Date |
Report No. |
Title |
Date June 18, 2010 |
Report No. GAO-10-621 |
Title
United States Government Accountability Office GAO
June 2010 Report to Congressional Requesters LOW-INCOME HOME ENERGY ASSISTANCE PROGRAM Greater Fraud Prevention Controls Are Needed GAO-10-621 June 2010 Highlights
Highlights of GAO-10-621, a report to congressional requesters Accountability Integrity Reliability LOW-INCOME HOME ENERGY ASSISTANCE PROGRAM
Greater Fraud Prevention Controls Are Neede... |
Date June 17, 2010 |
Report No. GAO-10-840T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 10:00 a.m. EST Thursday, June 17, 2010 Testimony Before the Subcommittees on Management, Investigations, and Oversight; and Border, Maritime, and Global Counterterrorism; Committee on Homeland Security, House of Representatives SECURE BORDER INITIATIVE DHS Needs to Follow Through on Plans to Reassess and Better ... |
Date June 11, 2010 |
Report No. GAO-10-657 |
Title
United States Government Accountability Office GAO
June 2010 Report to Congressional Committees ELECTRONIC RECORDS ARCHIVE Status Update on the National Archives and Records Administration’s Fiscal Year 2010 Expenditure Plan GAO-10-657 June 2010 ELECTRONIC RECORDS ARCHIVE Highlights
Highlights of GAO-10-657, a report to congressional committees Accountability Integrity Reliability Status Update ... |
Date June 9, 2010 |
Report No. GAO-10-822T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 1:00 p.m. EDT Wednesday, June 9, 2010 Testimony Before the Subcommittee on Oversight and Investigations, Committee on Armed Services, House of Representatives NATIONAL SECURITY Key Challenges and Solutions to Strengthen Interagency Collaboration
Statement of John H. Pendleton, Director, Defense Capabilities and ... |
Date May 6, 2010 |
Report No. GAO-10-414 |
Title
United States Government Accountability Office GAO
May 2010 Report to Congressional Requesters AVIATION SAFETY Improved Data Quality and Analysis Capabilities Are Needed as FAA Plans a Risk-Based Approach to Safety Oversight GAO-10-414 May 2010 AVIATION SAFETY Highlights
Highlights of GAO-10-414, a report to congressional requesters. Accountability Integrity Reliability Improved Data Quality and A... |
Date May 5, 2010 |
Report No. GAO-10-340 |
Title
United States Government Accountability Office GAO
May 2010 Report to Congressional Requesters SECURE BORDER INITIATIVE DHS Needs to Reconsider Its Proposed Investment in Key Technology Program GAO-10-340 May 2010 SECURE BORDER INITIATIVE Highlights
Highlights of GAO-10-340, a report to congressional requesters Accountability Integrity Reliability DHS Needs to Reconsider Its Proposed Investment in... |
Date April 23, 2010 |
Report No. GAO-10-324 |
Title
United States Government Accountability Office GAO
April 2010 Report to Congressional Requesters 2010 CENSUS Plans for Census Coverage Measurement Are on Track, but Additional Steps Will Improve Its Usefulness GAO-10-324 April 2010 2010 CENSUS Highlights
Highlights of GAO-10-324, a report to congressional requesters. Accountability Integrity Reliability Plans for Census Coverage Measurement Are on... |
Date April 22, 2010 |
Report No. GAO-10-439 |
Title
United States Government Accountability Office GAO
April 2010 Report to Congressional Requesters BEST PRACTICES DOD Can Achieve Better Outcomes by Standardizing the Way Manufacturing Risks Are Managed GAO-10-439 April 2010 BEST PRACTICES Highlights
Highlights of GAO-10-439, a report to congressional requesters Accountability Integrity Reliability DOD Can Achieve Better Outcomes by Standardizing th... |
Date April 15, 2010 |
Report No. GAO-10-603T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 2:00 p.m. EDT Thursday, April 15, 2010 Testimony Before the Subcommittee on Airland, Committee on Armed Services, U.S. Senate DEFENSE ACQUISITIONS Opportunities and Challenges for Army Ground Force Modernization Efforts
Statement of Michael J. Sullivan, Director Acquisition and Sourcing Management GAO-10-603T Ap... |
Date March 31, 2010 |
Report No. GAO-10-295 |
Title
United States Government Accountability Office GAO
March 2010 Report to Congressional Requesters END-STAGE RENAL DISEASE CMS Should Monitor Access to and Quality of Dialysis Care Promptly after Implementation of New Bundled Payment System GAO-10-295 March 2010 END-STAGE RENAL DISEASE Highlights
Highlights of GAO-10-295, a report to congressional requesters Accountability Integrity Reliability CMS ... |
Date March 26, 2010 |
Report No. GAO-10-517R |
Title
United States Government Accountability Office Washington, DC 20548 March 26, 2010 The Honorable Van Zeck Commissioner Bureau of the Public Debt Subject: Bureau of the Public Debt: Areas for Improvement in Information Security Controls Dear Mr. Zeck: In connection with fulfilling our requirement to audit the financial statements of the U.S. government, 1 we audited and reported on the Schedules of... |
Date March 26, 2010 |
Report No. GAO-10-331 |
Title
United States Government Accountability Office GAO
March 2010 Report to the Subcommittee on Air and Land Forces, Committee on Armed Services, House of Representatives UNMANNED AIRCRAFT SYSTEMS Comprehensive Planning and a Results-Oriented Training Strategy Are Needed to Support Growing Inventories GAO-10-331 March 2010 UNMANNED AIRCRAFT SYSTEMS Highlights
Highlights of GAO-10-331, a report to the ... |
Date March 24, 2010 |
Report No. GAO-10-478T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 2:00 p.m. EDT Wednesday, March 24, 2010 Testimony Before the Subcommittees on Air and Land Forces and Seapower and Expeditionary Forces, Committee on Armed Services, House of Representatives JOINT STRIKE FIGHTER Significant Challenges and Decisions Ahead
Statement of Michael Sullivan, Director Acquisition and So... |
Date March 19, 2010 |
Report No. GAO-10-382 |
Title
United States Government Accountability Office GAO
March 2010 Congressional Committees JOINT STRIKE FIGHTER Additional Costs and Delays Risk Not Meeting Warfighter Requirements on Time GAO-10-382 March 2009 JOINT STRIKE FIGHTER Highlights
Highlights of GAO-10-382, a report to congressional committees Accountability Integrity Reliability Additional Costs and Delays Risk Not Meeting Warfighter Requi... |
Date March 18, 2010 |
Report No. GAO-10-511T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 10:00 a.m. EDT, Thursday, March 18, 2010 Testimony Before the Committee on Homeland Security's Subcommittees on Management, Investigations, and Oversight; and Border, Maritime, and Global Counterterrorism SECURE BORDER INITIATIVE Testing and Problem Resolution Challenges Put Delivery of Technology Program at Ris... |
Date March 15, 2010 |
Report No. GAO-10-406 |
Title
United States Government Accountability Office GAO
March 2010 Report to the Subcommittee on Air and Land Forces, Committee on Armed Services, House of Representatives DEFENSE ACQUISITIONS Opportunities Exist to Position Army’s Ground Force Modernization Efforts for Success GAO-10-406 March 2010 DEFENSE ACQUISITIONS Highlights
Highlights of GAO-10-406, a report to the Subcommittee on Air and Land... |
Date March 11, 2010 |
Report No. GAO-10-520T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 10:00 a.m. EST Thursday, March 11, 2010 Testimony Before the Committee on Armed Services, U.S. Senate JOINT STRIKE FIGHTER Significant Challenges Remain as DOD Restructures Program
Statement of Michael Sullivan, Director Acquisition and Sourcing Management GAO-10-520T Mr. Chairman and Members of the Committee: T... |
Date Feb. 25, 2010 |
Report No. GAO-10-311 |
Title
United States Government Accountability Office GAO
February 2010 Report to Congressional Committees DEFENSE ACQUISITIONS Missile Defense Transition Provides Opportunity to Strengthen Acquisition Approach GAO-10-311 February 2010 DEFENSE ACQUISITIONS Highlights
Highlights of GAO-10-311, a report to congressional committees Accountability Integrity Reliability Missile Defense Transition Provides Opp... |
Date Feb. 23, 2010 |
Report No. GAO-10-430T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 2:30 p.m. EST Tuesday, February 23, 2010 Testimony before the Subcommittee on Federal Financial Management, Government Information, Federal Services and International Security, Committee on Homeland Security and Governmental Affairs, U.S. Senate 2010 CENSUS Key Enumeration Activities Are Moving Forward, but Info... |
Date Feb. 5, 2010 |
Report No. GAO-10-248 |
Title
United States Government Accountability Office GAO
February 2010 Report to Congressional Committees HIGHWAY RESEARCH The Second Strategic Highway Research Program Addresses the Four Required Areas, but Some Anticipated Research Was Not Funded GAO-10-248 February 2010 HIGHWAY RESEARCH Highlights
Highlights of GAO-10-248, a report to congressional committees Accountability Integrity Reliability The ... |
Date Jan. 29, 2010 |
Report No. GAO-10-158 |
Title
United States Government Accountability Office GAO
January 2010 Report to Congressional Requesters SECURE BORDER INITIATIVE DHS Needs to Address Testing and Performance Limitations That Place Key Technology Program at Risk GAO-10-158 January 2010 SECURE BORDER INITIATIVE Highlights
Highlights of GAO-10-158, a report to congressional requesters Accountability Integrity Reliability DHS Needs to Addr... |
Date Jan. 14, 2010 |
Report No. GAO-10-315R |
Title
United States Government Accountability Office Washington, DC 20548 January 14, 2010 The Honorable John Murtha Chairman Subcommittee on Defense Committee on Appropriations House of Representatives Subject: Briefing on Commercial and Department of Defense Space System Requirements and Acquisition Practices Dear Mr. Chairman: The Department of Defense (DOD) has had long-standing difficulties develop... |
Date Nov. 13, 2009 |
Report No. GAO-10-59 |
Title
United States Government Accountability Office GAO
November 2009 Report to Congressional Requesters 2010 CENSUS Census Bureau Has Made Progress on Schedule and Operational Control Tools, but Needs to Prioritize Remaining System Requirements GAO-10-59 November 2009 2010 CENSUS Highlights
Highlights of GAO-10-59, a report to congressional requesters Accountability Integrity Reliability Census Bureau... |
Date Oct. 29, 2009 |
Report No. GAO-10-55 |
Title
United States Government Accountability Office GAO
October 2009 Report to the Chairman, Subcommittee on Defense, Committee on Appropriations, House of Representatives DEFENSE ACQUISITIONS Challenges in Aligning Space System Components GAO-10-55 October 2009 DEFENSE ACQUISITIONS Highlights
Highlights of GAO-10-55, a report to the Chairman, Subcommittee on Defense, Committee on Appropriations, House... |
Date Oct. 28, 2009 |
Report No. GAO-10-188T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 2:00 p.m. EDT October 28, 2009 Testimony Before the Subcommittee on Aviation, Committee on Transportation and Infrastructure, House of Representatives NEXT GENERATION AIR TRANSPORTATION SYSTEM FAA Faces Challenges in Responding to Task Force Recommendations
Statement of Gerald L. Dillingham, Ph.D. Director, Phys... |
Date Oct. 28, 2009 |
Report No. GAO-10-102 |
Title
United States Government Accountability Office GAO
October 2009 Report to Congressional Committees HUMAN CAPITAL Monitoring of Safeguards and Addressing Employee Perceptions Are Key to Implementing a Civilian Performance Management System in DOD GAO-10-102 October 2009 HUMAN CAPITAL Highlights
Highlights of GAO-10-102, a report to congressional committees Accountability Integrity Reliability Monit... |
Date Oct. 1, 2009 |
Report No. GAO-10-105T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 10:00 a.m. EDT Thursday, October 1, 2009 Testimony Before the Subcommittee on Emergency Communications, Preparedness, and Response, Committee on Homeland Security, House of Representatives EMERGENCY MANAGEMENT Preliminary Observations on FEMA’s Community Preparedness Programs Related to the National Preparedne... |
Date Sept. 25, 2009 |
Report No. GAO-09-518 |
Title
United States Government Accountability Office GAO
September 2009 Report to the Subcommittee on Readiness and Management Support, Committee on Armed Services, U.S. Senate MILITARY READINESS DOD Needs to Strengthen Management and Oversight of the Defense Readiness Reporting System GAO-09-518 September 2009 MILITARY READINESS Highlights
Highlights of GAO-09-518, a report to the Subcommittee on Readi... |
Date Sept. 15, 2009 |
Report No. GAO-09-1002T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 9:30 a.m. EDT Tuesday, September 15, 2009 Testimony Before the Subcommittee on Government Management, Organization, and Procurement, House Committee on Oversight and Government Reform HOMELAND SECURITY Despite Progress, DHS Continues to Be Challenged in Managing Its Multi-Billion Dollar Annual Investment in Larg... |
Date Sept. 8, 2009 |
Report No. GAO-09-888 |
Title
United States Government Accountability Office GAO
September 2009 Report to Congressional Requesters INFORMATION TECHNOLOGY DOD Needs to Strengthen Management of Its Statutorily Mandated Software and System Process Improvement Efforts GAO-09-888 September 2009 INFORMATION TECHNOLOGY Highlights
Highlights of GAO-09-888, a report to congressional requesters Accountability Integrity Reliability DOD N... |
Date Aug. 26, 2009 |
Report No. GAO-09-844 |
Title
United States Government Accountability Office GAO
August 2009 Report to the Chairman, Committee on Science and Technology, House of Representatives NASA Constellation Program Cost and Schedule Will Remain Uncertain Until a Sound Business Case Is Established GAO-09-844 August 2009 NASA Highlights
Highlights of GAO-09-844, a report to the Chairman, Committee on Science and Technology, House of Repr... |
Date Aug. 10, 2009 |
Report No. GAO-09-635 |
Title
United States Government Accountability Office GAO
August 2009 Report to Congressional Committees UNITED STATES MERCHANT MARINE ACADEMY Internal Control Weaknesses Resulted in Improper Sources and Uses of Funds; Some Corrective Actions Are Under Way GAO-09-635 August 2009 Highlights
Highlights of GAO-09-635, a report to congressional committees Accountability Integrity Reliability UNITED STATES ME... |
Date July 28, 2009 |
Report No. GAO-09-768R |
Title
United States Government Accountability Office Washington, DC 20548 July 28, 2009 Congressional Committees Subject: Warfighter Support: Information on Army and Marine Corps Ground Combat Helmet Pads Combat soldiers operate in diverse environments and face injury threats that place demands on the protective equipment systems they use to provide consistent protection throughout a range of temperatur... |
Date June 30, 2009 |
Report No. GAO-09-577 |
Title
United States Government Accountability Office GAO
June 2009 Report to Congressional Requesters DEFENSE TRAVEL SYSTEM Implementation Challenges Remain GAO-09-577 June 2009 DEFENSE TRAVEL SYSTEM Highlights
Highlights of GAO-09-577, a report to congressional requesters Accountability Integrity Reliability Implementation Challenges Remain Why GAO Did This Study
In 1995, the Department of Defense (DOD... |
Date June 25, 2009 |
Report No. GAO-09-840 |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 1:00 p.m. EDT Thursday, June 25, 2009 Statement before the National Security Personnel System Task Group, Defense Business Board HUMAN CAPITAL Continued Monitoring of Internal Safeguards and an Action Plan to Address Employee Concerns Could Improve Implementation of the National Security Personnel System
Stateme... |
Date June 16, 2009 |
Report No. GAO-09-618 |
Title
United States Government Accountability Office GAO
June 2009 Report to Congressional Addressees NASA Commercial Partners Are Making Progress, but Face Aggressive Schedules to Demonstrate Critical Space Station Cargo Transport Capabilities GAO-09-618 June 2009 NASA Highlights
Highlights of GAO-09-618, a report to congressional addressees Accountability Integrity Reliability Commercial Partners Are ... |
Date June 16, 2009 |
Report No. GAO-09-793T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 2:30 p.m. EDT Tuesday, June 16, 2009 Testimony Before the Subcommittee on Airland, Committee on Armed Services, U.S. Senate DEFENSE ACQUISITIONS Issues to be Considered for Army’s Modernization of Combat Systems
Statement of Paul L. Francis, Managing Director Acquisition and Sourcing Management GAO-09-793T Jun... |
Date June 1, 2009 |
Report No. GAO-09-355 |
Title
United States Government Accountability Office GAO
June 2009 Report to Congressional Committees PRIVACY AND SECURITY Food and Drug Administration Faces Challenges in Establishing Protections for Its Postmarket Risk Analysis System GAO-09-355 June 2009 PRIVACY AND SECURITY Highlights
Highlights of GAO-09-355, a report to congressional committees Accountability Integrity Reliability Food and Drug Ad... |
Date May 20, 2009 |
Report No. GAO-09-718R |
Title
United States Government Accountability Office Washington, DC 20548 May 20, 2009 The Honorable Jerry Costello Chairman The Honorable Thomas E. Petri Ranking Member Subcommittee on Aviation Committee on Transportation and Infrastructure House of Representatives Subject: Responses to Questions for the Record: March 18, 2009, Hearing on ATC Modernization: Near-Term Achievable Goals This letter respon... |
Date May 20, 2009 |
Report No. GAO-09-711T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 2::30 p.m. EDT Wednesday, May 20, 2009 Testimony Before the Subcommittee on Air and Land Forces, Committee on Armed Services, House of Representatives JOINT STRIKE FIGHTER Strong Risk Management Essential as Program Enters Most Challenging Phase
Statement of Michael Sullivan, Director Acquisition and Sourcing Ma... |
Date May 13, 2009 |
Report No. GAO-09-322 |
Title
United States Government Accountability Office GAO
May 2009 Report to Congressional Committees BEST PRACTICES High Levels of Knowledge at Key Points Differentiate Commercial Shipbuilding from Navy Shipbuilding GAO-09-322 May 2009 BEST PRACTICES Highlights
Highlights of GAO-09-322, a report to congressional committees Accountability Integrity Reliability High Levels of Knowledge at Key Points Diffe... |
Date May 13, 2009 |
Report No. GAO-09-292 |
Title
United States Government Accountability Office GAO
May 2009 Report to Congressional Committees AVIATION SECURITY TSA Has Completed Key Activities Associated with Implementing Secure Flight, but Additional Actions Are Needed to Mitigate Risks GAO-09-292 May 2009 AVIATION SECURITY Highlights
Highlights of GAO-09-292, a report to congressional committees Accountability Integrity Reliability TSA Has C... |
Date May 7, 2009 |
Report No. GAO-09-613T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 2:30 p.m. EDT Thursday, May 7, 2009 Testimony Before the Subcommittee on Securities, Insurance, and Investment, Senate Committee on Banking, Housing, and Urban Affairs SECURITIES AND EXCHANGE COMMISSION Greater Attention Is Needed to Enhance Communication and Utilization of Resources in the Division of Enforceme... |
Date May 7, 2009 |
Report No. GAO-09-670T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 10:00 a.m. EDT Thursday, May 7, 2009 Testimony Before the Subcommittee on National Security and Foreign Affairs, Committee on Oversight and Government Reform, House of Representatives GLOBAL POSITIONING SYSTEM Significant Challenges in Sustaining and Upgrading Widely Used Capabilities
Statement of Cristina T. Ch... |
Date April 30, 2009 |
Report No. GAO-09-663T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 10:00 a.m. EDT Thursday, April 30, 2009 Testimony Before the Committee on Armed Services, House of Representatives DEFENSE ACQUISITIONS Charting a Course for Lasting Reform
Statement of Paul Francis, Managing Director Acquisition and Sourcing Management GAO-09-663T April 30, 2009 DEFENSE ACQUISITIONS Highlights
... |
Date April 1, 2009 |
Report No. GAO-09-464T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 2:00 p.m. EDT Wednesday, April 1, 2009 Testimony Before the Subcommittee on Readiness, Committee on Armed Services, House of Representatives HUMAN CAPITAL Improved Implementation of Safeguards and an Action Plan to Address Employee Concerns Could Increase Employee Acceptance of the National Security Personnel Sy... |
Date April 1, 2009 |
Report No. GAO-09-543T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 7:30 a.m. EDT Wednesday April 1, 2009 Testimony Before the Panel on Defense Acquisition Reform, Committee on Armed Services, House of Representatives DEFENSE ACQUISITIONS Measuring the Value of DOD's Weapon Programs Requires Starting with Realistic Baselines
Statement of Michael J. Sullivan, Director Acquisition... |
Date March 26, 2009 |
Report No. GAO-09-410T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 2:00 p.m. EDT March 26, 2009 Testimony Before the Subcommittee on Air and Land Forces, Committee on Armed Services, House of Representatives DEFENSE ACQUISITIONS Key Considerations for Planning Future Army Combat Systems
Statement of Paul L. Francis, Director Acquisition and Sourcing Management GAO-09-410T March... |
Date March 25, 2009 |
Report No. GAO-09-481T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 9:45 a.m. EDT Wednesday, March 25, 2009 Testimony Before the Subcommittee on Aviation Operations, Safety, and Security, Committee on Commerce, Science, and Transportation, U.S. Senate NEXT GENERATION AIR TRANSPORTATION SYSTEM Issues Associated with Midterm Implementation of Capabilities and Full System Transform... |
Date March 18, 2009 |
Report No. GAO-09-501T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 10:00 a.m. EDT Wednesday, March 18, 2000 Testimony Before the Committee on the Budget, House of Representatives DEFENSE ACQUISITIONS DOD Must Prioritize Its Weapon System Acquisitions and Balance Them with Available Resources
Statement of Statement of Michael J. Sullivan, Director Acquisition and Sourcing Manage... |