Date |
Report No. |
Title |
Date Oct. 21, 2011 |
Report No. GAO-12-7 |
Title
United States Government Accountability Office GAO
October 2011 Report to Congressional Committees INFORMATION TECHNOLOGY Critical Factors Underlying Successful Major Acquisitions GAO-12-7 October 2011 INFORMATION TECHNOLOGY
Critical Factors Underlying Successful Major Acquisitions
Highlights of GAO-12-7, a report to congressional committees Why GAO Did This Study
Planned federal information techn... |
Date Sept. 20, 2011 |
Report No. GAO-11-845 |
Title
United States Government Accountability Office GAO
September 2011 Report to Congressional Committees MILITARY TRAINING Actions Needed to Assess Workforce Requirements and Appropriate Mix of Army Training Personnel GAO-11-845 September 2011 MILITARY TRAINING
Actions Needed to Assess Workforce Requirements and Appropriate Mix of Army Training Personnel
Highlights of GAO-11-845, a report to congressi... |
Date Sept. 20, 2011 |
Report No. GAO-11-751 |
Title
United States Government Accountability Office GAO
September 2011 Report to Congressional Requesters PERSONAL ID VERIFICATION Agencies Should Set a Higher Priority on Using the Capabilities of Standardized Identification Cards GAO-11-751 September 2011 PERSONAL ID VERIFICATION
Agencies Should Set a Higher Priority on Using the Capabilities of Standardized Identification Cards
Highlights of GAO-11-... |
Date Sept. 19, 2011 |
Report No. GAO-11-806 |
Title
United States Government Accountability Office GAO
September 2011 Report to the Committee on Armed Services, U.S. Senate WEAPONS ACQUISITION REFORM Actions Needed to Address Systems Engineering and Developmental Testing Challenges GAO-11-806 September 2011 WEAPONS ACQUISITION REFORM
Actions Needed to Address Systems Engineering and Developmental Testing Challenges
Highlights of GAO-11-806, a repor... |
Date Sept. 16, 2011 |
Report No. GAO-11-774 |
Title
United States Government Accountability Office GAO
September 2011 Report to Congressional Addressees IRAQ DRAWDOWN Opportunities Exist to Improve Equipment Visibility, Contractor Demobilization, and Clarity of Post-2011 DOD Role GAO-11-774 September 2011 IRAQ DRAWDOWN
Opportunities Exist to Improve Equipment Visibility, Contractor Demobilization, and Clarity of Post-2011 DOD Role Highlights of GAO... |
Date Sept. 15, 2011 |
Report No. GAO-11-886 |
Title
United States Government Accountability Office GAO
September 2011 Report to Congressional Committees IRAQ AND AFGHANISTAN DOD, State, and USAID Cannot Fully Account for Contracts, Assistance Instruments, and Associated Personnel GAO-11-886 September 2011 IRAQ AND AFGHANISTAN
DOD, State, and USAID Cannot Fully Account for Contracts, Assistance Instruments, and Associated Personnel Highlights of GAO... |
Date Sept. 9, 2011 |
Report No. GAO-11-784 |
Title
United States Government Accountability Office GAO
September 2011 Report to Congressional Committees INTERAGENCY CONTRACTING Improvements Needed in Setting Fee Rates for Selected Programs GAO-11-784 September 2011 INTERAGENCY CONTRACTING Improvements Needed in Setting Fee Rates for Selected Programs
Highlights of GAO-11-784, a report to congressional committees Why GAO Did This Study
Federal agenc... |
Date June 21, 2011 |
Report No. GAO-11-494R |
Title
United States Government Accountability Office Washington, DC 20548 June 21, 2011 The Honorable Douglas H. Shulman Commissioner of Internal Revenue Subject: Management Report: Improvements Are Needed to Enhance the Internal Revenue Service’s Internal Controls and Operating Effectiveness Dear Mr. Shulman: In November 2010, we issued our report on the results of our audit of the financial statemen... |
Date May 27, 2011 |
Report No. GAO-11-538R |
Title
United States Government Accountability Office Washington, DC 20548 May 27, 2011 Congressional Committees Subject: OMB Service Contracts Inventory Guidance and Implementation Federal agencies rely on a multisector workforce of federal employees and contractor personnel to perform services needed to carry out their missions. Determining whether to obtain services through insourcing with current or ... |
Date Jan. 14, 2011 |
Report No. GAO-11-192 |
Title
United States Government Accountability Office GAO
January 2011 Report to Congressional Committees DEFENSE ACQUISITIONS Further Action Needed to Better Implement Requirements for Conducting Inventory of Service Contract Activities GAO-11-192 January 2011 DEFENSE ACQUISITIONS
Accountability • Integrity • Reliability Further Action Needed to Better Implement Requirements for Conducting Inventory... |
Date Dec. 1, 2010 |
Report No. GAO-11-182T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 10:00 a.m. EST Wednesday, December 1, 2010 Testimony Before the Committee on Health, Education, Labor, and Pensions, U.S. Senate PENSION BENEFIT GUARANTY CORPORATION Improvements Needed to Strengthen Governance Structure and Strategic Management
Statement of Barbara D. Bovbjerg, Managing Director Education, Work... |
Date Oct. 1, 2010 |
Report No. GAO-11-1 |
Title
United States Government Accountability Office GAO
October 2010 Report to Congressional Committees IRAQ AND AFGHANISTAN DOD, State, and USAID Face Continued Challenges in Tracking Contracts, Assistance Instruments, and Associated Personnel GAO-11-1 October 2010 IRAQ AND AFGHANISTAN
Accountability • Integrity • Reliability DOD, State, and USAID Face Continued Challenges in Tracking Contracts, A... |
Date June 29, 2010 |
Report No. GAO-10-829T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 10:00 a.m. EDT Tuesday, June 29, 2010 Testimony Before the Subcommittee on National Security and Foreign Affairs, Committee on Oversight and Government Reform, House of Representatives WARFIGHTER SUPPORT Cultural Change Needed to Improve How DOD Plans for and Manages Operational Contract Support
Statement of Wil... |
Date June 25, 2010 |
Report No. GAO-10-842T |
Title
United States Government Accountability Office GAO
June 25, 2010 Testimony Before the Subcommittee on Defense, Committee on Appropriations, House of Representatives WARFIGHTER SUPPORT Preliminary Observations on DOD's Progress and Challenges in Distributing Supplies and Equipment to Afghanistan
Statement of William M. Solis, Director Defense Capabilities and Management A classified version of this... |
Date May 20, 2010 |
Report No. GAO-10-744T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 2:30 p.m. EDT Thursday, May 20, 2010 Testimony before the Subcommittee on Oversight of Government Management, the Federal Workforce, and the District of Columbia, Committee on Homeland Security and Governmental Affairs, U.S. Senate SOURCING POLICY Initial Agency Efforts to Balance the Government to Contractor Mi... |
Date April 12, 2010 |
Report No. GAO-10-357 |
Title
United States Government Accountability Office GAO
April 2010 Report to Congressional Committees CONTINGENCY CONTRACTING Improvements Needed in Management of Contractors Supporting Contract and Grant Administration in Iraq and Afghanistan GAO-10-357 April 2010 CONTINGENCY CONTRACTING Highlights
Highlights of GAO-10-357, a report to congressional committees Accountability Integrity Reliability Impr... |
Date March 30, 2010 |
Report No. GAO-10-472 |
Title
United States Government Accountability Office GAO
March 2010 Report to Congressional Committees WARFIGHTER SUPPORT DOD Needs to Improve Its Planning for Using Contractors to Support Future Military Operations GAO-10-472 March 2010 WARFIGHTER SUPPORT Highlights
Highlights of GAO-10-472, a report to congressional committees Accountability Integrity Reliability DOD Needs to Improve Its Planning for ... |
Date March 23, 2010 |
Report No. GAO-10-509T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 2:00 p.m. EDT Tuesday, March 23, 2010 Testimony Before the Subcommittee on Oversight and Investigations, Committee on Armed Services, House of Representatives IRAQ AND AFGHANISTAN Agencies Face Challenges in Tracking Contracts, Grants, Cooperative Agreements, and Associated Personnel
Statement of John P. Hutton,... |
Date March 17, 2010 |
Report No. GAO-10-551T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 1:30 p.m. EDT Wednesday, March 17, 2010 Testimony Before the Subcommittee on Defense, Committee on Appropriations, House of Representatives WARFIGHTER SUPPORT Continued Actions Needed by DOD to Improve and Institutionalize Contractor Support in Contingency Operations
Statement of William M. Solis, Director Defen... |
Date March 4, 2010 |
Report No. GAO-10-266R |
Title
United States Government Accountability Office Washington, DC 20548 March 4, 2010 Congressional Committees Warfighter Support: A Cost Comparison of Using State Department Employees versus Contractors for Security Services in Iraq The U.S. government’s reliance on contractors, including the State Department’s and Department of Defense’s (DOD) use of private security contractors in Iraq, has b... |
Date Jan. 20, 2010 |
Report No. GAO-10-374T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 1:30 p.m. EST Wednesday, January 20, 2010 Testimony Before the Subcommittee on Defense, Committee on Appropriations, House of Representatives DEFENSE ACQUISITIONS Managing Risk to Achieve Better Outcomes
Statement of Paul Francis, Managing Director Acquisition and Sourcing Management Michael Golden, Managing Ass... |
Date Nov. 2, 2009 |
Report No. GAO-10-187 |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 9:30 a.m. EST Monday, November 2, 2009 Statement Before the Commission on Wartime Contracting in Iraq and Afghanistan CONTINGENCY CONTRACTING Further Improvements Needed in Agency Tracking of Contractor Personnel and Contracts in Iraq and Afghanistan
Statement of John P. Hutton, Director Acquisition and Sourcing... |
Date Oct. 6, 2009 |
Report No. GAO-10-58R |
Title
United States Government Accountability Office Washington, DC 20548 October 6, 2009 Congressional Committees Subject: Civilian Agencies’ Development and Implementation of Insourcing Guidelines Federal agencies rely on a multisector workforce composed of federal employees and contractor personnel to perform services as they carry out their missions. Determining whether to obtain services through ... |
Date Oct. 1, 2009 |
Report No. GAO-10-1 |
Title
United States Government Accountability Office GAO
October 2009 Report to Congressional Committees CONTINGENCY CONTRACTING DOD, State, and USAID Continue to Face Challenges in Tracking Contractor Personnel and Contracts in Iraq and Afghanistan GAO-10-1 October 2009 CONTINGENCY CONTRACTING Highlights
Highlights of GAO-10-1, a report to congressional committees Accountability Integrity Reliability D... |
Date July 31, 2009 |
Report No. GAO-09-351 |
Title
United States Government Accountability Office GAO
July 2009 Report to Congressional Committees CONTINGENCY CONTRACT MANAGEMENT DOD Needs to Develop and Finalize Background Screening and Other Standards for Private Security Contractors GAO-09-351 July 2009 CONTINGENCY CONTRACT MANAGEMENT Highlights
Highlights of GAO-09-351, a report to congressional committees Accountability Integrity Reliability ... |
Date April 28, 2009 |
Report No. GAO-09-616T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 10:00 a.m. EDT Tuesday, April 28, 2009 Testimony Before the Oversight and Investigations Subcommittee, Committee on Armed Services, House of Representatives ACQUISITION WORKFORCE DOD Can Improve Its Management and Oversight by Tracking Data on Contractor Personnel and Taking Additional Actions
Statement of John ... |
Date April 1, 2009 |
Report No. GAO-09-538T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 1:00 p.m. EDT Wednesday, April 1, 2009 Testimony Before the Subcommittee on Oversight and Investigations, Committee on Armed Services, House of Representatives CONTINGENCY CONTRACTING DOD, State, and USAID Are Taking Actions to Track Contracts and Contractor Personnel in Iraq and Afghanistan
Statement of John P.... |
Date March 25, 2009 |
Report No. GAO-09-342 |
Title
United States Government Accountability Office GAO
March 2009 Report to Congressional Requesters DEPARTMENT OF DEFENSE Additional Actions and Data Are Needed to Effectively Manage and Oversee DOD’s Acquisition Workforce GAO-09-342 March 2009 DEPARTMENT OF DEFENSE Highlights
Highlights of GAO-09-342, a report to congressional requesters Accountability Integrity Reliability Additional Actions and ... |
Date March 19, 2009 |
Report No. GAO-09-484T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 10:00 a.m. EST Thursday, March 19, 2009 Testimony Before the Subcommittee on Oversight, Committee on Ways and Means, House of Representatives TROUBLED ASSET RELIEF PROGRAM Status of Efforts to Address Transparency and Accountability Issues
Statement of Gene L. Dodaro Acting Comptroller General of the United Stat... |
Date March 11, 2009 |
Report No. GAO-09-474T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 10:00 A.M. EDT Wednesday, March 11, 2009 Testimony Before the Subcommittee on Domestic Policy, Committee on Oversight and Government Reform, House of Representatives TROUBLED ASSET RELIEF PROGRAM Status of Efforts to Address Transparency and Accountability Issues
Statement of Richard J. Hillman, Managing Directo... |
Date Feb. 24, 2009 |
Report No. GAO-09-417T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 2:00 p.m. EST Tuesday, February 24, 2009 Testimony Before the Subcommittee on Oversight and Investigations, Committee on Financial Services, House of Representatives TROUBLED ASSET RELIEF PROGRAM Status of Efforts to Address Transparency and Accountability Issues
Statement of Gene L. Dodaro Acting Comptroller Ge... |
Date Feb. 11, 2009 |
Report No. GAO-09-362T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 10:30 a.m. EST Thursday, February 12, 2009 Testimony before the Committee on Armed Services, House of Representatives IRAQ AND AFGHANISTAN Availability of Forces, Equipment, and Infrastructure Should Be Considered in Developing U.S. Strategy and Plans
Statement of Janet St. Laurent, Managing Director Defense Cap... |
Date Feb. 5, 2009 |
Report No. GAO-09-359T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 10:00 a.m. EST Thursday, February 5, 2009 Testimony Before the Committee on Banking, Housing, and Urban Affairs, U.S. Senate TROUBLED ASSET RELIEF PROGRAM Status of Efforts to Address Transparency and Accountability Issues
Statement of Gene L. Dodaro Acting Comptroller General of the United States GAO-09-359T Mr... |
Date Jan. 30, 2009 |
Report No. GAO-09-296 |
Title
United States Government Accountability Office GAO
January 2009 Report to Congressional Committees TROUBLED ASSET RELIEF PROGRAM Status of Efforts to Address Transparency and Accountability Issues GAO-09-296 January 2009 TROUBLED ASSET RELIEF PROGRAM Highlights
Highlights of GAO-09-296, a report to congressional committees Accountability Integrity Reliability Status of Efforts to Address Transpare... |
Date Jan. 9, 2009 |
Report No. GAO-09-27R |
Title
United States Government Accountability Office Washington, DC 20548 January 9, 2009 The Honorable Daniel E. Lungren Ranking Republican Member Subcommittee on Transportation and Infrastructure Protection Committee on Homeland Security House of Representatives The Honorable John L. Mica Ranking Republican Member Committee on Transportation and Infrastructure House of Representatives Subject: Aviatio... |
Date Dec. 10, 2008 |
Report No. GAO-09-266T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 10:00 a.m. EST Wednesday, December 10, 2008 Testimony Before the Committee on Financial Services, House of Representatives TROUBLED ASSET RELIEF PROGRAM Additional Actions Needed to Better Ensure Integrity, Accountability, and Transparency
Statement of Gene L. Dodaro Acting Comptroller General of the United Stat... |
Date Dec. 2, 2008 |
Report No. GAO-09-161 |
Title
United States Government Accountability Office GAO
December 2008 Report to Congressional Committees TROUBLED ASSET RELIEF PROGRAM Additional Actions Needed to Better Ensure Integrity, Accountability, and Transparency GAO-09-161 December 2008 TROUBLED ASSET RELIEF PROGRAM Highlights
Highlights of GAO-09-161, a report to congressional committees Accountability Integrity Reliability Additional Action... |
Date Oct. 23, 2008 |
Report No. GAO-09-61 |
Title
United States Government Accountability Office GAO
October 2008 Report to Congressional Requesters NUCLEAR SAFETY Department of Energy Needs to Strengthen Its Independent Oversight of Nuclear Facilities and Operations GAO-09-61 October 2008 NUCLEAR SAFETY Highlights
Highlights of GAO-09-61, a report to congressional requesters Accountability Integrity Reliability Department of Energy Needs to Stre... |
Date Oct. 8, 2008 |
Report No. GAO-09-15 |
Title
United States Government Accountability Office GAO
October 2008 Report to Congressional Committees FEDERAL RESEARCH Opportunities Exist to Improve the Management and Oversight of Federally Funded Research and Development Centers GAO-09-15 October 2008 FEDERAL RESEARCH Highlights
Highlights of GAO-09-15, a report to congressional committees Accountability Integrity Reliability Opportunities Exist t... |
Date Oct. 1, 2008 |
Report No. GAO-09-19 |
Title
United States Government Accountability Office GAO
October 2008 Report to Congressional Committees CONTINGENCY CONTRACTING DOD, State, and USAID Contracts and Contractor Personnel in Iraq and Afghanistan GAO-09-19 October 2008 CONTINGENCY CONTRACTING Highlights
Highlights of GAO-09-19, a report to congressional committees. Accountability Integrity Reliability DOD, State, and USAID Contracts and Co... |
Date July 31, 2008 |
Report No. GAO-08-966 |
Title
United States Government Accountability Office GAO
July 2008 Report to Congressional Committees REBUILDING IRAQ DOD and State Department Have Improved Oversight and Coordination of Private Security Contractors in Iraq, but Further Actions Are Needed to Sustain Improvements
This report was revised on August 1, 2008 to reflect a change to the text on page 2, in line 11 of the second paragraph, “pr... |
Date July 24, 2008 |
Report No. GAO-08-787 |
Title
United States Government Accountability Office GAO
July 2008 Report to Congressional Requesters U.S. POSTAL SERVICE Data Needed to Assess the Effectiveness of Outsourcing GAO-08-787 July 2008 U.S. POSTAL SERVICE Highlights
Highlights of GAO-08-787, a report to congressional requesters Accountability Integrity Reliability Data Needed to Assess the Effectiveness of Outsourcing Why GAO Did This Study... |
Date June 19, 2008 |
Report No. GAO-08-642R |
Title
United States Government Accountability Office Washington, DC 20548 June 19, 2008 The Honorable Byron L. Dorgan Chairman The Honorable Pete V. Domenici Ranking Member Subcommittee on Energy and Water Development Committee on Appropriations United States Senate The Honorable Peter J. Visclosky Chairman The Honorable David L. Hobson Ranking Member Subcommittee on Energy and Water Development Committ... |
Date May 28, 2008 |
Report No. GAO-08-582 |
Title
United States Government Accountability Office GAO
May 2008 Report to Congressional Requesters CENTERS FOR DISEASE CONTROL AND PREVENTION Human Capital Planning Has Improved, but Strategic View of Contractor Workforce Is Needed GAO-08-582 May 2008 Highlights
Highlights of GAO-08-582, a report to congressional requesters Accountability Integrity Reliability CENTERS FOR DISEASE CONTROL AND PREVENTIO... |
Date May 21, 2008 |
Report No. GAO-08-485 |
Title
United States Government Accountability Office GAO
May 2008 Report to Congressional Committees DEFENSE CONTRACTING Post-Government Employment of Former DOD Officials Needs Greater Transparency GAO-08-485 May 2008 DEFENSE CONTRACTING Highlights
Highlights of GAO-08-485, a report to congressional committees Accountability Integrity Reliability Post-Government Employment of Former DOD Officials Needs... |
Date May 15, 2008 |
Report No. GAO-08-772T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 10:00 a.m. EDT Thursday, May 15, 2008 Testimony Before the Committee on Oversight and Government Reform, House of Representatives DEFENSE CONTRACTING Progress Made in Implementing Defense Base Act Requirements, but Complete Information on Costs Is Lacking
Statement of John K. Needham, Director Acquisition and So... |
Date April 9, 2008 |
Report No. GAO-08-551T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 2:00 p.m. EDT Wednesday, April 9, 2008 Testimony
Before the Subcommittee on Government Management, Organization, and Procurement; Committee on Oversight and Government Reform, House of Representatives EMPLOYEE SECURITY Implementation of Identification Cards and DOD’s Personnel Security Clearance Program Need I... |
Date March 26, 2008 |
Report No. GAO-08-360 |
Title
United States Government Accountability Office GAO
March 2008 Report to Congressional Committees DEFENSE CONTRACTING Army Case Study Delineates Concerns with Use of Contractors as Contract Specialists GAO-08-360 March 2008 DEFENSE CONTRACTING Highlights
Highlights of GAO-08-360, a report to congressional committees Accountability Integrity Reliability Army Case Study Delineates Concerns with Use o... |
Date March 28, 2007 |
Report No. GAO-07-193 |
Title
United States Government Accountability Office GAO
March 2007 Report to Congressional Committees DISASTER PREPAREDNESS Better Planning Would Improve OSHA’s Efforts to Protect Workers’ Safety and Health in Disasters GAO-07-193 March 2007 DISASTER PREPAREDNESS Highlights
Highlights of GAO-07-193, a report to congressional committees Accountability Integrity Reliability Better Planning Would Impr... |
Date Sept. 22, 2006 |
Report No. GAO-06-999R |
Title
United States Government Accountability Office Washington, DC 20548 September 22, 2006 The Honorable Christopher Shays Chairman Subcommittee on National Security, Emerging Threats and International Relations Committee on Government Reform House of Representatives Subject: Military Operations: Background Screenings of Contractor Employees Supporting Deployed Forces May Lack Critical Information, bu... |