Date |
Report No. |
Title |
Date Nov. 16, 2011 |
Report No. GAO-12-232T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 1:30 p.m. EST Wednesday, November 16, 2011 Testimony
Before the Subcommittee on Technology, Information Policy, Intergovernmental Relations and Procurement Reform, Committee on Oversight and Government Reform, House of Representatives ACQUISITION WORKFORCE DOD’s Efforts to Rebuild Capacity Have Shown Some Prog... |
Date Nov. 16, 2011 |
Report No. GAO-12-245T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 9:00 a.m. EST Wednesday, November 16, 2011 Testimony Before the Committee on Homeland Security and Governmental Affairs, U.S. Senate SUSPENSION AND DEBARMENT Some Agency Programs Need Greater Attention, and Governmentwide Oversight Could Be Improved
Statement of William T. Woods, Director Acquisition and Sourcin... |
Date Nov. 15, 2011 |
Report No. GAO-12-57 |
Title
GAO
November 2011 United States Government Accountability Office Report to Congressional Requesters FEDERAL CONTRACTING OMB’s Acquisition Savings Initiative Had Results, but Improvements Needed GAO-12-57 November 2011 FEDERAL CONTRACTING
OMB’s Acquisition Savings Initiative Had Results, but Improvements Needed
Highlights of GAO-12-57, a report to congressional requesters Why GAO Did This Study... |
Date Nov. 3, 2011 |
Report No. GAO-12-83 |
Title
United States Government Accountability Office GAO
November 2011 Report to Congressional Requesters DEFENSE CONTRACT MANAGEMENT AGENCY Amid Ongoing Efforts to Rebuild Capacity, Several Factors Present Challenges in Meeting Its Missions GAO-12-83 November 2011 DEFENSE CONTRACT MANAGEMENT AGENCY
Amid Ongoing Efforts to Rebuild Capacity, Several Factors Present Challenges in Meeting Its Missions
High... |
Date Oct. 18, 2011 |
Report No. GAO-12-102R |
Title
United States Government Accountability Office Washington, DC 20548 October 18, 2011 The Honorable Joseph I. Lieberman Chairman Committee on Homeland Security and Governmental Affairs United States Senate The Honorable Jon Tester Committee on Homeland Security and Governmental Affairs United States Senate Subject: Prior Experience and Past Performance as Evaluation Criteria in the Award of F... |
Date Oct. 6, 2011 |
Report No. GAO-12-127T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 9:30 a.m. EDT Thursday, October 6, 2011 Testimony Before the Subcommittee on Technology, Information Policy, Intergovernmental Relations and Procurement Reform, Committee on Oversight and Government Reform, House of Representatives SUSPENSION AND DEBARMENT Some Agency Programs Need Greater Attention, and Governm... |
Date Sept. 28, 2011 |
Report No. GAO-11-892 |
Title
United States Government Accountability Office GAO
September 2011 Report to Congressional Committees DEFENSE ACQUISITION WORKFORCE Better Identification, Development, and Oversight Needed for Personnel Involved in Acquiring Services GAO-11-892 September 2011 DEFENSE ACQUISITION WORKFORCE
Better Identification, Development, and Oversight Needed for Personnel Involved in Acquiring Services
Highlight... |
Date Sept. 27, 2011 |
Report No. GAO-11-891 |
Title
United States Government Accountability Office GAO
September 2011 Report to Congressional Addressees CONTINGENCY CONTRACTING Improved Planning and Management Oversight Needed to Address Challenges with Closing Contracts GAO-11-891 September 2011 CONTINGENCY CONTRACTING
Improved Planning and Management Oversight Needed to Address Challenges with Closing Contracts Highlights of GAO-11-891, a report ... |
Date Sept. 23, 2011 |
Report No. GAO-11-767 |
Title
United States Government Accountability Office GAO
September 2011 Report to Congressional Addressees INDIAN HEALTH SERVICE Increased Oversight Needed to Ensure Accuracy of Data Used for Estimating Contract Health Service Need GAO-11-767 September 2011 INDIAN HEALTH SERVICE
Increased Oversight Needed to Ensure Accuracy of Data Used for Estimating Contract Health Service Need Highlights of GAO-11-76... |
Date Sept. 16, 2011 |
Report No. GAO-11-774 |
Title
United States Government Accountability Office GAO
September 2011 Report to Congressional Addressees IRAQ DRAWDOWN Opportunities Exist to Improve Equipment Visibility, Contractor Demobilization, and Clarity of Post-2011 DOD Role GAO-11-774 September 2011 IRAQ DRAWDOWN
Opportunities Exist to Improve Equipment Visibility, Contractor Demobilization, and Clarity of Post-2011 DOD Role Highlights of GAO... |
Date Sept. 15, 2011 |
Report No. GAO-11-886 |
Title
United States Government Accountability Office GAO
September 2011 Report to Congressional Committees IRAQ AND AFGHANISTAN DOD, State, and USAID Cannot Fully Account for Contracts, Assistance Instruments, and Associated Personnel GAO-11-886 September 2011 IRAQ AND AFGHANISTAN
DOD, State, and USAID Cannot Fully Account for Contracts, Assistance Instruments, and Associated Personnel Highlights of GAO... |
Date Sept. 15, 2011 |
Report No. GAO-11-942T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 10:00 a.m. EDT Thursday, September 15, 2011 Testimony Before the Committee on Small Business and Entrepreneurship, U.S. Senate DISASTER RECOVERY Federal Contracting in the Aftermath of Hurricanes Katrina and Rita
Statement of William T. Woods, Director Acquisition and Sourcing Management GAO-11-942T Chair Landri... |
Date Sept. 15, 2011 |
Report No. GAO-11-844T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 10:00 a.m. EDT Thursday, September 15, 2011 Testimony Before the Subcommittee on Contracting and Workforce, Committee on Small Business, House of Representatives SMALL BUSINESS CONTRACTING Opportunities to Improve the Effectiveness of Agency and SBA Advocates and Mentor-Protégé Programs
Statement of William B.... |
Date Sept. 9, 2011 |
Report No. GAO-11-784 |
Title
United States Government Accountability Office GAO
September 2011 Report to Congressional Committees INTERAGENCY CONTRACTING Improvements Needed in Setting Fee Rates for Selected Programs GAO-11-784 September 2011 INTERAGENCY CONTRACTING Improvements Needed in Setting Fee Rates for Selected Programs
Highlights of GAO-11-784, a report to congressional committees Why GAO Did This Study
Federal agenc... |
Date Sept. 6, 2011 |
Report No. GAO-11-794 |
Title
United States Government Accountability Office GAO
September 2011 Report to the Ranking Member, Committee on the Judiciary, U.S. Senate FEDERAL BUREAU OF INVESTIGATION Actions Taken to Address Most Procurement Recommendations GAO-11-794 September 2011 FEDERAL BUREAU OF INVESTIGATION
Actions Taken to Address Most Procurement Recommendations
Highlights of GAO-11-794, a report to the Ranking Member, ... |
Date Aug. 9, 2011 |
Report No. GAO-11-672 |
Title
United States Government Accountability Office GAO
August 2011 Report to the Committee on Homeland Security and Governmental Affairs, U.S. Senate ACQUISITION PLANNING Opportunities to Build Strong Foundations for Better Services Contracts GAO-11-672 August 2011 ACQUISITION PLANNING
Opportunities to Build Strong Foundations for Better Services Contracts
Highlights of GAO-11-672, a report to the Com... |
Date July 20, 2011 |
Report No. GAO-11-586 |
Title
United States Government Accountability Office GAO
July 2011 Report to Congressional Committees USDA SYSTEMS MODERNIZATION Management and Oversight Improvements Are Needed GAO-11-586 July 2011 USDA SYSTEMS MODERNIZATION
Accountability • Integrity • Reliability Management and Oversight Improvements Are Needed
Highlights of GAO-11-586, a report to congressional committees Why GAO Did This Study
... |
Date July 15, 2011 |
Report No. GAO-11-705R |
Title
United States Government Accountability Office Washington, DC 20548 July 15, 2011 The Honorable Bennie G. Thompson Ranking Member Committee on Homeland Security House of Representatives Subject: Federal Protective Service: Actions Needed to Resolve Delays and Inadequate Oversight Issues with FPS’s Risk Assessment and Management Program Dear Mr. Thompson: The Federal Protective Service (FPS), whi... |
Date July 15, 2011 |
Report No. GAO-11-793R |
Title
United States Government Accountability Office Washington, DC 20548 July 15, 2011 The Honorable Tom Harkin Chairman The Honorable Michael B. Enzi Ranking Member Committee on Health, Education, Labor, and Pensions United States Senate The Honorable Fred Upton Chairman The Honorable Henry A. Waxman Ranking Member Committee on Energy and Commerce House of Representatives Subject: World Trade Center H... |
Date July 14, 2011 |
Report No. GAO-11-797R |
Title
United States Government Accountability Office Washington, DC 20548 July 14, 2011 Congressional Committees Subject: Patient Protection and Affordable Care Act: Contracts Awarded and Consultants Retained by Federal Departments and Agencies to Assist in Implementing the Act The Patient Protection and Affordable Care Act (PPACA), as amended by the Health Care and Education Reconciliation Act of 2010 ... |
Date July 11, 2011 |
Report No. GAO-11-630 |
Title
United States Government Accountability Office GAO
July 2011 Report to Congressional Requesters LONG-TERM CARE INSURANCE Carrier Interest in the Federal Program, Changes to Its Actuarial Assumptions, and OPM Oversight GAO-11-630 July 2011 LONG-TERM CARE INSURANCE
Carrier Interest in the Federal Program, Changes to Its Actuarial Assumptions, and OPM Oversight
Highlights of GAO-11-630, a report to c... |
Date June 30, 2011 |
Report No. GAO-11-771T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 10:00 a.m. EDT Thursday, June 30, 2011 Testimony Before the Subcommittee on Contracting Oversight, Committee on Homeland Security and Governmental Affairs, U.S. Senate OPERATIONAL CONTRACT SUPPORT Actions Needed to Address Contract Oversight and Vetting of Non-U.S. Vendors in Afghanistan
Statement of William M. ... |
Date June 29, 2011 |
Report No. GAO-11-588 |
Title
United States Government Accountability Office GAO
June 2011 Report to the Ranking Member, Committee on the Judiciary, U.S. Senate PENSION BENEFIT GUARANTY CORPORATION More Strategic Approach to Contracting Still Needed GAO-11-588 June 2011 Accountability • Integrity • Reliability PENSION BENEFIT GUARANTY CORPORATION
More Strategic Approach to Contracting Still Needed Highlights of GAO-11-588,... |
Date June 15, 2011 |
Report No. GAO-11-549R |
Title
United States Government Accountability Office Washington, DC 20548 June 15, 2011 The Honorable Mary L. Landrieu Chair The Honorable Olympia J. Snowe Ranking Member Committee on Small Business and Entrepreneurship United States Senate The Honorable Sam Graves Chairman The Honorable Nydia M. Velázquez Ranking Member Committee on Small Business House of Representatives Subject: Improvements Needed ... |
Date June 15, 2011 |
Report No. GAO-11-548R |
Title
United States Government Accountability Office Washington, DC 20548 June 15, 2011 The Honorable Mary L. Landrieu Chair The Honorable Olympia J. Snowe Ranking Member Committee on Small Business and Entrepreneurship United States Senate The Honorable Sam Graves Chairman The Honorable Nydia M. Velázquez Ranking Member Committee on Small Business House of Representatives Subject: Mentor-Protégé Pro... |
Date June 8, 2011 |
Report No. GAO-11-355 |
Title
United States Government Accountability Office GAO
June 2011 Report to Congressional Addressees AFGHANISTAN U.S. Efforts to Vet Non-U.S. Vendors Need Improvement GAO-11-355 June 2011 AFGHANISTAN
Accountability • Integrity • Reliability U.S. Efforts to Vet Non-U.S. Vendors Need Improvement
Highlights of GAO-11-355, a report to congressional addressees Why GAO Did This Study
The Departments of D... |
Date June 3, 2011 |
Report No. GAO-11-418 |
Title
United States Government Accountability Office GAO
June 2011 Report to the Chair, Committee on Small Business and Entrepreneurship, U.S. Senate SMALL BUSINESS CONTRACTING Action Needed by Those Agencies Whose Advocates Do Not Report to Agency Heads as Required GAO-11-418 June 2011 SMALL BUSINESS CONTRACTING
Accountability • Integrity • Reliability Action Needed by Those Agencies Whose Advocate... |
Date June 3, 2011 |
Report No. GAO-11-436SP |
Title
|
Date May 27, 2011 |
Report No. GAO-11-538R |
Title
United States Government Accountability Office Washington, DC 20548 May 27, 2011 Congressional Committees Subject: OMB Service Contracts Inventory Guidance and Implementation Federal agencies rely on a multisector workforce of federal employees and contractor personnel to perform services needed to carry out their missions. Determining whether to obtain services through insourcing with current or ... |
Date May 25, 2011 |
Report No. GAO-11-68 |
Title
United States Government Accountability Office GAO
May 2011 Report to Congressional Requesters SECURE BORDER INITIATIVE Controls over Contractor Payments for the Technology Component Need Improvement GAO-11-68 May 2011
Accountability • Integrity • Reliability SECURE BORDER INITIATIVE
Controls over Contractor Payments for the Technology Component Need Improvement Highlights of GAO-11-68, a repo... |
Date May 25, 2011 |
Report No. GAO-11-635T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 10:00 a.m. EDT Wednesday, May 25, 2011 Testimony Before the Committee on Homeland Security and Governmental Affairs, U.S. Senate Opportunities to Reduce Potential Duplication in Government Programs, Save Tax Dollars, and Enhance Revenue
Statement of Gene L. Dodaro Comptroller General of the United States GAO-11-... |
Date May 20, 2011 |
Report No. GAO-11-492 |
Title
United States Government Accountability Office GAO
May 2011 Report to Congressional Committees BUDGET ISSUES Better Fee Design Would Improve Federal Protective Service’s and Federal Agencies’ Planning and Budgeting for Security GAO-11-492 May 2011 BUDGET ISSUES
Accountability • Integrity • Reliability Better Fee Design Would Improve Federal Protective Service’s and Federal Agencies’ Pl... |
Date April 25, 2011 |
Report No. GAO-11-580 |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 9:30 a.m. EDT Monday, April 25, 2011 Statement before the Commission on Wartime Contracting in Iraq and Afghanistan CONTINGENCY CONTRACTING Observations on Actions Needed to Address Systemic Challenges
Statement of Paul L. Francis, Managing Director Acquisition and Sourcing Management GAO-11-580 April 25, 2011 C... |
Date March 18, 2011 |
Report No. GAO-11-474R |
Title
United States Government Accountability Office Washington, DC 20548 March 18, 2011 Congressional Addressees: Subject: List of Selected Federal Programs That Have Similar or Overlapping Objectives, Provide Similar Services, or Are Fragmented Across Government Missions This report supplements our March 1, 2011, report Opportunities to Reduce Potential Duplication in Government Programs, Save Tax Dol... |
Date March 3, 2011 |
Report No. GAO-11-441T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 9:30 a.m. EST Thursday, March 3, 2011 Testimony Before the House Committee on Oversight and Government Reform Opportunities to Reduce Potential Duplication in Government Programs, Save Tax Dollars, and Enhance Revenue
Statement of Gene L. Dodaro Comptroller General of the United States GAO-11-441T Mr. Chairman, ... |
Date March 3, 2011 |
Report No. GAO-11-440T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 10:00 a.m. EST Thursday, March 3, 2011 Testimony Before the Committee on Small Business and Entrepreneurship, U.S. Senate 8(a) PROGRAM The Importance of Effective Fraud Prevention Controls
Statement of Gregory D. Kutz, Director Forensic Audits and Investigative Service GAO-11-440T Madam Chair, Ranking Member Sno... |
Date March 2, 2011 |
Report No. GAO-11-430T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 10:00 a.m. EST Wednesday, March 2, 2011 Testimony Before the Subcommittee on Oversight and Investigations, Committee on Energy and Commerce, House of Representatives MEDICARE Program Remains at High Risk Because of Continuing Management Challenges
Statement of Kathleen King Director, Health Care GAO-11-430T Marc... |
Date March 1, 2011 |
Report No. GAO-11-318SP |
Title
United States Government Accountability Office GAO
March 2011 Report to Congressional Addressees Opportunities to Reduce Potential Duplication in Government Programs, Save Tax Dollars, and Enhance Revenue GAO-11-318SP Contents Letter Section I GAO Identified Areas of Potential Duplication, Overlap, and Fragmentation, Which, if Effectively Addressed, Could Provide Financial and Other Benefits 1 5 S... |
Date Feb. 1, 2011 |
Report No. GAO-11-331T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 2:30 p.m. EST Tuesday, February 1, 2011 Testimony before the Subcommittee on Contracting Oversight, Committee on Homeland Security and Governmental Affairs, U.S. Senate CONTRACT AUDITS Role in Helping Ensure Effective Oversight and Reducing Improper Payments
Statement of Jeanette M. Franzel Managing Director Acc... |
Date Jan. 14, 2011 |
Report No. GAO-11-192 |
Title
United States Government Accountability Office GAO
January 2011 Report to Congressional Committees DEFENSE ACQUISITIONS Further Action Needed to Better Implement Requirements for Conducting Inventory of Service Contract Activities GAO-11-192 January 2011 DEFENSE ACQUISITIONS
Accountability • Integrity • Reliability Further Action Needed to Better Implement Requirements for Conducting Inventory... |
Date Oct. 28, 2010 |
Report No. GAO-11-61R |
Title
United States Government Accountability Office Washington, DC 20548 October 28, 2010 The Honorable Carl Levin Chairman The Honorable John McCain Ranking Member Committee on Armed Services United States Senate The Honorable Ike Skelton Chairman The Honorable Howard P. McKeon Ranking Member Committee on Armed Services House of Representatives Subject: DEFENSE ACQUISITIONS: Additional Guidance Needed... |
Date Oct. 28, 2010 |
Report No. GAO-11-60 |
Title
United States Government Accountability Office GAO
October 2010 Report to Congressional Committees MILITARY HOUSING Installations Need to Share Information on Their Section 801 On-Base Housing Contracts GAO-11-60 October 2010 MILITARY HOUSING
Accountability • Integrity • Reliability Installations Need to Share Information on Their Section 801 On-Base Housing Contracts
Highlights of GAO-11-60, ... |
Date Oct. 18, 2010 |
Report No. GAO-11-6 |
Title
United States Government Accountability Office GAO
October 2010 Report to Congressional Requesters SECURE BORDER INITIATIVE DHS Needs to Strengthen Management and Oversight of Its Prime Contractor GAO-11-6 October 2010 SECURE BORDER INITIATIVE
Accountability • Integrity • Reliability DHS Needs to Strengthen Management and Oversight of Its Prime Contractor
Highlights of GAO-11-6, a report to co... |
Date Oct. 1, 2010 |
Report No. GAO-11-1 |
Title
United States Government Accountability Office GAO
October 2010 Report to Congressional Committees IRAQ AND AFGHANISTAN DOD, State, and USAID Face Continued Challenges in Tracking Contracts, Assistance Instruments, and Associated Personnel GAO-11-1 October 2010 IRAQ AND AFGHANISTAN
Accountability • Integrity • Reliability DOD, State, and USAID Face Continued Challenges in Tracking Contracts, A... |
Date Sept. 17, 2010 |
Report No. GAO-10-1033 |
Title
United States Government Accountability Office GAO
September 2010 Report to Congressional Requesters FEDERAL CONTRACTING Assessments and Citations of Federal Labor Law Violations by Selected Federal Contractors GAO-10-1033 September 2010 FEDERAL CONTRACTING
Accountability • Integrity • Reliability Assessments and Citations of Federal Labor Law Violations by Selected Federal Contractors
Highlig... |
Date Sept. 14, 2010 |
Report No. GAO-10-909 |
Title
United States Government Accountability Office GAO
September 2010 Report to Congressional Committees PUBLIC TRANSPORTATION Use of Contractors is Generally Enhancing Transit Project Oversight, and FTA is Taking Actions to Address Some Stakeholder Concerns GAO-10-909 September 2010 PUBLIC TRANSPORTATION
Accountability • Integrity • Reliability Use of Contractors is Generally Enhancing Transit Pr... |
Date Aug. 23, 2010 |
Report No. GAO-10-1021CG |
Title
Challenges Facing Government and the Contracting Community
National Association of State Procurement Officials 2010 Annual Conference August 23, 2010
Gene L. Dodaro Acting Comptroller General U.S. Government Accountability Office GAO-10-1021CG Discussion Topics • • • • GAO’s Strategic Plan for Serving the Congress GAO’s High Risk Series Federal Contracting Initiatives Recovery Act Expe... |
Date July 29, 2010 |
Report No. GAO-10-723 |
Title
United States Government Accountability Office GAO
July 2010 Report to the Committee on Small Business and Entrepreneurship, U.S. Senate HURRICANES KATRINA AND RITA Federally Funded Programs Have Helped to Address the Needs of Gulf Coast Small Businesses, but Agency Data on Subcontracting Are Incomplete GAO-10-723 July 2010 HURRICANES KATRINA AND RITA Highlights
Highlights of GAO-10-723, a report ... |
Date July 29, 2010 |
Report No. GAO-10-784 |
Title
United States Government Accountability Office GAO
July 2010 Report to Congressional Requesters RECOVERY ACT Most DOE Cleanup Projects Appear to Be Meeting Cost and Schedule Targets, but Assessing Impact of Spending Remains a Challenge GAO-10-784 July 2010 RECOVERY ACT Highlights
Highlights of GAO-10-784, a report to congressional requesters Accountability Integrity Reliability Most DOE Cleanup Pr... |
Date July 28, 2010 |
Report No. GAO-10-920T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 1:00 p.m. EDT Wednesday, July 28, 2010 Testimony Before the Committee on Small Business, House of Representatives SMALL BUSINESS ADMINISTRATION Undercover Tests Show HUBZone Program Remains Vulnerable to Fraud and Abuse
Statement of Gregory Kutz, Managing Director Forensic Audits and Special Investigations GAO-1... |