Date |
Report No. |
Title |
Date Aug. 2, 2011 |
Report No. GAO-11-778 |
Title
United States Government Accountability Office GAO
August 2011 Report to Congressional Committees PUBLIC TRANSPORTATION Requirements for Smaller Capital Projects Generally Seen as Less Burdensome GAO-11-778 August 2011 PUBLIC TRANSPORTATION
Requirements for Smaller Capital Projects Generally Seen as Less Burdensome
Highlights of GAO-11-778, a report to congressional committees Why GAO Did This Stu... |
Date June 30, 2011 |
Report No. GAO-11-660 |
Title
United States Government Accountability Office GAO
June 2011 Report to Congressional Requesters PUBLIC TRANSPORTATION Washington Metro Could Benefit from Clarified Board Roles and Responsibilities, Improved Strategic Planning GAO-11-660 June 2011 PUBLIC TRANSPORTATION
Accountability • Integrity • Reliability Washington Metro Could Benefit from Clarified Board Roles and Responsibilities, Improv... |
Date June 14, 2011 |
Report No. GAO-11-688T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 2:30 p.m. EDT Tuesday, June 14, 2011 Testimony Before the Committee on Commerce, Science, and Transportation, U.S. Senate RAIL SECURITY TSA Improved Risk Assessment but Could Further Improve Training and Information Sharing
Statement of Steve Lord, Director Homeland Security and Justice Issues GAO-11-688T June 1... |
Date Jan. 31, 2011 |
Report No. GAO-11-199 |
Title
United States Government Accountability Office GAO
January 2011 Report to the Committee on Banking, Housing, and Urban Affairs, U.S. Senate RAIL TRANSIT FTA Programs Are Helping Address Transit Agencies’ Safety Challenges, but Improved Performance Goals and Measures Could Better Focus Efforts GAO-11-199 January 2011 RAIL TRANSIT
Accountability • Integrity • Reliability FTA Programs Are Helpi... |
Date Sept. 22, 2010 |
Report No. GAO-10-895 |
Title
United States Government Accountability Office GAO
September 2010 Report to Congressional Committees PUBLIC TRANSIT SECURITY INFORMATION SHARING DHS Could Improve Information Sharing through Streamlining and Increased Outreach GAO-10-895 September 2010 Accountability • Integrity • Reliability PUBLIC TRANSIT SECURITY INFORMATION SHARING
DHS Could Improve Information Sharing through Streamlining... |
Date Sept. 22, 2010 |
Report No. GAO-10-896SP |
Title
|
Date Sept. 14, 2010 |
Report No. GAO-10-909 |
Title
United States Government Accountability Office GAO
September 2010 Report to Congressional Committees PUBLIC TRANSPORTATION Use of Contractors is Generally Enhancing Transit Project Oversight, and FTA is Taking Actions to Address Some Stakeholder Concerns GAO-10-909 September 2010 PUBLIC TRANSPORTATION
Accountability • Integrity • Reliability Use of Contractors is Generally Enhancing Transit Pr... |
Date July 28, 2010 |
Report No. GAO-10-898 |
Title
d10898cover.ai Page 1 Friday, July 2, 2010 10:37 AM United States Government Accountability Office GAO
July 2010 Report to Congressional Committees TECHNOLOGY ASSESSMENT
Explosives Detection Technologies to Protect Passenger Rail A
www.gao.gov GAO-10-898 A July 2010 TECHNOLOGY ASSESSMENT Highlights
Highlights of GAO-10-898, a report to congressional committees Accountability Integrity Reliability ... |
Date May 27, 2010 |
Report No. GAO-10-435R |
Title
United States Government Accountability Office Washington, DC 20548 May 27, 2010 The Honorable John L. Mica Ranking Member Committee on Transportation and Infrastructure House of Representatives Subject: Transportation Security: Additional Actions Could Strengthen the Security of Intermodal Transportation Facilities Dear Mr. Mica, Terrorist attacks on mass transit and commuter rail facilities in M... |
Date April 21, 2010 |
Report No. GAO-10-650T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 2:30 p.m. EDT April 21, 2010 Testimony Before the Committee on Commerce, Science, and Transportation, U.S. Senate SURFACE TRANSPORTATION SECURITY TSA Has Taken Actions to Manage Risk, Improve Coordination, and Measure Performance, but Additional Actions Would Enhance Its Efforts
Statement of Stephen M. Lord, Dir... |
Date Dec. 10, 2009 |
Report No. GAO-10-314T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 9:30 a.m. EST Thursday, December 10, 2009 Testimony Before the Subcommittee on Housing, Transportation, and Community Development, Committee on Banking, Housing, and Urban Affairs, U.S. Senate RAIL TRANSIT Observations on FTA’s State Safety Oversight Program and Potential Change in Its Oversight Role
Statement... |
Date Dec. 8, 2009 |
Report No. GAO-10-293T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 10:00 a.m. EST Tuesday, December 8, 2009 Testimony Before the Subcommittee on Highways and Transit, Committee on Transportation and Infrastructure, House of Representatives RAIL TRANSIT Observations on FTA’s State Safety Oversight Program and Potential Change in Oversight Role
Statement of Katherine Siggerud, ... |
Date Oct. 29, 2009 |
Report No. GAO-10-19 |
Title
United States Government Accountability Office GAO
October 2009 Report to Congressional Committees PUBLIC TRANSPORTATION Federal Project Approval Process Remains a Barrier to Greater Private Sector Role and DOT Could Enhance Efforts to Assist Project Sponsors GAO-10-19 October 2009 PUBLIC TRANSPORTATION Highlights
Highlights of GAO-10-19, a report to congressional committees Accountability Integri... |
Date Aug. 6, 2009 |
Report No. GAO-09-784 |
Title
United States Government Accountability Office GAO
August 2009 Report to Congressional Committees PUBLIC TRANSPORTATION Better Data Needed to Assess Length of New Starts Process, and Options Exist to Expedite Project Development GAO-09-784 August 2009 PUBLIC TRANSPORTATION Highlights
Highlights of GAO-09-784, a report to congressional committees Accountability Integrity Reliability Better Data Nee... |
Date June 24, 2009 |
Report No. GAO-09-678 |
Title
United States Government Accountability Office GAO
June 2009 Report to the Chairman, Committee on Homeland Security, House of Representatives TRANSPORTATION SECURITY Key Actions Have Been Taken to Enhance Mass Transit and Passenger Rail Security, but Opportunities Exist to Strengthen Federal Strategy and Programs GAO-09-678 June 2009 TRANSPORTATION SECURITY Highlights
Highlights of GAO-09-678, a r... |
Date June 8, 2009 |
Report No. GAO-09-491 |
Title
United States Government Accountability Office GAO
June 2009 Report to the Chairman, Committee on Homeland Security, House of Representatives TRANSIT SECURITY GRANT PROGRAM DHS Allocates Grants Based on Risk, but Its Risk Methodology, Management Controls, and Grant Oversight Can Be Strengthened GAO-09-491 June 2009 TRANSIT SECURITY GRANT PROGRAM Highlights
Highlights of GAO-09-491, a report to the... |
Date June 3, 2009 |
Report No. GAO-09-763T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 2:00 p.m. EDT Wednesday, June 3, 2009 Testimony Before the Subcommittee on Housing, Transportation, and Community Development, Committee on Banking, Housing, and Urban Affairs, U.S. Senate PUBLIC TRANSPORTATION New Starts Program Challenges and Preliminary Observations on Expediting Project Development
Statement... |
Date April 29, 2009 |
Report No. GAO-09-597T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 11:00 a.m. EDT Wednesday, April 29, 2009 Testimony Before the Committee on Transportation and Infrastructure, House of Representatives RECOVERY ACT Initial Results on States' Use of and Accountability for Transportation Funds
Statement of Katherine Siggerud, Managing Director Physical Infrastructure Issues GAO-0... |
Date July 31, 2008 |
Report No. GAO-08-933R |
Title
United States Government Accountability Office Washington, DC 20548 July 31, 2008 Congressional Committees Subject: TSA’s Explosives Detection Canine Program: Status of Increasing Number of Explosives Detection Canine Teams This report formally transmits the attached briefing in response to section 1307 of the Implementing Recommendations of the 9/11 Commission Act of 2007. The act requires the ... |
Date July 29, 2008 |
Report No. GAO-08-843R |
Title
United States Government Accountability Office Washington, DC 20548 July 29, 2008 Congressional Requesters Subject: Surface Transportation Programs: Proposals Highlight Key Issues and Challenges in Restructuring the Programs The nation’s economic vitality and the quality of life of its citizens depend significantly on the availability, dependability, and security of its surface transportation ne... |
Date July 25, 2008 |
Report No. GAO-08-844 |
Title
United States Government Accountability Office GAO
July 2008 Report to Congressional Committees PUBLIC TRANSPORTATION Improvements Are Needed to More Fully Assess Predicted Impacts of New Starts Projects GAO-08-844 July 2008 PUBLIC TRANSPORTATION Highlights
Highlights of GAO-08-844, a report to congressional committees Accountability Integrity Reliability Improvements Are Needed to More Fully Asse... |
Date Feb. 15, 2008 |
Report No. GAO-08-243 |
Title
United States Government Accountability Office GAO
February 2008 Report to the Committee on Banking, Housing, and Urban Affairs, U.S. Senate EMERGENCY TRANSIT ASSISTANCE Federal Funding for Recent Disasters, and Options for the Future GAO-08-243 February 2008 EMERGENCY TRANSIT ASSISTANCE Highlights
Highlights of GAO-08-243, a report to the Committee on Banking, Housing, and Urban Affairs, U.S. Sen... |
Date May 10, 2007 |
Report No. GAO-07-812T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 10:00 a.m. EDT Thursday, May 10, 2007 Before the Subcommittee on Highways and Transit, Committee on Transportation and Infrastructure PUBLIC TRANSPORTATION Preliminary Analysis of Changes to and Trends in FTA’s New Starts and Small Starts Programs
Statement of Katherine Siggerud, Director Physical Infrastructu... |
Date April 24, 2007 |
Report No. GAO-07-724T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 2:30 p.m. EDT Tuesday, April 24, 2007 Testimony Before the Permanent Subcommittee on Investigations, Committee on Homeland Security and Governmental Affairs, U.S. Senate FEDERAL TRANSIT BENEFITS PROGRAM Ineffective Controls Result in Fraud and Abuse by Federal Workers
Statement of Gregory D. Kutz, Managing Direc... |
Date March 7, 2007 |
Report No. GAO-07-583T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 9:00 a.m. EST Wednesday, March 7, 2007 Testimony Before Congressional Subcommittees PASSENGER RAIL SECURITY Federal Strategy and Enhanced Coordination Needed to Prioritize and Guide Security Efforts
Statement of Norman J. Rabkin, Managing Director Homeland Security and Justice Issues GAO-07-583T March 7, 2007 PA... |
Date Feb. 13, 2007 |
Report No. GAO-07-459T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 2:00 p.m. EST Tuesday, February 13, 2007 Testimony before the Subcommittee on Homeland Security, Committee on Appropriations, House of Representatives PASSENGER RAIL SECURITY Federal Strategy and Enhanced Coordination Needed to Prioritize and Guide Security Efforts
Statement of Cathleen A. Berrick, Director Home... |
Date Feb. 6, 2007 |
Report No. GAO-07-442T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 10:00 a.m. EST Tuesday, February 6, 2007 Testimony before the Subcommittee on Transportation Security and Infrastructure Protection, Committee on Homeland Security, House of Representatives PASSENGER RAIL SECURITY Federal Strategy and Enhanced Coordination Needed to Prioritize and Guide Security Efforts
Statemen... |
Date Jan. 18, 2007 |
Report No. GAO-07-225T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 10:00 a.m. EDT Thursday, January 18, 2007 Testimony before the Committee on Commerce, Science, and Transportation, U.S. Senate PASSENGER RAIL SECURITY Enhanced Federal Leadership Needed to Prioritize and Guide Security Efforts
Statement of Cathleen A. Berrick, Director Homeland Security and Justice Issues GAO-07... |
Date July 19, 2006 |
Report No. GAO-06-997T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 2:00 p.m. EDT Wednesday, July 19, 2006 Testimony Before the Subcommittee on Highways, Transit, and Pipelines, Committee on Transportation and Infrastructure, House of Representatives RAIL TRANSIT Observations on FTA’s State Safety Oversight Program
Statement of Katherine Siggerud, Director Physical Infrastruct... |
Date May 15, 2006 |
Report No. GAO-06-516 |
Title
United States Government Accountability Office GAO
May 2006 Report to the Chairman, Committee on Government Reform, House of Representatives MASS TRANSIT Issues Related to Providing Dedicated Funding for the Washington Metropolitan Area Transit Authority GAO-06-516 May 2006 MASS TRANSIT Highlights
Highlights of GAO-06-516, a report to the Chairman, Committee on Government Reform, House of Represen... |
Date April 21, 2006 |
Report No. GAO-06-470 |
Title
United States Government Accountability Office GAO
April 2006 Report to the Chairman, Committee on Banking, Housing and Urban Affairs, U.S. Senate COMMUTER RAIL Commuter Rail Issues Should Be Considered in Debate over Amtrak GAO-06-470 April 2006 COMMUTER RAIL Highlights
Highlights of GAO-06-470, a report to the Chairman, Senate Committee on Banking, Housing and Urban Affairs Accountability Integr... |
Date March 29, 2006 |
Report No. GAO-06-557T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 2:00 p.m. EST Wednesday, March 29, 2006 Testimony before the Committee on Transportation and Infrastructure, Subcommittee on Highways, Transit, and Pipelines, House of Representatives PASSENGER RAIL SECURITY Evaluating Foreign Security Practices and Risk Can Help Guide Security Efforts
Statement of JayEtta Z. He... |
Date Nov. 2, 2005 |
Report No. GAO-06-52 |
Title
United States Government Accountability Office GAO
November 2005 Report to the Ranking Minority Member, Committee on Banking, Housing, and Urban Affairs, U.S. Senate TRANSPORTATION SERVICES Better Dissemination and Oversight of DOT’s Guidance Could Lead to Improved Access for Limited English-Proficient Populations GAO-06-52 a November 2005 TRANSPORTATION SERVICES Highlights
Highlights of GAO-06-... |
Date Nov. 2, 2005 |
Report No. GAO-06-186 |
Title
美国政府问责局 GAO
2005 年11月 报告摘要(中文) 运输服务 加强散播和监督运输部 的准则可以使不会说英 语的人获得更好的服务 GAO-06-186 这是美国政府的文件,在美国不受版权保护。本文件可以全文复印分发,无须政府问责局准 许。不过,由于本文件可能载列持有版权的图像或其他材料,如果你打算单... |
Date Nov. 2, 2005 |
Report No. GAO-06-188 |
Title
미합중국 감사원 GAO
2005년 11월 보고서 한국어 요약 교통 서비스 교통부 지침서의 보다 많은 배포와 그 이행여부의 감독으로 영어 미숙 인구를 위한 교통 편의 제공을 향상케 한다 GAO-06-188 본 자료는 미합중국 정부가 작성한 것이며 미국 내에서의 저작권 보호법에 저촉되지는 않습니다. 본 자료는 미국 ... |
Date Nov. 2, 2005 |
Report No. GAO-06-185 |
Title
Tribunal de Cuentas del Gobierno de los Estados Unidos GAO
Noviembre 2005 Resumen del informe en español SERVICIOS DE TRANSPORTE El Mejoramiento de la Difusión y Supervisión de la Guía del DOT Podría Redundar en un Mejor Acceso para las Personas con Conocimientos Limitados de Inglés GAO-06-185 Éste es un trabajo del Gobierno de los Estados Unidos y no está sujeto a la protección de los de... |
Date Nov. 2, 2005 |
Report No. GAO-06-187 |
Title
Văn Phòng Kế Toán Chính Phủ Hoa Kỳ GAO
Tháng 11 năm 2005 Tóm Lược Báo Cáo bằng tiếng Việt DỊCH VỤ DI CHUYỂN
Việc Phân Phối và Giám Thị tốt hơn có thể đưa đến Việc Tiếp Cận Được Cải Tiến dành cho Dân Chúng có Khả Năng Anh Ngữ Giới Hạn GAO-06-187 Đây là tài liệu của chính phủ Hoa Kỳ không phải chịu việc ... |
Date Sept. 9, 2005 |
Report No. GAO-05-851 |
Title
United States Government Accountability Office GAO
September 2005 Report to Congressional Requesters PASSENGER RAIL SECURITY Enhanced Federal Leadership Needed to Prioritize and Guide Security Efforts GAO-05-851 September 2005 PASSENGER RAIL SECURITY Highlights
Highlights of GAO-05-851, a report to congressional requesters Accountability Integrity Reliability Enhanced Federal Leadership Needed to ... |
Date July 28, 2005 |
Report No. GAO-05-922T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 10:00 a.m. EDT Thursday, July 28, 2005 Testimony Before the Committee on Government Reform, House of Representatives MASS TRANSIT Preliminary Views on Options for Additional Fiscal Oversight of the Washington Metropolitan Area Transit Authority
Statement of Katherine Siggerud, Director Physical Infrastructure Is... |
Date Feb. 18, 2005 |
Report No. GAO-05-358T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 10:00 a.m. EST Friday, February 18, 2005 Testimony Before the Committee on Government Reform, House of Representatives MASS TRANSIT Information on the Federal Role in Funding the Washington Metropolitan Area Transit Authority
Statement for the Record by Katherine Siggerud, Director Physical Infrastructure Issues... |
Date June 30, 2004 |
Report No. GAO-04-744 |
Title
United States General Accounting Office GAO
June 2004 Report to the Ranking Minority Member, Committee on Commerce, Science, and Transportation, U.S. Senate SURFACE TRANSPORTATION Many Factors Affect Investment Decisions GAO-04-744 a June 2004 SURFACE TRANSPORTATION Many Factors Affect Investment Decisions Highlights of GAO-04-744, a report to the Ranking Minority Member, Committee on Commerce, Sc... |
Date June 25, 2004 |
Report No. GAO-04-748 |
Title
United States General Accounting Office GAO
June 2004 Report to Congressional Committees MASS TRANSIT FTA Needs to Better Define and Assess Impact of Certain Policies on New Starts Program GAO-04-748 a June 2004 MASS TRANSIT FTA Needs to Better Define and Assess Impact of Certain Policies on New Starts Program Highlights of GAO-04-748, a report to congressional committees The Transportation Equity... |
Date March 23, 2004 |
Report No. GAO-04-598T |
Title
United States General Accounting Office GAO
For Release on Delivery Expected at 10:00 a.m. EST Tuesday, March 23, 2004 Testimony Before the Committee on Commerce, Science, and Transportation, U.S. Senate RAIL SECURITY Some Actions Taken to Enhance Passenger and Freight Rail Security, but Significant Challenges Remain
Statement of Peter F. Guerrero, Director, Physical Infrastructure Issues; and Nor... |
Date Sept. 9, 2003 |
Report No. GAO-03-1154T |
Title
United States General Accounting Office GAO
For Release on Delivery Expected at 9:30 a.m. EDT Tuesday, September 9, 2003 Testimony Before the Committee on Commerce, Science, and Transportation United States Senate TRANSPORTATION SECURITY Federal Action Needed to Enhance Security Efforts
Statement of Peter Guerrero, Director Physical Infrastructure Issues GAO-03-1154T September 9, 2003 TRANSPORTATI... |
Date June 24, 2003 |
Report No. GAO-03-729T |
Title
United States General Accounting Office GAO
For Release on Delivery Expected at 10:00 a.m. EDT Tuesday, June 24, 2003 Testimony Before the Committee on Banking, Housing, and Urban Affairs U.S. Senate FEDERAL TRANSIT ADMINISTRATION Bus Rapid Transit Offers Communities a Flexible Mass Transit Option
Statement of JayEtta Hecker, Director Physical Infrastructure Issues GAO-03-729T June 24, 2003 FEDERA... |
Date June 23, 2003 |
Report No. GAO-03-701 |
Title
United States General Accounting Office GAO
June 2003 Report to Congressional Committees MASS TRANSIT FTA Needs to Provide Clear Information and Additional Guidance on the New Starts Ratings Process GAO-03-701 a June 2003 MASS TRANSIT FTA Needs to Provide Clear Information and Additional Guidance on the New Starts Ratings Process Highlights of GAO-03-701, a report to the Committee on Banking, Hous... |
Date April 1, 2003 |
Report No. GAO-03-616T |
Title
United States General Accounting Office GAO
For Release on Delivery Expected at 10:30 a.m. EST in New York, New York Tuesday, April 1, 2003 Testimony Before the National Commission on Terrorist Attacks Upon the United States TRANSPORTATION SECURITY Post-September 11th Initiatives and Long-Term Challenges
Statement of Gerald L. Dillingham Director, Physical Infrastructure Issues GAO-03-616T This is... |
Date Dec. 13, 2002 |
Report No. GAO-03-263 |
Title
United States General Accounting Office GAO
December 2002 Report to Congressional Requesters MASS TRANSIT Federal Action Could Help Transit Agencies Address Security Challenges GAO-03-263 a December 2002 MASS TRANSIT Federal Action Could Help Transit Agencies Address Security Challenges Highlights of GAO-03-263, a report to Congressional Requesters About one-third of terrorist attacks worldwide ta... |
Date Sept. 30, 2002 |
Report No. GAO-02-1132T |
Title
United States General Accounting Office GAO Testimony
Before the Committee on Environment and Public Works U.S. Senate For Release on Delivery Expected at 10:00 a.m. EDT Monday, September 30, 2002 SURFACE AND MARITIME TRANSPORTATION Challenges and Strategies for Enhancing Mobility
Statement of JayEtta Z. Hecker Director, Physical Infrastructure Issues GAO-02-1132T Mr. Chairman and Members of the C... |
Date Sept. 18, 2002 |
Report No. GAO-02-1075T |
Title
United States General Accounting Office GAO
For Release on Delivery Expected at 2:30 p.m. EDT Wednesday, September 18, 2002 Testimony
Before the Subcommittee on Housing and Transportation, Committee on Banking, Housing, and Urban Affairs, U.S. Senate MASS TRANSIT Challenges in Securing Transit Systems
Statement of Peter Guerrero Director, Physical Infrastructure Issues GAO-02-1075T a Mr. Chairman ... |