Date |
Report No. |
Title |
Date Sept. 15, 2011 |
Report No. GAO-11-942T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 10:00 a.m. EDT Thursday, September 15, 2011 Testimony Before the Committee on Small Business and Entrepreneurship, U.S. Senate DISASTER RECOVERY Federal Contracting in the Aftermath of Hurricanes Katrina and Rita
Statement of William T. Woods, Director Acquisition and Sourcing Management GAO-11-942T Chair Landri... |
Date Sept. 15, 2011 |
Report No. GAO-11-844T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 10:00 a.m. EDT Thursday, September 15, 2011 Testimony Before the Subcommittee on Contracting and Workforce, Committee on Small Business, House of Representatives SMALL BUSINESS CONTRACTING Opportunities to Improve the Effectiveness of Agency and SBA Advocates and Mentor-Protégé Programs
Statement of William B.... |
Date June 16, 2011 |
Report No. GAO-11-558T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 10:00 a.m. EDT Thursday, June 16, 2011 Testimony Before the Committee on Small Business and Entrepreneurship, U.S. Senate SMALL BUSINESS PROGRAMS Efforts to Address Internal Control Weaknesses and Potential Duplication
Statement of William B. Shear, Director Financial Markets and Community Investment GAO-11-558T... |
Date June 3, 2011 |
Report No. GAO-11-418 |
Title
United States Government Accountability Office GAO
June 2011 Report to the Chair, Committee on Small Business and Entrepreneurship, U.S. Senate SMALL BUSINESS CONTRACTING Action Needed by Those Agencies Whose Advocates Do Not Report to Agency Heads as Required GAO-11-418 June 2011 SMALL BUSINESS CONTRACTING
Accountability • Integrity • Reliability Action Needed by Those Agencies Whose Advocate... |
Date June 3, 2011 |
Report No. GAO-11-436SP |
Title
|
Date May 25, 2011 |
Report No. GAO-11-68 |
Title
United States Government Accountability Office GAO
May 2011 Report to Congressional Requesters SECURE BORDER INITIATIVE Controls over Contractor Payments for the Technology Component Need Improvement GAO-11-68 May 2011
Accountability • Integrity • Reliability SECURE BORDER INITIATIVE
Controls over Contractor Payments for the Technology Component Need Improvement Highlights of GAO-11-68, a repo... |
Date April 7, 2011 |
Report No. GAO-11-543T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 1:30 p.m. EDT Thursday, April 7, 2011 Testimony
Before the Subcommittee on Technology, Information Policy, Intergovernmental Relations and Procurement Reform, Committee on Oversight and Government Reform, House of Representatives INDIAN ISSUES Observations on Some Unique Factors that May Affect Economic Activity... |
Date July 29, 2010 |
Report No. GAO-10-723 |
Title
United States Government Accountability Office GAO
July 2010 Report to the Committee on Small Business and Entrepreneurship, U.S. Senate HURRICANES KATRINA AND RITA Federally Funded Programs Have Helped to Address the Needs of Gulf Coast Small Businesses, but Agency Data on Subcontracting Are Incomplete GAO-10-723 July 2010 HURRICANES KATRINA AND RITA Highlights
Highlights of GAO-10-723, a report ... |
Date Dec. 16, 2009 |
Report No. GAO-10-306T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 10:00 a.m. EST Wednesday, December 16, 2009 Testimony Before the Subcommittee on Oversight and Investigations, Committee on Veterans’ Affairs, House of Representatives SERVICE-DISABLED VETERAN-OWNED SMALL BUSINESS PROGRAM Case Studies Show Fraud and Abuse Allowed Ineligible Firms to Obtain Millions of Dollars ... |
Date Nov. 19, 2009 |
Report No. GAO-10-255T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 10:00 a.m. EST Thursday, November 19, 2009 Testimony Before the Committee on Small Business, House of Representative SERVICE-DISABLED VETERAN-OWNED SMALL BUSINESS PROGRAM Case Studies Show Fraud and Abuse Allowed Ineligible Firms to Obtain Millions of Dollars in Contracts
Statement of Gregory D. Kutz, Managing D... |
Date Oct. 23, 2009 |
Report No. GAO-10-108 |
Title
United States Government Accountability Office GAO
October 2009 Report to the Chairwoman, Committee on Small Business, House of Representatives SERVICE-DISABLED VETERAN-OWNED SMALL BUSINESS PROGRAM Case Studies Show Fraud and Abuse Allowed Ineligible Firms to Obtain Millions of Dollars in Contracts GAO-10-108 October 2009 Highlights
Highlights of GAO-10-108, a report to the Chairwoman, Committee o... |
Date March 25, 2009 |
Report No. GAO-09-519T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 2:00 p.m. EDT Wednesday, March 25, 2009 Testimony Before the Committee on Small Business, House of Representatives HUBZONE PROGRAM Fraud and Abuse Identified in Four Metropolitan Areas
Statement of Gregory D. Kutz, Managing Director Forensic Audits and Special Investigations GAO-09-519T Madam Chairwoman and Memb... |
Date March 25, 2009 |
Report No. GAO-09-532T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 2:00 p.m. EDT Wednesday, March 25, 2009 Testimony Before the Committee on Small Business, House of Representatives SMALL BUSINESS ADMINISTRATION Status of Efforts to Address Previous Recommendations on the HUBZone Program
Statement of William B. Shear, Director Financial Markets and Community Investment GAO-09-5... |
Date Nov. 21, 2008 |
Report No. GAO-09-16 |
Title
United States Government Accountability Office GAO
November 2008 Report to Congressional Requesters SMALL BUSINESS ADMINISTRATION Agency Should Assess Resources Devoted to Contracting and Improve Several Processes in the 8(a) Program GAO-09-16 November 2008 SMALL BUSINESS ADMINISTRATION Highlights
Highlights of GAO-09-16, a report to congressional requesters Accountability Integrity Reliability Ag... |
Date July 17, 2008 |
Report No. GAO-08-975T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 10:00 a.m. EDT Thursday, July 17, 2008 Testimony Before the Committee on Small Business, House of Representatives SMALL BUSINESS ADMINISTRATION
Additional Actions Are Needed to Certify and Monitor HUBZone Businesses and Assess Program Results
Statement of William B. Shear, Director Financial Markets and Communit... |
Date June 17, 2008 |
Report No. GAO-08-643 |
Title
United States Government Accountability Office GAO
June 2008 Report to the Chairwoman, Committee on Small Business, House of Representatives SMALL BUSINESS ADMINISTRATION Additional Actions Are Needed to Certify and Monitor HUBZone Businesses and Assess Program Results GAO-08-643 June 2008 SMALL BUSINESS ADMINISTRATION Highlights
Highlights of GAO-08-643, a report to the Chairwoman, Committee on S... |
Date Feb. 27, 2008 |
Report No. GAO-08-515T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 10 a.m. EST Wednesday, February 27, 2008 Testimony Before the Subcommittee on Government Management, Organization, and Procurement, Committee on Oversight and Government Reform, House of Representatives FEDERAL ACQUISITION Oversight Plan Needed to Help Implement Acquisition Advisory Panel’s Recommendations
Sta... |
Date Dec. 20, 2007 |
Report No. GAO-08-160 |
Title
United States Government Accountability Office GAO
December 2007 Report to the Committee on Oversight and Government Reform, House of Representatives FEDERAL ACQUISITION Oversight Plan Needed to Help Implement Acquisition Advisory Panel Recommendations GAO-08-160 December 2007 FEDERAL ACQUISITION Highlights
Highlights of GAO-08-160, a report to the Committee on Oversight and Government Reform, Hou... |
Date July 12, 2007 |
Report No. GAO-07-877 |
Title
United States Government Accountability Office GAO
July 2007 Report to Congressional Requesters FEDERAL ADVERTISING Established Programs Were Largely Used to Address Executive Order Directive to Ensure Small and Minority-Owned Business Participation GAO-07-877 July 2007 FEDERAL ADVERTISING Highlights
Highlights of GAO-07-877, a report to congressional requesters Accountability Integrity Reliabilit... |
Date April 12, 2007 |
Report No. GAO-07-698T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 2:00 p.m. CDT Thursday, April 12, 2007 Testimony Before the Committee on Small Business, House of Representatives HURRICANE KATRINA Agency Contracting Data Should Be More Complete Regarding Subcontracting Opportunities for Small Businesses
Statement of William B. Shear, Director, Financial Markets and Community ... |
Date March 1, 2007 |
Report No. GAO-07-205 |
Title
United States Government Accountability Office GAO
March 2007 Report to Congressional Addressees HURRICANE KATRINA Agency Contracting Data Should Be More Complete Regarding Subcontracting Opportunities for Small Businesses GAO-07-205 March 2007 HURRICANE KATRINA Highlights
Highlights of GAO-07-205, a report to congressional addressees Accountability Integrity Reliability Agency Contracting Data Sh... |
Date June 21, 2006 |
Report No. GAO-06-874T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 1:00 p.m. EDT Wednesday, June 21, 2006 Testimony before the Committees on Government Reform and Small Business, House of Representatives ALASKA NATIVE CORPORATIONS Increased Use of Special 8(a) Provisions Calls for Tailored Oversight
Statement of David E. Cooper, Director Acquisition and Sourcing Management GAO-... |
Date June 14, 2006 |
Report No. GAO-06-791R |
Title
United States Government Accountability Office Washington, DC 20548 June 14, 2006 Congressional Committees Subject: Commerce Information Technology Solutions Next Generation Governmentwide Acquisition Contract Concerns have been raised about the fairness of the “bid down” approach of the Department of Commerce’s Information Technology Solutions Next Generation (COMMITS NexGen) contract. In r... |
Date April 27, 2006 |
Report No. GAO-06-399 |
Title
United States Government Accountability Office GAO
April 2006 Report to Congressional Requesters CONTRACT MANAGEMENT Increased Use of Alaska Native Corporations’ Special 8(a) Provisions Calls for Tailored Oversight GAO-06-399 April 2006 CONTRACT MANAGEMENT Highlights
Highlights of GAO-06-399, a report to congressional requesters Accountability Integrity Reliability Increased Use of Alaska Native... |
Date May 27, 2004 |
Report No. GAO-04-454 |
Title
United States General Accounting Office GAO
May 2004 Report to the Chairman and Ranking Minority Member, Committee on Small Business, House of Representatives CONTRACT MANAGEMENT Impact of Strategy to Mitigate Effects of Contract Bundling on Small Business Is Uncertain GAO-04-454 a May 2004 CONTRACT MANAGEMENT Impact of Strategy to Mitigate Effects of Contract Bundling Strategy on Small Business I... |
Date May 7, 2003 |
Report No. GAO-03-776R |
Title
United States General Accounting Office Washington, DC 20548 May 7, 2003 The Honorable Olympia J. Snowe Chair, Committee on Small Business and Entrepreneurship United States Senate Subject: Reporting of Small Business Contract Awards Does Not Reflect Current Business Size Dear Madam Chair: We have prepared this report in response to your concerns about whether large companies are receiving federal... |
Date May 7, 2003 |
Report No. GAO-03-704T |
Title
United States General Accounting Office GAO
For Release on Delivery Expected at 2:00 p.m. EDT Wednesday, May 7, 2003 Testimony Before the Committee on Small Business, House of Representatives CONTRACT MANAGEMENT Reporting of Small Business Contract Awards Does Not Reflect Current Business Size
Statement of David E. Cooper Director Acquisition and Sourcing Management GAO-03-704T May 7, 2003 CONTRAC... |
Date March 18, 2003 |
Report No. GAO-03-559T |
Title
United States General Accounting Office GAO
For Release on Delivery Expected at 9:30 a.m. EST Tuesday, March 18, 2003 Testimony Before the Senate Committee on Small Business and Entrepreneurship SMALL BUSINESS CONTRACTING Concerns About the Administration’s Plan to Address Contract Bundling Issues
Statement of David E. Cooper Director Acquisition and Sourcing Management GAO-03-559T Madam Chair a... |
Date Dec. 19, 2002 |
Report No. GAO-03-311R |
Title
United States General Accounting Office Washington, DC 20548 December 20, 2002 The Honorable Christopher S. Bond Ranking Minority Member Committee on Small Business and Entrepreneurship United States Senate Subject: Waivers of the Small Business Administration’s Nonmanufacturer Rule Have Limited Effect Dear Senator Bond: Under section 8(a) of the Small Business Act, the Small Business Administra... |
Date Oct. 26, 2001 |
Report No. GAO-02-57 |
Title
United States General Accounting Office GAO
October 2001 Report to the Ranking Minority Member, Committee on Small Business and Entrepreneurship, U.S. Senate SMALL BUSINESS HUBZone Program Suffers From Reporting and Implementation Difficulties GAO-02-57 United States General Accounting Office Washington, DC 20548 October 26, 2001 The Honorable Christopher S. Bond Ranking Minority Member Committee ... |
Date Aug. 1, 2001 |
Report No. GAO-01-551 |
Title
United States General Accounting Office GAO
August 2001 Report to the Ranking Member, Committee on Small Business and Entrepreneurship, U.S. Senate SMALL BUSINESS More Transparency Needed in Prime Contract Goal Program GAO-01-551 Contents Letter
Results in Brief Background Small Business Goal-Setting Process Has Changed SBA’s Rationale for Exclusions Is Not Clearly Defined Exclusions Represent A... |
Date Feb. 16, 2001 |
Report No. GAO-01-346 |
Title
United States General Accounting Office GAO
February 2001 Report to Congressional Committees FEDERAL PROCUREMENT Trends and Challenges in Contracting With Women-Owned Small Businesses GAO-01-346 Contents Letter Appendixes
Appendix I: Objectives, Scope, and Methodology 3 48 Appendix II: Federal Agencies’ Goals and Percentages of Contracts Annually Awarded to Women-Owned Small Businesses Appendix ... |
Date Jan. 18, 2001 |
Report No. GAO-01-119 |
Title
United States General Accounting Office GAO
January 2001 Report to Congressional Requesters SMALL BUSINESS Trends in Federal Procurement in the 1990s GAO-01-119 Contents Letter Appendixes
Appendix I: Descriptions Of Contract Vehicles 3 26 28 30 32 Appendix II: Objectives, Scope, and Methodology Appendix III: Comments From SBA Appendix IV: GAO Contacts and Staff Acknowledgements Figures Figure 1: K... |
Date July 20, 2000 |
Report No. RCED-00-196 |
Title
United States General Accounting Office GAO
July 2000 Report to the Chairman, Committee on Small Business, U.S. Senate SMALL BUSINESS SBA Could Better Focus Its 8(a) Program to Help Firms Obtain Contracts GAO/RCED-00-196 Contents Letter Appendixes
Appendix I: Objectives, Scope, and Methodology 3 26 33 44 Appendix II: GAO’s Survey of 8(a) Firms Appendix III: Comments From the Small Business Admin... |
Date April 17, 2000 |
Report No. GGD-00-102R |
Title
United States General Accounting Office Washington, D.C. 20548 General Government Division B-285075 April 17, 2000 The Honorable John D. Dingell Ranking Minority Member Committee on Commerce House of Representatives The Honorable Carolyn Cheeks Kilpatrick House of Representatives The Honorable Robert Menendez House of Representatives Subject: Federal Advertising Contracts: Distribution to Small Di... |
Date May 13, 1999 |
Report No. GGD-99-89R |
Title
GAO United States General Accounting Office Washington, D.C. 20548 General Government Division B-281295 May 13, 1999 The Honorable Spencer Bachus Chairman, Subcommittee on Domestic and International Monetary Policy The Honorable Peter King Chairman, Subcommittee on General Oversight and Investigations House Committee on Banking and Financial Services House of Representatives Subject: Small Busines... |
Date Dec. 13, 1995 |
Report No. T-OSI-96-1 |
Title
United States General Accounting
I Offhze Testimony
Before the Committee on Small Business,Houseof Representatives For Release on Delivery Expected at 9:30 a.m.,EST Wednesday December13,1995 SMALL BUSINESS ADMINISTIZATION CaseStudies Illustrate S(a) Program and Contractor Abuse
Statementof Donald J. Wheeler, Acting Director Office of Special Investigations GAO/T-OSI-96-l Madam Chair and Members of... |
Date Sept. 7, 1995 |
Report No. OSI-95-15 |
Title
United States General Accounting Office GAO
September 1995 Report to the Ranking Minority Member, Permanent Subcommittee on Investigations, Committee on Governmental Affairs, U.S. Senate SMALL BUSINESS ADMINISTRATION 8(a) Is Vulnerable to Program and Contractor Abuse GAO/OSI-95-15 GAO United States General Accounting Office Washington, D.C. 20548 Office of Special Investigations B-261485 September... |
Date June 26, 1995 |
Report No. RCED-95-173FS |
Title
United States General Accounting Office GAO
June 1995 Fact Sheet for Congressional Committees SMALL BUSINESS Construction Firms’ Access to Surety Bonds GAO/RCED-95-173FS GAO United States General Accounting Office Washington, D.C. 20548 Resources, Community, and Economic Development Division B-261207 June 26, 1995 The Honorable Christopher S. Bond Chairman The Honorable Dale Bumpers Ranking Mino... |
Date June 26, 1995 |
Report No. RCED-95-173S |
Title
United States General Accounting Offke GAO
June 1995 Supplement to .Fact Sheet for
Congressional Comdttees Access to Surety Bonds Foreword Federal law currently requires contractors to provide assurance-in the form of a surety bond-that federal construction contracts will be completed and that the contractors’ employees and suppliers will be paid. Most state and local governments and some privat... |
Date April 14, 1995 |
Report No. RCED-95-137 |
Title
United States General Accounting Office GAO
April 1995 Report to the Honorable Kweisi Mfume, House of Representatives SMALL BUSINESS Information on Eight Small and Disadvantaged Business Utilization Offices GAO/RCED-95-137 GAO United States General Accounting Office Washington, D.C. 20548 Resources, Community, and Economic Development Division B-258025 April 14, 1995 The Honorable Kweisi Mfume Hou... |
Date March 6, 1995 |
Report No. T-RCED-95-122 |
Title
United States General Accounting Office GAO Testimony
Before the Committee on Small Business, House of Representatives For Release on Delivery Expected at 2 p.m. EST LMonday March 6, 1995 SMALL BUSINESS Statusof SBA’ 8(a) Minority s BusinessDevelopment Program
Statementof hdy England-Joseph, Director Housing and Community Development Issues, Resources,Community, and Economic Development Division... |
Date Aug. 17, 1994 |
Report No. RCED-94-168 |
Title
Resources, Community, and Economic Development Division B-247934 August 17,1994 The Honorable Max S. Baucus Chairman The HonorabIe John H. Chafee Ranking Minority Member Committee on Environment and Public Works United States Senate The Honorable Norman Y. Mineta Chairman The Honorable Bud Shuster Ranking Minority Member Committee on Public Works and Transportation House of Representatives In res... |
Date Feb. 23, 1994 |
Report No. RCED-94-28 |
Title
lars il ,. 1 United States General Accounting Office Washington, D.C. 20548 Resources, Community, Economic Development B-254247 February 23, 1994 The Honorable Jimmy Hayes Chairman, Subcommittee on Investigations and Oversight Committee on Science, Space, and Technology House of Representatives Dear Mr. Chairman: As of April 1992, the Department of Energy (DOE) had an estimated $1 billion worth of... |
Date Sept. 22, 1993 |
Report No. T-RCED-93-56 |
Title
United States General Accounting Offke i44’ iGg * I’ \ Testimony
Before the Committee on Small Business House of Representatives For Release Delivery on Expectedat 10 a.m.,EDT Wednesday September 22,1!393 SMALL BUSINESS The Small Business Administration’ Progress ’ s in Restructuring Its Business Development Program
Statement of Jacquelyn Williams-Bridgers, Associate Director, Housing and ... |
Date Aug. 24, 1993 |
Report No. NSIAD-93-255R |
Title
\I
/ .e r4w33
United States General Accounting OfIke Washington, D.C. 20548 National Security and International Affairs Division * 1 GAO B-254228 August 24, 1993 The Honorable Sam Nunn Chairman, Committee on Armed Services United States Senate The Honorable Dale L. Bumpers Chairman, Committee on Small Business United States Senate The Honorable Ronald V. Dellums Chairman, Committee on Armed Servic... |
Date Oct. 6, 1992 |
Report No. RCED-93-36R |
Title
GAO UnitedStatee General Accounting Office Washington, D.C. 20548 Resources, Community, and Economic Development Division B-249703 October 6, 1992 The Honorable James H. Bilbray House of Representatives Dear Mr. Bilbray: In July 1991, you wrote us about congressional hearings held last year in Las Vegas, Nevada, that raised concerns about how well the Small Business Administration (SBA) was perfor... |
Date Sept. 1, 1992 |
Report No. RCED-92-148 |
Title
United States General Accounting Office --e-p GAO
September 1992 Report to Congressional Requesters HIGHWAY CONTRACTING Disadvantaged Business Eligibility Guidance and Oversight Are Ineffective RESTRICTED--Not
General Accounting to be released outside the
Office unless approved by the Office of Congression Relations. 5ssa5 GAO/WED-92-148 GAO United States General Accounting OflIce Washington, D.C.... |
Date Aug. 3, 1992 |
Report No. RCED-92-239BR |
Title
IJrritctcI StaLes (kneral
__l-..-.--ll”-_-l-..___-ll------”-. .-..1--~ -.-.I.~~ Accountinrt .I Office
- GAO
Angnst, l!M2 Eriefing Report to the Chairman, Committee on Small Business, U.S. St.!nate I WATER RESOURCES The Corps of Engineers’ Dredging Program for Small Business Firms . ,._, . ~ RESTRICTED--Not to be released outside General Accounting Office unless approved by the Office of Rela... |
Date July 28, 1992 |
Report No. RCED-92-185 |
Title
SMALL BUSINESS Efforts to Provide Federal Procurement Dollars to Women-Owned Businesses 111 Ill llllIlllll
147442 RESTRICTED--Not to be released outside the General Accounting Office unless specifically approved by the Office of CtiJgi7: * - c. . =-ml!! Relations. 55 49-E ^. ..__ .--.-.- . -..- ..___.. _.._ - ._-I I .._ _.__. -.- ...- --_-..-- ._.-^. ____. -- GAO United State8 General Accounting O... |