Menu Search Account

LegiStorm

Get LegiStorm App Visit Product Demo Website
» Get LegiStorm App
» Get LegiStorm Pro Free Demo

GAO Reports by subject "Cost overruns"

Full-text search of 52,071 reports from the Government Accountability Office
From To
Reset

Search Results:

Date Report No. Title
Date April 22, 2009 Report No. GAO-09-620T Title

Coast Guard: Update on Deepwater Program Management, Cost, and Acquisition Workforce

United States Government Accountability Office GAO For Release on Delivery Expected at 10:00 a.m. EDT Wednesday, April 22, 2009 Testimony Before the Subcommittee on Homeland Security, Committee on Appropriations, House of Representatives COAST GUARD Update on Deepwater Program Management, Cost, and Acquisition Workforce Statement of John P. Hutton, Director Acquisition and Sourcing Management GAO-...
Date April 2, 2009 Report No. GAO-09-323 Title

Geostationary Operational Environmental Satellites: Acquisition Is Under Way, but Improvements Needed in Management and Oversight

United States Government Accountability Office GAO April 2009 Report to Congressional Requesters GEOSTATIONARY OPERATIONAL ENVIRONMENTAL SATELLITES Acquisition Is Under Way, but Improvements Needed in Management and Oversight GAO-09-323 April 2009 Highlights Highlights of GAO-09-323, a report to congressional requesters Accountability Integrity Reliability GEOSTATIONARY OPERATIONAL ENVIRONMENTAL S...
Date March 24, 2009 Report No. GAO-09-462T Title

Coast Guard: Observations on Changes to Management and Oversight of the Deepwater Program

United States Government Accountability Office GAO For Release on Delivery Expected at 10:00 a.m. EDT Tuesday, March 24, 2009 Testimony Before the Subcommittee on Coast Guard and Maritime Transportation, Committee on Transportation and Infrastructure, House of Representatives COAST GUARD Observations on Changes to Management and Oversight of the Deepwater Program Statement of John P. Hutton, Direc...
Date March 13, 2009 Report No. GAO-09-338 Title

Defense Acquisitions: Production and Fielding of Missile Defense Components Continue with Less Testing and Validation Than Planned

United States Government Accountability Office GAO March 2009 Report to Congressional Committees DEFENSE ACQUISITIONS Production and Fielding of Missile Defense Components Continue with Less Testing and Validation Than Planned GAO-09-338 March 2009 DEFENSE ACQUISITIONS Highlights Highlights of GAO-09-338, a report to Congressional Committees Accountability Integrity Reliability Production and Fiel...
Date March 11, 2009 Report No. GAO-09-281 Title

Business Systems Modernization: Internal Revenue Service's Fiscal Year 2009 Expenditure Plan

United States Government Accountability Office GAO March 2009 Report to Congressional Committees BUSINESS SYSTEMS MODERNIZATION Internal Revenue Service’s Fiscal Year 2009 Expenditure Plan GAO-09-281 March 2009 BUSINESS SYSTEMS MODERNIZATION Highlights Highlights of GAO-09-281, a report to congressional committees Accountability Integrity Reliability Internal Revenue Service’s Fiscal Year 2009...
Date March 5, 2009 Report No. GAO-09-436T Title

NASA: Projects Need More Disciplined Oversight and Management to Address Key Challenges

United States Government Accountability Office GAO For Release on Delivery Expected at 10:00 a.m. EST Thursday, March 5, 2009 Testimony Before the Subcommittee on Space and Aeronautics, Committee on Science and Technology, House of Representatives NASA Projects Need More Disciplined Oversight and Management to Address Key Challenges Statement of Cristina Chaplain, Director Acquisition and Sourcing...
Date March 4, 2009 Report No. GAO-09-406T Title

Department of Energy: Contract and Project Management Concerns at the National Nuclear Security Administration and Office Of Environmental Management

United States Government Accountability Office GAO For Release on Delivery Expected at 2:00 p.m. EST Wednesday, March 4, 2009 Testimony Before the Subcommittee on Energy and Water Development, Committee on Appropriations, House of Representatives DEPARTMENT OF ENERGY Contract and Project Management Concerns at the National Nuclear Security Administration and Office of Environmental Management Stat...
Date March 2, 2009 Report No. GAO-09-3SP Title

GAO Cost Estimating and Assessment Guide: Best Practices for Developing and Managing Capital Program Costs

United States Government Accountability Office GAO Applied Research and Methods GAO Cost Estimating and Assessment Guide Best Practices for Developing and Managing Capital Program Costs March 2009 GAO-09-3SP Preface The U.S. Government Accountability Office is responsible for, among other things, assisting the Congress in its oversight of the federal government, including agencies’ stewardship o...
Date March 2, 2009 Report No. GAO-09-385 Title

Nuclear Weapons: NNSA and DOD Need to More Effectively Manage the Stockpile Life Extension Program

United States Government Accountability Office GAO March 2009 Report to the Subcommittee on Strategic Forces, Committee on Armed Services, House of Representatives NUCLEAR WEAPONS NNSA and DOD Need to More Effectively Manage the Stockpile Life Extension Program GAO-09-385 March 2009 NUCLEAR WEAPONS Highlights Highlights of GAO-09-385, a report to the Subcommittee on Strategic Forces, Committee on ...
Date Sept. 26, 2008 Report No. GAO-08-1081 Title

Nuclear Waste: Action Needed to Improve Accountability and Management of DOE's Major Cleanup Projects

United States Government Accountability Office GAO September 2008 Report to the Subcommittee on Energy and Water Development, Committee on Appropriations, House of Representatives NUCLEAR WASTE Action Needed to Improve Accountability and Management of DOE’s Major Cleanup Projects GAO-08-1081 September 2008 NUCLEAR WASTE Highlights Highlights of GAO-08-1081, a report to the Subcommittee on Energy...
Date Sept. 25, 2008 Report No. GAO-08-1159T Title

Defense Acquisitions: Fundamental Changes Are Needed to Improve Weapon Program Outcomes

United States Government Accountability Office GAO For Release on Delivery Expected at 2:30 p.m. EDT Thursday, September 25, 2008 Testimony Before the Subcommittee on Federal Financial Management, Government Information, Federal Services, and International Security, Committee on Homeland Security and Governmental Affairs, U.S. Senate DEFENSE ACQUISITIONS Fundamental Changes Are Needed to Improve W...
Date Sept. 24, 2008 Report No. GAO-08-1172T Title

Capitol Visitor Center: Update on Status of Project's Schedule and Cost as of September 24, 2008

United States Government Accountability Office GAO For Release on Delivery Expected at 11 a.m. EDT September 24, 2008 Testimony Before the Subcommittee on the Legislative Branch, Committee on Appropriations, House of Representatives CAPITOL VISITOR CENTER Update on Status of Project's Schedule and Cost as of September 24, 2008 Statement of Terrell G. Dorn, Director, Physical Infrastructure Issues ...
Date Sept. 22, 2008 Report No. GAO-08-1097 Title

Veterans Affairs: Additional Details Are Needed in Key Planning Documents to Guide the New Financial and Logistics Initiative

United States Government Accountability Office GAO September 2008 Report to the Subcommittee on Oversight and Investigations, Committee on Veterans’ Affairs, House of Representatives VETERANS AFFAIRS Additional Details Are Needed in Key Planning Documents to Guide the New Financial and Logistics Initiative GAO-08-1097 September 2008 VETERANS AFFAIRS Highlights Highlights of GAO-08-1097, a report...
Date Sept. 22, 2008 Report No. GAO-08-1108R Title

Combating Nuclear Smuggling: DHS's Program to Procure and Deploy Advanced Radiation Detection Portal Monitors Is Likely to Exceed the Department's Previous Cost Estimates

United States Government Accountability Office Washington, DC 20548 September 22, 2008 Congressional Requesters Subject: Combating Nuclear Smuggling: DHS’s Program to Procure and Deploy Advanced Radiation Detection Portal Monitors Is Likely to Exceed the Department’s Previous Cost Estimates Since the attacks of September 11, 2001, combating terrorism has been one of the nation’s highest prio...
Date Sept. 17, 2008 Report No. GAO-08-1164T Title

Department of Homeland Security: Progress and Continuing Concerns with Acquisition Management

United States Government Accountability Office GAO For Release on Delivery Expected at 2 p.m. EST Wednesday, September 17, 2008 Testimony Before the Subcommittee on Management, Investigations, and Oversight, Committee on Homeland Security, House of Representatives DEPARTMENT OF HOMELAND SECURITY Progress and Continuing Concerns with Acquisition Management Statement of John P. Hutton, Director Acqu...
Date Sept. 11, 2008 Report No. GAO-08-1154T Title

Next Generation Air Transportation System: Status of Key Issues Associated with the Transition to NextGen

United States Government Accountability Office GAO For Release on Delivery Expected at 10:00 a.m. EDT Thursday, September 11, 2008 Testimony Before the Committee on Science and Technology, House of Representatives NEXT GENERATION AIR TRANSPORTATION SYSTEM Status of Key Issues Associated with the Transition to NextGen Statement of Gerald L. Dillingham, Ph.D. Director, Physical Infrastructure Issues...
Date Sept. 11, 2008 Report No. GAO-08-1078 Title

Next Generation Air Transportation System: Status of Systems Acquisition and the Transition to the Next Generation Air Transportation System

United States Government Accountability Office GAO September 2008 Report to Congressional Requesters NEXT GENERATION AIR TRANSPORTATION SYSTEM Status of Systems Acquisition and the Transition to the Next Generation Air Transportation System GAO-08-1078 September 2008 Highlights Highlights of GAO-08-1078, a report to congressional requesters Accountability Integrity Reliability NEXT GENERATION AIR ...
Date Sept. 8, 2008 Report No. GAO-08-896 Title

DOD Business Systems Modernization: Important Management Controls Being Implemented on Major Navy Program, but Improvements Needed in Key Areas

United States Government Accountability Office GAO September 2008 Report to the Subcommittee on Readiness and Management Support, Committee on Armed Services, U.S. Senate DOD BUSINESS SYSTEMS MODERNIZATION Important Management Controls Being Implemented on Major Navy Program, but Improvements Needed in Key Areas GAO-08-896 September 2008 DOD BUSINESS SYSTEMS MODERNIZATION Highlights Highlights of ...
Date Sept. 8, 2008 Report No. GAO-08-922 Title

DOD Business Systems Modernization: Planned Investment in Navy Program to Create Cashless Shipboard Environment Needs to Be Justified and Better Managed

United States Government Accountability Office GAO September 2008 Report to the Subcommittee on Readiness and Management Support, Committee on Armed Services, U.S. Senate DOD BUSINESS SYSTEMS MODERNIZATION Planned Investment in Navy Program to Create Cashless Shipboard Environment Needs to Be Justified and Better Managed GAO-08-922 September 2008 DOD BUSINESS SYSTEMS MODERNIZATION Highlights Highl...
Date July 31, 2008 Report No. GAO-08-925 Title

Information Technology: Agencies Need to Establish Comprehensive Policies to Address Changes to Projects' Cost, Schedule, and Performance Goals

United States Government Accountability Office GAO July 2008 Report to Congressional Requesters INFORMATION TECHNOLOGY Agencies Need to Establish Comprehensive Policies to Address Changes to Projects’ Cost, Schedule, and Performance Goals GAO-08-925 July 2008 INFORMATION TECHNOLOGY Highlights Highlights of GAO-08-925, a report to congressional requesters Accountability Integrity Reliability Agen...
Date July 31, 2008 Report No. GAO-08-804 Title

Defense Acquisitions: Cost to Deliver Zumwalt-Class Destroyers Likely to Exceed Budget

United States Government Accountability Office GAO July 2008 Report to the Subcommittee on Seapower, Committee on Armed Services, U.S. Senate DEFENSE ACQUISITIONS Cost to Deliver Zumwalt-Class Destroyers Likely to Exceed Budget GAO-08-804 July 2008 DEFENSE ACQUISITIONS Highlights Highlights of GAO-08-804, a report to Subcommittee on Seapower, Committee on Armed Services, U.S. Senate Accountability...
Date July 31, 2008 Report No. GAO-08-1061T Title

Defense Acquisitions: Zumwalt-Class Destroyer Program Emblematic of Challenges Facing Navy Shipbuilding

United States Government Accountability Office GAO For Release on Delivery Expected at 10:00 a.m. EDT Thursday, July 31, 2008 Testimony Before the Subcommittee on Seapower and Expeditionary Forces, Committee on Armed Services, House of Representatives DEFENSE ACQUISITIONS Zumwalt-Class Destroyer Program Emblematic of Challenges Facing Navy Shipbuilding Statement of Paul L. Francis, Director Acquis...
Date July 28, 2008 Report No. GAO-08-822 Title

DOD Business Systems Modernization: Key Marine Corps System Acquisition Needs to Be Better Justified, Defined, and Managed

GAO July 2008 Report to the Subcommittee on Readiness and Management Support, Committee on Armed Services, U.S. Senate DOD BUSINESS SYSTEMS MODERNIZATION Key Marine Corps System Acquisition Needs to Be Better Justified, Defined, and Managed GAO-08-822 July 2008 DOD BUSINESS SYSTEMS MODERNIZATION Highlights Highlights of GAO-08-822, a report to the Subcommittee on Readiness and Management Support, ...
Date July 25, 2008 Report No. GAO-08-891 Title

State Department: Comprehensive Strategy Needed to Improve Passport Operations

United States Government Accountability Office GAO July 2008 Report to Congressional Requesters STATE DEPARTMENT Comprehensive Strategy Needed to Improve Passport Operations GAO-08-891 July 2008 STATE DEPARTMENT Highlights Highlights of GAO-08-891, a report to congressional requesters Accountability Integrity Reliability Comprehensive Strategy Needed to Improve Passport Operations Why GAO Did This...
Date July 18, 2008 Report No. GAO-08-756 Title

Air Traffic Control: FAA Uses Earned Value Techniques to Help Manage Information Technology Acquisitions, but Needs to Clarify Policy and Strengthen Oversight

United States Government Accountability Office GAO July 2008 Report to Congressional Requesters AIR TRAFFIC CONTROL FAA Uses Earned Value Techniques to Help Manage Information Technology Acquisitions, but Needs to Clarify Policy and Strengthen Oversight GAO-08-756 a July 2008 AIR TRAFFIC CONTROL Highlights Highlights of GAO-08-756, a report to congressional requesters Accountability Integrity Reli...
Date July 8, 2008 Report No. GAO-08-689 Title

Afghanistan Reconstruction: Progress Made in Constructing Roads, but Assessments for Determining Impact and a Sustainable Maintenance Program Are Needed

United States Government Accountability Office GAO July 2008 Report to Congressional Committees AFGHANISTAN RECONSTRUCTION Progress Made in Constructing Roads, but Assessments for Determining Impact and a Sustainable Maintenance Program Are Needed GAO-08-689 July 2008 AFGHANISTAN RECONSTRUCTION Highlights Highlights of GAO-08-689, a report to congressional committees Accountability Integrity Relia...
Date July 8, 2008 Report No. GAO-08-900T Title

Capitol Visitor Center: Update on Status of Project's Schedule and Cost as of June 27, 2008

United States Government Accountability Office GAO For Release on Delivery Expected at 7:00 p.m. EDT Tuesday, July 8, 2008 Testimony Before the Subcommittee on the Legislative Branch, Committee on Appropriations, House of Representatives CAPITOL VISITOR CENTER Update on Status of Project’s Schedule and Cost as of June 27, 2008 Statement of Terrell G. Dorn, Director, Physical Infrastructure Issue...
Date July 2, 2008 Report No. GAO-08-619 Title

Defense Acquisitions: A Knowledge-Based Funding Approach Could Improve Major Weapon System Program Outcomes

United States Government Accountability Office GAO July 2008 Report to the Committee on Armed Services, U.S. Senate DEFENSE ACQUISITIONS A Knowledge-Based Funding Approach Could Improve Major Weapon System Program Outcomes GAO-08-619 July 2008 DEFENSE ACQUISITIONS Highlights Highlights of GAO-08-619, a report to the Committee on Armed Services, U.S. Senate Accountability Integrity Reliability A Kn...
Date June 24, 2008 Report No. GAO-08-745 Title

Coast Guard: Change in Course Improves Deepwater Management and Oversight, but Outcome Still Uncertain

United States Government Accountability Office GAO June 2008 Report to Congressional Committees COAST GUARD Change in Course Improves Deepwater Management and Oversight, but Outcome Still Uncertain GAO-08-745 June 2008 COAST GUARD Highlights Highlights of GAO-08-745, a report to congressional committees Accountability Integrity Reliability Change in Course Improves Deepwater Management and Oversig...
Date June 19, 2008 Report No. GAO-08-899T Title

Environmental Satellites: Polar-orbiting Satellite Acquisition Faces Delays; Decisions Needed on Whether and How to Ensure Climate Data Continuity

United States Government Accountability Office GAO For Release on Delivery Expected at 10 a.m. EDT June 19, 2008 Testimony Before the House Committee on Science and Technology, Subcommittee on Energy and Environment ENVIRONMENTAL SATELLITES Polar-orbiting Satellite Acquisition Faces Delays; Decisions Needed on Whether and How to Ensure Climate Data Continuity Statement of David A. Powner, Director...
Date June 17, 2008 Report No. GAO-08-748 Title

Financial Audit: Material Weaknesses in Internal Control over the Processes Used to Prepare the Consolidated Financial Statements of the U.S. Government

United States Government Accountability Office GAO June 2008 Report to the Secretary of the Treasury and the Director of the Office of Management and Budget FINANCIAL AUDIT Material Weaknesses in Internal Control over the Processes Used to Prepare the Consolidated Financial Statements of the U.S. Government GAO-08-748 June 2008 FINANCIAL AUDIT Highlights Highlights of GAO-08-748, a report to the S...
Date June 16, 2008 Report No. GAO-08-554 Title

2010 Census: Census Bureau Should Take Action to Improve the Credibility and Accuracy of Its Cost Estimate for the Decennial Census

United States Government Accountability Office GAO June 2008 Report to the Subcommittee on Commerce, Justice, Science, and Related Agencies, Committee on Appropriations, House of Representatives 2010 CENSUS Census Bureau Should Take Action to Improve the Credibility and Accuracy of Its Cost Estimate for the Decennial Census GAO-08-554 June 2008 2010 CENSUS Highlights Highlights of GAO-08-554, a re...
Date June 3, 2008 Report No. GAO-08-782T Title

Defense Acquisitions: Better Weapon Program Outcomes Require Discipline, Accountability, and Fundamental Changes in the Acquisition Environment

United States Government Accountability Office GAO For Release on Delivery Expected at 9:30 a.m. EDT Tuesday, June 3, 2008 Testimony Before the Committee on Armed Services, U.S. Senate DEFENSE ACQUISITIONS Better Weapon Program Outcomes Require Discipline, Accountability, and Fundamental Changes in the Acquisition Environment Statement of Katherine V. Schinasi, Managing Director Acquisition and So...
Date May 30, 2008 Report No. GAO-08-641 Title

Department of Energy: Office of Science Has Kept Majority of Projects within Budget and on Schedule, but Funding and Other Challenges May Grow

United States Government Accountability Office GAO May 2008 Report to the Subcommittee on Investigations and Oversight, Committee on Science and Technology, House of Representatives DEPARTMENT OF ENERGY Office of Science Has Kept Majority of Projects within Budget and on Schedule, but Funding and Other Challenges May Grow GAO-08-641 May 2008 DEPARTMENT OF ENERGY Highlights Highlights of GAO-08-641...
Date May 29, 2008 Report No. GAO-08-634 Title

Prison Construction: Clear Communication on the Accuracy of Cost Estimates and Project Changes is Needed

United States Government Accountability Office GAO May 2008 Report to the Subcommittee on Commerce, Justice, Science, and Related Agencies, Committee on Appropriations, U.S. Senate PRISON CONSTRUCTION Clear Communication on the Accuracy of Cost Estimates and Project Changes Is Needed GAO-08-634 May 2008 PRISON CONSTRUCTION Highlights Highlights of GAO-08-634, a report to the Subcommittee on Commer...
Date May 22, 2008 Report No. GAO-08-776T Title

Personnel Clearances: Key Factors for Reforming the Security Clearance Process

United States Government Accountability Office GAO For Release on Delivery Expected at 2:30 p.m. EDT Thursday, May 22, 2008 Testimony Before the Subcommittee on Oversight of Government Management, the Federal Workforce, and the District of Columbia, Committee on Homeland Security and Governmental Affairs, U.S. Senate PERSONNEL CLEARANCES Key Factors for Reforming the Security Clearance Process Sta...
Date May 22, 2008 Report No. GAO-08-811T Title

Capitol Visitor Center: Update on Status of Project's Schedule and Cost as of May 22, 2008

United States Government Accountability Office GAO For Release on Delivery Expected at 10:00 a.m. EDT Thursday, May 22, 2008 Testimony before the Subcommittee on the Legislative Branch, Committee on Appropriations, House of Representatives CAPITOL VISITOR CENTER Update on Status of Project’s Schedule and Cost as of May 22, 2008 Statement of Terrell G. Dorn, Director, Physical Infrastructure Issu...
Date May 16, 2008 Report No. GAO-08-518 Title

Environmental Satellites: Polar-orbiting Satellite Acquisition Faces Delays; Decisions Needed on Whether and How to Ensure Climate Data Continuity

United States Government Accountability Office GAO May 2008 Report to the Subcommittees on Energy and Environment and Investigations and Oversight, Committee on Science and Technology, House of Representatives ENVIRONMENTAL SATELLITES Polar-orbiting Satellite Acquisition Faces Delays; Decisions Needed on Whether and How to Ensure Climate Data Continuity GAO-08-518 May 2008 ENVIRONMENTAL SATELLITES...
Date May 8, 2008 Report No. GAO-08-765T Title

Department of Homeland Security: Better Planning and Oversight Needed to Improve Complex Service Acquisition Outcomes

United States Government Accountability Office GAO For Release on Delivery Expected at 10:00 a.m. EDT Thursday, May 8, 2008 Testimony Before the Committee on Homeland Security, House of Representatives DEPARTMENT OF HOMELAND SECURITY Better Planning and Oversight Needed to Improve Complex Service Acquisition Outcomes Statement of John P. Hutton, Director Acquisition and Sourcing Management GAO-08-...
Date April 24, 2008 Report No. GAO-08-581T Title

NASA: Challenges in Completing and Sustaining the International Space Station

United States Government Accountability Office GAO For Release on Delivery Expected at 10:30 a.m. EDT Thursday, April 24, 2008 Testimony Before the Subcommittee on Space and Aeronautics, Committee on Science and Technology, House of Representatives NASA Challenges in Completing and Sustaining the International Space Station Statement of Cristina T. Chaplain, Director Acquisition and Sourcing Manag...
Date April 22, 2008 Report No. GAO-08-263 Title

Department of Homeland Security: Better Planning and Assessment Needed to Improve Outcomes for Complex Service Acquisitions

United States Government Accountability Office GAO April 2008 Report to Congressional Requesters DEPARTMENT OF HOMELAND SECURITY Better Planning and Assessment Needed to Improve Outcomes for Complex Service Acquisitions GAO-08-263 April 2008 DEPARTMENT OF HOMELAND SECURITY Highlights Highlights of GAO-08-263, a report to congressional requesters Accountability Integrity Reliability Better Planning...
Date April 15, 2008 Report No. GAO-08-685T Title

2010 Census: Census at Critical Juncture for Implementing Risk Reduction Strategies

United States Government Accountability Office GAO For Release on Delivery Expected at 3:15 p.m. EDT Tuesday, April 15, 2008 Testimony Before the Committee on Homeland Security and Governmental Affairs, U.S. Senate 2010 CENSUS Census at Critical Juncture for Implementing Risk Reduction Strategies Statement of Mathew Scirè Director, Strategic Issues David A. Powner Director, Information Technology...
Date April 15, 2008 Report No. GAO-08-677T Title

Capitol Visitor Center: Update on Status of Project's Schedule and Cost as of April 15, 2008

United States Government Accountability Office GAO For Release on Delivery Expected at 1:30 p.m. EDT Tuesday, April 15, 2008 Testimony Before the Subcommittee on the Legislative Branch, Committee on Appropriations, House of Representatives CAPITOL VISITOR CENTER Update on Status of Project’s Schedule and Cost as of April 15, 2008 Statement of Terrell G. Dorn, Director, Physical Infrastructure Is...
Date April 10, 2008 Report No. GAO-08-638T Title

Defense Acquisitions: 2009 Review of Future Combat System Is Critical to Program's Direction

United States Government Accountability Office GAO For Release on Delivery Expected at 2:00 p.m. EDT Thursday, April 10, 2008 Testimony Before the Subcommittee on Air and Land Forces, Committee on Armed Services, House of Representatives DEFENSE ACQUISITIONS 2009 Review of Future Combat System Is Critical to Program's Direction Statement of Paul L. Francis, Director Acquisition and Sourcing Manage...
Date April 9, 2008 Report No. GAO-08-659T Title

Census 2010: Census at Critical Juncture for Implementing Risk Reduction Strategies

United States Government Accountability Office GAO For Release on Delivery Expected at 2:00 p.m. EDT Wednesday, April 9, 2008 Testimony Before the Committee on Oversight and Government Reform and the Subcommittee on Information Policy, Census, and National Archives, House of Representatives CENSUS 2010 Census at Critical Juncture for Implementing Risk Reduction Strategies Statement of Mathew ScirÃ...
Date April 9, 2008 Report No. GAO-08-513R Title

United Nations: Renovation Schedule Accelerated after Delays, but Risks Remain in Key Areas

United States Government Accountability Office GAO April 2008 Correspondence to the Committee on Foreign Relations, U.S. Senate UNITED NATIONS Renovation Schedule Accelerated after Delays, but Risks Remain in Key Areas GAO-08-513R April 2008 UNITED NATIONS Highlights Highlights of GAO-08-513R, a correspondence to the Committee on Foreign Relations, U.S. Senate Accountability Integrity Reliability ...
Date March 12, 2008 Report No. GAO-08-545T Title

Capitol Visitor Center: Update on Status of Project's Schedule and Cost as of March 12, 2008

United States Government Accountability Office GAO For Release on Delivery Expected at 1:30 p.m. EST Wednesday, March 12, 2008 Testimony Before the Subcommittee on the Legislative Branch, Committee on Appropriations, House of Representatives CAPITOL VISITOR CENTER Update on Status of Project’s Schedule and Cost as of March 12, 2008 Statement of Terrell G. Dorn, Director, Physical Infrastructure ...
Date March 11, 2008 Report No. GAO-08-569T Title

Joint Strike Fighter: Impact of Recent Decisions on Program Risks

United States Government Accountability Office GAO For Release on Delivery Expected at 10:00 a.m. EDT Tuesday, March 11, 2008 Testimony before the Subcommittees on Air and Land Forces, and Seapower and Expeditionary Forces, Committee on Armed Services, House of Representatives JOINT STRIKE FIGHTER Impact of Recent Decisions on Program Risks Statement of Michael Sullivan, Director Acquisition and S...
Date March 11, 2008 Report No. GAO-08-388 Title

Joint Strike Fighter: Recent Decisions by DOD Add to Program Risks

United States Government Accountability Office GAO March 2008 Report to Congressional Committees JOINT STRIKE FIGHTER Recent Decisions by DOD Add to Program Risks GAO-08-388 March 2008 JOINT STRIKE FIGHTER Highlights Highlights of GAO-08-388, a report to Congressional Committees Accountability Integrity Reliability Recent Decisions by DOD Add to Program Risks Why GAO Did This Study The Joint Strik...
Date March 11, 2008 Report No. GAO-08-270R Title

Homeland Security: Status of Selected Aspects of the Coast Guard's Deepwater Program

United States Government Accountability Office Washington, DC 20548 March 11, 2008 The Honorable Maria Cantwell Chair Subcommittee on Oceans, Atmosphere, Fisheries, and Coast Guard Committee on Commerce, Science and Transportation United States Senate The Honorable Olympia J. Snowe Ranking Member Subcommittee on Oceans, Atmosphere, Fisheries, and Coast Guard Committee on Commerce, Science and Tran...