Menu Search Account

LegiStorm

Get LegiStorm App Visit Product Demo Website
» Get LegiStorm App
» Get LegiStorm Pro Free Demo

GAO Reports by subject "Procurement planning"

Full-text search of 51,974 reports from the Government Accountability Office
From To
Reset

Search Results:

Date Report No. Title
Date March 1, 2005 Report No. GAO-05-255 Title

Defense Acquisitions: Plans Need to Allow Enough Time to Demonstrate Capability of First Littoral Combat Ships

United States Government Accountability Office GAO March 2005 Report to Congressional Committees DEFENSE ACQUISITIONS Plans Need to Allow Enough Time to Demonstrate Capability of First Littoral Combat Ships GAO-05-255 March 2005 DEFENSE ACQUISITIONS Highlights Highlights of GAO-05-255, a report to congressional committees Accountability Integrity Reliability Plans Need to Allow Enough Time to Demo...
Date Feb. 11, 2005 Report No. GAO-05-229 Title

Contract Management: Opportunities to Improve Pricing of GSA Multiple Award Schedules Contracts

United States Government Accountability Office GAO February 2005 Report to the Chairman, Committee on Homeland Security and Governmental Affairs, U.S. Senate CONTRACT MANAGEMENT Opportunities to Improve Pricing of GSA Multiple Award Schedules Contracts GAO-05-229 a February 2005 CONTRACT MANAGEMENT Highlights Highlights of GAO-05-229, a report to Chairman, Senate Homeland Security and Governmental...
Date Sept. 30, 2004 Report No. GAO-04-1054 Title

Polar-Orbiting Environmental Satellites: Information on Program Cost and Schedule Changes

United States Government Accountability Office GAO September 2004 Report to the Subcommittee on Environment, Technology, and Standards, Committee on Science, House of Representatives POLAR-ORBITING ENVIRONMENTAL SATELLITES Information on Program Cost and Schedule Changes GAO-04-1054 a September 2004 POLAR-ORBITING ENVIRONMENTAL SATELLITES Highlights of GAO-04-1054, a report to Subcommittee on Envi...
Date Sept. 23, 2004 Report No. GAO-04-927 Title

Information Management: Planning for the Electronic Records Archives Has Improved

United States Government Accountability Office GAO September 2004 Report to Congressional Committees RECORDS MANAGEMENT Planning for the Electronic Records Archives Has Improved GAO-04-927 a September 2004 RECORDS MANAGEMENT Planning for the Electronic Records Archives Has Improved Highlights of GAO-04-927, a report to congressional committees Since 2001, the National Archives and Records Administ...
Date Sept. 3, 2004 Report No. GAO-04-973 Title

Defense Acquisitions: Challenges Facing the DD(X) Destroyer Program

United States Government Accountability Office GAO September 2004 Report to the Chairman, Subcommittee on Projection Forces, Committee on Armed Services, House of Representatives DEFENSE ACQUISITIONS Challenges Facing the DD(X) Destroyer Program GAO-04-973 a September 2004 DEFENSE ACQUISITIONS Challenges Facing the DD(X) Destroyer Program Highlights of GAO-04-973, a report to the Chairman of the S...
Date Aug. 13, 2004 Report No. GAO-04-900 Title

Force Structure: Department of the Navy's Tactical Aviation Integration Plan Is Reasonable, but Some Factors Could Affect Implementation

United States Government Accountability Office GAO August 2004 Report to Congressional Committees FORCE STRUCTURE Department of the Navy’s Tactical Aviation Integration Plan Is Reasonable, but Some Factors Could Affect Implementation GAO-04-900 August 2004 FORCE STRUCTURE Department of the Navy’s Tactical Aviation Integration Plan Is Reasonable, but Some Factors Could Affect Implementation Hig...
Date June 1, 2004 Report No. GAO-04-650G Title

Acquisition/Financial Systems Interface Requirements: Checklist for Reviewing Systems under the Federal Financial Management Improvement Act

United States General Accounting Office GAO June 2004 ACQUISITION/ FINANCIAL SYSTEMS INTERFACE REQUIREMENTS Checklist for Reviewing Systems under the Federal Financial Management Improvement Act GAO-04-650G a This is a work of the U.S. government and is not subject to copyright protection in the United States. It may be reproduced and distributed in its entirety without further permission from GAO...
Date April 7, 2004 Report No. GAO-04-437 Title

Biobased Products: Improved USDA Management Would Help Agencies Comply with Farm Bill Purchasing Requirements

United States General Accounting Office GAO April 2004 Report to Ranking Democratic Member, Committee on Agriculture, Nutrition, and Forestry, U.S. Senate BIOBASED PRODUCTS Improved USDA Management Would Help Agencies Comply with Farm Bill Purchasing Requirements GAO-04-437 April 2004 BIOBASED PRODUCTS Improved USDA Management Would Help Agencies Comply with Farm Bill Purchasing Requirements Highl...
Date April 1, 2004 Report No. GAO-04-635T Title

Defense Acquisitions: The Army's Future Combat Systems' Features, Risks, and Alternatives

United States General Accounting Office GAO For Release on Delivery Expected at 1:00 p.m. EST Thursday, April 1, 2004 Testimony Before the Subcommittee on Tactical Air and Land Forces, Committee on Armed Services, House of Representatives DEFENSE ACQUISITIONS The Army’s Future Combat Systems’ Features, Risks, and Alternatives Statement of Paul L. Francis, Director, Acquisition and Sourcing Man...
Date March 25, 2004 Report No. GAO-04-597T Title

Tactical Aircraft: Status of the F/A-22 and Joint Strike Fighter Programs

United States General Accounting Office GAO For Release on Delivery Expected at 9:00 a.m. EST Thursday, March 25, 2004 Testimony Before the Subcommittee on Tactical Air and Land Forces, Committee on Armed Services, House of Representatives TACTICAL AIRCRAFT Status of the F/A-22 and Joint Strike Fighter Programs Statement of Allen Li, Director, Acquisition and Sourcing Management GAO-04-597T March ...
Date March 24, 2004 Report No. GAO-04-595 Title

Coast Guard: Replacement of HH-65 Helicopter Engine

United States General Accounting Office GAO March 2004 Report to the Chairman, Committee on Commerce, Science, and Transportation, U.S. Senate COAST GUARD Replacement of HH-65 Helicopter Engine GAO-04-595 United States General Accounting Office Washington, DC 20548 March 24, 2004 The Honorable John McCain Chairman, Committee on Commerce, Science, and Transportation United States Senate Dear Mr. Ch...
Date March 15, 2004 Report No. GAO-04-391 Title

Tactical Aircraft: Changing Conditions Drive Need for New F/A-22 Business Case

United States General Accounting Office GAO March 2004 Report to Congressional Committees TACTICAL AIRCRAFT Changing Conditions Drive Need for New F/A-22 Business Case GAO-04-391 March 2004 TACTICAL AIRCRAFT Changing Conditions Drive Need for New F/A-22 Business Case Highlights of GAO-04-391, a report to congressional committees Following a history of increasing cost estimates to complete F/A-22 d...
Date March 1, 2004 Report No. GAO-04-394G Title

Information Technology Investment Management: A Framework for Assessing and Improving Process Maturity

United States General Accounting Office GAO March 2004 Version 1.1 Executive Guide INFORMATION TECHNOLOGY INVESTMENT MANAGEMENT A Framework for Assessing and Improving Process Maturity GAO-04-394G a March 2004 INFORMATION TECHNOLOGY INVESTMENT MANAGEMENT Highlights of GAO-04-394G, an executive guide. A Framework for Assessing and Improving Process Maturity In 2000, GAO published an exposure draft ...
Date Feb. 27, 2004 Report No. GAO-04-367 Title

Competitive Sourcing: Greater Emphasis Needed on Increasing Efficiency and Improving Performance

United States General Accounting Office GAO February 2004 Report to Congressional Requesters COMPETITIVE SOURCING Greater Emphasis Needed on Increasing Efficiency and Improving Performance GAO-04-367 February 2004 COMPETITIVE SOURCING Greater Emphasis Needed on Increasing Efficiency and Improving Performance Highlights of GAO-04-367, a report to the Honorable Robert C. Byrd, the Honorable Susan M....
Date Feb. 26, 2004 Report No. GAO-04-486T Title

Telecommunications: GSA Faces Challenges in Planning for New Governmentwide Program

United States General Accounting Office GAO For Release on Delivery Expected at 10:00 a.m. EST Thursday, February 26, 2004 Testimony Before the Committee on Government Reform, House of Representatives TELECOMMUNICATIONS GSA Faces Challenges in Planning for New Governmentwide Program Statement of Linda D. Koontz Director, Information Management Issues GAO-04-486T February 26, 2004 TELECOMMUNICATION...
Date Jan. 29, 2004 Report No. GAO-04-379R Title

Defense Acquisitions: Risks Posed by DOD's New Space Systems Acquisition Policy

United States General Accounting Office Washington, DC 20548 January 29, 2004 The Honorable Wayne Allard Chairman The Honorable Bill Nelson Ranking Minority Member Subcommittee on Strategic Forces Committee on Armed Services United States Senate Subject: Defense Acquisitions: Risks Posed by DOD’s New Space Systems Acquisition Policy On November 18, 2003, we testified before the Subcommittee on t...
Date Jan. 16, 2004 Report No. GAO-04-138 Title

Budget Issues: Agency Implementation of Capital Planning Principles Is Mixed

United States General Accounting Office GAO January 2004 Report to the Subcommittee on Government Efficiency and Financial Management, Committee on Government Reform, House of Representatives BUDGET ISSUES Agency Implementation of Capital Planning Principles Is Mixed GAO-04-138 a January 2004 BUDGET ISSUES Agency Implementation of Capital Planning Principles Is Mixed Highlights of GAO-04-138, a re...
Date Dec. 10, 2003 Report No. GAO-04-206 Title

Satellite Communications: Strategic Approach Needed for DOD's Procurement of Commercial Satellite Bandwidth

United States General Accounting Office GAO December 2003 Report to Congressional Requesters SATELLITE COMMUNICATIONS Strategic Approach Needed for DOD’s Procurement of Commercial Satellite Bandwidth GAO-04-206 December 2003 SATELLITE COMMUNICATIONS Strategic Approach Needed for DOD’s Procurement of Commercial Satellite Bandwidth Highlights of GAO-04-206, a report to congressional requesters I...
Date Oct. 14, 2003 Report No. GAO-04-169R Title

Military Aircraft: Observations on DOD's Aerial Refueling Aircraft Acquisition Options

United States General Accounting Office Washington, DC 20548 October 14, 2003 The Honorable John Warner Chairman The Honorable Carl Levin Ranking Member Committee on Armed Services United States Senate Subject: Military Aircraft: Observations on DOD’s Aerial Refueling Aircraft Acquisition Options During the Senate Armed Services Committee’s September 4, 2003 hearing on the Department of Defens...
Date Oct. 3, 2003 Report No. GAO-04-155R Title

Government Operations: Questions for Competitive Sourcing Hearing Record

Comptroller General of the United States United States General Accounting Office Washington, DC 20548 October 3, 2003 The Honorable George V. Voinovich Chairman The Honorable Richard J. Durbin Ranking Member Subcommittee on Oversight of Government Management, the Federal Workforce, and the District of Columbia Committee on Governmental Affairs United States Senate Subject: Questions for Competitiv...
Date Sept. 30, 2003 Report No. GAO-03-1068 Title

Contract Management: No Reliable Data to Measure Benefits of the Simplified Acquisition Test Program

United States General Accounting Office GAO September 2003 Report to Congressional Committees CONTRACT MANAGEMENT No Reliable Data to Measure Benefits of the Simplified Acquisition Test Program GAO-03-1068 September 2003 CONTRACT MANAGEMENT No Reliable Data to Measure Benefits of the Simplified Acquisition Test Program Highlights of GAO-03-1068, a report to the Senate and House Committees on Armed...
Date July 25, 2003 Report No. GAO-03-799 Title

Contract Management: INS Contracting Weaknesses Need Attention from the Department of Homeland Security

United States General Accounting Office GAO July 2003 Report to the Committee on Government Reform, House of Representatives CONTRACT MANAGEMENT INS Contracting Weaknesses Need Attention from the Department of Homeland Security GAO-03-799 July 2003 CONTRACT MANAGEMENT INS Contracting Weaknesses Need Attention from the Department of Homeland Security Highlights of GAO-03-799, a report to House Gove...
Date June 26, 2003 Report No. GAO-03-943T Title

Competitive Sourcing: Implementation Will Be Key to Success of New Circular A-76

United States General Accounting Office GAO For Release on Delivery Expected at 10:00 a.m. EDT Thursday, June 26, 2003 Testimony Before the Committee on Government Reform, House of Representatives COMPETITIVE SOURCING Implementation Will Be Key to Success of New Circular A-76 Statement of David M. Walker Comptroller General of the United States GAO-03-943T June 26, 2003 COMPETITIVE SOURCING Implem...
Date June 23, 2003 Report No. GAO-03-895R Title

National Defense: Multiyear Procurement Authority for the Virginia Class Submarine Program

United States General Accounting Office Washington, DC 20548 June 23, 2003 The Honorable Jerry Lewis Chairman Subcommittee on Defense Committee on Appropriations House of Representatives Subject: Multiyear Procurement Authority for the Virginia Class Submarine Program Dear Mr. Chairman: On May 29, 2003 we briefed your staff on the fiscal year 2004 budget request for the Virginia class submarine pr...
Date June 13, 2003 Report No. GAO-03-802R Title

Contract Management: Comments on Selected Provisions of the Services Acquisition Reform Act of 2003, H.R. 1837

United States General Accounting Office Washington, DC 20548 June 13, 2003 The Honorable Tom Davis Chairman The Honorable Henry Waxman Ranking Minority Member Committee on Government Reform House of Representatives Subject: Contract Management: Comments on Selected Provisions of the Services Acquisition Reform Act of 2003, H.R. 1837 This is a follow up to our April 30, 2003, testimony 1 on the pro...
Date April 30, 2003 Report No. GAO-03-716T Title

Contract Management: Comments on Proposed Services Acquisition Reform Act

United States General Accounting Office GAO For Release on Delivery Expected at 10:00 a.m. EDT Wednesday, April 30, 2003 Testimony Before the Committee on Government Reform, House of Representatives CONTRACT MANAGEMENT Comments on Proposed Services Acquisition Reform Act Statement of William T. Woods, Director Acquisition and Sourcing Management GAO-03-716T This is a work of the U.S. government an...
Date March 18, 2003 Report No. GAO-03-559T Title

Small Business Contracting: Concerns About the Administration's Plan to Address Contract Bundling Issues

United States General Accounting Office GAO For Release on Delivery Expected at 9:30 a.m. EST Tuesday, March 18, 2003 Testimony Before the Senate Committee on Small Business and Entrepreneurship SMALL BUSINESS CONTRACTING Concerns About the Administration’s Plan to Address Contract Bundling Issues Statement of David E. Cooper Director Acquisition and Sourcing Management GAO-03-559T Madam Chair a...
Date Feb. 28, 2003 Report No. GAO-03-406 Title

Customs Service Modernization: Automated Commercial Environment Progressing, but Further Acquisition Management Improvements Needed

United States General Accounting Office GAO February 2003 Report to Congressional Committees CUSTOMS SERVICE MODERNIZATION Automated Commercial Environment Progressing, but Further Acquisition Management Improvements Needed GAO-03-406 a February 2003 CUSTOMS SERVICE MODERNIZATION Automated Commercial Environment Progressing, but Further Acquisition Management Improvements Needed Highlights of GAO-...
Date Feb. 28, 2003 Report No. GAO-03-440 Title

Contract Management: DLA Properly Implemented Best Value Contracting for Clothing and Textiles and Views and Supplier Base as Uncertain

United States General Accounting Office GAO February 2003 Report to the Chairman and Ranking Minority Member, Committee on Armed Services, House of Representatives CONTRACT MANAGEMENT DLA Properly Implemented Best Value Contracting for Clothing and Textiles and Views the Supplier Base as Uncertain GAO-03-440 a February 2003 CONTRACT MANAGEMENT DLA Properly Implemented Best Value Contracting for Cl...
Date Dec. 18, 2002 Report No. GAO-03-55 Title

Acquisition Workforce: Status of Agency Efforts to Address Future Needs

United States General Accounting Office GAO December 2002 Report to Senate Committee on Governmental Affairs ACQUISITION WORKFORCE Status of Agency Efforts to Address Future Needs GAO-03-55 December 2002 ACQUISITION WORKFORCE Status of Agency Efforts to Address Future Needs Highlights of GAO-03-55, a report to Senate Committee on Governmental Affairs The federal government is dramatically changing...
Date Oct. 19, 2001 Report No. GAO-02-39 Title

Joint Strike Fighter Acquisition: Mature Critical Technologies Needed to Reduce Risks

United States General Accounting Office GAO October 2001 Report to the Chairman, Subcommittee on National Security, Veterans' Affairs, and International Relations, Committee on Government Reform, House of Representatives JOINT STRIKE FIGHTER ACQUISITION Mature Critical Technologies Needed to Reduce Risks GAO-02-39 Contents Letter Results in Brief Background Technology Readiness Assessments Provide...
Date June 20, 2001 Report No. GAO-01-633 Title

Space Station: Inadequate Planning and Design Led to Propulsion Module Project Failure

United States General Accounting Office GAO June 2001 Report to Congressional Requesters SPACE STATION Inadequate Planning and Design Led to Propulsion Module Project Failure GAO-01-633 Contents Letter Appendix I Comments From the National Aeronautics and Space Administration 1 15 Appendix II Staff Acknowledgments 17 Figures Figure 1: Diagram of Node X Option 11 Page i GAO-01-633 Space Station Uni...
Date April 5, 2001 Report No. GAO-01-18 Title

Defense Logistics: Unfinished Actions Limit Reliability of the Munition Requirements Determination Process

United States General Accounting Office GAO April 2001 Report to the Chairman, Subcommittee on Readiness and Management Support, Committee on Armed Services, U.S. Senate DEFENSE LOGISTICS Unfinished Actions Limit Reliability of the Munition Requirements Determination Process GAO-01-18 Contents Letter Appendix I Scope and Methodology 1 16 Appendix II Related DOD Inspector General and General Accoun...
Date March 8, 2001 Report No. GAO-01-288 Title

Best Practices: Better Matching of Needs and Resources Will Lead to Better Weapon System Outcomes

United States General Accounting Office GAO March 2001 Report to the Chairman and Ranking Member, Subcommittee on Readiness and Management Support, Committee on Armed Services, U.S. Senate BEST PRACTICES Better Matching of Needs and Resources Will Lead to Better Weapon System Outcomes GAO-01-288 Contents Letter Executive Summary Chapter 1 Introduction Chapter 2 Timely Matching of Requirements and ...
Date Nov. 8, 2000 Report No. GAO-01-91 Title

Tax Systems Modernization: Results of Review of IRS' August 2000 Interim Spending Plan

United States General Accounting Office GAO November 2000 Report to Congressional Committees TAX SYSTEMS MODERNIZATION Results of Review of IRS’ August 2000 Interim Spending Plan GAO-01-91 Contents Letter Appendixes Appendix I: Briefing Slides From September 22, 2000, Briefing of Senate and House Appropriations Subcommittee Staff 3 14 59 61 65 Appendix II: Objectives, Scope, and Methodology Appe...
Date Sept. 26, 2000 Report No. NSIAD-00-204 Title

Unmanned Aerial Vehicles: Questionable Basis for Revisions to Shadow 200 Acquisition Strategy

United States General Accounting Office GAO September 2000 Report to the Chairman, Subcommittee on Military Research and Development, Committee on Armed Services, House of Representatives UNMANNED AERIAL VEHICLES Questionable Basis for Revisions to Shadow 200 Acquisition Strategy GAO/NSIAD-00-204 Contents Letter Appendixes Appendix I: The Army Is Incorporating Lessons Learned From Previous Experie...
Date Sept. 21, 2000 Report No. T-HEHS-00-199 Title

Pension Benefit Guaranty Corporation: Contract Management Needs Improvement

United States General Accounting Office GAO For Release on Delivery Expected at 9:30 a.m. Thursday, September 21, 2000 Testimony Before the Special Committee on Aging and the Committee on Small Business, United States Senate PENSION BENEFIT GUARANTY CORPORATION Contract Management Needs Improvement Statement of Barbara D. Bovbjerg, Associate Director Education, Workforce, and Income Security Issue...
Date Sept. 18, 2000 Report No. HEHS-00-130 Title

Pension Benefit Guaranty Corporation: Contracting Management Needs Improvement

United States General Accounting Office GAO September 2000 Report to the Chairman, Senate Special Committee on Aging; and the Chairman, Committee on Small Business, United States Senate PENSION BENEFIT GUARANTY CORPORATION Contracting Management Needs Improvement GAO/HEHS-00-130 Contents Letter Appendixes Appendix I: Scope and Methodology 3 40 44 45 58 41 7 9 10 11 13 16 17 Appendix II: PBGC Organ...
Date Aug. 25, 2000 Report No. NSIAD-00-212R Title

Defense Acquisitions: Status of Strategic C4 System Modernization and Plans to Integrate Additional Mission Capabilities

United States General Accounting Office Washington, DC 20548 National Security and International Affairs Division B-285810 August 25, 2000 The Honorable Jerry Lewis Chairman, Subcommittee on Defense Committee on Appropriations U. S. House of Representatives Subject: Defense Acquisitions: Status of Strategic C4 System Modernization and Plans To Integrate Additional Mission Capabilities Dear Mr. Cha...
Date July 31, 2000 Report No. NSIAD-00-199 Title

Best Practices: A More Constructive Test Approach Is Key to Better Weapon System Outcomes

United States General Accounting Office GAO July 2000 Report to the Chairman and Ranking Minority Member, Subcommittee on Readiness and Management Support, Committee on Armed Services, U.S. Senate BEST PRACTICES A More Constructive Test Approach Is Key to Better Weapon System Outcomes GAO/NSIAD-00-199 Contents Letter Executive Summary Chapter 1 Introduction The Role of Testing and Evaluation in Pr...
Date July 28, 2000 Report No. NSIAD-00-182 Title

Defense Acquisitions: Howitzer Program Experiencing Cost Increases and Schedule Delays

United States General Accounting Office GAO July 2000 Report to Congressional Requesters DEFENSE ACQUISITIONS Howitzer Program Experiencing Cost Increases and Schedule Delays GAO/NSIAD-00-182 Contents Letter Appendixes Appendix I: Lightweight Howitzer Fiscal Year 2001 Budget Request 3 24 27 8 9 Appendix II: Comments From the Department of Defense Tables Table 1: Key Program Events Table 2: Changes...
Date July 27, 2000 Report No. NSIAD-00-171 Title

Electronic Warfare: Phased Approach to Infrared Upgrades Would Reduce Risk to Helicopters

United States General Accounting Office GAO July 2000 Report to the Chairman, Subcommittee on Military Research and Development, Committee on Armed Services, House of Representatives ELECTRONIC WARFARE Phased Approach to Infrared Upgrades Would Reduce Risk to Helicopters GAO/NSIAD-00-171 United States General Accounting Office Washington, D.C. 20548 National Security and International Affairs Divi...
Date July 11, 2000 Report No. NSIAD-00-149 Title

Defense Acquisitions: Comprehensive Strategy Needed to Improve Ship Cruise Missile Defense

United States General Accounting Office GAO July 2000 Report to Congressional Requesters DEFENSE ACQUISITIONS Comprehensive Strategy Needed to Improve Ship Cruise Missile Defense GAO/NSIAD-00-149 Contents Letter Appendixes Appendix I: Planned Self-Defense Capabilities for Amphibious Transport Dock Ships 3 26 27 41 51 5 11 13 13 16 6 8 20 21 Appendix II: Current and Planned Ship Self-Defense Equipm...
Date June 29, 2000 Report No. NSIAD-00-153 Title

Missile Defense: Cost Increases Call for Analysis of How Many New Patriot Missiles to Buy

United States General Accounting Office GAO June 2000 Report to the Chairman, Subcommittee on Defense, Committee on Appropriations, House of Representatives MISSILE DEFENSE Cost Increases Call for Analysis of How Many New Patriot Missiles to Buy GAO/NSIAD-00-153 United States General Accounting Office Washington, D.C. 20548 National Security and International Affairs Division B-282712 June 29, 200...
Date June 12, 2000 Report No. RCED/AIMD-00-130 Title

National Airspace System: Persistent Problems in FAA's New Navigation System Highlight Need for Periodic Reevaluation

United States General Accounting Office GAO June 2000 Report to the Chairman, Subcommittee on Transportation, Committee on Appropriations, U.S. Senate NATIONAL AIRSPACE SYSTEM Persistent Problems in FAA’s New Navigation System Highlight Need for Periodic Reevaluation GAO/RCED/AIMD-00-130 Contents Letter Appendixes Appendix I: Objectives, Scope, and Methodology 3 28 31 33 37 38 Appendix II: Exper...
Date May 25, 2000 Report No. T-HEHS-00-121 Title

DOD and VA Health Care: Jointly Buying and Mailing Out Pharmaceuticals Could Save Millions of Dollars

United States General Accounting Office GAO For Release on Delivery Expected at 10:00 a.m. Thursday, May 25, 2000 Testimony Before the Subcommittee on Oversight and Investigations, Committee on Veterans’ Affairs, House of Representatives DOD AND VA HEALTH CARE Jointly Buying and Mailing Out Pharmaceuticals Could Save Millions of Dollars Statement of Stephen P. Backhus, Director Veterans’ Affai...
Date May 10, 2000 Report No. T-NSIAD-00-173 Title

Defense Acquisitions: Decisions on the Joint Strike Fighter Will Be Critical for Acquisition Reform

United States General Accounting Office GAO For Release on Delivery Expected at 10:00 a.m. Wednesday, May 10, 2000 Testimony Before the Subcommittee on National Security, Veterans Affairs, and International Relations, Committee on Government Reform, House of Representatives DEFENSE ACQUISITIONS Decisions on the Joint Strike Fighter Will Be Critical for Acquisition Reform Statement of Louis J. Rodr...
Date May 9, 2000 Report No. NSIAD-00-74 Title

Joint Strike Fighter Acquisition: Development Schedule Should Be Changed to Reduce Risks

United States General Accounting Office GAO May 2000 Report to the Chairman, Subcommittee on National Security, Veterans’ Affairs, and International Relations, Committee on Government Reform, House of Representatives JOINT STRIKE FIGHTER ACQUISITION Development Schedule Should Be Changed to Reduce Risks GAO/NSIAD-00-74 Contents Letter Appendixes Appendix I: International Participation in the Joi...
Date May 8, 2000 Report No. NSIAD-00-67 Title

Defense Acquisitions: Antiarmor Weapons Master Plan Does Not Identify Potential Excesses or Support Planned Procurements

United States General Accounting Office GAO May 2000 Report to the Chairman, Subcommittee on Defense, Committee on Appropriations, House of Representatives DEFENSE ACQUISITIONS Antiarmor Munitions Master Plan Does Not Identify Potential Excesses or Support Planned Procurements GAO/NSIAD-00-67 Contents Letter Appendixes Appendix I: Antiarmor Requirements Modeling Practices 3 16 20 21 22 24 Appendix...
Date April 26, 2000 Report No. T-NSIAD-00-137 Title

Defense Acquisition: Employing Best Practices Can Shape Better Weapon System Decisions

United States General Accounting Office GAO For Release on Delivery Expected at 10:00 a.m. EST Wednesday, April 26, 2000 Testimony Before the Subcommittee on Readiness and Management Support, Committee on Armed Services, U.S. Senate DEFENSE ACQUISITION Employing Best Practices Can Shape Better Weapon System Decisions Statement of David M. Walker, Comptroller General of the United States GAO/T-NSIA...