United States Government Accountability Office GAO
July 2010 Report to the Committee on Oversight and Government Reform, House of Representatives FEDERAL CONTRACTING Opportunities Exist to Increase Competition and Assess Reasons When Only One Offer Is Received GAO-10-833 July 2010 FEDERAL CONTRACTING Highlights
Highlights of GAO-10-833, a report to the Committee on Oversight and Government Reform,... |
Date July 15, 2010 |
Report No. GAO-10-809 |
Title
United States Government Accountability Office GAO
July 2010 Report to the Republican Leader, U.S. Senate RECOVERY ACT Contracting Approaches and Oversight Used by Selected Federal Agencies and States GAO-10-809 July 2010 RECOVERY ACT Highlights
Highlights of GAO-10-809, a report to the Republican Leader, U.S. Senate Accountability Integrity Reliability Contracting Approaches and Oversight Used by... |
Date July 15, 2010 |
Report No. GAO-10-864T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 10:00 a.m. EDT Thursday, July 15, 2010 Testimony
Before the Subcommittee on Federal Financial Management, Government Information, Federal Services, and International Security, Homeland Security and Governmental Affairs Committee, U.S. Senate MEDICARE RECOVERY AUDIT CONTRACTING Lessons Learned to Address Improper... |
Date July 14, 2010 |
Report No. GAO-10-737 |
Title
United States Government Accountability Office GAO
July 2010 Report to Congressional Committees HEALTH CARE QUALITY MEASUREMENT The National Quality Forum Has Begun a 4-Year Contract with HHS GAO-10-737 July 2010 HEALTH CARE QUALITY MEASUREMENT Highlights
Highlights of GAO-10-737, a report to congressional committees Accountability Integrity Reliability The National Quality Forum Has Begun a 4-Yea... |
Date June 30, 2010 |
Report No. GAO-10-862T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 2:30 p.m. EDT Wednesday, June 30, 2010 Testimony Before the Subcommittee on Contracting Oversight, Committee on Homeland Security and Governmental Affairs, U.S. Senate CONTRACTING STRATEGIES Better Data and Management Needed to Leverage Value of Interagency and Enterprisewide Contracts
Statement of John K. Needh... |
Date June 25, 2010 |
Report No. GAO-10-759 |
Title
United States Government Accountability Office GAO
June 2010 Report to the Chairwoman, Committee on Small Business, House of Representatives SMALL BUSINESS ADMINISTRATION Undercover Tests Show HUBZone Program Remains Vulnerable to Fraud and Abuse GAO-10-759 June 2010 SMALL BUSINESS ADMINISTRATION Highlights
Highlights of GAO-10-759, a report to the Chairwoman, Committee on Small Business, House of... |
Date May 28, 2010 |
Report No. GAO-10-458 |
Title
United States Government Accountability Office GAO
May 2010 Report to Congressional Committees DEPARTMENT OF VETERANS AFFAIRS Agency Has Exceeded Contracting Goals for Veteran-Owned Small Businesses, but It Faces Challenges with Its Verification Program GAO-10-458 May 2010 DEPARTMENT OF VETERANS AFFAIRS Highlights
Highlights of GAO-10-458, a report to congressional committees Accountability Integr... |
Date May 20, 2010 |
Report No. GAO-10-744T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 2:30 p.m. EDT Thursday, May 20, 2010 Testimony before the Subcommittee on Oversight of Government Management, the Federal Workforce, and the District of Columbia, Committee on Homeland Security and Governmental Affairs, U.S. Senate SOURCING POLICY Initial Agency Efforts to Balance the Government to Contractor Mi... |
Date April 29, 2010 |
Report No. GAO-10-367 |
Title
United States Government Accountability Office GAO
April 2010 Report to Congressional Requesters CONTRACTING STRATEGIES
Data and Oversight Problems Hamper Opportunities to Leverage Value of Interagency and Enterprisewide Contracts GAO-10-367 April 2010 CONTRACTING STRATEGIES Highlights
Highlights of GAO-10-367, a report to congressional requesters Accountability Integrity Reliability Data and Over... |
Date April 29, 2010 |
Report No. GAO-10-673T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 1:00 p.m. EDT Thursday, April 29, 2010 Testimony Before the Committee on Veterans Affairs, Subcommittee on Economic Opportunity, House of Representatives DEPARTMENT OF VETERANS AFFAIRS Preliminary Observations on Issues Related to Contracting Opportunities for Veteran-owned Small Businesses
Statement of William ... |
Date April 28, 2010 |
Report No. GAO-10-637T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 2:30 p.m. EDT Wednesday, April 28, 2010 Testimony Before the Ad Hoc Subcommittee on Contracting Oversight, Committee on Homeland Security and Governmental Affairs, U.S. Senate CENTERS FOR MEDICARE AND MEDICAID SERVICES Pervasive Internal Control Weaknesses Hindered Effective Contract Management
Statement of Kay ... |
Date April 23, 2010 |
Report No. GAO-10-459R |
Title
United States Government Accountability Office Washington, DC 20548 April 23, 2010 Congressional Committees Subject: The Office of Management and Budget’s Acquisition Workforce Development Strategic Plan for Civilian Agencies The President acknowledged that many federal contracting arrangements do not serve the needs of the federal government or the interests of the American taxpayer in a March ... |
Date April 14, 2010 |
Report No. GAO-10-614T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 10:00 a.m. EDT Wednesday, April 14, 2010 Testimony Before the Committee on Homeland Security, House of Representatives HOMELAND SECURITY Federal Protective Service’s Use of Contract Guards Requires Reassessment and More Oversight
Statement of Mark L. Goldstein, Director Physical Infrastructure Issues GAO-10-61... |
Date April 13, 2010 |
Report No. GAO-10-341 |
Title
United States Government Accountability Office GAO
April 2010 Report to Congressional Requesters HOMELAND SECURITY Federal Protective Service’s Contract Guard Program Requires More Oversight and Reassessment of Use of Contract Guards GAO-10-341 April 2010 HOMELAND SECURITY Highlights
Highlights of GAO-10-341, a report to congressional requesters Accountability Integrity Reliability Federal Prote... |
Date April 12, 2010 |
Report No. GAO-10-357 |
Title
United States Government Accountability Office GAO
April 2010 Report to Congressional Committees CONTINGENCY CONTRACTING Improvements Needed in Management of Contractors Supporting Contract and Grant Administration in Iraq and Afghanistan GAO-10-357 April 2010 CONTINGENCY CONTRACTING Highlights
Highlights of GAO-10-357, a report to congressional committees Accountability Integrity Reliability Impr... |
Date March 31, 2010 |
Report No. GAO-10-527R |
Title
United States Government Accountability Office Washington, DC 20548 March 31, 2010 Congressional Committees Subject: Defense Budget: Fourth Quarter Obligation Rates and Contract Obligations for Fiscal Years 2006-09 This letter formally transmits the enclosed briefing in response to the National Defense Authorization Act for Fiscal Year 2010 (Pub. L. No. 111-84), which requires GAO to review Depart... |
Date March 31, 2010 |
Report No. GAO-10-143 |
Title
United States Government Accountability Office GAO
March 2010 Report to Congressional Requesters MEDICARE RECOVERY AUDIT CONTRACTING Weaknesses Remain in Addressing Vulnerabilities to Improper Payments, Although Improvements Made to Contractor Oversight GAO-10-143 March 2010 MEDICARE RECOVERY AUDIT CONTRACTING Highlights
Highlights of GAO-10-143, a report to congressional requesters Accountability... |
Date March 30, 2010 |
Report No. GAO-10-472 |
Title
United States Government Accountability Office GAO
March 2010 Report to Congressional Committees WARFIGHTER SUPPORT DOD Needs to Improve Its Planning for Using Contractors to Support Future Military Operations GAO-10-472 March 2010 WARFIGHTER SUPPORT Highlights
Highlights of GAO-10-472, a report to congressional committees Accountability Integrity Reliability DOD Needs to Improve Its Planning for ... |
Date March 30, 2010 |
Report No. GAO-10-425 |
Title
United States Government Accountability Office GAO
March 2010 Report to the Chairwoman, Committee on Small Business, House of Representatives 8(a) PROGRAM Fourteen Ineligible Firms Received $325 Million in Sole-Source and Set-Aside Contracts GAO-10-425 March 2010 8(a) PROGRAM Highlights
Highlights of GAO10-425, a report to the Chairwoman, Committee on Small Business, House of Representatives Accou... |
Date March 25, 2010 |
Report No. GAO-10-71 |
Title
United States Government Accountability Office GAO
March 2010 Report to the Committee on Finance, U.S. Senate MEDICARE CONTRACTING REFORM Agency Has Made Progress with Implementation, but Contractors Have Not Met All Performance Standards GAO-10-71 March 2010 MEDICARE CONTRACTING REFORM Highlights
Highlights of GAO-10-71, a report to the Committee on Finance, U.S. Senate Accountability Integrity R... |
Date March 23, 2010 |
Report No. GAO-10-509T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 2:00 p.m. EDT Tuesday, March 23, 2010 Testimony Before the Subcommittee on Oversight and Investigations, Committee on Armed Services, House of Representatives IRAQ AND AFGHANISTAN Agencies Face Challenges in Tracking Contracts, Grants, Cooperative Agreements, and Associated Personnel
Statement of John P. Hutton,... |
Date March 17, 2010 |
Report No. GAO-10-551T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 1:30 p.m. EDT Wednesday, March 17, 2010 Testimony Before the Subcommittee on Defense, Committee on Appropriations, House of Representatives WARFIGHTER SUPPORT Continued Actions Needed by DOD to Improve and Institutionalize Contractor Support in Contingency Operations
Statement of William M. Solis, Director Defen... |
Date Jan. 20, 2010 |
Report No. GAO-10-374T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 1:30 p.m. EST Wednesday, January 20, 2010 Testimony Before the Subcommittee on Defense, Committee on Appropriations, House of Representatives DEFENSE ACQUISITIONS Managing Risk to Achieve Better Outcomes
Statement of Paul Francis, Managing Director Acquisition and Sourcing Management Michael Golden, Managing Ass... |
Date Jan. 14, 2010 |
Report No. GAO-10-199 |
Title
United States Government Accountability Office GAO
January 2010 Report to the Subcommittee on Energy and Water Development, Committee on Appropriations, House of Representatives DEPARTMENT OF ENERGY Actions Needed to Develop High-Quality Cost Estimates for Construction and Environmental Cleanup Projects GAO-10-199 January 2010 DEPARTMENT OF ENERGY Highlights
Highlights of GAO-10-199, a report to t... |
Date Nov. 20, 2009 |
Report No. GAO-10-39 |
Title
United States Government Accountability Office GAO
November 2009 Report to Congressional Requesters DEFENSE ACQUISITIONS Further Actions Needed to Address Weaknesses in DOD’s Management of Professional and Management Support Contracts GAO-10-39 November 2009 DEFENSE ACQUISITIONS Highlights
Highlights of GAO-10-39, a report to congressional requesters Accountability Integrity Reliability Further ... |
Date Nov. 6, 2009 |
Report No. GAO-10-52 |
Title
United States Government Accountability Office GAO
November 2009 Report to Congressional Committees MILLENNIUM CHALLENGE CORPORATION MCC Has Addressed a Number of Implementation Challenges, but Needs to Improve Financial Controls and Infrastructure Planning GAO-10-52 November 2009 MILLENNIUM CHALLENGE CORPORATION Highlights
Highlights of GAO-10-52, a report to congressional committees Accountabili... |
Date Nov. 2, 2009 |
Report No. GAO-10-179 |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 9:30 a.m. EST November 2, 2009 Statement Before the Commission on Wartime Contracting in Iraq and Afghanistan OPERATION IRAQI FREEDOM Preliminary Observations on DOD Planning for the Drawdown of U.S. Forces from Iraq
Statement of William M. Solis, Director Defense Capabilities and Management GAO-10-179 November ... |
Date Oct. 23, 2009 |
Report No. GAO-10-60 |
Title
United States Government Accountability Office GAO
October 2009 Report to Congressional Requesters CENTERS FOR MEDICARE AND MEDICAID SERVICES Deficiencies in Contract Management Internal Control Are Pervasive GAO-10-60 October 2009 Highlights
Highlights of GAO-10-60, a report to congressional requesters Accountability Integrity Reliability CENTERS FOR MEDICARE AND MEDICAID SERVICES
Deficiencies in... |
Date Oct. 15, 2009 |
Report No. GAO-10-63R |
Title
United States Government Accountability Office Washington, DC 20548 October 15, 2009 The Honorable Charles E. Grassley Ranking Member Committee on Finance United States Senate The Honorable Bart Gordon Chairman Committee on Science and Technology House of Representatives The Honorable Brad Miller Chairman Subcommittee on Investigations and Oversight Committee on Science and Technology House of Rep... |
Date Oct. 15, 2009 |
Report No. GAO-10-163T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 8:00 a.m. EDT Thursday, October 15, 2009 Testimony Before the Panel on Defense Acquisition Reform, Committee on Armed Services, House of Representatives DEFENSE MANAGEMENT Widespread DCAA Audit Problems Leave Billions of Taxpayer Dollars Vulnerable to Fraud, Waste, Abuse, and Mismanagement
Statement of Gregory D... |
Date Oct. 14, 2009 |
Report No. GAO-10-184CG |
Title
Maximizing DOD's Untapped Potential to Improve Business Performance
DOD Performance Breakthrough Convention Lansdowne, VA October 14, 2009 Gene L. Dodaro, Acting Comptroller General of the United States It is a pleasure to be here today to discuss business operations at the Department of Defense (DOD). The Deputy Secretary and other conference organizers are to be commended for bringing together s... |
Date Oct. 6, 2009 |
Report No. GAO-10-58R |
Title
United States Government Accountability Office Washington, DC 20548 October 6, 2009 Congressional Committees Subject: Civilian Agencies’ Development and Implementation of Insourcing Guidelines Federal agencies rely on a multisector workforce composed of federal employees and contractor personnel to perform services as they carry out their missions. Determining whether to obtain services through ... |
Date Sept. 29, 2009 |
Report No. GAO-09-1032T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 10:00 a.m. EDT Tuesday, September 29, 2009 Testimony Before the Subcommittee on Contracting Oversight, Committee on Homeland Security and Governmental Affairs, U.S. Senate FEDERAL CONTRACTING Observations on the Government’s Contracting Data Systems
Statement of William T. Woods, Director Acquisition and Sourc... |
Date Sept. 24, 2009 |
Report No. GAO-09-1040T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 9:30 a.m. EDT Thursday, September 24, 2009 Testimony Before the Defense Acquisition Reform Panel, Committee on Armed Services, House of Representatives DEFENSE ACQUISITIONS Sound Practices Critical to Ensuring Value for the Defense Logistics Agency’s Acquisitions
Statement of William M. Solis, Director Defense... |
Date Sept. 24, 2009 |
Report No. GAO-09-879 |
Title
United States Government Accountability Office GAO
September 2009 Report to the Ranking Member, Subcommittee on Oversight of Government Management, the Federal Workforce, and the District of Columbia, Committee on Homeland Security and Governmental Affairs, U.S. Senate CONTINUING RESOLUTIONS Uncertainty Limited Management Options and Increased Workload in Selected Agencies GAO-09-879 September 200... |
Date Sept. 22, 2009 |
Report No. GAO-09-591 |
Title
United States Government Accountability Office GAO
September 2009 Report to Congressional Committees DEFENSE CONTRACTING INTEGRITY Opportunities Exist to Improve DOD’s Oversight of Contractor Ethics Programs GAO-09-591 September 2009 DEFENSE CONTRACTING INTEGRITY Highlights
Highlights of GAO-09-591, a report to congressional committees Accountability Integrity Reliability Opportunities Exist to ... |
Date Sept. 22, 2009 |
Report No. GAO-09-646SP |
Title
|
Date Aug. 3, 2009 |
Report No. GAO-09-839T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 3:00 p.m. EDT Monday, August 3, 2009 Testimony
Before the Subcommittee on Federal Financial Management, Government Information, Federal Services, and International Security, Committee on Homeland Security and Governmental Affairs, U.S. Senate FEDERAL CONTRACTING Application of OMB Guidance Can Improve Use of Awa... |
Date July 31, 2009 |
Report No. GAO-09-351 |
Title
United States Government Accountability Office GAO
July 2009 Report to Congressional Committees CONTINGENCY CONTRACT MANAGEMENT DOD Needs to Develop and Finalize Background Screening and Other Standards for Private Security Contractors GAO-09-351 July 2009 CONTINGENCY CONTRACT MANAGEMENT Highlights
Highlights of GAO-09-351, a report to congressional committees Accountability Integrity Reliability ... |
Date July 24, 2009 |
Report No. GAO-09-733 |
Title
United States Government Accountability Office GAO
July 2009 Report to Congressional Committees ELECTRONIC RECORDS ARCHIVE The National Archives and Records Administration’s Fiscal Year 2009 Expenditure Plan GAO-09-733 July 2009 ELECTRONIC RECORDS ARCHIVE Highlights
Highlights of GAO-09-733, a report to congressional committees Accountability Integrity Reliability The National Archives and Recor... |
Date July 23, 2009 |
Report No. GAO-09-925T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 10:00 a.m. EDT Thursday, July 23, 2009 Testimony Before the Subcommittee on the Legislative Branch, Committee on Appropriations, House of Representatives CAPITOL VISITOR CENTER Construction Expected to Be Completed within Current Budget Estimate
Statement of Terrell G. Dorn, Director, Physical Infrastructure Iss... |
Date July 21, 2009 |
Report No. GAO-09-820 |
Title
United States Government Accountability Office GAO
July 2009 Report to Congressional Committees PROJECT BIOSHIELD HHS Can Improve Agency Internal Controls for Its New Contracting Authorities GAO-09-820 July 2009 PROJECT BIOSHIELD Highlights
Highlights of GAO-09-820, a report to congressional committees Accountability Integrity Reliability HHS Can Improve Agency Internal Controls for Its New Contra... |
Date June 24, 2009 |
Report No. GAO-09-579 |
Title
United States Government Accountability Office GAO
June 2009 Report to Congressional Committees CONTRACT MANAGEMENT Minimal Compliance with New Safeguards for Time-andMaterials Contracts for Commercial Services and Safeguards Have Not Been Applied to GSA Schedules Program GAO-09-579 June 2009 CONTRACT MANAGEMENT Highlights
Highlights of GAO-09-579, a report to congressional committees Accountabili... |
Date June 22, 2009 |
Report No. GAO-09-552 |
Title
United States Government Accountability Office GAO
June 2009 Report to Congressional Committees ARMY CORPS OF ENGINEERS Recent Changes Have Reduced the Use of Continuing Contracts, but Management Processes Need to Be Improved GAO-09-552 June 2009 ARMY CORPS OF ENGINEERS Highlights
Highlights of GAO-09-552, a report to congressional committees Accountability Integrity Reliability Recent Changes Hav... |
Date May 29, 2009 |
Report No. GAO-09-630 |
Title
United States Government Accountability Office GAO
May 2009 Report to Congressional Requesters FEDERAL CONTRACTING Guidance on Award Fees Has Led to Better Practices but Is Not Consistently Applied GAO-09-630 May 2009 FEDERAL CONTRACTING Highlights
Highlights of GAO-09-630, a report to Congressional Requesters Accountability Integrity Reliability Guidance on Award Fees Has Led to Better Practices ... |
Date May 13, 2009 |
Report No. GAO-09-322 |
Title
United States Government Accountability Office GAO
May 2009 Report to Congressional Committees BEST PRACTICES High Levels of Knowledge at Key Points Differentiate Commercial Shipbuilding from Navy Shipbuilding GAO-09-322 May 2009 BEST PRACTICES Highlights
Highlights of GAO-09-322, a report to congressional committees Accountability Integrity Reliability High Levels of Knowledge at Key Points Diffe... |
Date April 28, 2009 |
Report No. GAO-09-616T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 10:00 a.m. EDT Tuesday, April 28, 2009 Testimony Before the Oversight and Investigations Subcommittee, Committee on Armed Services, House of Representatives ACQUISITION WORKFORCE DOD Can Improve Its Management and Oversight by Tracking Data on Contractor Personnel and Taking Additional Actions
Statement of John ... |
Date April 23, 2009 |
Report No. GAO-09-643T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 8:00 a.m. EDT Thursday, April 23, 2009 Testimony Before the Defense Acquisition Reform Panel, Committee on Armed Services, U.S. House of Representatives DEFENSE ACQUISITIONS Actions Needed to Ensure Value for Service Contracts
Statement of John Hutton, Director, Acquisition and Sourcing Management and William So... |
Date April 23, 2009 |
Report No. GAO-09-374 |
Title
United States Government Accountability Office GAO
April 2009 Report to Congressional Requesters FEDERAL CONTRACTORS Better Performance Information Needed to Support Agency Contract Award Decisions GAO-09-374 April 2009 FEDERAL CONTRACTORS Highlights
Highlights of GAO-09-374, a report to congressional requesters Accountability Integrity Reliability Better Performance Information Needed to Support ... |
Date April 1, 2009 |
Report No. GAO-09-538T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 1:00 p.m. EDT Wednesday, April 1, 2009 Testimony Before the Subcommittee on Oversight and Investigations, Committee on Armed Services, House of Representatives CONTINGENCY CONTRACTING DOD, State, and USAID Are Taking Actions to Track Contracts and Contractor Personnel in Iraq and Afghanistan