Date Nov. 16, 2011 |
Report No. GAO-12-68 |
Title
GAO
November 2011 United States Government Accountability Office Report to Congressional Committees HAITI RECONSTRUCTION Factors Contributing to Delays in USAID Infrastructure Construction GAO-12-68 November 2011 HAITI RECONSTRUCTION
Factors Contributing to Delays in USAID Infrastructure Construction
Highlights of GAO-12-68, a report to congressional committees Why GAO Did This Study
On January 12... |
Date Nov. 8, 2011 |
Report No. GAO-12-96 |
Title
United States Government Accountability Office GAO
November 2011 Report to Congressional Committees FEDERAL BUREAU OF INVESTIGATION Actions Needed to Document Security Decisions and Address Issues with Condition of Headquarters Buildings GAO-12-96 November 2011 FEDERAL BUREAU OF INVESTIGATION
Accountability • Integrity • Reliability Highlights of GAO-12-96, a report to congressional committees... |
Date Nov. 2, 2011 |
Report No. GAO-12-79 |
Title
GAO
November 2011 United States Government Accountability Office Report to the Subcommittee on Federal Financial Management, Government Information, Federal Services, and International Security, Committee on Homeland Security and Governmental Affairs, U.S. Senate GREEN BUILDING Federal Initiatives for the Nonfederal Sector Could Benefit from More Interagency Collaboration GAO-12-79 November 2011 G... |
Date Sept. 28, 2011 |
Report No. GAO-11-857 |
Title
United States Government Accountability Office GAO
September 2011 Report to the Ranking Member, Committee on Homeland Security, House of Representatives FEDERAL COURTHOUSES Improved Collaboration Needed to Meet Demands of a Complex Security Environment GAO-11-857 September 2011 FEDERAL COURTHOUSES
Improved Collaboration Needed to Meet Demands of a Complex Security Environment
Highlights of GAO-11-... |
Date Aug. 4, 2011 |
Report No. GAO-11-879T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 2:30 p.m. EDT Thursday, August 4, 2011 Testimony
Before the Subcommittee on Federal Financial Management, Government Information, Federal Services, and International Security, Committee on Homeland Security and Government Affairs, U.S. Senate FEDERAL REAL PROPERTY Overreliance on Leasing Contributed to High-Risk... |
Date July 19, 2011 |
Report No. GAO-11-570 |
Title
United States Government Accountability Office GAO
July 2011 Report to Congressional Committees VA AND DOD HEALTH CARE First Federal Health Care Center Established, but Implementation Concerns Need to Be Addressed GAO-11-570 July 2011 VA AND DOD HEALTH CARE
First Federal Health Care Center Established, but Implementation Concerns Need to Be Addressed
Highlights of GAO-11-570, a report to congressi... |
Date Feb. 28, 2011 |
Report No. GAO-11-390 |
Title
United States Government Accountability Office GAO
February 2011 Report to Congressional Requesters NATIONAL ARCHIVES Framework Governing Use of Presidential Library Facilities and Staff GAO-11-390 February 2011 NATIONAL ARCHIVES
Accountability • Integrity • Reliability Framework Governing Use of Presidential Library Facilities and Staff
Highlights of GAO-11-390, a report to congressional requ... |
Date Nov. 19, 2010 |
Report No. GAO-11-103 |
Title
United States Government Accountability Office GAO
November 2010 Report to the Subcommittee on Energy and Water Development, Committee on Appropriations, U.S. Senate NUCLEAR WEAPONS National Nuclear Security Administration’s Plans for Its Uranium Processing Facility Should Better Reflect Funding Estimates and Technology Readiness GAO-11-103 November 2010 NUCLEAR WEAPONS
Accountability • Integr... |
Date Sept. 22, 2010 |
Report No. GAO-10-873 |
Title
United States Government Accountability Office GAO
September 2010 Report to the Subcommittee on Financial Services and General Government, Committee on Appropriations, House of Representatives BUILDING SECURITY New Federal Standards Hold Promise, But Could Be Strengthened to Better Protect Leased Space GAO-10-873 September 2010 BUILDING SECURITY
Accountability • Integrity • Reliability New Fed... |
Date July 26, 2010 |
Report No. GAO-10-686 |
Title
United States Government Accountability Office GAO
July 2010 Report to the Chairman, Subcommittee on Defense, Committee on Appropriations, House of Representatives DEFENSE ACQUISITIONS Guidance Needed on Navy’s Use of Investment Incentives at Private Shipyards GAO-10-686 July 2010 DEFENSE ACQUISITIONS Highlights
Highlights of GAO-10-686, a report to the Chairman, Subcommittee on Defense, Committ... |
Date July 20, 2010 |
Report No. GAO-10-689 |
Title
United States Government Accountability Office GAO
July 2010 Report to Committee on Foreign Relations, Senate and the Committee on Foreign Affairs, House of Representatives NEW EMBASSY COMPOUNDS State Faces Challenges in Sizing Facilities and Providing for Operations and Maintenance Requirements GAO-10-689 July 2010 NEW EMBASSY COMPOUNDS Highlights
Highlights of GAO-10-689, a report to Committee o... |
Date May 25, 2010 |
Report No. GAO-10-753T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 10:00 a.m. EDT Tuesday, May 25, 2010 Testimony
Before the Subcommittee on Economic Development, Public Buildings, and Emergency Management, Committee on Transportation and Infrastructure, House of Representatives FEDERAL COURTHOUSE CONSTRUCTION Preliminary Results Show Better Planning, Oversight, and Courtroom S... |
Date March 26, 2010 |
Report No. GAO-10-378 |
Title
United States Government Accountability Office GAO
March 2010 Report to the Subcommittee on Energy and Water Development, Committee on Appropriations, House of Representatives NUCLEAR NONPROLIFERATION DOE Needs to Address Uncertainties with and Strengthen Independent Safety Oversight of Its Plutonium Disposition Program GAO-10-378 March 2010 NUCLEAR NONPROLIFERATION Highlights
Highlights of GAO-10... |
Date Jan. 14, 2010 |
Report No. GAO-10-199 |
Title
United States Government Accountability Office GAO
January 2010 Report to the Subcommittee on Energy and Water Development, Committee on Appropriations, House of Representatives DEPARTMENT OF ENERGY Actions Needed to Develop High-Quality Cost Estimates for Construction and Environmental Cleanup Projects GAO-10-199 January 2010 DEPARTMENT OF ENERGY Highlights
Highlights of GAO-10-199, a report to t... |
Date Dec. 14, 2009 |
Report No. GAO-10-189 |
Title
United States Government Accountability Office GAO
December 2009 Report to the Ranking Member, Committee on Veterans’ Affairs, House of Representatives VA CONSTRUCTION VA Is Working to Improve Initial Project Cost Estimates, but Should Analyze Cost and Schedule Risks GAO-10-189 December 2009 VA CONSTRUCTION Highlights
Highlights of GAO-10-189, a report to the Ranking Member, Committee on Veteran... |
Date Nov. 25, 2009 |
Report No. GAO-10-9 |
Title
United States Government Accountability Office GAO
November 2009 Report to Congressional Requesters INTERNATIONAL SPACE STATION Significant Challenges May Limit Onboard Research GAO-10-9 November 2009 INTERNATIONAL SPACE STATION Highlights
Highlights of GAO-10-9, a report to congressional requesters Accountability Integrity Reliability Significant Challenges May Limit Onboard Research Why GAO Did ... |
Date Oct. 28, 2009 |
Report No. GAO-10-169R |
Title
United States Government Accountability Office Washington, DC 20548 B-318838 October 28, 2009 The Honorable Blanche Lincoln Chairman The Honorable Saxby Chambliss Ranking Minority Member Committee on Agriculture, Nutrition, and Forestry United States Senate The Honorable Collin C. Peterson Chairman The Honorable Frank D. Lucas Ranking Minority Member Committee on Agriculture House of Representativ... |
Date Oct. 23, 2009 |
Report No. GAO-10-115 |
Title
United States Government Accountability Office GAO
October 2009 Report to the Subcommittee on Energy and Water Development, Committee on Appropriations, U.S. Senate NUCLEAR WEAPONS National Nuclear Security Administration Needs to Better Manage Risks Associated with Modernization of Its Kansas City Plant GAO-10-115 October 2009 NUCLEAR WEAPONS Highlights
Highlights of GAO-10-115, a report to the S... |
Date July 30, 2009 |
Report No. GAO-09-870R |
Title
United States Government Accountability Office GAO
July 2009 Correspondence to the Ranking Member, Committee on Foreign Relations, U.S. Senate UNITED NATIONS Renovation Still Scheduled for Completion in 2013, but Risks to Its Schedule and Cost Remain GAO-09-870R a July 30, 2009 UNITED NATIONS Highlights
Highlights of GAO-09-870R, a report to Ranking Member, Richard G. Lugar Accountability Integrit... |
Date July 23, 2009 |
Report No. GAO-09-925T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 10:00 a.m. EDT Thursday, July 23, 2009 Testimony Before the Subcommittee on the Legislative Branch, Committee on Appropriations, House of Representatives CAPITOL VISITOR CENTER Construction Expected to Be Completed within Current Budget Estimate
Statement of Terrell G. Dorn, Director, Physical Infrastructure Iss... |
Date June 9, 2009 |
Report No. GAO-09-686T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 10:00 a.m. EDT Tuesday, June 9, 2009 Testimony Before the Subcommittee on Health, Committee on Veterans’ Affairs, House of Representatives VA HEALTH CARE Overview of VA’s Capital Asset Management
Statement of Mark L. Goldstein, Director Physical Infrastructure GAO-09-686T June 9, 2009 VA HEALTH CARE Highligh... |
Date May 7, 2009 |
Report No. GAO-09-451 |
Title
United States Government Accountability Office GAO
May 2009 Report to Congressional Requesters NUCLEAR AND WORKER SAFETY Limited Information Exists on Costs and Reasons for Work Stoppages at DOE’s Hanford Site GAO-09-451 May 2009 NUCLEAR AND WORKER SAFETY Highlights
Highlights of GAO-09-451, a report to congressional requesters Accountability Integrity Reliability Limited Information Exists on C... |
Date May 6, 2009 |
Report No. GAO-09-673T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 11:00 a.m. EDT May 6, 2009 Testimony before the Committee on House Administration, House of Representatives ARCHITECT OF THE CAPITOL Plans for Renovating the Cannon House Office Building and Garages
Statement of Terrell G. Dorn, Director Physical Infrastructure Issues GAO-09-673T Mr. Chairman and Members of the ... |
Date April 28, 2009 |
Report No. GAO-09-662T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 2:00 p.m. EDT Tuesday, April 28, 2009 Testimony Before the Subcommittee on Social Security, Committee on Ways and Means, House of Representatives SOCIAL SECURITY ADMINISTRATION Effective Information Technology Management Essential for Data Center Initiative
Statement of Valerie C. Melvin, Director Information Ma... |
Date Feb. 20, 2009 |
Report No. GAO-09-392R |
Title
United States Government Accountability Office Washington, DC 20548 February 20, 2009 The Honorable Eleanor Holmes Norton Chairwoman Subcommittee on Economic Development, Public Buildings, and Emergency Management Committee on Transportation and Infrastructure House of Representatives Subject: Government Printing Office: Issues Faced in Obtaining a New Facility Dear Madam Chairwoman: The main faci... |
Date Jan. 22, 2009 |
Report No. GAO-09-324T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 10:00 a.m. EST Thursday, January 22, 2009 Testimony Before the Committee on Transportation and Infrastructure, House of Representatives REAL PROPERTY Infrastructure Investment Presents Opportunities to Address Long-standing Real Property Backlogs and Reduce Energy Consumption
Statement of Terrell G. Dorn, Direct... |
Date Jan. 16, 2009 |
Report No. GAO-09-48 |
Title
United States Government Accountability Office GAO
January 2009 Report to Congressional Committees EMBASSY CONSTRUCTION Additional Actions Are Needed to Address Contractor Participation GAO-09-48 January 2009 EMBASSY CONSTRUCTION Highlights
Highlights of GAO-09-48, a report to congressional committees Accountability Integrity Reliability Additional Actions Are Needed to Address Contractor Particip... |
Date Jan. 16, 2009 |
Report No. GAO-09-47SP |
Title
|
Date Oct. 31, 2008 |
Report No. GAO-09-111R |
Title
United States Government Accountability Office Washington, DC 20548 October 31, 2008 The Honorable Barbara Boxer Chairman The Honorable James M. Inhofe Ranking Member Committee on Environment and Public Works United States Senate The Honorable John D. Dingell Chairman The Honorable Joe L. Barton Ranking Member Committee on Energy and Commerce House of Representatives Subject: Status of GSA’s Imp... |
Date Sept. 24, 2008 |
Report No. GAO-08-1172T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 11 a.m. EDT September 24, 2008 Testimony Before the Subcommittee on the Legislative Branch, Committee on Appropriations, House of Representatives CAPITOL VISITOR CENTER Update on Status of Project's Schedule and Cost as of September 24, 2008
Statement of Terrell G. Dorn, Director, Physical Infrastructure Issues ... |
Date July 8, 2008 |
Report No. GAO-08-900T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 7:00 p.m. EDT Tuesday, July 8, 2008 Testimony Before the Subcommittee on the Legislative Branch, Committee on Appropriations, House of Representatives CAPITOL VISITOR CENTER Update on Status of Project’s Schedule and Cost as of June 27, 2008
Statement of Terrell G. Dorn, Director, Physical Infrastructure Issue... |
Date June 25, 2008 |
Report No. GAO-08-923T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 10:00 a.m. EDT Wednesday, June 25, 2008 Testimony Before the Committee on Oversight and Government Reform, House of Representatives MILITARY CONSTRUCTION Kaiserslautern Military Community Center Project Continues to Experience Problems
Statement of Gregory D. Kutz, Managing Director Forensic Audits and Special I... |
Date June 17, 2008 |
Report No. GAO-08-665 |
Title
United States Government Accountability Office GAO
June 2008 Report to Congressional Committees DEFENSE INFRASTRUCTURE High-Level Leadership Needed to Help Communities Address Challenges Caused by DOD-Related Growth GAO-08-665 June 2008 DEFENSE INFRASTRUCTURE Highlights
Highlights of GAO-08-665, a report to congressional committees Accountability Integrity Reliability High-Level Leadership Needed ... |
Date May 29, 2008 |
Report No. GAO-08-634 |
Title
United States Government Accountability Office GAO
May 2008 Report to the Subcommittee on Commerce, Justice, Science, and Related Agencies, Committee on Appropriations, U.S. Senate PRISON CONSTRUCTION Clear Communication on the Accuracy of Cost Estimates and Project Changes Is Needed GAO-08-634 May 2008 PRISON CONSTRUCTION Highlights
Highlights of GAO-08-634, a report to the Subcommittee on Commer... |
Date May 23, 2008 |
Report No. GAO-08-593 |
Title
United States Government Accountability Office GAO
May 2008 Report to the Subcommittee on Energy and Water Development, Committee on Appropriations, House of Representatives NUCLEAR WEAPONS NNSA Needs to Establish a Cost and Schedule Baseline for Manufacturing a Critical Nuclear Weapon Component GAO-08-593 May 2008 NUCLEAR WEAPONS Highlights
Highlights of GAO-08-593, a report to the Subcommittee o... |
Date May 22, 2008 |
Report No. GAO-08-623 |
Title
United States Government Accountability Office GAO
May 2008 Report to the Chairman, Committee on Homeland Security, House of Representatives BORDER SECURITY State Department Should Plan for Potentially Significant Staffing and Facilities Shortfalls Caused by Changes in the Visa Waiver Program GAO-08-623 May 2008 BORDER SECURITY Highlights
Highlights of GAO-08-623, a report to the Chairman, Committ... |
Date May 22, 2008 |
Report No. GAO-08-811T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 10:00 a.m. EDT Thursday, May 22, 2008 Testimony before the Subcommittee on the Legislative Branch, Committee on Appropriations, House of Representatives CAPITOL VISITOR CENTER Update on Status of Project’s Schedule and Cost as of May 22, 2008
Statement of Terrell G. Dorn, Director, Physical Infrastructure Issu... |
Date April 30, 2008 |
Report No. GAO-08-528SP |
Title
|
Date April 30, 2008 |
Report No. GAO-08-510 |
Title
United States Government Accountability Office GAO
April 2008 Report to Congressional Requesters DIGITAL TELEVISION TRANSITION Majority of Broadcasters Are Prepared for the DTV Transition, but Some Technical and Coordination Issues Remain GAO-08-510 April 2008 DIGITAL TELEVISION TRANSITION Highlights
Highlights of GAO-08-510, a report to congressional requesters Accountability Integrity Reliabilit... |
Date April 24, 2008 |
Report No. GAO-08-595R |
Title
United States Government Accountability Office Washington, DC 20548 April 24, 2008 Congressional Requesters Subject: International Boundary and Water Commission: Two Alternatives for Improving Wastewater Treatment at the United States-Mexico Border For many years, untreated wastewater originating in Tijuana, Mexico, has entered the United States, largely via the Tijuana River. Tijuana’s sewage s... |
Date April 22, 2008 |
Report No. GAO-08-483 |
Title
United States Government Accountability Office GAO
April 2008 Report to Congressional Committees GLOBAL NUCLEAR ENERGY PARTNERSHIP DOE Should Reassess Its Approach to Designing and Building Spent Nuclear Fuel Recycling Facilities GAO-08-483 April 2008 GLOBAL NUCLEAR ENERGY PARTNERSHIP Highlights
Highlights of GAO-08-483, a report to congressional committees Accountability Integrity Reliability DOE... |
Date April 15, 2008 |
Report No. GAO-08-677T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 1:30 p.m. EDT Tuesday, April 15, 2008 Testimony Before the Subcommittee on the Legislative Branch, Committee on Appropriations, House of Representatives CAPITOL VISITOR CENTER Update on Status of Project’s Schedule and Cost as of April 15, 2008
Statement of Terrell G. Dorn, Director, Physical Infrastructure Is... |
Date April 9, 2008 |
Report No. GAO-08-513R |
Title
United States Government Accountability Office GAO
April 2008 Correspondence to the Committee on Foreign Relations, U.S. Senate UNITED NATIONS Renovation Schedule Accelerated after Delays, but Risks Remain in Key Areas GAO-08-513R April 2008 UNITED NATIONS Highlights
Highlights of GAO-08-513R, a correspondence to the Committee on Foreign Relations, U.S. Senate Accountability Integrity Reliability ... |
Date March 12, 2008 |
Report No. GAO-08-545T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 1:30 p.m. EST Wednesday, March 12, 2008 Testimony Before the Subcommittee on the Legislative Branch, Committee on Appropriations, House of Representatives CAPITOL VISITOR CENTER Update on Status of Project’s Schedule and Cost as of March 12, 2008
Statement of Terrell G. Dorn, Director, Physical Infrastructure ... |
Date Feb. 7, 2008 |
Report No. GAO-08-475T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 10:00 a.m. EST Thursday, February 7, 2008 Testimony Before the Subcommittee on the Legislative Branch, Committee on Appropriations, House of Representatives CAPITOL VISITOR CENTER Update on Status of Project's Schedule and Cost as of February 7, 2008
Statement of Terrell G. Dorn, Director, Physical Infrastructur... |
Date Dec. 12, 2007 |
Report No. GAO-08-250T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 10:00 a.m. EST Wednesday, December 12, 2007 Testimony Before the Senate Committee on Rules and Administration SMITHSONIAN INSTITUTION Status of Efforts to Address a Range of Funding and Governance Challenges
Statement of Mark L. Goldstein, Director Physical Infrastructure Issues GAO-08-250T December 12, 2007 SMI... |
Date Nov. 14, 2007 |
Report No. GAO-08-227T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 9:00 a.m. EST Wednesday, November 14, 2007 Testimony Before the Subcommittee on the Legislative Branch, Committee on Appropriations, House of Representatives CAPITOL VISITOR CENTER Update on Status of Project's Schedule and Cost as of October 31, 2007
Statement of Terrell G. Dorn, Director, Physical Infrastructu... |
Date July 31, 2007 |
Report No. GAO-07-1149T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 9:00 a.m. EDT Tuesday, July 31, 2007 Testimony Before the Subcommittee on the Legislative Branch, Committee on Appropriations, House of Representatives CAPITOL VISITOR CENTER Update on Status of Project’s Schedule and Cost as of July 31, 2007
Statement of Terrell G. Dorn, Director, Physical Infrastructure Issu... |
Date June 27, 2007 |
Report No. GAO-07-897T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 9:00 a.m. EDT Wednesday, June 27, 2007 Testimony Before the Subcommittee on the Legislative Branch, Committee on Appropriations, House of Representatives CAPITOL VISITOR CENTER Update on Status of Project's Schedule and Cost as of June 27, 2007
Statement of Terrell G. Dorn, Director, Physical Infrastructure Issu... |
Date June 26, 2007 |
Report No. GAO-07-654 |
Title
United States Government Accountability Office GAO
June 2007 Report to Congressional Addressees ENERGY EFFICIENCY Important Challenges Must Be Overcome to Realize Significant Opportunities for Energy Efficiency Improvements in Gulf Coast Reconstruction GAO-07-654 June 2007 ENERGY EFFICIENCY Highlights
Highlights of GAO-07-654, a report to congressional addressees Accountability Integrity Reliabili... |