Menu Search Account

LegiStorm

Get LegiStorm App Visit Product Demo Website
» Get LegiStorm App
» Get LegiStorm Pro Free Demo

GAO Reports by subject "Electric power generation"

Full-text search of 51,965 reports from the Government Accountability Office
From To
Reset

Search Results:

Date Report No. Title
Date Oct. 29, 2010 Report No. GAO-11-35 Title

Energy-Water Nexus: A Better and Coordinated Understanding of Water Resources Could Help Mitigate the Impacts of Potential Oil Shale Development

United States Government Accountability Office GAO October 2010 Report to Congressional Requesters ENERGY-WATER NEXUS A Better and Coordinated Understanding of Water Resources Could Help Mitigate the Impacts of Potential Oil Shale Development GAO-11-35 October 2010 ENERGY-WATER NEXUS Accountability • Integrity • Reliability A Better and Coordinated Understanding of Water Resources Could Help M...
Date Oct. 23, 2009 Report No. GAO-10-147 Title

Defense Critical Infrastructure: Actions Needed to Improve the Identification and Management of Electrical Power Risks and Vulnerabilities to DOD Critical Assets

United States Government Accountability Office GAO October 2009 Report to Congressional Committees DEFENSE CRITICAL INFRASTRUCTURE Actions Needed to Improve the Identification and Management of Electrical Power Risks and Vulnerabilities to DOD Critical Assets GAO-10-147 Contents Letter Results in Brief Background DOD’s Most Critical Assets Are Vulnerable to Electrical Power Disruptions, but DOD ...
Date Oct. 16, 2009 Report No. GAO-10-23 Title

Energy-Water Nexus: Improvements to Federal Water Use Data Would Increase Understanding of Trends in Power Plant Water Use

United States Government Accountability Office GAO October 2009 Report to the Chairman, Committee on Science and Technology, House of Representatives ENERGY-WATER NEXUS Improvements to Federal Water Use Data Would Increase Understanding of Trends in Power Plant Water Use GAO-10-23 October 2009 ENERGY-WATER NEXUS Highlights Highlights of GAO-10-23, a report to the Chairman, Committee on Science and...
Date June 30, 2009 Report No. GAO-09-653 Title

Defense Infrastructure: Planning Challenges Could Increase Risks for DOD in Providing Utility Services When Needed to Support the Military Buildup on Guam

United States Government Accountability Office GAO June 2009 Report to Congressional Requesters DEFENSE INFRASTRUCTURE Planning Challenges Could Increase Risks for DOD in Providing Utility Services When Needed to Support the Military Buildup on Guam GAO-09-653 June 2009 DEFENSE INFRASTRUCTURE Highlights Highlights of GAO-09-653, a report to congressional requesters Accountability Integrity Reliabi...
Date March 3, 2009 Report No. GAO-09-388T Title

Defense Management: Increased Attention on Fuel Demand Management at DOD's Forward-Deployed Locations Could Reduce Operational Risks and Costs

United States Government Accountability Office GAO For Release on Delivery Expected at 1:00 p.m. EST Tuesday, March 3, 2009 Testimony Before the Subcommittee on Readiness, Committee on Armed Services, House of Representatives DEFENSE MANAGEMENT Increased Attention on Fuel Demand Management at DOD’s Forward-Deployed Locations Could Reduce Operational Risks and Costs Statement of William M. Solis,...
Date Feb. 20, 2009 Report No. GAO-09-300 Title

Defense Management: DOD Needs to Increase Attention on Fuel Demand Management at Forward-Deployed Locations

United States Government Accountability Office GAO February 2009 Report to the Subcommittee on Readiness, Committee on Armed Services, House of Representatives DEFENSE MANAGEMENT DOD Needs to Increase Attention on Fuel Demand Management at Forward-Deployed Locations GAO-09-300 a February 2009 DEFENSE MANAGEMENT Highlights Highlights of GAO-09-300, a report to the Subcommittee on Readiness, Committ...
Date Sept. 22, 2008 Report No. GAO-08-987 Title

Electricity Restructuring: FERC Could Take Additional Steps to Analyze Regional Transmission Organizations' Benefits and Performance

United States Government Accountability Office GAO September 2008 Report to the Committee on Homeland Security and Governmental Affairs, U.S. Senate ELECTRICITY RESTRUCTURING FERC Could Take Additional Steps to Analyze Regional Transmission Organizations’ Benefits and Performance GAO-08-987 September 2008 ELECTRICITY RESTRUCTURING Highlights Highlights of GAO-08-987, a report to the Committee on...
Date May 1, 2008 Report No. GAO-08-601R Title

Energy: Economic and Other Implications of Switching from Coal to Natural Gas at the Capitol Power Plant and at Electricity-Generating Units Nationwide

United States Government Accountability Office Washington, DC 20548 May 1, 2008 The Honorable Mary L. Landrieu Chair The Honorable Lamar Alexander Ranking Member Subcommittee on Legislative Branch Committee on Appropriations United States Senate The Honorable Debbie Wasserman Schultz Chair The Honorable Tom Latham Ranking Member Subcommittee on Legislative Branch Committee on Appropriations House ...
Date Feb. 1, 2008 Report No. GAO-08-347R Title

Transmission Lines: Issues Associated with High-Voltage Direct-Current Transmission Lines along Transportation Rights of Way

United States Government Accountability Office Washington, DC 20548 February 1, 2008 Congressional Addressees Subject: Transmission Lines: Issues Associated with High-Voltage Direct-Current Transmission Lines along Transportation Rights of Way Electricity is central to the national economy and the daily lives of many Americans, powering homes, businesses, and industries. Today, an extensive system...
Date May 15, 2007 Report No. GAO-07-677 Title

Rebuilding Iraq: Integrated Strategic Plan Needed to Help Restore Iraq's Oil and Electricity Sectors

United States Government Accountability Office GAO May 2007 Report to Congressional Committees REBUILDING IRAQ Integrated Strategic Plan Needed to Help Restore Iraq’s Oil and Electricity Sectors On June 22, 2007, the Web version of this report was reissued to reflect changes to enemy-initiated attack data provided by the Defense Intelligence Agency. On June 13, 2007, DIA notified GAO that its Ap...
Date Sept. 20, 2006 Report No. GAO-06-1110T Title

Nuclear Energy: DOE's Next Generation Nuclear Plant Project Is at an Early Stage of Development

United States Government Accountability Office GAO For Release on Delivery Expected at 1:00 p.m. EDT Wednesday, September 20, 2006 Testimony Before the Subcommittee on Energy and Resources, Committee on Government Reform, House of Representatives NUCLEAR ENERGY DOE’s Next Generation Nuclear Plant Project Is at an Early Stage of Development Statement of Jim Wells, Director Natural Resources and E...
Date Sept. 20, 2006 Report No. GAO-06-1056 Title

Nuclear Energy: Status of DOE's Effort to Develop the Next Generation Nuclear Plant

United States Government Accountability Office GAO September 2006 Report to the Chairman, Subcommittee on Energy and Resources, Committee on Government Reform, House of Representatives NUCLEAR ENERGY Status of DOE’s Effort to Develop the Next Generation Nuclear Plant GAO-06-1056 September 2006 NUCLEAR ENERGY Highlights Highlights of GAO-06-1056, a report to the Chairman, Subcommittee on Energy a...
Date Aug. 31, 2006 Report No. GAO-06-810 Title

Tennessee Valley Authority: Plans to Reduce Debt While Meeting Demand for Power

United States Government Accountability Office GAO August 2006 Report to the Chairman, Subcommittee on Water Resources and Environment, Committee on Transportation and Infrastructure, House of Representatives TENNESSEE VALLEY AUTHORITY Plans to Reduce Debt While Meeting Demand for Power GAO-06-810 August 2006 TENNESSEE VALLEY AUTHORITY Highlights Highlights of GAO-06-810, a report to the Chairman,...
Date July 11, 2006 Report No. GAO-06-930T Title

Renewable Energy: Increased Geothermal Development Will Depend on Overcoming Many Challenges

United States Government Accountability Office GAO For Release on Delivery Expected at 2:30 p.m. EDT Tuesday, July 11, 2006 Testimony Before the Committee on Energy and Natural Resources, United States Senate RENEWABLE ENERGY Increased Geothermal Development Will Depend on Overcoming Many Challenges Statement of Jim Wells, Director Natural Resources and Environment GAO-06-930T July 11, 2006 RENEWA...
Date May 24, 2006 Report No. GAO-06-629 Title

Renewable Energy: Increased Geothermal Development Will Depend on Overcoming Many Challenges

United States Government Accountability Office GAO May 2006 Report to the Ranking Minority Member, Committee on Energy and Natural Resources, U.S. Senate RENEWABLE ENERGY Increased Geothermal Development Will Depend on Overcoming Many Challenges GAO-06-629 a May 2006 RENEWABLE ENERGY Highlights Highlights of GAO-06-629, a report to the Ranking Minority Member, Committee on Energy and Natural Resou...
Date Nov. 15, 2005 Report No. GAO-06-237 Title

Electricity Restructuring: Key Challenges Remain

United States Government Accountability Office GAO November 2005 Report to the Chairman, Subcommittee on Energy and Resources, Committee on Government Reform, House of Representatives ELECTRICITY RESTRUCTURING Key Challenges Remain GAO-06-237 a November 2005 ELECTRICITY RESTRUCTURING Highlights Highlights of GAO-06-237, report to the Chairman, Subcommittee on Energy and Resources, Committee on Gov...
Date Sept. 16, 2005 Report No. GAO-05-906 Title

Wind Power: Impacts on Wildlife and Government Responsibilities for Regulating Development and Protecting Wildlife

United States Government Accountability Office GAO September 2005 Report to Congressional Requesters WIND POWER Impacts on Wildlife and Government Responsibilities for Regulating Development and Protecting Wildlife GAO-05-906 a September 2005 WIND POWER Highlights Highlights of GAO-05-906, a report to congressional requesters Accountability Integrity Reliability Impacts on Wildlife and Government ...
Date Sept. 7, 2005 Report No. GAO-05-872 Title

Rebuilding Iraq: U.S. Water and Sanitation Efforts Need Improved Measures for Assessing Impact and Sustained Resources for Maintaning Facilities

United States Government Accountability Office GAO September 2005 Report to Congressional Committees REBUILDING IRAQ U.S. Water and Sanitation Efforts Need Improved Measures for Assessing Impact and Sustained Resources for Maintaining Facilities GAO-05-872 September 2005 REBUILDING IRAQ Highlights Highlights of GAO-05-872, a report to Congressional Committees Accountability Integrity Reliability U...
Date March 16, 2005 Report No. GAO-05-414T Title

Meeting Energy Demand in the 21st Century: Many Challenges and Key Questions

United States Government Accountability Office GAO For Release on Delivery Expected at 2:00 p.m. EST Wednesday, March 16, 2005 Testimony Before the Subcommittee on Energy and Resources, Committee on Government Reform, House of Representatives MEETING ENERGY ST DEMAND IN THE 21 CENTURY Many Challenges and Key Questions Statement of Jim Wells, Director Natural Resources and Environment GAO-05-414T M...
Date Sept. 3, 2004 Report No. GAO-04-756 Title

Renewable Energy: Wind Power's Contribution to Electric Power Generation and Impact on Farms and Rural Communities

United States Government Accountability Office GAO September 2004 Report to the Ranking Democratic Member, Committee on Agriculture, Nutrition, and Forestry, U.S. Senate RENEWABLE ENERGY Wind Power’s Contribution to Electric Power Generation and Impact on Farms and Rural Communities GAO-04-756 a September 2004 RENEWABLE ENERGY Wind Power’s Contribution to Electric Power Generation and Impact o...
Date June 28, 2004 Report No. GAO-04-902R Title

Rebuilding Iraq: Resource, Security, Governance, Essential Services, and Oversight Issues

United States General Accounting Office GAO June 2004 Report to Congressional Committees REBUILDING IRAQ Resource, Security, Governance, Essential Services, and Oversight Issues GAO-04-902R a United States General Accounting Office Washington, DC 20548 June 28, 2004 The Honorable Richard G. Lugar Chairman The Honorable Joseph R. Biden Ranking Minority Member Committee on Foreign Relations United S...
Date Nov. 18, 2003 Report No. GAO-04-204 Title

Electricity Restructuring: 2003 Blackout Identifies Crisis and Opportunity for the Electricity Sector

United States General Accounting Office GAO November 2003 Report to the Chairman, Senate Committee on Governmental Affairs ELECTRICITY RESTRUCTURING 2003 Blackout Identifies Crisis and Opportunity for the Electricity Sector GAO-04-204 Contents Letter Summary 1 1 Appendix I 2003 Blackout Identifies Crisis and Opportunity for the Electricity Sector 5 This is a work of the U.S. government and is not ...
Date Oct. 30, 2002 Report No. GAO-03-49 Title

Air Pollution: Meeting Future Electricity Demand Will Increase Emission of Some Harmful Substances

United States General Accounting Office GAO October 2002 Report to Congressional Requesters AIR POLLUTION Meeting Future Electricity Demand Will Increase Emissions of Some Harmful Substances GAO-03-49 October 2002 AIR POLLUTION Meeting Future Electricity Demand Will Increase Emissions of Some Harmful Substances Highlights of GAO-03-49, a report to the Chairmen of the Senate Committee on Environmen...
Date June 12, 2002 Report No. GAO-02-709 Title

Air Pollution: Emissions from Older Electricity Generating Units

United States General Accounting Office GAO June 2002 Report to Congressional Committees AIR POLLUTION Emissions from Older Electricity Generating Units GAO-02-709 Contents Letter Results in Brief Background Units that Began Operation before 1972 Emitted More Sulfur Dioxide and Nitrogen Oxides per Unit of Electricity Produced than Newer Units Emissions from Older Units Were Often Higher than the E...
Date Aug. 2, 2001 Report No. GAO-01-1019T Title

Energy Markets: Results of FERC Outage Study and Other Market Power Studies

United States General Accounting Office GAO Testimony Before the Subcommittee on Energy Policy, Natural Resources and Regulatory Affairs, Committee on Government Reform, House of Representatives For Release on Delivery Expected at 2:00 p.m. Thursday, August 2, 2001 ENERGY MARKETS Results of FERC Outage Study and Other Market Power Studies Statement of Jim Wells, Director Natural Resources and Envi...
Date June 29, 2001 Report No. GAO-01-865R Title

California Electricity Market Options for 2001: Military Generation and Private Backup Possibilities

United States General Accounting Office Washington, DC 20548 June 29, 2001 Congressional Requesters Subject: California Electricity Market Options for 2001: Military Generation and Private Backup Possibilities Since May of 2000, California’s restructured electricity market has experienced rapidly rising prices and uncertain reliability. These problems led to widespread disruptions in service (re...
Date May 25, 2001 Report No. GAO-01-790T Title

Air Pollution: Air Quality and Respiratory Problems in and Near the Great Smoky Mountains

United States General Accounting Office GAO Testimony Before the Subcommittee on Legislative, Committee on Appropriations, House of Representatives For Release on Delivery Expected at 2:00 p.m., Friday, May 25, 2001 AIR POLLUTION Air Quality and Respiratory Problems in and Near the Great Smoky Mountains Statement of David M. Walker Comptroller General of the United States GAO-01-790T Mr. Chairman ...
Date May 25, 2001 Report No. GAO-01-658 Title

Air Pollution: Air Quality and Respiratory Problems in and Near the Great Smoky Mountains

United States General Accounting Office GAO May 2001 Briefing Report to Congressional Committees AIR POLLUTION Air Quality and Respiratory Problems in and Near the Great Smoky Mountains GAO-01-658 Contents Letter Briefing Section I Overview 1 10 Briefing Section II Visibility 12 Briefing Section III Ozone 18 Briefing Section IV Respiratory Illnesses 24 Briefing Section V TVA’s Emissions 34 Appen...
Date May 2, 2001 Report No. GAO-01-499 Title

Licensing Hydropower Projects: Better Time and Cost Data Needed to Reach Informed Decisions About Process Reforms

United States General Accounting Office GAO May 2001 Report to Congressional Requesters LICENSING HYDROPOWER PROJECTS Better Time and Cost Data Needed to Reach Informed Decisions About Process Reforms GAO-01-499 Contents Letter Appendix I FERC’s Traditional Licensing Process 1 19 Appendix II FERC’s Alternative Licensing Process 20 Appendix III Objectives, Scope, and Methodology 21 Appendix IV ...
Date Feb. 8, 2001 Report No. GAO-01-373 Title

Federal Power: The Evolution of Preference in Marketing Federal Power

United States General Accounting Office GAO February 2001 Report to the Chairman, Committee on Resources, House of Representatives FEDERAL POWER The Evolution of Preference in Marketing Federal Power GAO-01-373 United States General Accounting Office Washington, D.C. 20548 Lr e t e February 8, 2001 The Honorable James V. Hansen Chairman, Committee on Resources House of Representatives Dear Mr. Cha...
Date April 21, 2000 Report No. RCED-00-127 Title

Federal Power: The Evolution of Preference in Marketing Federal Power

Date March 30, 2000 Report No. AIMD-00-114 Title

Power Marketing Administrations: Their Ratesetting Practices Compared With Those of Nonfederal Utilities

United States General Accounting Office GAO March 2000 Report to the Chairman, Subcommittee on Water and Power, Committee on Resources, House of Representatives POWER MARKETING ADMINISTRATIONS Their Ratesetting Practices Compared With Those of Nonfederal Utilities GAO/AIMD-00-114 Contents Letter Appendixes Appendix I: Objectives, Scope, and Methodology Appendix II: Comments From Southeastern, Sout...
Date Nov. 19, 1999 Report No. AIMD-00-47R Title

Tennessee Valley Authority: Response to Questions From September 22, 1999, Hearing

·-' AGAO B-284074 Accountability * Integrity *Relability United States General Accounting Office Washington, DC 20548 Accounting and Information Management Division November 19, 1999 The Honorable Sherwood L. Boehlert Chairman, Subcommittee on Water Resources and Environment Committee on Transportation and Infrastructure House of Representatives Subject: Tennessee ValleyAuthority: Response to Que...
Date Oct. 27, 1999 Report No. T-RCED-00-20 Title

Nuclear Nonproliferation: Heavy Fuel Oil Delivered to North Korea Under the Agreed Framework

United States General Accounting Office GAO For Release on Delivery Expected at 10 a.m. EDT Wednesday October 27, 1999 Testimony Before the Committee on International Relations, House of Representatives NUCLEAR NONPROLIFERATION Heavy Fuel Oil Delivered to North Korea Under the Agreed Framework Statement of Ms. Gary L. Jones, Associate Director, Resources, Community, and Economic Development Divisi...
Date June 24, 1999 Report No. T-RCED/AIMD-99-229 Title

Federal Power: The Role of the Power Marketing Administrations in a Restructured Electricity Industry

United States General Accounting Office GAO For Release on Delivery Expected at 2 p.m. EDT Thursday June 24, 1999 Testimony Before the Subcommittee on Water and Power, Committee on Resources, House of Representatives FEDERAL POWER The Role of the Power Marketing Administrations in a Restructured Electricity Industry Statement of Victor S. Rezendes, Director, Energy, Resources, and Science Issues, ...
Date May 17, 1999 Report No. RCED-99-154 Title

Tennessee Valley Authority: Future Study of Lake Levels Should Involve Public and Consider Costs and Benefits

United States General Accounting Office GAO May 1999 Report to the Honorable Van Hilleary, House of Representatives TENNESSEE VALLEY AUTHORITY Future Study of Lake Levels Should Involve Public and Consider Costs and Benefits GAO/RCED-99-154 GAO United States General Accounting Office Washington, D.C. 20548 Resources, Community, and Economic Development Division B-282488 May 17, 1999 The Honorable ...
Date May 14, 1999 Report No. RCED-99-130 Title

Renewable Energy: DOE's Funding and Markets for Wind Energy and Solar Cell Technologies

United States General Accounting Office GAO May 1999 Report to Congressional Requesters RENEWABLE ENERGY DOE’s Funding and Markets for Wind Energy and Solar Cell Technologies GAO/RCED-99-130 GAO United States General Accounting Office Washington, D.C. 20548 Resources, Community, and Economic Development Division B-282303 May 14, 1999 The Honorable John R. Kasich Chairman, Committee on the Budget...
Date April 30, 1999 Report No. AIMD-99-142 Title

Tennessee Valley Authority: Assessment of the 10-Year Business Plan

United States General Accounting Office GAO April 1999 Report to Congressional Requesters TENNESSEE VALLEY AUTHORITY Assessment of the 10-Year Business Plan GAO/AIMD-99-142 GAO United States General Accounting Office Washington, D.C. 20548 Accounting and Information Management Division B-281916 Le er t Letter April 30, 1999 The Honorable Bob Franks The Honorable Marty Meehan The Honorable Zach Wam...
Date April 6, 1999 Report No. AIMD-99-114 Title

Year 2000 Computing Crisis: Readiness of the Electric Power Industry

United States General Accounting Office GAO April 1999 Report to the Committee on the Year 2000 Technology Problem, U.S. Senate YEAR 2000 COMPUTING CRISIS Readiness of the Electric Power Industry GAO/AIMD-99-114 GAO United States General Accounting Office Washington, D.C. 20548 Accounting and Information Management Division B-280845 Le er t Letter April 6, 1999 The Honorable Robert F. Bennett Chai...
Date March 30, 1999 Report No. RCED-99-63 Title

Federal Power: Implications of Reduced Maintenance and Repairs of Federal Hydropower Plants

United States General Accounting Office GAO March 1999 Report to the Chairman, Subcommittee on Water and Power, Committee on Resources, House of Representatives FEDERAL POWER Implications of Reduced Maintenance and Repairs of Federal Hydropower Plants GAO/RCED-99-63 GAO United States General Accounting Office Washington, D.C. 20548 Resources, Community, and Economic Development Division B-282016 M...
Date Jan. 28, 1999 Report No. RCED-99-55 Title

Federal Power: PMA Rate Impacts, by Service Area

United States General Accounting Office GAO January 1999 Report to Congressional Requesters FEDERAL POWER PMA Rate Impacts, by Service Area GAO/RCED-99-55 GAO United States General Accounting Office Washington, D.C. 20548 Resources, Community, and Economic Development Division B-281758 January 28, 1999 The Honorable John T. Doolittle Chairman, Subcommittee on Water and Power Committee on Resources...
Date Nov. 16, 1998 Report No. RCED-99-15 Title

Federal Power: Regional Effects of Changes in PMAs' Rates

United States General Accounting Office GAO November 1998 Report to Congressional Requesters FEDERAL POWER Regional Effects of Changes in PMAs’ Rates GAO/RCED-99-15 GAO United States General Accounting Office Washington, D.C. 20548 Resources, Community, and Economic Development Division B-281133 November 16, 1998 The Honorable Don Young Chairman, Committee on Resources House of Representatives T...
Date June 30, 1998 Report No. AIMD-98-164 Title

Power Marketing Administrations: Repayment of Power Costs Needs Closer Monitoring

United States General Accounting Office GAO June 1998 Report to Congressional Requesters POWER MARKETING ADMINISTRATIONS Repayment of Power Costs Needs Closer Monitoring GAO/AIMD-98-164 GAO United States General Accounting Office Washington, D.C. 20548 Accounting and Information Management Division B-279016 June 30, 1998 The Honorable John R. Kasich Chairman Committee on the Budget House of Repres...
Date March 31, 1998 Report No. RCED-98-133R Title

Tennessee Valley Authority: Information on Nonpower Programs

{G T 9General AO United States Accounting Office Washington, D.C. 20548 Resources, Community, and Economic Development Division i ~-' B-279514 March 31, 1998 The Honorable Fred Thompson United States Senate The Honorable Bill Frist United States Senate Subject: Tennessee Valley Authority: Information on Nonpower Programs As agreed with your offices, we are providing you with information on the Ten...
Date March 30, 1998 Report No. T-AIMD-98-123 Title

Rural Utilities Service: Risk Assessment for the Electric Loan Portfolio

United States General Accounting Office GAO For Release on Delivery Expected at 10 a.m. Monday, March 30, 1998 Testimony Before the Subcommittee on Government Management, Information and Technology Committee on Government Reform and Oversight House of Representatives RURAL UTILITIES SERVICE Risk Assessment for the Electric Loan Portfolio Statement of Linda M. Calbom Director, Resources, Community,...
Date March 6, 1998 Report No. RCED-98-43 Title

Federal Power: Options for Selected Power Marketing Administrations' Role in a Changing Electricity Industry

United States General Accounting Office GAO March 1998 Report to Congressional Requesters FEDERAL POWER Options for Selected Power Marketing Administrations’ Role in a Changing Electricity Industry GAO/RCED-98-43 GAO United States General Accounting Office Washington, D.C. 20548 Resources, Community, and Economic Development Division B-278620 March 6, 1998 The Honorable Don Young Chairman, Commi...
Date April 9, 1997 Report No. RCED-97-107R Title

Energy Policy: DOE's Policy, Programs, and Issues Related to Electricity Conservation

,i .. i,. GAO United States General Accounting Office Washington, D.C. 20548 Resources, Community, Economic Development and Division ES-276443 April 9, 1997 The Honorable John R. Kasich Chairman, Committee on the Budget House of Representatives Subject: Energv Policv: DOE’ Policv. Programs, and Issues Related to s Electricitv Conservation Dear Mr. Chairman: As requested, we are providing you wit...
Date Oct. 16, 1996 Report No. GGD-97-17R Title

Government Operations: Capitol Hill Lighting Retrofit

GAO United States General Accounting Office Washington, D.C. 20548 General Government Division B-275026 October 16, 1996 The Honorable William L. Ensign, FAIA Acting Architect of the Capitol Dear Mr. Ensign: Your September 3, 1996, letter requested our opinion of the methodology you propose to use to identify energy savings achieved under the “Shared Energy Lighting Retrofit Performance Contract...
Date Aug. 30, 1996 Report No. RCED-96-226 Title

Northwest Power Planning Council: Greater Public Oversight of Business Operations Would Enhance Accountability

United States General Accounting Office GAO August 1996 Report to Congressional Requesters NORTHWEST POWER PLANNING COUNCIL Greater Public Oversight of Business Operations Would Enhance Accountability G A O years 1921 - 1996 GAO/RCED-96-226 GAO United States General Accounting Office Washington, D.C. 20548 Resources, Community, and Economic Development Division B-272741 August 30, 1996 The Honorab...
Date July 25, 1996 Report No. T-RCED-96-180 Title

Federal Power: Outages Reduce the Reliability of Hydroelectric Power Plants in the Southeast

United States General Accounting Office GAO For Release on Delivery Expected at 2:00 p.m., EDT, Thursday, July 25, 1996 Testimony Before the Subcommittee on Water and Power Resources, Committee on Resources, House of Representatives FEDERAL POWER Outages Reduce the Reliability of Hydroelectric Power Plants in the Southeast Statement of Victor S. Rezendes, Director, Energy, Resources, and Science I...