch... |
Date April 30, 2009 |
Report No. GAO-09-663T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 10:00 a.m. EDT Thursday, April 30, 2009 Testimony Before the Committee on Armed Services, House of Representatives DEFENSE ACQUISITIONS Charting a Course for Lasting Reform
Statement of Paul Francis, Managing Director Acquisition and Sourcing Management GAO-09-663T April 30, 2009 DEFENSE ACQUISITIONS Highlights
... |
Date April 30, 2009 |
Report No. GAO-09-648T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 1:00 p.m. EDT Thursday, April 30, 2009 Testimony Before the Subcommittee on Strategic Forces, Committee on Armed Services, House of Representatives SPACE ACQUISITIONS Government and Industry Partners Face Substantial Challenges in Developing New DOD Space Systems
Statement of Cristina Chaplain, Director Acquisit... |
Date April 23, 2009 |
Report No. GAO-09-643T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 8:00 a.m. EDT Thursday, April 23, 2009 Testimony Before the Defense Acquisition Reform Panel, Committee on Armed Services, U.S. House of Representatives DEFENSE ACQUISITIONS Actions Needed to Ensure Value for Service Contracts
Statement of John Hutton, Director, Acquisition and Sourcing Management and William So... |
Date April 22, 2009 |
Report No. GAO-09-620T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 10:00 a.m. EDT Wednesday, April 22, 2009 Testimony Before the Subcommittee on Homeland Security, Committee on Appropriations, House of Representatives COAST GUARD Update on Deepwater Program Management, Cost, and Acquisition Workforce
Statement of John P. Hutton, Director Acquisition and Sourcing Management GAO-... |
Date April 21, 2009 |
Report No. GAO-09-344 |
Title
United States Government Accountability Office GAO
April 2009 Report to Congressional Requesters DEFENSE MANAGEMENT DOD Needs to Improve Program Management, Policy, and Testing to Enhance Ability to Field Operationally Useful Non-lethal Weapons GAO-09-344 April 2009 DEFENSE MANAGEMENT Highlights
Highlights of GAO-09-344, a report to congressional requesters Accountability Integrity Reliability DOD... |
Date April 9, 2009 |
Report No. GAO-09-500R |
Title
United States Government Accountability Office Washington, DC 20548 April 9, 2009 Congressional Committees Subject: High-Level Leadership Needed to Help Guam Address Challenges Caused by DODRelated Growth In an effort to improve the U.S. military’s flexibility to address conventional and terrorist threats worldwide, the Department of Defense (DOD) plans to relocate more than 8,000 Marines and an... |
Date April 1, 2009 |
Report No. GAO-09-543T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 7:30 a.m. EDT Wednesday April 1, 2009 Testimony Before the Panel on Defense Acquisition Reform, Committee on Armed Services, House of Representatives DEFENSE ACQUISITIONS Measuring the Value of DOD's Weapon Programs Requires Starting with Realistic Baselines
Statement of Michael J. Sullivan, Director Acquisition... |
Date March 30, 2009 |
Report No. GAO-09-326SP |
Title
United States Government Accountability Office GAO
March 2009 Report to Congressional Committees DEFENSE ACQUISITIONS Assessments of Selected Weapon Programs GAO-09-326SP a March 2009 DEFENSE ACQUISITIONS Highlights
Highlights of GAO-09-326SP, a report to congressional committees Accountability Integrity Reliability Assessments of Selected Weapon Programs Why GAO Did This Study
This is GAO’s sev... |
Date March 30, 2009 |
Report No. GAO-09-449R |
Title
United States Government Accountability Office Washington, DC 20548 March 30, 2009 Congressional Committees Subject: Global War on Terrorism: Reported Obligations for the Department of Defense Since 2001, Congress has provided the Department of Defense (DOD) with about $808 billion in supplemental and annual appropriations, as of March 2009, primarily for military operations in support of the Glob... |
Date March 26, 2009 |
Report No. GAO-09-466T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 9:00 a.m. EDT Thursday, March 26, 2009 Testimony Before the Strategic Forces Subcommittee, Committee on Armed Services, House of Representatives DEFENSE MANAGEMENT Key Challenges Should be Addressed When Considering Changes to Missile Defense Agency's Roles and Missions
Statement of John H. Pendleton, Director D... |
Date March 26, 2009 |
Report No. GAO-09-410T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 2:00 p.m. EDT March 26, 2009 Testimony Before the Subcommittee on Air and Land Forces, Committee on Armed Services, House of Representatives DEFENSE ACQUISITIONS Key Considerations for Planning Future Army Combat Systems
Statement of Paul L. Francis, Director Acquisition and Sourcing Management GAO-09-410T March... |
Date March 25, 2009 |
Report No. GAO-09-476T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 10:00 a.m. EST Wednesday, March 25, 2009 Testimony Before the Committee on Armed Services, House of Representatives IRAQ AND AFGHANISTAN Security, Economic, and Governance Challenges to Rebuilding Efforts Should Be Addressed in U.S. Strategies
Statement of Jacquelyn Williams-Bridgers Managing Director, Internati... |
Date March 24, 2009 |
Report No. GAO-09-294SP |
Title
United States Government Accountability Office GAO
March 2009 Report to Congressional Committees IRAQ Key Issues for Congressional Oversight GAO-09-294SP Contents Letter Next Steps for U.S. Engagement in Iraq
Enclosure I: Determining What Conditions Need to Be Met to Undertake a Responsible Drawdown of U.S. Forces Enclosure II: Implementing Key Operational Requirements of the U.S.-Iraq Security Ag... |
Date March 18, 2009 |
Report No. GAO-09-501T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 10:00 a.m. EDT Wednesday, March 18, 2000 Testimony Before the Committee on the Budget, House of Representatives DEFENSE ACQUISITIONS DOD Must Prioritize Its Weapon System Acquisitions and Balance Them with Available Resources
Statement of Statement of Michael J. Sullivan, Director Acquisition and Sourcing Manage... |
Date March 17, 2009 |
Report No. GAO-09-302 |
Title
United States Government Accountability Office GAO
March 2009 Report to Congressional Committees GLOBAL WAR ON TERRORISM DOD Needs to More Accurately Capture and Report the Costs of Operation Iraqi Freedom and Operation Enduring Freedom GAO-09-302 March 2009 GLOBAL WAR ON TERRORISM Highlights
Highlights of GAO-09-302, a report to congressional committees Accountability Integrity Reliability DOD Ne... |
Date March 13, 2009 |
Report No. GAO-09-338 |
Title
United States Government Accountability Office GAO
March 2009 Report to Congressional Committees DEFENSE ACQUISITIONS Production and Fielding of Missile Defense Components Continue with Less Testing and Validation Than Planned GAO-09-338 March 2009 DEFENSE ACQUISITIONS Highlights
Highlights of GAO-09-338, a report to Congressional Committees Accountability Integrity Reliability Production and Fiel... |
Date March 12, 2009 |
Report No. GAO-09-303 |
Title
United States Government Accountability Office GAO
March 2009 Report to Congressional Committees JOINT STRIKE FIGHTER
Accelerating Procurement before Completing Development Increases the Government’s Financial Risk GAO-09-303 March 2009 JOINT STRIKE FIGHTER Highlights
Highlights of GAO-09-303, a report to congressional committees Accountability Integrity Reliability Accelerating Procurement befo... |
Date March 12, 2009 |
Report No. GAO-09-460T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 10:00 a.m. DST Thursday, March 12, 2009 Testimony Before the Committee on Armed Services, House of Representatives DOD’S HIGH-RISK AREAS Actions Needed to Reduce Vulnerabilities and Improve Business Outcomes
Statement of Gene L. Dodaro Acting Comptroller General of the United States GAO-09-460T March 12, 2009 ... |
Date March 12, 2009 |
Report No. GAO-09-288 |
Title
United States Government Accountability Office GAO
March 2009 Report to Congressional Committees DEFENSE ACQUISITIONS Decisions Needed to Shape Army’s Combat Systems for the Future GAO-09-288 March 2009 DEFENSE ACQUISITIONS Highlights
Highlights of GAO-09-288, a report to congressional committees Accountability Integrity Reliability Decisions Needed to Shape Army's Combat Systems for the Future ... |
Date March 5, 2009 |
Report No. GAO-09-416T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 1:00 p.m. EST Thursday, March 5, 2009 Testimony Before the Subcommittee on Oversight and Investigations, Committee on Armed Services, House of Representatives DOD BUSINESS TRANSFORMATION Status of DOD’s Actions on Previous Recommendations for the Defense Travel System
Statement of Asif A. Khan Director, Financ... |
Date March 3, 2009 |
Report No. GAO-09-431T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 9:30 a.m. EST Tuesday, March 3, 2009 Testimony Before the Committee on Armed Services, U.S. Senate DEFENSE ACQUISITIONS DOD Must Balance Its Needs with Available Resources and Follow an Incremental Approach to Acquiring Weapon Systems
Statement of Michael J. Sullivan, Director Acquisition and Sourcing Management... |
Date March 3, 2009 |
Report No. GAO-09-388T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 1:00 p.m. EST Tuesday, March 3, 2009 Testimony Before the Subcommittee on Readiness, Committee on Armed Services, House of Representatives DEFENSE MANAGEMENT Increased Attention on Fuel Demand Management at DOD’s Forward-Deployed Locations Could Reduce Operational Risks and Costs
Statement of William M. Solis,... |
Date Feb. 27, 2009 |
Report No. GAO-09-295R |
Title
United States Government Accountability Office Washington, DC 20548 February 27, 2009 Congressional Committees Subject: Defense Acquisitions: Perspectives on Potential Changes to Department of Defense Acquisition Management Framework The National Defense Authorization Act (NDAA) for Fiscal Year 2008 directed GAO to report on potential modifications of the organization and structure of the Departme... |
Date Feb. 20, 2009 |
Report No. GAO-09-181 |
Title
United States Government Accountability Office GAO
February 2009 Report to the Subcommittee on National Security and Foreign Affairs, Committee on Oversight and Government Reform, House of Representatives DEFENSE MANAGEMENT Actions Needed to Address Stakeholder Concerns, Improve Interagency Collaboration, and Determine Full Costs Associated with the U.S. Africa Command GAO-09-181 February 2009 DEF... |
Date Feb. 19, 2009 |
Report No. GAO-09-383CG |
Title
CHALLENGES FACING THE NEW ADMINISTRATION AND THE 111TH CONGRESS
Before the AGA 2009 Leadership Conference
Washington, DC February 19, 2009 By Gene L. Dodaro Acting Comptroller General GAO-09-383CG Transition: Assisting The New Administration & The New Congress 2
GAO-09-383CG GAO-09-383CG GAO-09-383CG Financial Institutions and Markets • Financial Regulatory System • GAO Role in Financial Rescu... |
Date Feb. 11, 2009 |
Report No. GAO-09-362T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 10:30 a.m. EST Thursday, February 12, 2009 Testimony before the Committee on Armed Services, House of Representatives IRAQ AND AFGHANISTAN Availability of Forces, Equipment, and Infrastructure Should Be Considered in Developing U.S. Strategy and Plans
Statement of Janet St. Laurent, Managing Director Defense Cap... |
Date Jan. 30, 2009 |
Report No. GAO-09-217 |
Title
United States Government Accountability Office GAO
January 2009 Report to Congressional Committees MILITARY BASE REALIGNMENTS AND CLOSURES DOD Faces Challenges in Implementing Recommendations on Time and Is Not Consistently Updating Savings Estimates GAO-09-217 January 2009 Highlights
Highlights of GAO-09-217, a report to congressional committees Accountability Integrity Reliability MILITARY BASE ... |