Date |
Report No. |
Title |
Date June 3, 2011 |
Report No. GAO-11-563 |
Title
United States Government Accountability Office GAO
June 2011 Report to Congressional Requesters NUCLEAR REGULATORY COMMISSION Oversight of Underground Piping Systems Commensurate with Risk, but Proactive Measures Could Help Address Future Leaks GAO-11-563 June 2011 NUCLEAR REGULATORY COMMISSION
Accountability • Integrity • Reliability Oversight of Underground Piping Systems Commensurate with R... |
Date April 29, 2010 |
Report No. GAO-10-489 |
Title
United States Government Accountability Office GAO
April 2010 Report to the Chairman, Subcommittee on Oversight of Government Management, the Federal Workforce, and the District of Columbia, Committee on Homeland Security and Governmental Affairs, U.S. Senate NUCLEAR SAFETY Convention on Nuclear Safety Is Viewed by Most Member Countries as Strengthening Safety Worldwide GAO-10-489 April 2010 NUCLE... |
Date April 29, 2010 |
Report No. GAO-10-550SP |
Title
|
Date June 30, 2008 |
Report No. GAO-08-747 |
Title
United States Government Accountability Office GAO
June 2008 Report to Congressional Requesters NUCLEAR SAFETY NRC’s Oversight of Fire Protection at U.S. Commercial Nuclear Reactor Units Could Be Strengthened GAO-08-747 June 2008 NUCLEAR SAFETY Highlights
Highlights of GAO-08-747, a report to congressional requesters Accountability Integrity Reliability NRC’s Oversight of Fire Protection at U.... |
Date Jan. 17, 2007 |
Report No. GAO-07-105 |
Title
United States Government Accountability Office GAO
January 2007 Report to the Subcommittee on Oversight of Government Management, the Federal Workforce, and the District of Columbia, Committee on Homeland Security and Governmental Affairs, U.S. Senate HUMAN CAPITAL Retirements and Anticipated New Reactor Applications Will Challenge NRC’s Workforce GAO-07-105 January 2007 HUMAN CAPITAL Highlights... |
Date Sept. 27, 2006 |
Report No. GAO-06-1029 |
Title
United States Government Accountability Office GAO
September 2006 Report to Congressional Requesters NUCLEAR REGULATORY COMMISSION Oversight of Nuclear Power Plant Safety Has Improved, but Refinements Are Needed GAO-06-1029 a September 2006 NUCLEAR REGULATORY COMMISSION Highlights
Highlights of GAO-06-1029, a report to congressional requesters Accountability Integrity Reliability Oversight of Nucl... |
Date June 19, 2006 |
Report No. GAO-06-888T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 4:00 p.m. EDT Monday, June 19, 2006 Testimony Before the Subcommittee on Oversight and Investigations, Committee on Energy and Commerce, U.S. House of Representatives NUCLEAR REGULATORY COMMISSION Preliminary Observations on Its Process to Oversee the Safe Operation of Nuclear Power Plants
Statement of Jim Wells... |
Date June 15, 2006 |
Report No. GAO-06-886T |
Title
United States Government Accountability Office GAO
Not to Be Released Before 9:30 a.m. EDT Thursday, June 22, 2006 Testimony Before the Subcommittee on Clean Air, Climate Change, and Nuclear Safety, Committee on Environment and Public Works, United States Senate NUCLEAR REGULATORY COMMISSION Preliminary Observations on Its Oversight to Ensure the Safe Operation of Nuclear Power Plants
Statement fo... |
Date April 4, 2006 |
Report No. GAO-06-555T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 2:00 p.m. EDT Tuesday, April 4, 2006 Testimony Before the Subcommittee on National Security, Emerging Threats, and International Relations, House Committee on Government Reform NUCLEAR POWER Plants Have Upgraded Security, but the Nuclear Regulatory Commission Needs to Improve Its Process for Revising the Design ... |
Date March 14, 2006 |
Report No. GAO-06-388 |
Title
United States Government Accountability Office GAO
March 2006 Report to the Chairman, Subcommittee on National Security, Emerging Threats, and International Relations, Committee on Government Reform, House of Representatives NUCLEAR POWER PLANTS Efforts Made to Upgrade Security, but the Nuclear Regulatory Commission’s Design Basis Threat Process Should Be Improved GAO-06-388 a March 2006 NUCLEAR... |
Date May 26, 2005 |
Report No. GAO-05-754T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 10:00 a.m. EDT Thursday, May 26, 2005 Testimony Before the Subcommittee on Clean Air, Climate Change, and Nuclear Safety, Committee on Environment and Public Works, U.S. Senate NUCLEAR REGULATORY COMMISSION Challenges Facing NRC in Effectively Carrying Out Its Mission
Statement of Jim Wells, Director Natural Res... |
Date Sept. 14, 2004 |
Report No. GAO-04-1064T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 10:00 a.m. EDT Tuesday, September 14, 2004 Testimony
Before the Subcommittee on National Security, Emerging Threats, and International Relations, Committee on Government Reform, House of Representatives NUCLEAR REGULATORY COMMISSION Preliminary Observations on Efforts to Improve Security at Nuclear Power Plants
... |
Date May 17, 2004 |
Report No. GAO-04-415 |
Title
United States General Accounting Office GAO
May 2004 Report to Congressional Requesters NUCLEAR REGULATION NRC Needs to More Aggressively and Comprehensively Resolve Issues Related to the Davis-Besse Nuclear Power Plant’s Shutdown GAO-04-415 a May 2004 NUCLEAR REGULATION NRC Needs to More Aggressively and Comprehensively Resolve Issues Related to the Davis-Besse Nuclear Power Plant’s Shutdown ... |
Date March 10, 2003 |
Report No. GAO-03-528T |
Title
United States General Accounting Office GAO
For Release on Delivery Expected at 2.00 p.m. Monday, March 10, 2003 Testimony
Before the Subcommittee on National Security, Emerging Threats and International Relations, Committee on Government Reform, House of Representatives NUCLEAR REGULATION Emergency Preparedness Issues at the Indian Point 2 Nuclear Power Plant
Statement of Jim Wells, Director Natu... |
Date May 8, 2001 |
Report No. GAO-01-707T |
Title
United States General Accounting Office GAO Testimony
Before the Subcommittee on Clean Air, Wetlands, Private Property, and Nuclear Safety, Committee on Environment and Public Works, U.S. Senate For Release on Delivery Expected at 9:30 a.m., Tuesday, May 8, 2001 NUCLEAR REGULATION Challenges Confronting NRC in a Changing Regulatory Environment
Statement of Ms. Gary L. Jones, Director Natural Resou... |
Date April 25, 2000 |
Report No. RCED-00-97 |
Title
United States General Accounting Office GAO
April 2000 Report to the Subcommittee on Energy and Water Development, Committee on Appropriations, House of Representatives NUCLEAR SAFETY Concerns With the Continuing Operation of Soviet-Designed Nuclear Power Reactors GAO/RCED-00-97 Contents Letter Executive Summary Chapter 1 Introduction
Background International Nuclear Safety Assistance Efforts U.S.... |
Date March 9, 2000 |
Report No. T-RCED-00-115 |
Title
United States General Accounting Office GAO
For Release on Delivery Expected at 9 a.m. EDT Thursday, March 9, 2000 Testimony
Before the Subcommittee on Clean Air, Wetlands, Private Property, and Nuclear Safety, Committee on Environment and Public Works, U.S. Senate NUCLEAR REGULATION Regulatory and Cultural Changes Challenge NRC
Statement of Ms. Gary L. Jones, Associate Director, Energy, Resources... |
Date Jan. 19, 2000 |
Report No. RCED-00-29 |
Title
United States General Accounting Office GAO
January 2000 Report to the Chairman, Subcommittee on Clean Air, Wetlands, Private Property, and Nuclear Safety, Committee on Environment and Public Works, U.S. Senate NUCLEAR REGULATION NRC Staff Have Not Fully Accepted Planned Changes GAO/RCED-00-29 Contents Letter Appendixes
Appendix I: Results of GAO’s Survey of NRC’s Staff 3 24 44 59 Appendix II:... |
Date Oct. 26, 1999 |
Report No. T-AIMD-00-27 |
Title
United States General Accounting Office GAO
For Release on Delivery Expected at 10 a.m. Tuesday, October 26, 1999 Testimony
Before the Subcommittee on Technology, Committee on Science, and the Subcommittee on Government Management, Information and Technology, Committee on Government Reform, House of Representatives Y2K COMPUTING CHALLENGE Nuclear Power Industry Reported Nearly Ready; More Risk Red... |
Date Aug. 6, 1999 |
Report No. RCED-99-243 |
Title
United States General Accounting Office GAO
August 1999 Report to the Chairman, Committee on Foreign Relations, U.S. Senate NUCLEAR SAFETY Information on the International Nuclear Regulators Association GAO/RCED-99-243 United States General Accounting Office Washington, D.C. 20548 Resources, Community, and Economic Development Division B-283100 Letter August 6, 1999 The Honorable Jesse Helms Chair... |
Date March 19, 1999 |
Report No. RCED-99-95 |
Title
United States General Accounting Office GAO
March 1999 Report to Congressional Requesters NUCLEAR REGULATION Strategy Needed to Regulate Safety Using Information on Risk GAO/RCED-99-95 GAO United States General Accounting Office Washington, D.C. 20548 Resources, Community, and Economic Development Division B-281928 March 19, 1999 The Honorable Joseph R. Biden, Jr. United States Senate The Honorabl... |
Date March 17, 1999 |
Report No. T-RCED-99-127 |
Title
United States General Accounting Office GAO
For Release on Delivery Expected at 2 p.m. EST Wednesday March 17, 1999 Testimony
Before the Committee on Foreign Relations, U.S. Senate NUCLEAR SAFETY The Convention on Nuclear Safety
Statement of Ms. Gary L. Jones, Associate Director, Energy, Resources, and Science Issues, Resources, Community, and Economic Development Division GAO/T-RCED-99-127 Mr. Ch... |
Date Feb. 4, 1999 |
Report No. T-RCED-99-71 |
Title
United States General Accounting Office GAO
For Release on Delivery Expected at 9 a.m. EST Thursday February 4, 1999 Testimony
Before the Subcommittee on Clean Air, Wetlands, Private Property, and Nuclear Safety, Commmittee on Environment and Public Works, U.S. Senate NUCLEAR REGULATORY COMMISSION Strategy Needed to Develop a Risk-Informed Safety Approach
Statement of Ms. Gary L. Jones, Associate ... |
Date July 30, 1998 |
Report No. T-RCED-98-252 |
Title
United States General Accounting Office GAO
For Release on Delivery Expected at 9 a.m. EDT Thursday July 30, 1998 Testimony
Before the Subcommittee on Clean Air, Wetlands, Private Property, and Nuclear Safety, Committee on Environment and Public Works, U.S. Senate NUCLEAR REGULATORY COMMISSION Preventing Problem Plants Requires More Effective Action by NRC
Statement of Gary Jones, Associate Direct... |
Date March 6, 1998 |
Report No. AIMD-98-90R |
Title
United States General Accounting Office Was&in-n, D.C. 20548 Accounting and Information Management Division B-279244 March 6, 1998 Mr. David Meyer, Chief Rules and Directives Branch Division of Administrative Services Nuclear Regulatory Commission Subject: Year 2000 Readiness: NRC’s Pronosed Nuclear Powernlants Dear Mr. Meyer: We appreciate the opportunity to comment on the Nuclear Regulatory Co... |
Date Sept. 2, 1997 |
Report No. HEHS-97-162 |
Title
United States General Accounting Office GAO
September 1997 Report to the Chairman, Subcommittee on Oversight and Investigations, Committee on Commerce, House of Representatives NUCLEAR POWER SAFETY Industry Concerns With Federal Whistleblower Protection System GAO/HEHS-97-162 GAO United States General Accounting Office Washington, D.C. 20548 Health, Education, and Human Services Division B-275364 ... |
Date May 30, 1997 |
Report No. RCED-97-145 |
Title
United States General Accounting Office GAO
May 1997 Report to Congressional Requesters NUCLEAR REGULATION Preventing Problem Plants Requires More Effective NRC Action GAO/RCED-97-145 GAO United States General Accounting Office Washington, D.C. 20548 Resources, Community, and Economic Development Division B-276754 May 30, 1997 The Honorable Joseph I. Lieberman United States Senate The Honorable Jo... |
Date March 31, 1997 |
Report No. HEHS-97-51 |
Title
United States General Accounting Office GAO
March 1997 Report to Congressional Requesters NUCLEAR EMPLOYEE SAFETY CONCERNS Allegation System Offers Better Protection, but Important Issues Remain GAO/HEHS-97-51 GAO United States General Accounting Office Washington, D.C. 20548 Health, Education, and Human Services Division B-270675 March 31, 1997 The Honorable John D. Dingell Ranking Minority Membe... |
Date March 24, 1997 |
Report No. RCED-97-72 |
Title
United States General Accounting Office GAO
March 1997 Report to Congressional Requesters NUCLEAR SAFETY International Atomic Energy Agency’s Nuclear Technical Assistance for Cuba GAO/RCED-97-72 GAO United States General Accounting Office Washington, D.C. 20548 Resources, Community, and Economic Development Division B-276158 March 24, 1997 The Honorable Jesse A. Helms Chairman, Committee on Fore... |
Date Jan. 2, 1997 |
Report No. AA-97-16(1) |
Title
United States General Accounting Office GAO Resources, Community, and Economic Development Division January 1997 Energy, Resources, and Science Issue Area Active Assignments . . V-- I i i I I I i I I I I I i I Foreword This report was prepared primarily to inform Congressional members and key staff of ongoing assignmentsin the General Accounting Office's Energy, Resources, and Science issue area. ... |
Date Jan. 2, 1997 |
Report No. RCED-97-39 |
Title
United States General Accounting Office GAO
January 1997 Report to Congressional Requesters NUCLEAR SAFETY Uncertainties About the Implementation and Costs of the Nuclear Safety Convention GAO/RCED-97-39 GAO United States General Accounting Office Washington, D.C. 20548 Resources, Community, and Economic Development Division B-275746 January 2, 1997 The Honorable Jesse Helms Chairman, Committee on... |
Date Oct. 29, 1996 |
Report No. RCED-97-5 |
Title
United States General Accounting Office GAO
October 1996 Report to the Chairman, Committee on Foreign Relations, U.S. Senate NUCLEAR SAFETY Status of U.S. Assistance to Improve the Safety of Soviet-Designed Reactors G A O years
1921 - 1996 GAO/RCED-97-5 GAO United States General Accounting Office Washington, D.C. 20548 Resources, Community, and Economic Development Division B-272926 October 29, 19... |
Date Oct. 3, 1995 |
Report No. RCED-96-10 |
Title
United States General Accounting Office GAO
October 1995 Report to the Ranking Minority Member, Committee on Commerce, House of Representatives NUCLEAR REGULATION Weaknesses in NRC’s Inspection Program at a South Texas Nuclear Power Plant GAO/RCED-96-10 GAO United States General Accounting Office Washington, D.C. 20548 Resources, Community, and Economic Development Division B-262200 October 3, 1... |
Date Aug. 1, 1995 |
Report No. T-RCED-95-236 |
Title
United States General Accounting Office GAO
For Rcltxsc on Delivery Expccicd at 2:(N)p.m. EDT Tuesday Augus;l I. 19% Testimony
Before the Subcommitteeon the Western Hemisphere, Committee on International Relations, House of Representatives NUCLEAR SAFETY Concerns With the Nuclear Power Reactors in Cuba
Statementof Keith 0. Fultz, Assistant Comptroller General, Resources, Community, and Economic De... |
Date June 28, 1995 |
Report No. RCED-95-157 |
Title
Uuited States General Accounting Office GAO
June 1995 Report to the Ranking Minority Member, Committee on Commerce, House of Representatives NUCLEAR SAFETY U.S. Assistance to Upgrade Soviet-Designed Nuclear Reactors in the Czech Republic United States General. Accounting Office Washington, D.C. 20648 Resources, Community, and
Economic Development Division B-261096 June Z&l995 The Honorable John D.... |
Date Sept. 29, 1994 |
Report No. RCED-94-234 |
Title
( /.r~yQL’ United States General Accounting
I Office i II Report to Congressional Requesters September 1994 NUCLEAR SAFETY International Assistance Efforts to Make Soviet-Designed Reactors Safer GAO/WED-94-234 E Notice: This is a reprint of a GAO report. United States General Accounting Oface Washington, D.C. 20648 Resources, Community, Economic Development and
Division B-257420 September 29,199... |
Date Sept. 22, 1993 |
Report No. NSIAD/RCED-93-284 |
Title
s~“~lt~‘llll)(~1~ I !I!):$ NUCLEAR NONPROLIFERATION .AND SAFETY Challenges Facing t International Atomic Energy Agency RESTRICTED--Not to be released General Accounting Office unless approved by the Office of Relations. S809cl ---.~;~~o/NsI/ZI)/I1~‘1151)-!1:~-:!H‘1 :I -~----- GAO United States General Accounting Of’fice Washington, D.C. 20548 National Security aqd International Affairs D... |
Date May 14, 1993 |
Report No. RCED-93-153 |
Title
Ekport to Congressional Requesters ii& 1993 NUCLEAR SAFETY Progress Toward International Agreement to Improve Reactor Safety “, “, “““.l- _ ,.” ._ . . “._-l -._.. “. -“- ..- I- . .-._. ._.. --..““l.l.-. ._““. _I.-. .--..-----. GAO United Statee General Accounting OilIce Washington, D.C. 20848 Economic Development Division Resources,Community, and B-263106 May 14,1993 The ... |
Date Oct. 30, 1992 |
Report No. RCED-93-14 |
Title
lJxGtml States General Accounting Office GAO Report to the Chairman, Subcornrnittee on Oversight and Investigations, Committee on Energy and Commerce, House of Representatives
i NUCLEAR SECURITY Safeguards and Security Planning at DOE Facilities Incomplete 148434 GAO united Statee General Accounting OfXlce Washhgton, D.C. 20648 B-249847 October 30, 1992 The Honorable John D. Dingell Chairman, Subc... |
Date Aug. 18, 1992 |
Report No. GGD-92-129 |
Title
GAO UI(RATNE ENERGY Conditions Affecting ’ U.S. Trade and Investment
.- .- -- II llllllll Ill ll
147596 RESTRICTED--Not to be release& outside the General Accounting Office unless specifically approved by the Office of Congressional Relations. 555lbq RELE&D ._... . .“lll” . ---..-- ..----.... -..-.--.. - .--..- “--..-- -.--.--- ---_- ____- - GAO United Statee
Genera) Accounting Of’fice W... |
Date Sept. 25, 1991 |
Report No. RCED-91-207 |
Title
NUCLEAR R&D Research Efforts Under Way to Support Nuclear Power Plant License Renew% I III
145262 RELEASED P GAO United States General Accounting Office Washington, DC. 20548 Resources, Community, Economic Development and Division B-244937 September 26,199l The Honorable George E. Brown, Jr. Chairman, Committee on Science, Space, and Technology House of Representatives Dear Mr. Chairman: Within th... |
Date May 16, 1991 |
Report No. RCED-91-122 |
Title
GAO NR.C’ Relationship s VVith the Institute of Nuclear Power Operations * ._“._. I. .” ..-_._ _..- ..-__ -..- __.-- -.-- ___ -.--. --.-...._lml_----- .--_---- GAO General Acwunting Office Wtwhingtm, D.C. 20548 ltemurces, Community, and Economic Development Division united States B-241468 May 16,199l The Honorable Peter H. Kostmayer Chairman, Subcommitteeon Energy and the Environment Committ... |
Date March 6, 1991 |
Report No. T-RCED-91-9 |
Title
? United States General Accounting OfWe ’ GA!0 Testimony For Release on Delivery Expected at 9:30 a.m. EST Wednesday March 6, 1991 Nuclear Safety and Health: Nonconforming Products Are A Governmentwide Problem Stutement of Judy England-Joseph, AssociateDirector Energy Issues Resources,Community, and Economic Development Division scfon* Committee on Governmental Affairs United States Senate Mr. C... |
Date Dec. 17, 1990 |
Report No. RCED-91-36 |
Title
-...-. -l-..----l-.--_---. --___.._ .,... “..“” ^_ _“-_. -..I” Ilr~il.t~cl St,aCt~s G$*leral “___.._ ._,__..._. __.. ..~“_ Atw~urrting .“~-- Of’f’iw ~.-~ ----.._.-_-__ -_ --___ Ihw~llll,t~r l!M) NUCLEAR REGULATION NRC’s Efforts to Ensure Effective Maintenance Are Incomplete 142846 -..--- - (;AO/‘K(:EI)-!)l-:~ri t Resources, Community, and Economic Development Division B-241... |
Date Oct. 16, 1990 |
Report No. RCED-91-6 |
Title
NUCLEAR SAFETY AND HEALTH Counterfeit and Substandard Products Are a Governmentwide Concern 142684 --- (;Ao/tt(:I~:I)-!)l-~i I ..__._......-._ . .__._ --~ ..-- ___-. . .__ .-.-_.- _-..-.-...----- --__ - _-- _I____ _- i I f Resources, Community, and Economic Development Division 11-240922 October 16,199O The Honorable John D. Dingell Chairman, Subcommittee on Oversight and Investigations Committee ... |
Date Dec. 26, 1989 |
Report No. RCED-90-24 |
Title
* d I ( ll~lit.wl St ;~tw Gvnc1ral Accounting Office / GAO
--_-__.-..__._ -__. -._” . Ihw~~lIll,c~r l!lH!l Report to the Chairman, Environment, ’ ’ !; hergy and Natural Resources SubcOmmittee, Cornrnittee on Government Operations, House of Representatives -NUCLEAR HEALTH AND SAFETY Better Earthquake Protection Needed at DOE’s Savannah River
Site GAO United States General Accounting Office ... |
Date May 4, 1989 |
Report No. RCED-89-95 |
Title
GAO May NUCLEAR l!)H!b
._._ _-._ ._ ._.I-.. _ “...l_l.l. “... --.. ..” .._._..^ -.-._” ..-... ----111 ... _.-.-- REGULATION NRC’s Restart Actions Appear Reasonalr>le-But Criteria Needed *GAO General Accounting Office Washington, D.C. 20648 Resources, Community, and Economic Development Division united states B-236146 May 4,1989 The Honorable Paul S. Sarbanes Vice Chairman, Joint Economic... |
Date April 3, 1989 |
Report No. RCED-89-90 |
Title
0 2 .3 CD cn
Tt CD ‘J a 0
5 0 Resources, Community, and Economic Development Division B-223682 April 3, 1989 The Honorable Edward J. Markey House of Representatives Dear Mr. Markey: On January 16,1987, you asked us to examine the December1986 accident at the Surry nuclear plant owned by Virginia Power and assess problems that face aging nuclear plants. On the basis of subsequent agreementswith y... |
Date March 23, 1989 |
Report No. RCED-89-67 |
Title
I irlit~tvl -.A’ _--__.“. _I..-_-_St,;it~sAw0unt.in.g ” I” -.... I.._ I_.I ,^.- bknc~ral Off‘icr I_.........-_r_ .._-. .--.I_..- * -._ II ...^1.,... 1 _ --._.,..-,. Rctport 1,othe Chairman, Envir~ment, GAO Knwgy, z-d Natural Resources
iCiuE,&~mmi Committee on Government ttee, Operations, House of’ Representatives /,*
. What Can Be Done to Revive the Nuclear Option? I _-,.. . -. . ........ |
Date April 27, 1988 |
Report No. T-RCED-88-37 |
Title
United States General Accounting Office 1 GAO Testimony For Release on Delivery Expected at 10:00 a.m. EST Wednesday April 27, 1988 Proposal to Reorganize NRC Statement J. Dexter Resources, Division of Peach, Assistant Comptroller General Community, and Economic Development Before the Committee on Governmental United States Senate Affairs 135660 ,-, ‘ ,~ \(-s” -- l.‘“-* t:- c ‘ TO GAO/T-... |