Date |
Report No. |
Title |
Date Nov. 6, 2007 |
Report No. GAO-08-68 |
Title
United States Government Accountability Office GAO
November 2007 Report to Congressional Committees GLOBAL WAR ON TERRORISM DOD Needs to Take Action to Encourage Fiscal Discipline and Optimize the Use of Tools Intended to Improve GWOT Cost Reporting GAO-08-68 November 2007 GLOBAL WAR ON TERRORISM Highlights
Highlights of GAO-08-68, a report to congressional committees Accountability Integrity Reli... |
Date Aug. 31, 2007 |
Report No. GAO-07-1077 |
Title
United States Government Accountability Office GAO
August 2007 Report to Congressional Requesters DEFENSE INFRASTRUCTURE Management Actions Needed to Ensure Effectiveness of DOD’s Risk Management Approach for the Defense Industrial Base GAO-07-1077 August 2007 DEFENSE INFRASTRUCTURE Highlights
Highlights of GAO-07-1077, a report to congressional requesters Accountability Integrity Reliability Ma... |
Date Aug. 2, 2007 |
Report No. GAO-07-1029R |
Title
Washington, DC 20548 August 2, 2007 The Honorable Bill Nelson Chairman The Honorable Jeff Sessions Ranking Member Subcommittee on Strategic Forces Committee on Armed Services United States Senate The Honorable Ellen Tauscher Chairwoman The Honorable Terry Everett Ranking Member Subcommittee on Strategic Forces Committee on Armed Services House of Representatives The Honorable Silvestre Reyes House... |
Date July 31, 2007 |
Report No. GAO-07-839 |
Title
United States Government Accountability Office GAO
July 2007 Report to Congressional Requesters DEFENSE CONTRACT MANAGEMENT DOD’s Lack of Adherence to Key Contracting Principles on Iraq Oil Contract Put Government Interests at Risk GAO-07-839 July 2007 DEFENSE CONTRACT MANAGEMENT Highlights
Highlights of GAO-07-839, a report to congressional requesters Accountability Integrity Reliability DOD's ... |
Date July 16, 2007 |
Report No. GAO-07-851 |
Title
United States Government Accountability Office GAO
July 2007 Report to Congressional Committees HUMAN CAPITAL DOD Needs Better Internal Controls and Visibility over Costs for Implementing Its National Security Personnel System GAO-07-851 July 2007 HUMAN CAPITAL Highlights
Highlights of GAO-07-851, a report to congressional committees Accountability Integrity Reliability DOD Needs Better Internal C... |
Date July 10, 2007 |
Report No. GAO-07-1064T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 2:30 p.m. EDT Tuesday, July 10, 2007 Testimony
Before the Subcommittee on Oversight of Government Management, the Federal Workforce, and the District of Columbia, Committee on Homeland Security and Governmental Affairs, U.S. Senate DOD’S HIGH-RISK AREAS Efforts to Improve Supply Chain Can Be Enhanced by Linkag... |
Date June 29, 2007 |
Report No. GAO-07-273 |
Title
United States Government Accountability Office GAO
June 2007 Report to the Committee on Armed Services, U.S. Senate DEFENSE CONTRACTING Improved Insight and Controls Needed over DOD’s Time-andMaterials Contracts GAO-07-273 June 2007 DEFENSE CONTRACTING Highlights
Highlights of GAO-07-273, a report to the Committee on Armed Services, U.S. Senate Accountability Integrity Reliability Improved Insig... |
Date June 28, 2007 |
Report No. GAO-07-620 |
Title
United States Government Accountability Office GAO
June 2007 Report to the Subcommittee on Emerging Threats and Capabilities, Committee on Armed Services, U.S. Senate DEFENSE ACQUISITIONS An Analysis of the Special Operations Command’s Management of Weapon System Programs GAO-07-620 June 2007 DEFENSE ACQUISITIONS Highlights
Highlights of GAO-07-620, a report to the Subcommittee on Emerging Threa... |
Date June 19, 2007 |
Report No. GAO-07-559 |
Title
United States Government Accountability Office GAO
June 2007 Report to Congressional Committees DEFENSE CONTRACTING Use of Undefinitized Contract Actions Understated and Definitization Time Frames Often Not Met GAO-07-559 June 2007 DEFENSE CONTRACTING Highlights
Highlights of GAO-07-559, a report to congressional committees Accountability Integrity Reliability Use of Undefinitized Contract Actions... |
Date June 8, 2007 |
Report No. GAO-07-759 |
Title
United States Government Accountability Office GAO
June 2007 Report to the Chairman, Subcommittee on Air and Land Forces, Committee on Armed Services, House of Representatives DEFENSE ACQUISITIONS Analysis of Processes Used to Evaluate Active Protection Systems GAO-07-759 June 2007 DEFENSE ACQUISITIONS Highlights
Highlights of GAO-07-759, a report to Subcommittee on Air and Land Forces, Committee ... |
Date June 6, 2007 |
Report No. GAO-07-380 |
Title
United States Government Accountability Office GAO
June 2007 Report to Congressional Committees DEFENSE ACQUISITIONS Role of Lead Systems Integrator on Future Combat Systems Program Poses Oversight Challenges GAO-07-380 June 2007 DEFENSE ACQUISITIONS Highlights
Highlights of GAO-07-380, a report to congressional committees Accountability Integrity Reliability Role of Lead Systems Integrator on Fut... |
Date May 24, 2007 |
Report No. GAO-07-745 |
Title
United States Government Accountability Office GAO
May 2007 Report to the Subcommittee on Emerging Threats and Capabilities, Committee on Armed Services, U.S. Senate DEFENSE ACQUISITIONS Success of Advanced SEAL Delivery System Hinges on Establishing a Sound Contracting Strategy and Performance Criteria GAO-07-745 May 2007 DEFENSE ACQUISITIONS Highlights
Highlights of GAO-07-745, a report to the S... |
Date May 21, 2007 |
Report No. GAO-07-803R |
Title
United States Government Accountability Office Washington, DC 20548 May 21, 2007 The Honorable Solomon P. Ortiz Chairman The Honorable Jo Ann Davis Ranking Member Subcommittee on Readiness Committee on Armed Services House of Representatives Subject: Defense Infrastructure: Full Costs and Security Implications of Cheyenne Mountain Realignment Have Not Been Determined The Department of Defense (DOD... |
Date May 18, 2007 |
Report No. GAO-07-783R |
Title
United States Government Accountability Office Washington, DC 20548 May 18, 2007 The Honorable Carl Levin Chairman The Honorable John McCain Ranking Member Committee on Armed Services United States Senate The Honorable Daniel K. Inouye Chairman The Honorable Ted Stevens Ranking Member Subcommittee on Defense Committee on Appropriations United States Senate The Honorable Ike Skelton Chairman The Ho... |
Date May 18, 2007 |
Report No. GAO-07-631 |
Title
United States Government Accountability Office GAO
May 2007 Report to Congressional Committees DEFENSE BUDGET Trends in Operation and Maintenance Costs and Support Services Contracting GAO-07-631 May 2007 DEFENSE BUDGET Highlights
Highlights of GAO-07-631, a report to congressional committees Accountability Integrity Reliability Trends in Operation and Maintenance Costs and Support Services Contra... |
Date May 17, 2007 |
Report No. GAO-07-578 |
Title
United States Government Accountability Office GAO
May 2007 Report to the Subcommittee on Air and Land Forces, Committee on Armed Services, House of Representatives DEFENSE ACQUISITIONS Greater Synergies Possible for DOD’s Intelligence, Surveillance, and Reconnaissance Systems GAO-07-578 May 2007 DEFENSE ACQUISITIONS Highlights
Highlights of GAO-07-578, a report to the Subcommittee on Air and La... |
Date May 11, 2007 |
Report No. GAO-07-538 |
Title
United States Government Accountability Office GAO
May 2007 Report to Congressional Committees BUSINESS SYSTEMS MODERNIZATION DOD Needs to Fully Define Policies and Procedures for Institutionally Managing Investments GAO-07-538 May 2007 BUSINESS SYSTEMS MODERNIZATION Highlights
Highlights of GAO-07-538, a report to congressional committees Accountability Integrity Reliability DOD Needs to Fully De... |
Date May 10, 2007 |
Report No. GAO-07-832T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 10:00 a.m. EDT Thursday, May 10, 2007 Testimony Before the Subcommittee on Defense, Committee on Appropriations, House of Representatives DEFENSE ACQUISITIONS Improved Management and Oversight Needed to Better Control DOD’s Acquisition of Services
Statement of John P. Hutton, Director Acquisition and Sourcing ... |
Date April 30, 2007 |
Report No. GAO-07-618 |
Title
United States Government Accountability Office GAO
April 2007 Report to Congressional Committees DEFENSE MANAGEMENT High-Level Leadership Commitment and Actions Are Needed to Address Corrosion Issues GAO-07-618 April 2007 DEFENSE MANAGEMENT Highlights
Highlights of GAO-07-618, a report to congressional committees Accountability Integrity Reliability High-Level Leadership Commitment and Actions Are... |
Date April 30, 2007 |
Report No. GAO-07-799T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 1:30 p.m. EDT Monday, April 30, 2007 Testimony before the Subcommittee on Defense, Committee on Appropriations, U.S. House of Representatives DEFENSE ACQUISITIONS Missile Defense Agency’s Flexibility Reduces Transparency of Program Cost
Statement of Paul Francis, Director, Acquisition and Sourcing Management G... |
Date April 26, 2007 |
Report No. GAO-07-688R |
Title
United States Government Accountability Office Washington, DC 20548 April 26, 2007 The Honorable Carl Levin Chairman The Honorable John McCain Ranking Member Committee on Armed Services United States Senate The Honorable Ike Skelton Chairman The Honorable Duncan L. Hunter Ranking Member Committee on Armed Services House of Representatives Subject: Defense Budget: Review of DOD’s Report on Budget... |
Date April 19, 2007 |
Report No. GAO-07-730T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 2:30 p.m. EDT Thursday, April 19, 2007 Testimony before the Subcommittee on Strategic Forces, Senate Committee on Armed Services SPACE ACQUISITIONS Actions Needed to Expand and Sustain Use of Best Practices
Statement of Cristina T. Chaplain, Director Acquisition and Sourcing Management Team GAO-07-730T April 19,... |
Date April 19, 2007 |
Report No. GAO-07-596T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 10:00 a.m. EDT Thursday, April 19, 2007 Testimony Before the Subcommittee on Air and Land Forces, Committee on Armed Services, House of Representatives INTELLIGENCE, SURVEILLANCE, AND RECONNAISSANCE Preliminary Observations on DOD’s Approach to Managing Requirements for New Systems, Existing Assets, and System... |
Date April 17, 2007 |
Report No. GAO-07-430 |
Title
United States Government Accountability Office GAO
April 2007 Report to Congressional Committees MISSILE DEFENSE Actions Needed to Improve Information for Supporting Future Key Decisions for Boost and Ascent Phase Elements GAO-07-430 April 2007 MISSILE DEFENSE Highlights
Highlights of GAO-07-430, a report to congressional committees Accountability Integrity Reliability Actions Needed to Improve In... |
Date April 12, 2007 |
Report No. GAO-07-546 |
Title
United States Government Accountability Office GAO
April 2007 Report to Congressional Committees DEFENSE ACQUISITIONS Status and Challenges of Joint Forces Command’s Limited Acquisition Authority GAO-07-546 April 2007 DEFENSE ACQUISITIONS Highlights
Highlights of GAO-07-546, a report to congressional committees Accountability Integrity Reliability Status and Challenges of Joint Forces Command’... |
Date April 11, 2007 |
Report No. GAO-07-727T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 3:00 p.m. EDT Wednesday, April 11, 2007 Testimony before the Subcommittee on Strategic Forces, Committee on Armed Services, United States Senate DEFENSE ACQUISITIONS Missile Defense Needs a Better Balance between Flexibility and Accountability
Statement of Paul Francis, Director, Acquisition and Sourcing Managem... |
Date March 30, 2007 |
Report No. GAO-07-388 |
Title
United States Government Accountability Office GAO
March 2007 Report to the Committee on Armed Services, U.S. Senate BEST PRACTICES An Integrated Portfolio Management Approach to Weapon System Investments Could Improve DOD’s Acquisition Outcomes GAO-07-388 March 2007 BEST PRACTICES Highlights
Highlights of GAO-07-388, a report to the Committee on Armed Services, U.S. Senate Accountability Integr... |
Date March 30, 2007 |
Report No. GAO-07-406SP |
Title
United States Government Accountability Office GAO
March 2007 Report to Congressional Committees DEFENSE ACQUISITIONS Assessments of Selected Weapon Programs GAO-07-406SP March 2007 DEFENSE ACQUISITIONS Highlights
Highlights of GAO-07-406SP, a report to congressional committees Accountability Integrity Reliability Assessments of Selected Weapon Programs Why GAO Did This Study
This report is GAO’... |
Date March 27, 2007 |
Report No. GAO-07-672T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 10:00 a.m. EDT Tuesday, March 27, 2007 Testimony before the Subcommittee on Air and Land Forces, Committee on Armed Services, House of Representatives DEFENSE ACQUISITIONS Future Combat System Risks Underscore the Importance of Oversight Statement of Paul L. Francis, Director Acquisition and Sourcing Management ... |
Date March 26, 2007 |
Report No. GAO-07-640R |
Title
United States Government Accountability Office Washington, DC 20548 March 26, 2007 The Honorable Daniel K. Akaka Chairman The Honorable John Ensign Ranking Member Subcommittee on Readiness and Management Support Committee on Armed Services United States Senate Subject: Defense Services Acquisition: Questions for the Record On January 17, 2007, I testified before the Subcommittee on the Department ... |
Date March 22, 2007 |
Report No. GAO-07-656T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 2:00 p.m. EDT Thursday, March 22, 2007 Testimony before the Subcommittees on Air and Land Forces, and Seapower and Expeditionary Forces, Committee on Armed Services, House of Representatives DEFENSE ACQUISITIONS Analysis of Costs for the Joint Strike Fighter Engine Program
Statement of Michael Sullivan, Director... |
Date March 15, 2007 |
Report No. GAO-07-376 |
Title
United States Government Accountability Office GAO
March 2007 Report to Congressional Committees DEFENSE ACQUISITIONS Key Decisions to Be Made on Future Combat System GAO-07-376 March 2007 DEFENSE ACQUISITIONS Highlights
Highlights of GAO-07-376, a report to congressional committees Accountability Integrity Reliability Key Decisions to Be Made on Future Combat System Why GAO Did This Study
The Fut... |
Date March 15, 2007 |
Report No. GAO-07-387 |
Title
United States Government Accountability Office GAO
March 2007 Report to Congressional Committees DEFENSE ACQUISITIONS Missile Defense Acquisition Strategy Generates Results but Delivers Less at a Higher Cost GAO-07-387 March 2007 DEFENSE ACQUISITIONS Highlights
Highlights of GAO-07-387, a report to congressional committees Accountability Integrity Reliability Missile Defense Acquisition Strategy G... |
Date March 15, 2007 |
Report No. GAO-07-360 |
Title
United States Government Accountability Office GAO
March 2007 Report to Congressional Committees JOINT STRIKE FIGHTER Progress Made and Challenges Remain GAO-07-360 March 2007 JOINT STRIKE FIGHTER Highlights
Highlights of GAO-07-360, a report to congressional committees Accountability Integrity Reliability Progress Made and Challenges Remain Why GAO Did This Study
The Joint Strike Fighter (JSF) pr... |
Date March 7, 2007 |
Report No. GAO-07-566T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 3:00 p.m. EST Wednesday, March 7, 2007 Testimony Before the House Committee on Armed Services, Air and Land Forces Subcommittee DEFENSE ACQUISITIONS Issues Concerning Airlift and Tanker Programs
Statement of William M. Solis, Director Defense Capabilities and Management Issues and Michael J. Sullivan, Director A... |
Date March 2, 2007 |
Report No. GAO-07-281 |
Title
United States Government Accountability Office GAO
March 2007 Report to Congressional Committees DEFENSE INVENTORY Opportunities Exist to Improve the Management of DOD’s Acquisition Lead Times for Spare Parts GAO-07-281 March 2007 DEFENSE INVENTORY Highlights
Highlights of GAO-07-281, a report to congressional committees Accountability Integrity Reliability Opportunities Exist to Improve the Man... |
Date Feb. 26, 2007 |
Report No. GAO-07-396R |
Title
United States Government Accountability Office Washington, DC 20548 February 26, 2007 The Honorable Carl Levin Chairman The Honorable John McCain Ranking Minority Member Committee on Armed Services United States Senate The Honorable Ike Skelton Chairman The Honorable Duncan L. Hunter Ranking Minority Member Committee on Armed Services House of Representatives Subject: Defense Management: DLA Has M... |
Date Feb. 15, 2007 |
Report No. GAO-07-426T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 10:00 a.m. EST Thursday, February 15, 2007 Testimony before the Committee on Oversight and Government Reform, House of Representatives REBUILDING IRAQ Reconstruction Progress Hindered by Contracting, Security, and Capacity Challenges
Statement of David M. Walker Comptroller General of the United States GAO-07-42... |
Date Jan. 31, 2007 |
Report No. GAO-07-310 |
Title
United States Government Accountability Office GAO
January 2007 HIGH-RISK SERIES An Update GAO-07-310 January 2007 HIGH-RISK SERIES Highlights
Highlights of GAO-07-310, a report to Congress on GAO’s High-Risk Series Accountability Integrity Reliability An Update Why GAO Did This Report
GAO’s audits and evaluations identify federal programs and operations that, in some cases, are high risk due ... |
Date Jan. 26, 2007 |
Report No. GAO-07-211 |
Title
United States Government Accountability Office GAO
January 2007 Report to the Ranking Minority Member, Subcommittee on Defense, Committee on Appropriations, House of Representatives FORCE STRUCTURE Joint Seabasing Would Benefit from a Comprehensive Management Approach and Rigorous Experimentation before Services Spend Billions on New Capabilities GAO-07-211 January 2007 FORCE STRUCTURE Highlights
... |
Date Jan. 17, 2007 |
Report No. GAO-07-359T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 2:30 p.m. EST January 17, 2007 Testimony Before the Subcommittee on Readiness and Management Support, Committee on Armed Services, U.S. Senate DEFENSE ACQUISITIONS DOD Needs to Exert Management and Oversight to Better Control Acquisition of Services
Statement of Katherine V. Schinasi, Managing Director Acquisiti... |
Date Dec. 21, 2006 |
Report No. GAO-07-217R |
Title
United States Government Accountability Office Washington, DC 20548 December 21, 2006 The Honorable C. W. Bill Young Chairman The Honorable John P. Murtha Ranking Minority Member Subcommittee on Defense Committee on Appropriations House of Representatives Subject: Defense Contracting—Questions for the Record On September 7, 2006, I testified before the Subcommittee on recent trends in Department... |
Date Dec. 15, 2006 |
Report No. GAO-07-30R |
Title
United States Government Accountability Office Washington, DC 20548 December 15, 2006 Congressional Committees Subject: Rebuilding Iraq—Status of DOD’s Reconstruction Program Of the $18.4 billion that Congress appropriated for Iraq relief and reconstruction in fiscal year 2004, the Department of Defense (DOD) received the largest share— $13.5 billion.1 As of September 30, 2006, DOD had oblig... |
Date Nov. 30, 2006 |
Report No. GAO-07-126 |
Title
United States Government Accountability Office GAO
November 2006 Report to Congressional Committees DEPOT MAINTENANCE Actions Needed to Provide More Consistent Funding Allocation Data to Congress GAO-07-126 November 2006 DEPOT MAINTENANCE Highlights
Highlights of GAO-07-126, a report to congressional committees Accountability Integrity Reliability Actions Needed to Provide More Consistent Funding ... |
Date Nov. 30, 2006 |
Report No. GAO-07-115 |
Title
United States Government Accountability Office GAO
November 2006 Report to the Subcommittee on Projection Forces, Committee on Armed Services, House of Representatives DEFENSE ACQUISITIONS Challenges Remain in Developing Capabilities for Naval Surface Fire Support GAO-07-115 November 2006 DEFENSE ACQUISITIONS Highlights
Highlights of GAO-07-115, a report to Subcommittee on Projection Forces, Commi... |
Date Nov. 17, 2006 |
Report No. GAO-07-96 |
Title
United States Government Accountability Office GAO
November 2006 Report to Subcommittee on Strategic Forces, Committee on Armed Services, House of Representatives SPACE ACQUISITIONS DOD Needs to Take More Action to Address Unrealistic Initial Cost Estimates of Space Systems GAO-07-96 November 2006 SPACE ACQUISITIONS Highlights
Highlights of GAO-07-96, a report to Subcommittee on Strategic Forces, ... |
Date Nov. 16, 2006 |
Report No. GAO-07-229T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 9:30 a.m. EST Thursday, November 16, 2006 Testimony Before the Subcommittee on Readiness and Management Support, Committee on Armed Services, U.S. Senate DEFENSE BUSINESS TRANSFORMATION A Comprehensive Plan, Integrated Efforts, and Sustained Leadership Are Needed to Assure Success
Statement of David M. Walker Co... |
Date Nov. 9, 2006 |
Report No. GAO-07-20 |
Title
United States Government Accountability Office GAO
November 2006 Report to the Subcommittee on Readiness and Management Support, Committee on Armed Services, U.S. Senate DEFENSE ACQUISITIONS Tailored Approach Needed to Improve Service Acquisition Outcomes GAO-07-20 November 2006 DEFENSE ACQUISITIONS Highlights
Highlights of GAO-07-20, a report to the Subcommittee on Readiness and Management Suppor... |
Date Sept. 28, 2006 |
Report No. GAO-06-1130T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 10:00 a.m. EDT Thursday, September 28, 2006 Testimony before the Committee on Government Reform, House of Representatives REBUILDING IRAQ Continued Progress Requires Overcoming Contract Management Challenges
Statement of Katherine V. Schinasi, Managing Director, Acquisition and Sourcing Management GAO-06-1130T S... |
Date Sept. 25, 2006 |
Report No. GAO-06-1132 |
Title
United States Government Accountability Office GAO
September 2006 Report to Congressional Committees IRAQ CONTRACT COSTS DOD Consideration of Defense Contract Audit Agency’s Findings GAO-06-1132 September 2006 IRAQ CONTRACT COSTS Highlights
Highlights of GAO-06-1132, a report to Congressional Committees Accountability Integrity Reliability DOD Consideration of Defense Contract Audit Agency's Fin... |