GAO Reports by subject "Schedule slippages"

Full-text search of 52,072 reports from the Government Accountability Office
From To
Reset

Search Results:

Date Report No. Title
Date Feb. 28, 2007 Report No. GAO-07-357 Title

Foreign Assistance: USAID Signature Tsunami Reconstruction Efforts in Indonesia and Sri Lanka Exceed Initial Cost and Schedule Estimates, and Face Further Risks

United States Government Accountability Office GAO February 2007 Report to Congressional Committees FOREIGN ASSISTANCE USAID Signature Tsunami Reconstruction Efforts in Indonesia and Sri Lanka Exceed Initial Cost and Schedule Estimates, and Face Further Risks GAO-07-357 February 2007 FOREIGN ASSISTANCE Highlights Highlights of GAO-07-357, a report to congressional committees Accountability Integri...
Date Feb. 16, 2007 Report No. GAO-07-507T Title

Capitol Visitor Center: Update on Status of Project's Schedule and Cost as of February 16, 2007

United States Government Accountability Office GAO For Release on Delivery Expected at 2:30 p.m. EST Friday, February 16, 2007 Testimony Before the Subcommittee on the Legislative Branch, Committee on Appropriations, House of Representatives CAPITOL VISITOR CENTER Update on Status of Project’s Schedule and Cost as of February 16, 2007 Statement of Terrell G. Dorn, Director Physical Infrastructur...
Date Feb. 15, 2007 Report No. GAO-07-446T Title

Coast Guard: Preliminary Observations on Deepwater Program Assets and Management Challenges

United States Government Accountability Office GAO For Release on Delivery Expected at 10:00 a.m. EST Thursday, February 15, 2007 Testimony Before the Subcommittee on Homeland Security, Committee on Appropriations, House of Representatives COAST GUARD Preliminary Observations on Deepwater Program Assets and Management Challenges Statement of John P. Hutton, Acting Director Acquisition and Sourcing...
Date Feb. 15, 2007 Report No. GAO-07-414R Title

International Affairs: Update on the United Nations' Capital Master Plan

United States Government Accountability Office Washington, DC 20548 February 15, 2007 The Honorable Richard G. Lugar Ranking Minority Member Committee on Foreign Relations United States Senate Subject: Update on the United Nations’ Capital Master Plan Dear Senator Lugar: Since 2000, the United Nations (UN) has been developing a Capital Master Plan (CMP) to renovate its headquarters complex in Ne...
Date Feb. 14, 2007 Report No. GAO-07-460T Title

Coast Guard: Coast Guard Efforts to Improve Management and Address Operational Challenges in the Deepwater Program

United States Government Accountability Office GAO For Release on Delivery Expected at 2:30 p.m. EST Wednesday, February 14, 2007 Testimony Before the Subcommittee on Oceans, Atmosphere, Fisheries, and Coast Guard, Committee on Commerce, Science and Transportation, U.S. Senate COAST GUARD Coast Guard Efforts to Improve Management and Address Operational Challenges in the Deepwater Program Statemen...
Date Feb. 8, 2007 Report No. GAO-07-436T Title

Commonwealth of the Northern Mariana Islands: Serious Economic, Fiscal, and Accountability Challenges

United States Government Accountability Office GAO For Release on Delivery Expected at 10:00 a.m. EST Thursday, February 8, 2007 Testimony Before the Committee on Energy and Natural Resources, U.S. Senate COMMONWEALTH OF THE NORTHERN MARIANA ISLANDS Serious Economic, Fiscal, and Accountability Challenges Statement of Jeanette Franzel, Director Financial Management and Assurance GAO-07-436T Februar...
Date Jan. 31, 2007 Report No. GAO-07-42 Title

Energy Efficiency: Long-standing Problems with DOE's Program for Setting Efficiency Standards Continue to Result in Forgone Energy Savings

United States Government Accountability Office GAO January 2007 Report to Congressional Requesters ENERGY EFFICIENCY Long-standing Problems with DOE’s Program for Setting Efficiency Standards Continue to Result in Forgone Energy Savings GAO-07-42 January 2007 ENERGY EFFICIENCY Highlights Highlights of GAO-07-42, a report to congressional requesters Accountability Integrity Reliability Long-stand...
Date Jan. 5, 2007 Report No. GAO-07-157 Title

Medical Devices: Status of FDA's Program for Inspections by Accredited Organizations

United States Government Accountability Office GAO January 2007 Report to Congressional Committees MEDICAL DEVICES Status of FDA’s Program for Inspections by Accredited Organizations GAO-07-157 January 2007 MEDICAL DEVICES Highlights Highlights of GAO-07-157, a report to congressional committees Accountability Integrity Reliability Status of FDA’s Program for Inspections by Accredited Organiza...
Date Dec. 12, 2006 Report No. GAO-07-119 Title

U.S. Insular Areas: Economic, Fiscal, and Financial Accountability Challenges

United States Government Accountability Office GAO December 2006 Report to the Committee on Energy and Natural Resources, U.S. Senate U.S. INSULAR AREAS Economic, Fiscal, and Financial Accountability Challenges GAO-07-119 December 2006 U.S. INSULAR AREAS Highlights Highlights of GAO-07-119, a report to Committee on Energy and Natural Resources, U.S. Senate Accountability Integrity Reliability Econ...
Date Nov. 30, 2006 Report No. GAO-07-115 Title

Defense Acquisitions: Challenges Remain in Developing Capabilities for Naval Surface Fire Support

United States Government Accountability Office GAO November 2006 Report to the Subcommittee on Projection Forces, Committee on Armed Services, House of Representatives DEFENSE ACQUISITIONS Challenges Remain in Developing Capabilities for Naval Surface Fire Support GAO-07-115 November 2006 DEFENSE ACQUISITIONS Highlights Highlights of GAO-07-115, a report to Subcommittee on Projection Forces, Commi...
Date Nov. 15, 2006 Report No. GAO-07-129T Title

Capitol Visitor Center: Update on Status of Project's Schedule and Cost As of November 15, 2006

United States Government Accountability Office GAO For Release on Delivery Expected at 2:30 p.m. EST Wednesday, November 15, 2006 Testimony Before the Subcommittee on the Legislative Branch, Committee on Appropriations, U.S. Senate CAPITOL VISITOR CENTER Update on Status of Project’s Schedule and Cost As of November 15, 2006 Statement of Bernard L. Ungar, Director Bradley M. James, Assistant Dir...
Date Oct. 19, 2006 Report No. GAO-07-38 Title

Small Business Innovation Research: Agencies Need to Strengthen Efforts to Improve the Completeness, Consistency, and Accuracy of Awards Data

United States Government Accountability Office GAO October 2006 Report to Congressional Committees SMALL BUSINESS INNOVATION RESEARCH Agencies Need to Strengthen Efforts to Improve the Completeness, Consistency, and Accuracy of Awards Data GAO-07-38 October 2006 Highlights Highlights of GAO-07-38, a report to congressional committees Accountability Integrity Reliability SMALL BUSINESS INNOVATION R...
Date Sept. 28, 2006 Report No. GAO-06-1130T Title

Rebuilding Iraq: Continued Progress Requires Overcoming Contract Management Challenges

United States Government Accountability Office GAO For Release on Delivery Expected at 10:00 a.m. EDT Thursday, September 28, 2006 Testimony before the Committee on Government Reform, House of Representatives REBUILDING IRAQ Continued Progress Requires Overcoming Contract Management Challenges Statement of Katherine V. Schinasi, Managing Director, Acquisition and Sourcing Management GAO-06-1130T S...
Date Sept. 28, 2006 Report No. GAO-06-1127T Title

NASA: Sound Management and Oversight Key to Addressing Crew Exploration Vehicle Project Risks

United States Government Accountability Office GAO For Release on Delivery Expected at 2:00 p.m. EDT Thursday, September 28, 2006 Testimony before the Committee on Science, House of Representatives NASA Sound Management and Oversight Key to Addressing Crew Exploration Vehicle Project Risks Statement of Allen Li, Director, Acquisition and Sourcing Management GAO-06-1127T September 28, 2006 NASA Hig...
Date Sept. 22, 2006 Report No. GAO-06-830 Title

Contract Management: Service Contract Approach to Aircraft Simulator Training Has Room for Improvement

United States Government Accountability Office GAO September 2006 Report to the Subcommittee on Readiness, Committee on Armed Services, U.S. House of Representatives CONTRACT MANAGEMENT Service Contract Approach to Aircraft Simulator Training Has Room for Improvement GAO-06-830 September 2006 CONTRACT MANAGEMENT Highlights Highlights of GAO-06-830, a report to the Subcommittee on Readiness, Commit...
Date Sept. 21, 2006 Report No. GAO-06-1058T Title

Capitol Visitor Center: Update on Status of Project's Schedule and Cost as of September 21, 2006

United States Government Accountability Office GAO For Release on Delivery Expected at 10:30 a.m. EDT Thursday, September 21, 2006 Testimony Before the Subcommittee on the Legislative Branch, Committee on Appropriations, U.S. Senate CAPITOL VISITOR CENTER Update on Status of Project’s Schedule and Cost As of September 21, 2006 Statement of Terrell Dorn, Director Bernard L. Ungar, Director Physic...
Date Sept. 15, 2006 Report No. GAO-06-1025 Title

Kennedy Center: Progress Made on GAO Recommendations, but Oversight Challenges Still Exist

United States Government Accountability Office GAO September 2006 Report to the Subcommittee on Interior, Environment, and Related Agencies, Committee on Appropriations, House of Representatives KENNEDY CENTER Progress Made on GAO Recommendations, but Oversight Challenges Still Exist GAO-06-1025 a September 2006 KENNEDY CENTER Highlights Highlights of GAO-06-1025, a report to the Subcommittee on I...
Date Sept. 14, 2006 Report No. GAO-06-883 Title

Best Practices: Stronger Practices Needed to Improve DOD Technology Transition Processes

United States Government Accountability Office GAO September 2006 Report to Congressional Committees BEST PRACTICES Stronger Practices Needed to Improve DOD Technology Transition Processes GAO-06-883 September 2006 BEST PRACTICES Highlights Highlights of GAO-06-883, a report to congressional committees Accountability Integrity Reliability Stronger Practices Needed to Improve DOD Technology Transit...
Date Sept. 11, 2006 Report No. GAO-06-955 Title

Defense Acquisitions: Restructured JTRS Program Reduces Risk, but Significant Challenges Remain

United States Government Accountability Office GAO September 2006 Report to Congressional Committees DEFENSE ACQUISITIONS Restructured JTRS Program Reduces Risk, but Significant Challenges Remain GAO-06-955 September 2006 DEFENSE ACQUISITIONS Highlights Highlights of GAO-06-955, a report to congressional committees Accountability Integrity Reliability Restructured JTRS Program Reduces Risk, but Si...
Date Aug. 2, 2006 Report No. GAO-06-828T Title

Capitol Visitor Center: Update on Status of Project's Schedule and Cost As of August 2, 2006

United States Government Accountability Office GAO For Release on Delivery Expected at 10:30 a.m. EDT Wednesday, August 2, 2006 Testimony Before the Subcommittee on the Legislative Branch, Committee on Appropriations, U.S. Senate CAPITOL VISITOR CENTER Update on Status of Project’s Schedule and Cost As of August 2, 2006 Statement of Terrell Dorn, Director Bernard L. Ungar, Director Physical Infr...
Date July 25, 2006 Report No. GAO-06-991T Title

Tactical Aircraft: Questions Concerning the F-22A's Business Case

United States Government Accountability Office GAO For Release on Delivery Expected at 9:30 a.m. EST Tuesday, July 25, 2006 Testimony before the Subcommittee on Airland, Committee on Armed Services, U.S. Senate TACTICAL AIRCRAFT Questions Concerning the F-22A’s Business Case Statement of David M. Walker, Comptroller General of the United States GAO-06-991T July 25, 2006 TACTICAL AIRCRAFT Highlig...
Date July 17, 2006 Report No. GAO-06-817R Title

NASA: Long-Term Commitment to and Investment in Space Exploration Program Requires More Knowledge

United States Government Accountability Office Washington, DC 20548 July 17, 2006 The Honorable Sherwood Boehlert Chairman The Honorable Bart Gordon Ranking Minority Member Committee on Science House of Representatives Subject: NASA: Long-Term Commitment to and Investment in Space Exploration Program Requires More Knowledge The National Aeronautics and Space Administration (NASA) plans to spend ne...
Date July 14, 2006 Report No. GAO-06-634 Title

NASA's James Webb Space Telescope: Knowledge-Based Acquisition Approach Key to Addressing Program Challenges

United States Government Accountability Office GAO July 2006 Report to Congressional Committees NASA’S JAMES WEBB SPACE TELESCOPE Knowledge-Based Acquisition Approach Key to Addressing Program Challenges GAO-06-634 July 2006 Highlights Highlights of GAO-06-634, a report to congressional committees Accountability Integrity Reliability NASA’S JAMES WEBB SPACE TELESCOPE Knowledge-Based Acquisitio...
Date July 14, 2006 Report No. GAO-06-947R Title

Information Technology Management: Observations on the Financial Crimes Enforcement Network's (FinCEN's) BSA Direct Retrieval and Sharing (BSA Direct R&S) Project

United States Government Accountability Office Washington, DC 20548 July 14, 2006 The Honorable Christopher Bond Chairman The Honorable Patty Murray Ranking Minority Member Subcommittee on Transportation, Treasury, the Judiciary, HUD and Related Agencies Committee on Appropriations United States Senate Subject: Information Technology Management: Observations on the Financial Crimes Enforcement Net...
Date July 6, 2006 Report No. GAO-06-666 Title

Defense Acquisitions: Further Management and Oversight Changes Needed for Efforts to Modernize Cheyenne Mountain Attack Warning Systems

United States Government Accountability Office GAO July 2006 Report to Congressional Committees DEFENSE ACQUISITIONS Further Management and Oversight Changes Needed for Efforts to Modernize Cheyenne Mountain Attack Warning Systems GAO-06-666 July 2006 DEFENSE ACQUISITIONS Highlights Highlights of GAO-06-666, a report to congressional committees Accountability Integrity Reliability Further Manageme...
Date June 30, 2006 Report No. GAO-06-722 Title

DOE Contracting: Better Performance Measures and Management Needed to Address Delays in Awarding Contracts

United States Government Accountability Office GAO June 2006 Report to the Chairman, Committee on Government Reform, House of Representatives DOE CONTRACTING Better Performance Measures and Management Needed to Address Delays in Awarding Contracts GAO-06-722 a June 2006 DOE CONTRACTING Highlights Highlights of GAO-06-722, a report to the Chairman, Committee on Government Reform, House of Represent...
Date June 30, 2006 Report No. GAO-06-641 Title

Embassy Construction: State Has Made Progress Constructing New Embassies, but Better Planning Is Needed for Operations and Maintenance Requirements

United States Government Accountability Office GAO June 2006 Report to the Chairman, Committee on Foreign Relations, U.S. Senate EMBASSY CONSTRUCTION State Has Made Progress Constructing New Embassies, but Better Planning Is Needed for Operations and Maintenance Requirements GAO-06-641 June 2006 EMBASSY CONSTRUCTION Highlights Highlights of GAO-06-641, a report to the Chairman, Committee on Foreig...
Date June 28, 2006 Report No. GAO-06-827T Title

Capitol Visitor Center: Update on Status of Project's Schedule and Cost As of June 28, 2006

United States Government Accountability Office GAO For Release on Delivery Expected at 10:30 a.m. EDT Wednesday, June 28, 2006 Testimony Before the Subcommittee on the Legislative Branch, Committee on Appropriations, U.S. Senate CAPITOL VISITOR CENTER Update on Status of Project’s Schedule and Cost As of June 28, 2006 Statement of Terrell Dorn, Director Bernard L. Ungar, Director Physical Infras...
Date June 15, 2006 Report No. GAO-06-272 Title

2010 Census: Census Bureau Needs to Take Prompt Actions to Resolve Long-standing and Emerging Address and Mapping Challenges

United States Government Accountability Office GAO June 2006 Report to Congressional Committees 2010 CENSUS Census Bureau Needs to Take Prompt Actions to Resolve Long-standing and Emerging Address and Mapping Challenges GAO-06-272 June 2006 2010 CENSUS Highlights Highlights of GAO-06-272, a report to congressional committees Accountability Integrity Reliability Census Bureau Needs to Take Prompt A...
Date June 1, 2006 Report No. GAO-06-776R Title

Defense Acquisitions: Space System Acquisition Risks and Keys to Addressing Them

United States Government Accountability Office Washington, DC 20548 June 1, 2006 The Honorable Jeff Sessions Chairman The Honorable Bill Nelson Ranking Minority Member Subcommittee on Strategic Forces Committee on Armed Services United States Senate Subject: Defense Acquisitions: Space System Acquisition Risks and Keys to Addressing Them On April 6, 2006, we testified before the subcommittee on th...
Date May 31, 2006 Report No. GAO-06-692 Title

Cooperative Threat Reduction: DOD Needs More Reliable Data to Better Estimate the Cost and Schedule of the Shchuch'ye Facility

United States Government Accountability Office GAO May 2006 Report to the Chairman, Subcommittee on Federal Financial Management, Government Information, and International Security, Committee on Homeland Security and Governmental Affairs, U.S. Senate COOPERATIVE THREAT REDUCTION DOD Needs More Reliable Data to Better Estimate the Cost and Schedule of the Shchuch’ye Facility GAO-06-692 May 2006 C...
Date May 31, 2006 Report No. GAO-06-623 Title

United States Coast Guard: Improvements Needed in Management and Oversight of Rescue System Acquisition

United States Government Accountability Office GAO May 2006 Report to Congressional Committees UNITED STATES COAST GUARD Improvements Needed in Management and Oversight of Rescue System Acquisition GAO-06-623 May 2006 UNITED STATES COAST GUARD Highlights Highlights of GAO-06-623, a report to congressional committees Accountability Integrity Reliability Improvements Needed in Management and Oversig...
Date May 24, 2006 Report No. GAO-06-537 Title

Space Acquisitions: DOD Needs Additional Knowledge as it Embarks on a New Approach for Transformational Satellite Communications System

United States Government Accountability Office GAO May 2006 Report to Congressional Committees SPACE ACQUISITIONS DOD Needs Additional Knowledge as it Embarks on a New Approach for Transformational Satellite Communications System GAO-06-537 May 2006 SPACE ACQUISITIONS Highlights Highlights of GAO-06-537, a report to congressional committees Accountability Integrity Reliability DOD Needs Additional...
Date May 24, 2006 Report No. GAO-06-803T Title

Capitol Visitor Center: Update on Status of Projects's Schedule and Cost As of May 24, 2006

United States Government Accountability Office GAO For Release on Delivery Expected at 10:00 a.m. EDT Wednesday, May 24, 2006 Testimony Before the Subcommittee on the Legislative Branch, Committee on Appropriations, U.S. Senate CAPITOL VISITOR CENTER Update on Status of Projects’s Schedule and Cost As of May 24, 2006 Statement of Terrell Dorn, Director Bernard L. Ungar, Director Physical Infrast...
Date May 1, 2006 Report No. GAO-06-349 Title

Defense Acquisitions: The Expeditionary Fighting Vehicle Encountered Difficulties in Design Demonstration and Faces Future Risks

United States Government Accountability Office GAO May 2006 Report to Congressional Committees DEFENSE ACQUISITIONS The Expeditionary Fighting Vehicle Encountered Difficulties in Design Demonstration and Faces Future Risks GAO-06-349 May 2006 DEFENSE ACQUISITIONS Highlights Highlights of GAO-06-349, a report to Congressional Committees Accountability Integrity Reliability The Expeditionary Fightin...
Date April 27, 2006 Report No. GAO-06-665T Title

Capitol Visitor Center: Update on Status of Project's Schedule and Cost as of April 27, 2006

United States Government Accountability Office GAO For Release on Delivery Expected at 10:30 a.m. EDT Thursday, April 27, 2006 Testimony Before the Subcommittee on the Legislative Branch, Committee on Appropriations, U.S. Senate CAPITOL VISITOR CENTER Update on Status of Project’s Schedule and Cost as of April 27, 2006 Statement of Terrell Dorn, Director Bernard L. Ungar, Director Physical Infra...
Date April 25, 2006 Report No. GAO-06-550T Title

Yucca Mountain: DOE's Planned Nuclear Waste Repository Faces Quality Assurance and Management Challenges

United States Government Accountability Office GAO For Release on Delivery Expected at 2:00 p.m. EDT Tuesday, April 25, 2006 Testimony Before the Subcommittee on the Federal Workforce and Agency Organization, Committee on Government Reform, House of Representatives YUCCA MOUNTAIN DOE’s Planned Nuclear Waste Repository Faces Quality Assurance and Management Challenges Statement of Jim Wells, Dire...
Date April 14, 2006 Report No. GAO-06-368 Title

Defense Acquisitions: Major Weapon Systems Continue to Experience Cost and Schedule Problems under DOD's Revised Policy

United States Government Accountability Office GAO April 2006 Report to Congressional Committees DEFENSE ACQUISITIONS Major Weapon Systems Continue to Experience Cost and Schedule Problems under DOD’s Revised Policy GAO-06-368 April 2006 DEFENSE ACQUISITIONS Highlights Highlights of GAO-06-368, a report to congressional committees Accountability Integrity Reliability Major Weapon Systems Continu...
Date April 6, 2006 Report No. GAO-06-602T Title

Hanford Waste Treatment Plant: Contractor and DOE Management Problems Have Led to Higher Costs, Construction Delays, and Safety Concerns

United States Government Accountability Office GAO For Release on Delivery Expected at 10:00 a.m. EDT Thursday, April 6, 2006 Testimony Before the Subcommittee on Energy and Water Development and Related Agencies, Committee on Appropriations, House of Representatives HANFORD WASTE TREATMENT PLANT Contractor and DOE Management Problems Have Led to Higher Costs, Construction Delays, and Safety Conce...
Date April 6, 2006 Report No. GAO-06-626T Title

Space Acquisitions: Improvements Needed in Space Systems Acquisitions and Keys to Achieving Them

United States Government Accountability Office GAO For Release on Delivery Expected at 3:30 p.m. EDT Thursday, April 6, 2006 Testimony before the Subcommittee on Strategic Forces, Senate Committee on Armed Services SPACE ACQUISITIONS Improvements Needed in Space Systems Acquisitions and Keys to Achieving Them Statement of Cristina T. Chaplain Acting Director, Acquisition and Sourcing Management Te...
Date April 5, 2006 Report No. GAO-06-585T Title

Defense Acquisitions: Actions Needed to Get Better Results on Weapons Systems Investments

United States Government Accountability Office GAO For Release on Delivery Expected at 10:00 a.m. EDT Wednesday, April 5, 2006 Testimony Before the Armed Services Committee, House of Representatives DEFENSE ACQUISITIONS Actions Needed to Get Better Results on Weapons Systems Investments Statement of David M. Walker Comptroller General of the United States GAO-06-585T April 5, 2006 DEFENSE ACQUISIT...
Date April 4, 2006 Report No. GAO-06-564T Title

Defense Acquisitions: Improved Business Case Key for Future Combat System's Success

United States Government Accountability Office GAO For Release on Delivery Expected at 2:00 p.m. EDT Tuesday, April 4, 2006 Testimony Before the Subcommittee on Tactical Air and Land Forces, Committee on Armed Services, House of Representatives DEFENSE ACQUISITIONS Improved Business Case Key for Future Combat System’s Success Statement of Paul L. Francis, Director, Acquisition and Sourcing Manag...
Date March 31, 2006 Report No. GAO-06-391 Title

Defense Acquisitions: Assessments of Selected Major Weapon Programs

United States Government Accountability Office GAO March 2006 Report to Congressional Committees DEFENSE ACQUISITIONS Assessments of Selected Major Weapon Programs The Web version of this report was reposted on April 3, 2006, to reflect a change to the text on page 1 since the original version was posted on March 31, 2006. A typographical error was identified wherein the report states “In the pa...
Date March 30, 2006 Report No. GAO-06-573T Title

Polar-Orbiting Operational Environmental Satellites: Cost Increases Trigger Review and Place Program's Direction on Hold

United States Government Accountability Office GAO For Release on Delivery Expected at 11 a.m. EST Thursday, March 30, 2006 Testimony Before the Subcommittee on Disaster Prevention and Prediction, Committee on Commerce, Science, and Transportation, U.S. Senate POLAR-ORBITING OPERATIONAL ENVIRONMENTAL SATELLITES Cost Increases Trigger Review and Place Program’s Direction on Hold Statement of Davi...
Date March 28, 2006 Report No. GAO-06-558T Title

Combating Nuclear Smuggling: Challenges Facing U.S. Efforts to Deploy Radiation Detection Equipment in Other Countries and in the United States

United States Government Accountability Office GAO For Release on Delivery Expected at 9:30 a.m. EST Tuesday, March 28, 2006 Testimony Before the Permanent Subcommittee on Investigations, Committee on Homeland Security and Governmental Affairs, U.S. Senate COMBATING NUCLEAR SMUGGLING Challenges Facing U.S. Efforts to Deploy Radiation Detection Equipment in Other Countries and in the United States ...
Date March 28, 2006 Report No. GAO-06-523T Title

Tactical Aircraft: Recapitalization Goals Are Not Supported by Knowledge-Based F-22A and JSF Business Cases

GAO For Release on Delivery Expected at 2:30 p.m. EST Tuesday, March 28, 2006 Testimony before the Subcommittee on AirLand, Committee on Armed Services, U.S. Senate TACTICAL AIRCRAFT Recapitalization Goals Are Not Supported by Knowledge-Based F-22A and JSF Business Cases Statement of Michael Sullivan, Director Acquisition and Sourcing Management GAO-06-523T March 2006 TACTICAL AIRCRAFT Highlights ...
Date March 22, 2006 Report No. GAO-06-389 Title

Combating Nuclear Smuggling: DHS Has Made Progress Deploying Radiation Detection Equipment at U.S. Ports-of-Entry, but Concerns Remain

United States Government Accountability Office GAO March 2006 Report to Congressional Requesters COMBATING NUCLEAR SMUGGLING DHS Has Made Progress Deploying Radiation Detection Equipment at U.S. Ports-of-Entry, but Concerns Remain GAO-06-389 a March 2006 COMBATING NUCLEAR SMUGGLING Highlights Highlights of GAO-06-389, a report to congressional requesters Accountability Integrity Reliability DHS Ha...
Date March 22, 2006 Report No. GAO-06-160 Title

Defense Logistics: Several Factors Limited the Production and Installation of Army Truck Armor during Current Wartime Operations

United States Government Accountability Office GAO March 2006 Report to Congressional Committees DEFENSE LOGISTICS Several Factors Limited the Production and Installation of Army Truck Armor during Current Wartime Operations GAO-06-160 a March 2006 DEFENSE LOGISTICS Highlights Highlights of GAO-06-160, a report to congressional committees Accountability Integrity Reliability Several Factors Limite...
Date March 20, 2006 Report No. GAO-06-310 Title

Business Systems Modernization: IRS Needs to Complete Recent Efforts to Develop Policies and Procedures to Guide Requirements Development and Management

United States Government Accountability Office GAO March 2006 Report to the Chairman, Subcommittee on Transportation, Treasury, the Judiciary, HUD, and Related Agencies, Committee on Appropriations, U.S. Senate BUSINESS SYSTEMS MODERNIZATION IRS Needs to Complete Recent Efforts to Develop Policies and Procedures to Guide Requirements Development and Management This report was reposted to the inter...
Date March 17, 2006 Report No. GAO-06-313 Title

Yucca Mountain: Quality Assurance at DOE's Planned Nuclear Waste Repository Needs Increased Management Attention

United States Government Accountability Office GAO March 2006 Report to the Chairman, Subcommittee on the Federal Workforce and Agency Organization, Committee on Government Reform, House of Representatives YUCCA MOUNTAIN Quality Assurance at DOE’s Planned Nuclear Waste Repository Needs Increased Management Attention GAO-06-313 a March 2006 YUCCA MOUNTAIN Highlights Highlights of GAO-06-313, a re...