Menu Search Account

LegiStorm

Get LegiStorm App Visit Product Demo Website
» Get LegiStorm App
» Get LegiStorm Pro Free Demo

GAO Reports by subject "Nuclear powerplant construction"

Full-text search of 51,868 reports from the Government Accountability Office
From To
Reset

Search Results:

Date Report No. Title
Date Nov. 19, 2010 Report No. GAO-11-103 Title

Nuclear Weapons: National Nuclear Security Administration's Plans for Its Uranium Processing Facility Should Better Reflect Funding Estimates and Technology Readiness

United States Government Accountability Office GAO November 2010 Report to the Subcommittee on Energy and Water Development, Committee on Appropriations, U.S. Senate NUCLEAR WEAPONS National Nuclear Security Administration’s Plans for Its Uranium Processing Facility Should Better Reflect Funding Estimates and Technology Readiness GAO-11-103 November 2010 NUCLEAR WEAPONS Accountability • Integr...
Date March 26, 2010 Report No. GAO-10-378 Title

Nuclear Nonproliferation: DOE Needs to Address Uncertainties with and Strengthen Independent Safety Oversight of Its Plutonium Disposition Program

United States Government Accountability Office GAO March 2010 Report to the Subcommittee on Energy and Water Development, Committee on Appropriations, House of Representatives NUCLEAR NONPROLIFERATION DOE Needs to Address Uncertainties with and Strengthen Independent Safety Oversight of Its Plutonium Disposition Program GAO-10-378 March 2010 NUCLEAR NONPROLIFERATION Highlights Highlights of GAO-10...
Date Sept. 26, 2008 Report No. GAO-08-1081 Title

Nuclear Waste: Action Needed to Improve Accountability and Management of DOE's Major Cleanup Projects

United States Government Accountability Office GAO September 2008 Report to the Subcommittee on Energy and Water Development, Committee on Appropriations, House of Representatives NUCLEAR WASTE Action Needed to Improve Accountability and Management of DOE’s Major Cleanup Projects GAO-08-1081 September 2008 NUCLEAR WASTE Highlights Highlights of GAO-08-1081, a report to the Subcommittee on Energy...
Date June 2, 1997 Report No. RCED/NSIAD-97-165 Title

Nuclear Nonproliferation: Implementation of the U.S./North Korean Agreed Framework on Nuclear Issues

United States General Accounting Office GAO June 1997 Report to the Chairman, Committee on Energy and Natural Resources, U.S. Senate NUCLEAR NONPROLIFERATION Implementation of the U.S./North Korean Agreed Framework on Nuclear Issues GAO/RCED/NSIAD-97-165 GAO United States General Accounting Office Washington, D.C. 20548 Resources, Community, and Economic Development Division B-276968 June 2, 1997 ...
Date March 24, 1997 Report No. RCED-97-72 Title

Nuclear Safety: International Atomic Energy Agency's Nuclear Technical Assistance for Cuba

United States General Accounting Office GAO March 1997 Report to Congressional Requesters NUCLEAR SAFETY International Atomic Energy Agency’s Nuclear Technical Assistance for Cuba GAO/RCED-97-72 GAO United States General Accounting Office Washington, D.C. 20548 Resources, Community, and Economic Development Division B-276158 March 24, 1997 The Honorable Jesse A. Helms Chairman, Committee on Fore...
Date March 4, 1997 Report No. RCED-97-85R Title

Department of Energy: Major System Acquisitions From 1980 Through 1996

GAO United States General Accounting Office Washington, D.C. 20548 Resources, Community, Economic Development and Division B-276266 March 4, 1997 The Honorable John R. Kasich Chairman, Committee on the Budget House of Representatives Subject: Department of Energv: Maior Svstem Acquisitions From 1980 Through 1996 Dear Mr. Chairman: As requested, we are providing you with a listing of the major syst...
Date Aug. 1, 1995 Report No. T-RCED-95-236 Title

Nuclear Safety: Concerns with the Nuclear Power Reactors in Cuba

United States General Accounting Office GAO For Rcltxsc on Delivery Expccicd at 2:(N)p.m. EDT Tuesday Augus;l I. 19% Testimony Before the Subcommitteeon the Western Hemisphere, Committee on International Relations, House of Representatives NUCLEAR SAFETY Concerns With the Nuclear Power Reactors in Cuba Statementof Keith 0. Fultz, Assistant Comptroller General, Resources, Community, and Economic De...
Date May 26, 1993 Report No. T-RCED-93-47 Title

Federal Research: Superconducting Super Collider Cost and Schedule

l4qz87 1 “% United States General Accounting Office GAO For Release on Delivery Expected at 10:00 a.m., EDT Wednesday May 26, 1993 Testimony Before the Committee on Science,Space,and Technology, House of Representatives FEDERAL RESEARCH Superconducting Super Collider Cost and Schedule Statementof Victor S. Rezendes,Director, Energy and Science Issues,Resources,Community, and Economic Development...
Date March 31, 1993 Report No. RCED-93-133R Title

Energy: GAO Products on Bonneville Power Administration

‘btGAO l United States General Accounting Office Washington, D.C. 20648 Resources, Community, and Economic Development Division B-252738 March 31, 1993 The Honorable George Miller ’ Chairman, Committee on Natural Resources House of Representatives Dear Mr. Chairman: This letter with enclosures responds to your February 1993 request that we summarize our work on the Bonneville Power Administrat...
Date Sept. 24, 1992 Report No. RCED-92-262 Title

Nuclear Safety: Concerns About the Nuclear Power Reactors in Cuba

IJnited States General Accounting Of9cti GAO September 1992 Report to the Chairman, Subcommittee on Nuclear Regulation, Committee on Environment and Public Works, U.S. Senate NUCLEAR SAFETY Concerns About the Nuclear Power Reactors in Cuba . .,-- RESTRICTED--Not to be released outside the General Accounting Office unless specifically approved by the Office of Congressi Relations. SSSWO/ . MEAbm -C...
Date Sept. 27, 1989 Report No. RCED-89-212 Title

Nuclear Health and Safety: Policy Implications of Funding DOE's K Reactor Cooling Tower Project

fii V i 2 .-- f = - i , 1 P GAO United States General Accounting Office Washington, D.C. 20548 Resources, Qmununity, and Economic Development Division B-236604 September27,198Q The Honorable J. James Exon Chairman, Subcommittee on Strategic Forces and Nuclear Deterrence Committee on Armed Services United States Senate The Honorable John M. Spratt, Jr. Chairman, Department of Energy DefenseNuclear ...
Date Sept. 21, 1989 Report No. RCED-89-206 Title

Nuclear Science: Better Information Needed for Selection of New Production Reactor

Unf ted States Generpl Aceonnting Office' GM September 1989 Report to the Honorable Vic wg Hodd'of Representatives i , NUCLEAR SCIENCEa Better Infomation Needed for Selection of New Production Reactor GAO United States General Accounting Office Washington, D.C. 20548 Resources, Community, and Economic Development Division B-231142 September 21, 1989 The Honorable Vic Fazio House of Representatives...
Date May 24, 1989 Report No. T-RCED-89-46 Title

Energy: GAO's Views on DOE's New Production Reactor Selection Process

United States General Accounting Office j ‘: ’ i ’ ’ -.-._..- Testimony I 38720 .-- For Release on Delivery Expectedat 9:30 a.m. EDT Wednesday May 24, 1989 GAO's Views on DOE's New Production Selection Process Reactor Staternentof J. Dexter Peach Assistant Corrptroller General Resources, Camunity, and Economic Developent Division Before the Departmat of mergy Defense Facilities Panel Cmnit...
Date March 9, 1989 Report No. RCED-89-88FS Title

Nuclear Science: Effect of Conversion of Washington Nuclear Plant No. 1 on Debt and Electric Rates

United States General Accounting Office GAO M&h 1989 Fact Sheet for Congressional Requesters NUCLEAR SCIENCE Effect of Conversion of Washington Nuclear Plant No.1 on Debt and Electric Rates - GAO/RCED439438FS GAO United States General Accounting Ofllce Washington, D.C. 20548 Resources, Community, Economic Development and Division B-231142 March9,1989 The Honorable George Miller Subcommittee on Wat...
Date March 18, 1988 Report No. RCED-88-73 Title

Nuclear Regulation: Action Needed To Ensure That Utilities Monitor and Repair Pipe Damage

b 13s4m * . United States General Aceounting~OiTice Report to the Honorable Edward J. Markey, House of Representatives ch 1988 NUCLEAR REGULATION Action Needed to Ensure That Utilities Monitor and Repair Pipe Damage United States General Accounting Office Washington, D.C. 20548 Resources, Community, and Economic Development Division B-223582 March 18, 1988 The Honorable Edward J. Markey House of R...
Date April 9, 1986 Report No. RCED-86-79 Title

Nuclear Science: Information on DOE Accelerators Should Be Better Disclosed in the Budget

Development, Committee on Appropriations United Stat-esSenate -... -_ --...- -...-....-.-.. ..I ----..-“~_ ._ _-. .. _.._.____...... .-. -.-.-.-. April 1986 NUCLEAR SCIENCE Information on.DOE Accelerators Should Be Better Disclosedin the Budget .._. -...-.. .._ .” .-~ ..- .- ..I.. United States General Accounting Office Washington, D.C. 20648 Resources, Community, Economic Development and Divi...
Date Jan. 8, 1986 Report No. RCED-86-72FS Title

TVA Nuclear Power: Information on Certain Aspects of TVA's Nuclear Power Program

United States Gene&f Acc&nting Office GAO 0 January 1986 Fact Sheet for the Honorable Gordon J. Humphrey United States Senate J&i‘\ a%%0 I 55 TVA tiMLEAR POWER Information on Certain, Aspects of TVA’s Nuclear Power Program 1 iNI ll 1111111 128808 GAO/RCED-86-72FS UNITED STATES GENERAL WASHINGTON, ACCOUNTING D.C. 20548 OFFICE RESOURCES, COMMUNITY, AND ECONOMIC DEVELOPMENT DIVISION January 8, 19...
Date Aug. 3, 1984 Report No. RCED-84-27 Title

Energy: Status of Bonneville Power Administration's Efforts To Improve Its Oversight of Three Nuclear Power Projects

Comptroller General Status Of Bonneville Power Administration’s Efforts To Improve Its Oversight Of Three Nuclear Power Projects In the early 1970 5, the Department of Energy’s Bonneville Power Admlnlstratlon acquired all or part of the powergener,iting capC~biIity of three nuclear projects being constructed In the Paclflc Northwest by the WashIngton Public Power Supply System Under Its contra...
Date March 12, 1984 Report No. 123637 Title

Energy: The Bonneville Power Administration's Oversight Activities Related to Washington Public Power Supply System

&I , j , UNITED,STATES GENERAL ACCOUNTING OFFICE STATEMENTOF KEVINBOJ.AND F. . SENIORASBOCIATE DIRECVJR RESUJRCES, CCPBIUNITY, ANDECONOMIC DEVEIXX'M E N T DIVISION BEEORETBE S U B C C M M Im ONMINING, FORESTMANAGMENT,AND TtiEBCNNEVILLEFOWERALMINISl!RATION -ITTEE ON INl!ERIORANDINSULAR'AFFAIRS UNITEDSTATESEOUSEOF REPRESENTATIVES h M r. Chairm an and m rs of the Subcom nittee: j Ws appreciate this o...
Date April 15, 1983 Report No. RCED-83-123 Title

Energy: Triennial Assessment of TVA, FY's 1980-1982

BY’THE COMPTROLLERG~l)lERAL Report ToThe Congress OF THEUNITEDSTATES Triennial Assessment Of The Te8nn.essee VaHey A&q~rityT,-‘Fisca 1yea,,,Fs1 98()- 1982 ,,, “, This report summarizes GAO’s work at the Tennessee Valley Authority (TVA) during the past 3 years. Because TVA is a Federal corporation, GAO is required to report on TVA’s status every 3 years. The report presents the progress T...
Date March 17, 1982 Report No. EMD-82-56 Title

Energy: DOE Did Not Provide the Subcommittee With All Documents Related to the Clinch River Breeder Reactor Steam Generator Contract

UNITED STATES GENERAL ACCOUNTING OFFICE WASHINGTON, D.C. 20548 March 17, 1982 B-164105 The Honorable John D. Dingell Chairman, Subcommittee on Oversight and Investigations Committee on Energy and Commerce House of Representatives Dear Mr. Chairman: The Departmen?of the Subcommittee Breeder ,,Lwtill RELEASED 117874 Subject: late4 ;tp j$vt Contract for the Cl+ ~t&~&~yr Reactor's Steam Generator4 7 D...
Date Nov. 19, 1981 Report No. 116884 Title

Energy: Quality Assurance in the Construction of Nuclear Powerplants

UNITED STATES GENLRAL ACCOUNTING OFFICE WASHINGTON, D C 20548 FOR RELEASE ON DELIVERY EXPLCTED AT 9 45 a in TIIURSDAY, NOVEMBER 19, 1981 Statement of John W Harman, Acting Associate Director Energy and Ulnerals Division 3efore the Subcommit-Lee on Energy and Env-ironment House Committee on Interior and Insular Affairs Quality Assurance'yn the Construction of Nuclear Powerplants Mr Chairman and Mem...
Date March 16, 1981 Report No. 088863 Title

Energy: Tennessee Valley Authority Electric Power Rates

UNITED STATES GENERAL ACCOUNTING WASHINGTON, D.C. OFFICE FOR RELEASE ON DELIVERY EXPECTED AT 9:OO AM MARCH 16. 1981 STATEMENT OF J. DEXTER PEACH DIRECTOR, ENERGY AND MINERALS DIVISION BEFORE THE COMMITTEE ON ENVIRONMENT AND PUBLIC WORKS U.S. SENATE Mr. Chairman: We appreciate your invitation Valley paid rate by to discuss some of our relates reto cent work at the Tennessee power rates the electric...
Date Dec. 8, 1980 Report No. EMD-81-25 Title

Energy: Electric Powerplant Cancellations and Delays

I BY THECOMPTROLLERGENERAL #eport To The Congress dF THEUNITEDSTATES Electric Powerplant @ancellations And Delays F om 1974 through 1978, the Nation’s electric u ilities canceled plans for 184electrical genera i ing units and delayed construction on most new units. Delays, particularly for nuplants, are getting longer each year. delays. Continued cancellations contribute to increased oil greater...
Date Nov. 7, 1980 Report No. EMD-81-3 Title

Energy: Economic Impact of Closing the Indian Point Nuclear Facility

3 ” \13’iw REJ’O~TBY'IHE ’ (lwnptroller General RELE*~~~ OF THE UNITEDSTATES Economic Impact OfClosing The Indian Point Nuclear Facility T e close proximity of the Indian Point nucl ar plant to the heavily populated New Y :, rk City area has raised questions about the safety of its continued operations. What could be the economic impact on the utility owners and consumers if the nuclear pl...
Date Jan. 2, 1980 Report No. EMD-80-35 Title

Energy: Alignment of Recommendations in EMD-79-105 With Senate Bill 885

UNITED STATES GENERAL ACCOUNTING OFFICE WASHINGTON, D.C. 20548 EIERGY AND MINMALS, DIVISION JANUARY 2, 1980 B-114858 C1 The Honorable John D. Dingell Chairman, Subcommittee on Energy and Power Committee on Interstate and Foreign Commerce House of Representatives 111183 Dear Mr. Chairman: Subject: C ignment of Recomme.pdations in EMD-79-105 (EMD-80-35) with Senate bill 88X. Your recent letter reque...
Date Oct. 10, 1979 Report No. EMD-80-01 Title

Energy: Nuclear Construction Times for the Second and Subsequent Plants at a Multi-Plant Site Are Overstated

UNlm STATES CmmL WASHINGTON, ACCOUNTING OFFICE OS. 201548 -Y AND MINIIR(UI DIVISION OCTOBER 10.1979 B-114858 The Honorable Joseph M. Hendrie Chairman, Nuclear Regulatory COmmiSSiOn /+,+&Q&067 Times for the Second lb-'uclear Construction and Subsequent Plants at a Multi-Plant Site are Overstatedc-3 (EMD-80-01) Dear Mr. Chairman: The lengthening of construction times has significantly increased the ...
Date July 30, 1979 Report No. EMD-79-95 Title

Energy: Analysis of Estimated Cost for Three Pacific Northwest Nuclear Power Plants

REPORTBY THE ULS. This report analyzes the cost estimates for three nuclear powerplants being constructed by Washington Public Power Supply System in the Pacific Northwest and compares their estimated cost with estimates made by Ebasco, a national nuclear engineering and construction firm. The large difference between the estimates is because --differences exist in the base construction period use...
Date May 23, 1979 Report No. EMD-79-15 Title

Energy: Nuclear Reactor Options To Reduce the Risk of Proliferation and To Succeed Current Light Water Reactor Technology

BY THE COMPTROLLER GENERAL t llnillllllllllllllllllllllllll LM’l09445 OF THEUNITEDSTATES tions To Reduce n And To Succe Current Light Water Re ctor Technology ly all commercial nuclear reactors in the United States are light water reactors. Until recently, the “heir apparent” to the light water reactor was the liquid metal fast breeder reactor. Primarily because of proliferation concerns, th...
Date May 15, 1979 Report No. EMD-79-67 Title

Energy: NRC's Operator Licensing Program

COMPTROLLER GENERAL WASHINGTON. OF THE D.C. UNITED rrATES 20548 B-127945 who The Honorable United States Dear Senator Richard Senate Schweiker: S. Schweiker M# 109588 This report responds to your April 19, 1979, request for a prompt analysis of the Nuclear Regulatory Commission's program for licensing nuclear powerplant operators. As you indicated, information from the Three Mile Island nuclear ac...
Date March 22, 1979 Report No. PSAD-79-49 Title

Government Operations: Tennessee Valley Authority Can Improve Estimates and Should Reassess Reserve Requirements for Nuclear Power Plants

General Accounting Office,, Tennessee Valley Authority Can Improve Estimates And Should Reassess Reserve Requirements For Nuclear Power Plants Cost estimates for Hartsville, Phipps Bend, and Yellow Creek nuclear powerplants are understated several hundred million dollars each, because of excluded costs and optimistic and probably unachievable construction schedules. GAO recommends that cost and sc...
Date Feb. 15, 1979 Report No. 108623 Title

Energy: Electric Energy Options for the Tennessee Valley Authority

UNITED STATES GENERALACCOUNTINGOFFICE WASHINGTON, D.C. FOR RELEASE ON DELIVERY EXPECTEDAT 1O:OO A.M. EST FEBRUARY15, 1979 . . STATEMENTOF J. DEXTER PEACH DIRECTOR, ENERGYAND MINERALS DIVISION BEFORE THE COMMITTEE ON BUDGET U.S. SENATE 108623 Senator Sasser: your invitation to discuss -aAwill focus our recent report We appreciate entitled Tennessee '&lectric Valley Energy Options Authority." 1 spec...
Date Sept. 13, 1978 Report No. EMD-78-36 Title

Energy: Before Licensing Floating Nuclear Power Plants, Many Answers Are Needed

DOCUMENT RESUME 07099 - [82M27657] Before Licensing Ploating Nuclea,' Powerplants, Many Answers Are Needed. END-78-36; B-127945. Septl "ber 13, 1978. 33 pp. + 2 appendices (7 pp.). Report to the Congress; by Elmex B. Staats, Ccsmptroller General. Issue Ares Energy: Making Nuclear Fission a Substantial Energy Scurc.: (1608). Contact: Energy and Minerals Div. Budget Function: Natura· Energy 1305). ...
Date Sept. 7, 1978 Report No. EMD-78-80 Title

Energy: The Nuclear Regulatory Commission Needs To Aggressively Monitor and Independently Evaluate Nuclear Power Plant Construction

DOCUMENT RESOME 07097 - [B2547567] Nleeds To Aggressively ,onitor The Nuclear Regulatory Commissi and Independently Evaluate Nuclear Poverplant Construction. EMD-78-80; B-16410E. September 7, 1978. 34 pp. * 2 appendices (5 pp.) . Report to the Congress; by Elmer B. Staats, Comptroller General. I.sue Area: Energy: MakiD- Nuclear Fission a Substantial Energy Source (1608). Contact: Energy and Minera...
Date Feb. 16, 1978 Report No. EMD-78-37 Title

Energy: The Nuclear Regulatory Commission's Licensing of Tennessee Valley Authority Reactors

/05073 DO)MENT BRESURS 05073 - [B0545465] (Restricted) (The Nuclear Regulatory CoMsissioans Licensing of Tennessee Valley Authority Reactors]. BD-78-37; B-127945. Petruary 16, 1978. 7 pp. Report to Rep. Tom Bevill, Chairman, House Committee on Appropriations: Public lorks Subcommittee; by Bl er B. staats, Comptroller General. Issue Area: Energy (1600). Contact: Energy and minerals Div. Budget Func...
Date Jan. 27, 1978 Report No. EMD-78-31 Title

Energy: Federal Attempts to Influence the Outcome of the June 1976 California Nuclear Referendum

DOCUMENT RESuME 04786 - [B032520C.1 Federal attempts to Intfluence the Outcome of the June 1976 California Nuclear Referendum. E2D-.78-31; B-130961. January 27, 1978. 28 pp. + 3 appendfce. (9 pp.). Report to Sen. Henry .1 Jackson, Chairman, Senate Committee on Energy and Natural Res General. rces; by ElmeL B. Staats, Comptroller Issue Area: Energy: Exerttive Branch Organization and Processes for D...
Date Oct. 28, 1977 Report No. EMD-78-4 Title

Energy: How the Nuclear Regulatory Commission Carries Out Its Responsibilities under the National Environmental Policy Act of 1969

LCCUEN 04C05 - r 3054299 Ri SUME r How the Nuclear Reculatory Com..ssicn Carries Out Its ReFonsibilitie es under 19691. ED-7b-4; B-170 (4 pp.) 1 the Nati.ral EnviLccnmentai Policy Act of 86. October 2, 1;7. 6 pp. 4 eclcure zeport to Rep. illiam J. Ccmptroiler General. Hghes; by Fcbert F Keller, Acting Issui Aea. Energy: Federal Role as a Proprietcr of Energy r.ic~-urces (1603); Environmental rctec...
Date Sept. 30, 1976 Report No. EMD-76-12 Title

Energy: Evaluation of the Publication and Distribution of "Shedding Light on Facts About Nuclear Energy"

EPORT T BY THE COMP OF THE UNITED S luation Of T istni bution Facts Abo Energy Research and Deweloprnent Administration Shedding Light is an Energy Research and Development Administration pamphlet intended for use in an internal performance improvement program. It was circulated in California 2 to 4 months before a ballot on nuclear energy in that State. GAO believes this pamphlet did not make an ...
Date April 14, 1976 Report No. 099373 Title

Energy: Clinch River Breeder Reactor Project

UNITED STATES GENERALACCOUNTINGOFFICE WASHINGTON,D.C. 20548 FOR RELEASE ON DELIVERY Expected at lo:30 a.m. EST Wednesday, April 14, 1976 STATEMENTOF PAUL G. DEMBLING, GENERALCOUNSEL BEFORE THE JOINT COMMITTEEON ATOMIC ENERGY -,I! ON THE PROPOSED CONTRACT FOR THE CLINCH RIVER BREEDERREACTORPROJECT Mr. Chairman and Members of the Committee: We are pleased certain Research _ aspects to respond to you...
Date March 1, 1976 Report No. PSAD-76-86 Title

Energy: Bellefonte Nuclear Plant

STUDY 4 4 BY THE STAFF OF THE ACCOUNTING OFFICE l-MO99944 GENERAL iillilllllllll!liIllIIl;lillilll Bellefonte Nuclear Plant Tennessee Valley Authority The Bellefonte Nuclear Plant is being constructed by the Tennessee Valley Authority for the purpose of generating electricity. It is TVA’s fourth nuclear plant and is situated near Scottsboro, Alabama. This study is part of GAO’s effort to provi...
Date Oct. 22, 1975 Report No. 096944 Title

Energy: Review of NRC's Environmental Protection Program in the Licensing of Commercial Nuclear Power Plants

f!- ,‘% _.* 7 7 e. I ’ *j; rt .’ $L‘ /i A UNITEDSTATES GENERAL ACCOUNTING OFFICE 4r WASHINGTON, P;C. ,20548 RESOURCES AND DEVELOPMENT ECONOMIC DIVISION OCT 221975 ( -: < Mr. Lee V. Gossick Etvecutive Director for Operations Nuclear Regulatory Commission 4 Dear Mr. Gossick: Wehave completed a review of the Nuclear Regulatory Commission's program for evaluating- as required by the National E...
Date March 1, 1975 Report No. 097098 Title

Energy: Sequoyah Nuclear Plant

. I U. S. GENCtiL lit.COUh'TiNG OFFlt;E STnFF STUDY .I i j TENNBS~~.E VaLLLY AUTHOKITY .. . / -_ . 1 : 7 I--.-..y-~,,~~ --____ y.‘--ny-.xliz-,d. -T_-..e----. .---A--.-...---------_ .-----_ .- I ,/---_ SUMMARY “HAP’~ 1 i j. \ ‘-- .- \ IhYYODUCTION Authority, Purpose, and Scope of Operations Financial Arrangement , 2uciear Power Pla 4 Sequoyah Nuclear'Plant Description Scope- of Study PROJEC...
Date Jan. 1, 1975 Report No. 097121 Title

Government Operations: Fast Flux Test Facility Program

L \ FLliX TEST FACILITY PRO!2 4?f lnlllllllll~l~ Ill1 Ill11 Ill lllllulll lnlllllll LM097121 FAST JA?fVAW 19 75 1. YAlWlEtLwCE C.44K ! [ACM CEi Cft 2. 1UfDR CASK 1ORalHC STATIORI 5. LIQUII) I-fffROGLH PEWADS 1. SOBlUM WEAIOVALSfArlOH 5. 6. 7. 8. 9. RAPS CAPS GAS COIPffESSOA ~34 COIPRESSOR BOX ASSE~AILY CELL 7Af-dX CELL COLO BOX ASSLMDlLY ARGON diGOH &ELLS CELtS lOME COMPRESSOR (OHE COMPRESSOR.EACH...
Date Jan. 31, 1972 Report No. B-127945 Title

Energy: Management Improvements Needed in the Review and Evaluation of Applications To Construct and Operate Nuclear Power Plants

S OF THE UNITED STATES Atomic Energy Commission BY THE COMPTROLLER GENERAL OF THE UNITED STATES COMf’TROLLEY;I GENERAL WASH!NGTON. OF D.C. THE UNITED STATES aOatS B- 127945 Dear Mr. Chairman: This is our report on management improvements needed in the review and evaluation of applications to construct and operate nuclear power plants. The review was made in accordance with your request dated Jun...