Date |
Report No. |
Title |
Date Nov. 8, 2011 |
Report No. GAO-12-96 |
Title
United States Government Accountability Office GAO
November 2011 Report to Congressional Committees FEDERAL BUREAU OF INVESTIGATION Actions Needed to Document Security Decisions and Address Issues with Condition of Headquarters Buildings GAO-12-96 November 2011 FEDERAL BUREAU OF INVESTIGATION
Accountability • Integrity • Reliability Highlights of GAO-12-96, a report to congressional committees... |
Date Sept. 29, 2011 |
Report No. GAO-11-766 |
Title
United States Government Accountability Office GAO
September 2011 Report to Congressional Addressees WARFIGHTER SUPPORT Improved Cost Analysis and Better Oversight Needed over Army Nonstandard Equipment GAO-11-766 September 2011 WARFIGHTER SUPPORT
Improved Cost Analysis and Better Oversight Needed over Army Nonstandard Equipment
Highlights of GAO-11-766, a report to congressional addressees Why GA... |
Date Nov. 23, 2010 |
Report No. GAO-11-72 |
Title
United States Government Accountability Office GAO
November 2010 Report to Congressional Committees INFORMATION TECHNOLOGY HUD Needs to Better Define Commitments and Disclose Risks for Modernization Projects in Future Expenditure Plans GAO-11-72 November 2010 INFORMATION TECHNOLOGY
Accountability • Integrity • Reliability HUD Needs to Better Define Commitments and Disclose Risks for Modernizat... |
Date Sept. 24, 2010 |
Report No. GAO-10-946R |
Title
United States Government Accountability Office Washington, DC 20548 September 24, 2010 The Honorable Barbara A. Mikulski Chairwoman The Honorable Richard C. Shelby Ranking Member Subcommittee on Commerce, Justice, Science and Related Agencies Committee on Appropriations United States Senate Subject: U.S. Patent and Trademark Office: Performance Management Processes The Department of Commerce’s U... |
Date Sept. 14, 2010 |
Report No. GAO-10-905 |
Title
United States Government Accountability Office GAO
September 2010 Report to Congressional Requesters HOUSING AND COMMUNITY GRANTS HUD Needs to Enhance Its Requirements and Oversight of Jurisdictions’ Fair Housing Plans GAO-10-905 September 2010 HOUSING AND COMMUNITY GRANTS
Accountability • Integrity • Reliability HUD Needs to Enhance Its Requirements and Oversight of Jurisdictions’ Fair Ho... |
Date Sept. 9, 2010 |
Report No. GAO-10-843 |
Title
United States Government Accountability Office GAO
September 2010 Report to Congressional Requesters AVIATION WEATHER Agencies Need to Improve Performance Measurement and Fully Address Key Challenges GAO-10-843 September 2010 AVIATION WEATHER
Accountability • Integrity • Reliability Agencies Need to Improve Performance Measurement and Fully Address Key Challenges
Highlights of GAO-10-843, a re... |
Date July 29, 2010 |
Report No. GAO-10-679SP |
Title
Aviation Safety: Icing and Winter Weather-Related Recommendations That NTSB Has Issued Since 1996 (GAO-10-679SP), an E-supplement to (GAO-10-678)
Read the Full Report: Aviation Safety: Improved Planning Could Help FAA Address Challenges Related to Winter Weather Operations (GAO-10-678) Background Information Introduction Ice formation on aircraft can disrupt the smooth flow of air over the wings a... |
Date July 29, 2010 |
Report No. GAO-10-678 |
Title
United States Government Accountability Office GAO
July 2010 Report to Congressional Requesters AVIATION SAFETY Improved Planning Could Help FAA Address Challenges Related to Winter Weather Operations GAO-10-678 July 2010 AVIATION SAFETY Highlights
Highlights of GAO-10-678, a report to congressional requesters Accountability Integrity Reliability Improved Planning Could Help FAA Address Challenges... |
Date July 27, 2010 |
Report No. GAO-10-629 |
Title
United States Government Accountability Office GAO
July 2010 Report to Congressional Committees NEXTGEN AIR TRANSPORTATION SYSTEM FAA’s Metrics Can Be Used to Report on Status of Individual Programs, but Not of Overall NextGen Implementation or Outcomes GAO-10-629 July 2010 NEXTGEN AIR TRANSPORTATION SYSTEM Highlights
Highlights of GAO-10-629, a report to congressional committees Accountability ... |
Date July 16, 2010 |
Report No. GAO-10-720 |
Title
United States Government Accountability Office GAO
July 2010 Report to Congressional Committees MILITARY TRAINING Army and Marine Corps Face Challenges to Address Projected Future Requirements GAO-10-720 July 2010 MILITARY TRAINING Highlights
Highlights of GAO-10-720, a report to congressional committees Accountability Integrity Reliability Army and Marine Corps Face Challenges to Address Projecte... |
Date July 15, 2010 |
Report No. GAO-10-932T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 10:00 a.m. EDT Thursday, July 15, 2010 Testimony Before the Subcommittee on State, Foreign Operations, and Related Programs, Committee on Appropriations AFGHANISTAN DEVELOPMENT USAID Continues to Face Challenges in Managing and Overseeing U.S. Development Assistance Programs
Statement of Charles Michael Johnson ... |
Date July 14, 2010 |
Report No. GAO-10-368 |
Title
United States Government Accountability Office GAO
July 2010 Report to Congressional Addressees AFGHANISTAN DEVELOPMENT Enhancements to Performance Management and Evaluation Efforts Could Improve USAID’s Agricultural Programs GAO-10-368 a July 2010 AFGHANISTAN DEVELOPMENT Highlights
Highlights of GAO-10-368, a report to congressional addressees Accountability Integrity Reliability Enhancements t... |
Date July 14, 2010 |
Report No. GAO-10-756SP |
Title
Afghanistan Development: Poverty and Major Crop Production (GAO-10-756SP), an E-supplement to GAO-10-368 Read the Full Report: Afghanistan Development: Enhancements to Performance Management and Evaluation Efforts Could Improve USAID’s Agricultural Programs (GAO-10-368) Table of Contents Background Information ......................................................................................... |
Date June 30, 2010 |
Report No. GAO-10-588SP |
Title
United States Government Accountability Office GAO
June 2010 Report to Congressional Addressees DEPARTMENT OF HOMELAND SECURITY Assessments of Selected Complex Acquisitions GAO-10-588SP June 2010 DEPARTMENT OF HOMELAND SECURITY Highlights
Highlights of GAO-10-588SP, a report to congressional addressees Accountability Integrity Reliability Assessments of Selected Complex Acquisitions Why GAO Did Th... |
Date June 24, 2010 |
Report No. GAO-10-602 |
Title
United States Government Accountability Office GAO
June 2010 Report to the Subcommittee on Readiness, Committee on Armed Services, House of Representatives DEFENSE INFRASTRUCTURE Army Needs to Improve Its Facility Planning Systems to Better Support Installations Experiencing Significant Growth GAO-10-602 June 2010 DEFENSE INFRASTRUCTURE Highlights
Highlights of GAO-10-602, a report to the Subcommi... |
Date June 21, 2010 |
Report No. GAO-10-417 |
Title
United States Government Accountability Office GAO
June 2010 Report to Congressional Requesters FEDERAL COURTHOUSE CONSTRUCTION Better Planning, Oversight, and Courtroom Sharing Needed to Address Future Costs GAO-10-417 June 2010 FEDERAL COURTHOUSE CONSTRUCTION Highlights
Highlights of GAO-10-417, a report to congressional requesters Accountability Integrity Reliability Better Planning, Oversight,... |
Date June 10, 2010 |
Report No. GAO-10-677R |
Title
United States Government Accountability Office Washington, DC 20548 June 10, 2010 Congressional Requesters Subject: Selected Federal Agencies’ Policies for Choosing Conference Locations Press accounts in 2009 indicated that some federal agencies had issued directives to their staff discouraging them from choosing certain locations for conferences. This was because of the perception by some that ... |
Date May 25, 2010 |
Report No. GAO-10-753T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 10:00 a.m. EDT Tuesday, May 25, 2010 Testimony
Before the Subcommittee on Economic Development, Public Buildings, and Emergency Management, Committee on Transportation and Infrastructure, House of Representatives FEDERAL COURTHOUSE CONSTRUCTION Preliminary Results Show Better Planning, Oversight, and Courtroom S... |
Date April 30, 2010 |
Report No. GAO-10-461 |
Title
United States Government Accountability Office GAO
April 2010 Report to the Chairman, Subcommittee on Readiness, Committee on Armed Services, House of Representatives DEFENSE LOGISTICS Actions Needed to Improve Implementation of the Army Logistics Modernization Program GAO-10-461 April 2010 DEFENSE LOGISTICS Highlights
Highlights of GAO-10-461, a report to the Chairman, Subcommittee on Readiness, ... |
Date April 30, 2010 |
Report No. GAO-10-436 |
Title
United States Government Accountability Office GAO
April 2010 Report to the Subcommittee on Readiness, Committee on Armed Services, House of Representatives DEFENSE INFRASTRUCTURE DOD Needs to Determine and Use the Most Economical Building Materials and Methods When Acquiring New Permanent Facilities GAO-10-436 April 2010 DEFENSE INFRASTRUCTURE Highlights
Highlights of GAO-10-436, a report to the ... |
Date April 26, 2010 |
Report No. GAO-10-685 |
Title
Abril 2010 ACCESO AL IDIOMA Highlights
Resumen del GAO-10-91, informe enviado a los legisladores solicitantes Accountability Integrity Reliability Ciertos organismos pueden mejorar los servicios que prestan a las personas que tienen dominio insuficiente del ingles (DII) El Motivo de este Estudio
La Orden del Ejecutivo 13166 (11de agosto, 2000) instruye a cada organismo federal a mejorar el acceso ... |
Date April 26, 2010 |
Report No. GAO-10-91 |
Title
United States Government Accountability Office GAO
April 2010 Report to Congressional Requesters LANGUAGE ACCESS Selected Agencies Can Improve Services to Limited English Proficient Persons GAO-10-91 April 2010 LANGUAGE ACCESS Highlights
Highlights of GAO-10-91, a report to congressional requesters Accountability Integrity Reliability Selected Agencies Can Improve Services to Limited English Profi... |
Date April 23, 2010 |
Report No. GAO-10-324 |
Title
United States Government Accountability Office GAO
April 2010 Report to Congressional Requesters 2010 CENSUS Plans for Census Coverage Measurement Are on Track, but Additional Steps Will Improve Its Usefulness GAO-10-324 April 2010 2010 CENSUS Highlights
Highlights of GAO-10-324, a report to congressional requesters. Accountability Integrity Reliability Plans for Census Coverage Measurement Are on... |
Date Nov. 6, 2009 |
Report No. GAO-10-52 |
Title
United States Government Accountability Office GAO
November 2009 Report to Congressional Committees MILLENNIUM CHALLENGE CORPORATION MCC Has Addressed a Number of Implementation Challenges, but Needs to Improve Financial Controls and Infrastructure Planning GAO-10-52 November 2009 MILLENNIUM CHALLENGE CORPORATION Highlights
Highlights of GAO-10-52, a report to congressional committees Accountabili... |
Date July 15, 2009 |
Report No. GAO-09-801T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 10:00 a.m. EDT Wednesday, July 15, 2009 Testimony
Before the Subcommittee on Economic Development, Public Buildings, and Emergency Management, Committee on Transportation and Infrastructure, House of Representatives FEDERAL REAL PROPERTY An Update on High Risk Issues
Statement of Mark L. Goldstein, Director Phys... |
Date July 15, 2009 |
Report No. GAO-09-696 |
Title
United States Government Accountability Office GAO
July 2009 Report to Congressional Requesters U.S. POSTAL SERVICE Mail Delivery Efficiency Has Improved, but Additional Actions Needed to Achieve Further Gains GAO-09-696 July 2009 U.S. POSTAL SERVICE Highlights
Highlights of GAO-09-696, a report to congressional requesters Accountability Integrity Reliability Mail Delivery Efficiency Has Improved,... |
Date May 29, 2009 |
Report No. GAO-09-722R |
Title
United States Government Accountability Office Washington, DC 20548 May 29, 2009 Stephen R. Malphrus Staff Director for Management Board of Governors of the Federal Reserve System Subject: Federal Reserve Banks: Areas for Improvement in Information Security Controls Dear Mr. Malphrus: In connection with fulfilling our requirement to audit the financial statements of the U.S. government, 1 we audit... |
Date March 12, 2009 |
Report No. GAO-09-427T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 10:00 a.m. EDT Thursday, March 12, 2009 Testimony Before the Subcommittee on Military Construction, Veterans’ Affairs, and Related Agencies; House Committee on Appropriations INFORMATION TECHNOLOGY Challenges Remain for VA’s Sharing of Electronic Health Records with DOD
Statement of Valerie C. Melvin, Direct... |
Date March 25, 2008 |
Report No. GAO-08-422 |
Title
United States Government Accountability Office GAO
March 2008 Report to Congressional Requesters NATIVE HAWAIIAN EDUCATION ACT Greater Oversight Would Increase Accountability and Enable Targeting of Funds to Areas with Greatest Need GAO-08-422 March 2008 NATIVE HAWAIIAN EDUCATION ACT Highlights
Highlights of GAO-08-422, a report to congressional requesters Accountability Integrity Reliability Grea... |
Date Jan. 18, 2008 |
Report No. GAO-08-372 |
Title
United States Government Accountability Office GAO
January 2008 Report to the Committee on the Budget, U.S. Senate ENTITLEMENT REFORM PROCESS Other Countries’ Experiences Provide Useful Insights for the United States GAO-08-372 January 18, 2008 ENTITLEMENT REFORM PROCESS: Highlights
Highlights of GAO-08-372, a report to the Committee on the Budget, U.S. Senate Accountability Integrity Reliabilit... |
Date Jan. 17, 2007 |
Report No. GAO-07-234 |
Title
United States Government Accountability Office GAO
January 2007 Report to the Subcommittee on Oversight of Government Management, the Federal Workforce, and the District of Columbia, Committee on Homeland Security and Governmental Affairs, U.S. Senate DOD’S HIGH-RISK AREAS Progress Made Implementing Supply Chain Management Recommendations, but Full Extent of Improvement Unknown GAO-07-234 a Janu... |
Date Oct. 5, 2006 |
Report No. GAO-07-14 |
Title
United States Government Accountability Office GAO
October 2006 Report to Congressional Committees UNITED NATIONS Management Reforms Progressing Slowly with Many Awaiting General Assembly Review GAO-07-14 October 2006 UNITED NATIONS Highlights
Highlights of GAO-07-14, a report to congressional committees Accountability Integrity Reliability Management Reforms Progressing Slowly with Many Awaiting ... |
Date Nov. 9, 2005 |
Report No. GAO-06-234T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 2:00 p.m. EST Wednesday, November 9, 2005 Testimony Before the Subcommittee on Readiness and Management Support, Committee on Armed Services, U.S. Senate DEFENSE MANAGEMENT Foundational Steps Being Taken to Manage DOD Business Systems Modernization, but Much Remains to be Accomplished to Effect True Business Tra... |
Date Dec. 10, 2004 |
Report No. GAO-05-106 |
Title
United States Government Accountability Office GAO
December 2004 Report to the Chairman and Ranking Minority Member, Committee on Commerce, Science, and Transportation, U.S. Senate PORT SECURITY Better Planning Needed to Develop and Operate Maritime Worker Identification Card Program GAO-05-106 December 2004 PORT SECURITY Highlights
Highlights of GAO-05-106, a report to the Chairman and Ranking Mi... |
Date Oct. 4, 2004 |
Report No. GAO-05-45 |
Title
United States Government Accountability Office GAO
October 2004 Report to Congressional Committees MEDICARE Incomplete Plan to Transfer Appeals Workload from SSA to HHS Threatens Service to Appellants GAO-05-45 a October 2004 MEDICARE Highlights
Highlights of GAO-05-45, a report to the Senate Committee on Finance, the House Committee on Energy and Commerce, and the House Committee on Ways and Mean... |
Date Sept. 15, 2004 |
Report No. GAO-04-933 |
Title
United States Government Accountability Office GAO
September 2004 Report to the Chairman, Subcommittee on Interior and Related Agencies, Committee on Appropriations, House of Representatives KENNEDY CENTER More Information on Project Status and Budgets Needed to Understand the Impact of Future Funding Decisions GAO-04-933 a September 2004 KENNEDY CENTER More Information on Project Status and Budge... |
Date July 20, 2004 |
Report No. GAO-04-963T |
Title
United States General Accounting Office GAO
For Release on Delivery Expected at 10:00 a.m. EST Tuesday, July 20, 2004 Testimony Before the Subcommittee on National Security, Emerging Threats, and International Relations Committee on Government Reform, House of Representatives HOMELAND SECURITY Federal Leadership and Intergovernmental Cooperation Required to Achieve First Responder Interoperable Co... |
Date July 20, 2004 |
Report No. GAO-04-740 |
Title
United States Government Accountability Office GAO
July 2004 Report to Congressional Requesters HOMELAND SECURITY Federal Leadership and Intergovernmental Cooperation Required to Achieve First Responder Interoperable Communications GAO-04-740 July 2004 HOMELAND SECURITY Federal Leadership and Intergovernmental Cooperation Required to Achieve First Responder Interoperable Communications Highlights ... |
Date July 9, 2004 |
Report No. GAO-04-780 |
Title
United States General Accounting Office GAO
July 2004 Report to Congressional Requesters CRITICAL INFRASTRUCTURE PROTECTION Improving Information Sharing with Infrastructure Sectors GAO-04-780 a July 2004 CRITICAL INFRASTRUCTURE PROTECTION
Highlights of GAO-04-780, a report to congressional requesters Improving Information Sharing with Infrastructure Sectors Critical infrastructure protection (CIP... |
Date June 25, 2004 |
Report No. GAO-04-581 |
Title
United States General Accounting Office GAO
June 2004 Report to Congressional Requesters STUDENT MENTORING PROGRAMS Education’s Monitoring and Information Sharing Could Be Improved GAO-04-581 June 2004 STUDENT MENTORING PROGRAMS Education’s Monitoring and Information Sharing Could Be Improved Highlights of GAO-04-581, a report to congressional requesters As part of the No Child Left Behind Act... |
Date June 15, 2004 |
Report No. GAO-04-887T |
Title
United States General Accounting Office GAO
For Release on Delivery Expected at 10:30 a.m. EDT Tuesday, June 15, 2004 Testimony Before the Subcommittee on Aviation, House Committee on Transportation and Infrastructure FEDERAL AVIATION ADMINISTRATION Plan Still Needed to Meet Challenges to Effectively Managing Air Traffic Controller Workforce
Statement of JayEtta Z. Hecker, Director Physical Infras... |
Date May 4, 2004 |
Report No. GAO-04-548 |
Title
United States General Accounting Office GAO
May 2004 Report to the Ranking Minority Member, Subcommittee on Financial Management, the Budget, and International Security, Committee on Governmental Affairs, U.S. Senate DATA MINING Federal Efforts Cover a Wide Range of Uses GAO-04-548 a May 2004 DATA MINING Federal Efforts Cover a Wide Range of Uses Highlights of GAO-04-548, a report to the Ranking M... |
Date April 22, 2004 |
Report No. GAO-04-638T |
Title
United States General Accounting Office GAO
For Release on Delivery Expected at 10:00 a.m. EDT Thursday, April 22, 2004 Testimony Before the Committee on Government Reform, House of Representatives CONTINUITY OF OPERATIONS Improved Planning Needed to Ensure Delivery of Essential Services
Statement of Linda D. Koontz Director, Information Management Issues GAO-04-638T April 22, 2004 CONTINUITY OF O... |
Date Jan. 15, 2004 |
Report No. GAO-04-37 |
Title
United States General Accounting Office GAO
January 2004 Report to Congressional Requesters 2010 CENSUS Cost and Design Issues Need to Be Addressed Soon GAO-04-37 a January 2004 2010 CENSUS Cost and Design Issues Need to Be Addressed Soon Highlights of GAO-04-37, a report to congressional requesters The key to a successful census is meticulous planning as it helps ensure greater cost-effectiveness... |
Date Sept. 10, 2003 |
Report No. GAO-03-1141T |
Title
United States General Accounting Office GAO
For Release on Delivery Expected at 10:00 a.m. EDT Wednesday, September 10, 2003 Testimony
Before the Chairman, Subcommittee on Economic Development, Public Buildings, and Emergency Management, Committee on Transportation and Infrastructure, House of Representatives KENNEDY CENTER Improvements Needed to Strengthen the Construction Process
Statement of Ma... |
Date Sept. 5, 2003 |
Report No. GAO-03-823 |
Title
United States General Accounting Office GAO
September 2003 Report to the Subcommittee on Economic Development, Public Buildings, and Emergency Management, Committee on Transportation and Infrastructure, House of Representatives KENNEDY CENTER Improvements Needed to Strengthen the Management and Oversight of the Construction Process GAO-03-823 a September 2003 KENNEDY CENTER Improvements Needed to ... |
Date March 29, 2002 |
Report No. GAO-02-158 |
Title
United States General Accounting Office GAO
March 2002 Report to Congressional Requesters WILDLAND FIRE MANAGEMENT Improved Planning Will Help Agencies Better Identify Fire-Fighting Preparedness Needs GAO-02-158 Contents Letter
Results in Brief Background Agencies Have Not Effectively Determined Fire-Fighting Preparedness Needs Agencies Have Not Yet Obtained All of the Additional Fire-Fighting Per... |
Date July 14, 1997 |
Report No. GGD-97-142 |
Title
United States General Accounting Office GAO
July 1997 Report to the Ranking Minority Member, Committee on Governmental Affairs, U.S. Senate 2000 CENSUS Progress Made on Design, but Risks Remain GAO/GGD-97-142 GAO United States General Accounting Office Washington, D.C. 20548 General Government Division B-276531 July 14, 1997 The Honorable John Glenn Ranking Minority Member Committee on Governmenta... |
Date May 6, 1997 |
Report No. RCED-97-140R |
Title
United States General Accounting Office Washington, D.C. 20548 Resources, Community, Economic Development and Division B-276769 May 6, 1997 The Honorable Joe McDade Chairman The Honorable Vie Fazio Ranking Minority Member Subcommittee on Energy and Water Development Committee on Appropriations House of Representatives Subject: Denartment of Energv: Training Cost Data for Fiscal Years 1995 Through ... |
Date April 11, 1997 |
Report No. NSIAD-97-104 |
Title
United States General Accounting Office GAO
April 1997 Report to Congressional Requesters U.S. CURRENCY Treasury’s Plans to Study Genuine and Counterfeit U.S. Currency Abroad GAO/NSIAD-97-104 GAO United States General Accounting Office Washington, D.C. 20548 National Security and International Affairs Division B-276332 April 11, 1997 The Honorable Spencer Bachus The Honorable John M. Spratt, Jr.... |