GAO Reports by subject "Schedule slippages"

Full-text search of 52,071 reports from the Government Accountability Office
From To
Reset

Search Results:

Date Report No. Title
Date March 5, 2009 Report No. GAO-09-408T Title

2010 Census: Little Time Remains to Address Operational Challenges

United States Government Accountability Office GAO For Release on Delivery Expected at 10:00 a.m. EST Thursday, March 5, 2009 Testimony Before the Subcommittee on Information Policy, Census, and National Archives, Committee on Oversight and Government Reform, House of Representatives 2010 CENSUS Little Time Remains to Address Operational Challenges Statement of Robert Goldenkoff Director, Strategi...
Date March 5, 2009 Report No. GAO-09-436T Title

NASA: Projects Need More Disciplined Oversight and Management to Address Key Challenges

United States Government Accountability Office GAO For Release on Delivery Expected at 10:00 a.m. EST Thursday, March 5, 2009 Testimony Before the Subcommittee on Space and Aeronautics, Committee on Science and Technology, House of Representatives NASA Projects Need More Disciplined Oversight and Management to Address Key Challenges Statement of Cristina Chaplain, Director Acquisition and Sourcing...
Date March 4, 2009 Report No. GAO-09-406T Title

Department of Energy: Contract and Project Management Concerns at the National Nuclear Security Administration and Office Of Environmental Management

United States Government Accountability Office GAO For Release on Delivery Expected at 2:00 p.m. EST Wednesday, March 4, 2009 Testimony Before the Subcommittee on Energy and Water Development, Committee on Appropriations, House of Representatives DEPARTMENT OF ENERGY Contract and Project Management Concerns at the National Nuclear Security Administration and Office of Environmental Management Stat...
Date March 3, 2009 Report No. GAO-09-431T Title

Defense Acquisitions: DOD Must Balance Its Needs with Available Resources and Follow an Incremental Approach to Acquiring Weapon Systems

United States Government Accountability Office GAO For Release on Delivery Expected at 9:30 a.m. EST Tuesday, March 3, 2009 Testimony Before the Committee on Armed Services, U.S. Senate DEFENSE ACQUISITIONS DOD Must Balance Its Needs with Available Resources and Follow an Incremental Approach to Acquiring Weapon Systems Statement of Michael J. Sullivan, Director Acquisition and Sourcing Management...
Date March 2, 2009 Report No. GAO-09-306SP Title

NASA: Assessments of Selected Large-Scale Projects

United States Government Accountability Office GAO March 2009 Report to Congressional Committees NASA Assessments of Selected Large-Scale Projects GAO-09-306SP March 2009 NASA Assessments of Selected Large-Scale Projects Highlights of GAO-09-306SP, a report to congressional committees Why GAO Did This Study The National Aeronautics and Space Administration (NASA) plans to invest billions in the c...
Date March 2, 2009 Report No. GAO-09-385 Title

Nuclear Weapons: NNSA and DOD Need to More Effectively Manage the Stockpile Life Extension Program

United States Government Accountability Office GAO March 2009 Report to the Subcommittee on Strategic Forces, Committee on Armed Services, House of Representatives NUCLEAR WEAPONS NNSA and DOD Need to More Effectively Manage the Stockpile Life Extension Program GAO-09-385 March 2009 NUCLEAR WEAPONS Highlights Highlights of GAO-09-385, a report to the Subcommittee on Strategic Forces, Committee on ...
Date Feb. 26, 2009 Report No. GAO-09-318R Title

Securities and Exchange Commission: Oversight of U.S. Equities Market Clearing Agencies

United States Government Accountability Office Washington, DC 20548 February 26, 2009 The Honorable Carl Levin Chairman Permanent Subcommittee on Investigations Committee on Homeland Security and Governmental Affairs United States Senate The Honorable Charles Grassley Ranking Member Committee on Finance United States Senate Subject: Securities and Exchange Commission: Oversight of U.S. Equities Ma...
Date Feb. 25, 2009 Report No. GAO-09-403T Title

Defense Acquisitions: Charting a Course for Improved Missile Defense Testing

United States Government Accountability Office GAO For Release on Delivery Expected at 1:00 p.m. EDT Wednesday, February 25, 2009 Testimony Before the Subcommittee on Strategic Forces, Committee on Armed Services, House of Representatives DEFENSE ACQUISITIONS Charting a Course for Improved Missile Defense Testing Statement of Paul Francis, Director, Acquisition and Sourcing Management GAO-09-403T ...
Date Feb. 11, 2009 Report No. GAO-09-362T Title

Defense Management: Actions Needed to Overcome Long-standing Challenges with Weapon Systems Acquisition and Service Contract Management

United States Government Accountability Office GAO For Release on Delivery Expected at 10:30 a.m. EST Thursday, February 12, 2009 Testimony before the Committee on Armed Services, House of Representatives IRAQ AND AFGHANISTAN Availability of Forces, Equipment, and Infrastructure Should Be Considered in Developing U.S. Strategy and Plans Statement of Janet St. Laurent, Managing Director Defense Cap...
Date Jan. 30, 2009 Report No. GAO-09-217 Title

Military Base Realignments and Closures: DOD Faces Challenges in Implementing Recommendations on Time and Is Not Consistently Updating Savings Estimates

United States Government Accountability Office GAO January 2009 Report to Congressional Committees MILITARY BASE REALIGNMENTS AND CLOSURES DOD Faces Challenges in Implementing Recommendations on Time and Is Not Consistently Updating Savings Estimates GAO-09-217 January 2009 Highlights Highlights of GAO-09-217, a report to congressional committees Accountability Integrity Reliability MILITARY BASE ...
Date Dec. 19, 2008 Report No. GAO-09-261R Title

DOD Personnel Clearances: Preliminary Observations about Timeliness and Quality

United States Government Accountability Office Washington, DC 20548 December 19, 2008 Congressional Committees Subject: DOD Personnel Clearances: Preliminary Observations about Timeliness and Quality The enclosed briefing provides our preliminary assessment of the timeliness and quality of the Department of Defense’s (DOD) personnel security clearance program. These findings are based on an ongo...
Date Dec. 12, 2008 Report No. GAO-09-36 Title

Federal-Aid Highways: Federal Requirements for Highways May Influence Funding Decisions and Create Challenges, but Benefits and Costs Are Not Tracked

United States Government Accountability Office GAO December 2008 Report to Congressional Requesters FEDERAL-AID HIGHWAYS Federal Requirements for Highways May Influence Funding Decisions and Create Challenges, but Benefits and Costs Are Not Tracked GAO-09-36 December 2008 FEDERAL-AID HIGHWAYS Highlights Highlights of GAO-09-36, a report to congressional requesters Accountability Integrity Reliabil...
Date Dec. 5, 2008 Report No. GAO-09-55 Title

Immigration Benefits: Actions Needed to Address Vulnerabilities in Process for Granting Permanent Residency

United States Government Accountability Office GAO December 2008 Report to the Chairman, Committee on Homeland Security, House of Representatives IMMIGRATION BENEFITS Actions Needed to Address Vulnerabilities in Process for Granting Permanent Residency GAO-09-55 December 2008 IMMIGRATION BENEFITS Highlights Highlights of GAO-09-55, a report to the Chairman, Committee on Homeland Security, House of...
Date Nov. 24, 2008 Report No. GAO-09-68 Title

Wildland Fire Management: Interagency Budget Tool Needs Further Development to Fully Meet Key Objectives

United States Government Accountability Office GAO November 2008 Report to the Chairman, Committee on Energy and Natural Resources, U.S. Senate WILDLAND FIRE MANAGEMENT Interagency Budget Tool Needs Further Development to Fully Meet Key Objectives GAO-09-68 November 2008 WILDLAND FIRE MANAGEMENT Highlights Highlights of GAO-09-68, a report to the Chairman, Committee on Energy and Natural Resources...
Date Nov. 18, 2008 Report No. GAO-09-29 Title

Department of Homeland Security: Billions Invested in Major Programs Lack Appropriate Oversight

United States Government Accountability Office GAO November 2008 Report to the Chairman, Subcommittee on Homeland Security, Committee on Appropriations, House of Representatives DEPARTMENT OF HOMELAND SECURITY Billions Invested in Major Programs Lack Appropriate Oversight GAO-09-29 November 2008 DEPARTMENT OF HOMELAND SECURITY Highlights Highlights of GAO-09-29, a report to the Chairman, Subcommit...
Date Nov. 18, 2008 Report No. GAO-09-189R Title

Defense Acquisitions: Status of the Safety, Performance, and Reliability of the Expeditionary Fire Support System

United States Government Accountability Office Washington, DC 20548 November 18, 2008 The Honorable Carl Levin Chairman Committee on Armed Services United States Senate Subject: Defense Acquisitions: Status of the Safety, Performance, and Reliability of the Expeditionary Fire Support System The Expeditionary Fire Support System (EFSS)—which consists of two kinds of motorized vehicles, a 120-mm m...
Date Oct. 20, 2008 Report No. GAO-09-130R Title

Responses to Questions for the Record; September 2008 Hearing on the Next Generation Air Transportation System: Status and Issues

United States Government Accountability Office Washington, DC 20548 October 20, 2008 The Honorable Bart Gordon Chairman Committee on Science and Technology House of Representatives Subject: Responses to Questions for the Record; September 2008 Hearing on the Next Generation Air Transportation System: Status and Issues This letter responds to your September 26, 2008, request that we address questio...
Date Oct. 16, 2008 Report No. GAO-09-10 Title

Federal Real Property: Government's Fiscal Exposure from Repair and Maintenance Backlogs Is Unclear

United States Government Accountability Office GAO October 2008 Report to the Committee on Oversight and Government Reform, House of Representatives FEDERAL REAL PROPERTY Government’s Fiscal Exposure from Repair and Maintenance Backlogs Is Unclear GAO-09-10 October 2008 FEDERAL REAL PROPERTY Highlights Highlights of GAO-09-10, a report to the Committee on Oversight and Government Reform, House o...
Date Oct. 8, 2008 Report No. GAO-09-40 Title

Information Technology: Management Improvements Needed on the Department of Homeland Security's Next Generation Information Sharing System

United States Government Accountability Office GAO October 2008 Report to Congressional Requesters INFORMATION TECHNOLOGY Management Improvements Needed on the Department of Homeland Security’s Next Generation Information Sharing System GAO-09-40 October 2008 INFORMATION TECHNOLOGY Highlights Highlights of GAO-09-40, a report to congressional requesters Accountability Integrity Reliability Manag...
Date Sept. 30, 2008 Report No. GAO-08-1073 Title

Space Acquisitions: DOD's Goals for Resolving Space Based Infrared System Software Problems Are Ambitious

United States Government Accountability Office GAO September 2008 Report to Congressional Committees SPACE ACQUISITIONS DOD’s Goals for Resolving Space Based Infrared System Software Problems Are Ambitious GAO-08-1073 September 2008 SPACE ACQUISITIONS Highlights Highlights of GAO-08-1073, a report to Congressional Committees Accountability Integrity Reliability DOD's Goals for Resolving Space Ba...
Date Sept. 30, 2008 Report No. GAO-08-1018 Title

Financial Management: Persistent Financial Management Systems Issues Remain for Many CFO Act Agencies

United States Government Accountability Office GAO September 2008 Report to Congressional Committees FINANCIAL MANAGEMENT Persistent Financial Management Systems Issues Remain for Many CFO Act Agencies GAO-08-1018 September 2008 FINANCIAL MANAGEMENT Highlights Highlights of GAO-08-1018, a report to congressional committees Accountability Integrity Reliability Persistent Financial Management System...
Date Sept. 26, 2008 Report No. GAO-08-1081 Title

Nuclear Waste: Action Needed to Improve Accountability and Management of DOE's Major Cleanup Projects

United States Government Accountability Office GAO September 2008 Report to the Subcommittee on Energy and Water Development, Committee on Appropriations, House of Representatives NUCLEAR WASTE Action Needed to Improve Accountability and Management of DOE’s Major Cleanup Projects GAO-08-1081 September 2008 NUCLEAR WASTE Highlights Highlights of GAO-08-1081, a report to the Subcommittee on Energy...
Date Sept. 26, 2008 Report No. GAO-08-1059 Title

USAID Acquisition and Assistance: Actions Needed to Develop and Implement a Strategic Workforce Plan

United States Government Accountability Office GAO September 2008 Report to the Committee on Oversight and Government Reform, House of Representatives USAID ACQUISITION AND ASSISTANCE Actions Needed to Develop and Implement a Strategic Workforce Plan GAO-08-1059 September 2008 USAID ACQUISITION AND ASSISTANCE Highlights Highlights of GAO-08-1059, a report to the Committee on Oversight and Governme...
Date Sept. 26, 2008 Report No. GAO-08-1063 Title

DOD Financial Management: Improvements Are Needed in Antideficiency Act Controls and Investigations

United States Government Accountability Office GAO September 2008 Report to Congressional Committees DOD FINANCIAL MANAGEMENT Improvements Are Needed in Antideficiency Act Controls and Investigations GAO-08-1063 September 2008 DOD FINANCIAL MANAGEMENT Highlights Highlights of GAO-08-1063, a report to congressional committees Accountability Integrity Reliability Improvements Are Needed in Antidefic...
Date Sept. 26, 2008 Report No. GAO-08-1113 Title

Defense Acquisitions: Sound Business Case Needed to Implement Missile Defense Agency's Targets Program

United States Government Accountability Office GAO September 2008 Report to Congressional Committees DEFENSE ACQUISITIONS Sound Business Case Needed to Implement Missile Defense Agency’s Targets Program GAO-08-1113 September 2008 DEFENSE ACQUISITIONS Highlights Highlights of GAO-08-1113, a report to congressional committees Accountability Integrity Reliability Sound Business Case Needed to Imple...
Date Sept. 25, 2008 Report No. GAO-08-1178T Title

Combating Nuclear Smuggling: DHS Needs to Consider the Full Costs and Complete All Tests Prior to Making a Decision on Whether to Purchase Advanced Portal Monitors

United States Government Accountability Office GAO For Release on Delivery Expected at 9:30 a.m. EDT Thursday, September 25, 2008 Testimony Before the Committee on Homeland Security and Governmental Affairs United States Senate COMBATING NUCLEAR SMUGGLING DHS Needs to Consider the Full Costs and Complete All Tests Prior to Making a Decision on Whether to Purchase Advanced Portal Monitors Statement...
Date Sept. 25, 2008 Report No. GAO-08-1060 Title

Defense Acquisitions: DOD's Requirements Determination Process Has Not Been Effective in Prioritizing Joint Capabilities

United States Government Accountability Office GAO September 2008 Report to the Committee on Armed Services, U.S. Senate DEFENSE ACQUISITIONS DOD’s Requirements Determination Process Has Not Been Effective in Prioritizing Joint Capabilities GAO-08-1060 September 2008 DEFENSE ACQUISITIONS Highlights Highlights of GAO-08-1060, a report to the Committee on Armed Services, U.S. Senate Accountability...
Date Sept. 25, 2008 Report No. GAO-08-1159T Title

Defense Acquisitions: Fundamental Changes Are Needed to Improve Weapon Program Outcomes

United States Government Accountability Office GAO For Release on Delivery Expected at 2:30 p.m. EDT Thursday, September 25, 2008 Testimony Before the Subcommittee on Federal Financial Management, Government Information, Federal Services, and International Security, Committee on Homeland Security and Governmental Affairs, U.S. Senate DEFENSE ACQUISITIONS Fundamental Changes Are Needed to Improve W...
Date Sept. 24, 2008 Report No. GAO-08-1142T Title

Visa Waiver Program: Actions Are Needed to Improve Management of the Expansion Process, and to Assess and Mitigate Program Risks

United States Government Accountability Office GAO For Release on Delivery Expected at 2:30 p.m. EDT Wednesday, September 24, 2008 Testimony Before the Subcommittee on Terrorism, Technology, and Homeland Security, Committee on the Judiciary, United States Senate VISA WAIVER PROGRAM Actions Are Needed to Improve Management of the Expansion Process, and to Assess and Mitigate Program Risks Statement...
Date Sept. 24, 2008 Report No. GAO-08-1137 Title

Military Disability System: Increased Supports for Servicemembers and Better Pilot Planning Could Improve the Disability Evaluation Process

United States Government Accountability Office GAO September 2008 Report to Congressional Requesters MILITARY DISABILITY SYSTEM Increased Supports for Servicemembers and Better Pilot Planning Could Improve the Disability Evaluation Process GAO-08-1137 September 2008 MILITARY DISABILITY SYSTEM Highlights Highlights of GAO-08-1137, a report to congressional requesters Accountability Integrity Reliab...
Date Sept. 24, 2008 Report No. GAO-08-1172T Title

Capitol Visitor Center: Update on Status of Project's Schedule and Cost as of September 24, 2008

United States Government Accountability Office GAO For Release on Delivery Expected at 11 a.m. EDT September 24, 2008 Testimony Before the Subcommittee on the Legislative Branch, Committee on Appropriations, House of Representatives CAPITOL VISITOR CENTER Update on Status of Project's Schedule and Cost as of September 24, 2008 Statement of Terrell G. Dorn, Director, Physical Infrastructure Issues ...
Date Sept. 22, 2008 Report No. GAO-08-1097 Title

Veterans Affairs: Additional Details Are Needed in Key Planning Documents to Guide the New Financial and Logistics Initiative

United States Government Accountability Office GAO September 2008 Report to the Subcommittee on Oversight and Investigations, Committee on Veterans’ Affairs, House of Representatives VETERANS AFFAIRS Additional Details Are Needed in Key Planning Documents to Guide the New Financial and Logistics Initiative GAO-08-1097 September 2008 VETERANS AFFAIRS Highlights Highlights of GAO-08-1097, a report...
Date Sept. 22, 2008 Report No. GAO-08-1086 Title

Secure Border Initiative: DHS Needs to Address Significant Risks in Delivering Key Technology Investment

United States Government Accountability Office GAO September 2008 Report to Congressional Requesters SECURE BORDER INITIATIVE DHS Needs to Address Significant Risks in Delivering Key Technology Investment GAO-08-1086 September 2008 SECURE BORDER INITIATIVE Highlights Highlights of GAO-08-1086, a report to congressional requesters Accountability Integrity Reliability DHS Needs to Address Significan...
Date Sept. 18, 2008 Report No. GAO-08-1054R Title

Defense Infrastructure: NORAD and USNORTHCOM Need to Reevaluate Vulnerabilities Associated with Moving the NORAD Command Center from Cheyenne Mountain to Peterson Air Force Base, and to Acknowledge Acceptance of the Risks

United States Government Accountability Office Washington, DC 20548 September 18, 2008 Congressional Committees Subject: Defense Infrastructure: NORAD and USNORTHCOM Need to Reevaluate Vulnerabilities Associated with Moving the NORAD Command Center from Cheyenne Mountain to Peterson Air Force Base, and to Acknowledge Acceptance of the Risks In July 2006, the former Commander of North American Aero...
Date Sept. 17, 2008 Report No. GAO-08-1041R Title

Commercial Aviation: Impact of Airline Crew Scheduling on Delays and Cancellations of Commercial Flights

United States Government Accountability Office Washington, DC 20548 September 17, 2008 The Honorable Ted Stevens United States Senate Subject: Commercial Aviation: Impact of Airline Crew Scheduling on Delays and Cancellations of Commercial Flights Dear Senator Stevens: Media coverage of airline service problems, combined with congressional hearings on these problems, has put flight delays and canc...
Date Sept. 17, 2008 Report No. GAO-08-1005 Title

Defense Infrastructure: Opportunity to Improve the Timeliness of Future Overseas Planning Reports and Factors Affecting the Master Planning Effort for the Military Buildup on Guam

United States Government Accountability Office GAO September 2008 Report to Congressional Committees DEFENSE INFRASTRUCTURE Opportunity to Improve the Timeliness of Future Overseas Planning Reports and Factors Affecting the Master Planning Effort for the Military Buildup on Guam GAO-08-1005 September 2008 DEFENSE INFRASTRUCTURE Highlights Highlights of GAO-08-1005, a report to congressional commit...
Date Sept. 17, 2008 Report No. GAO-08-1164T Title

Department of Homeland Security: Progress and Continuing Concerns with Acquisition Management

United States Government Accountability Office GAO For Release on Delivery Expected at 2 p.m. EST Wednesday, September 17, 2008 Testimony Before the Subcommittee on Management, Investigations, and Oversight, Committee on Homeland Security, House of Representatives DEPARTMENT OF HOMELAND SECURITY Progress and Continuing Concerns with Acquisition Management Statement of John P. Hutton, Director Acqu...
Date Sept. 12, 2008 Report No. GAO-08-889 Title

Federal Courthouse Construction: Estimated Costs to House the L.A. District Court Have Tripled and There Is No Consensus on How to Proceed

United States Government Accountability Office GAO September 2008 Report to Congressional Requesters FEDERAL COURTHOUSE CONSTRUCTION Estimated Costs to House the L.A. District Court Have Tripled and There Is No Consensus on How to Proceed GAO-08-889 September 2008 FEDERAL COURTHOUSE CONSTRUCTION Highlights Highlights of GAO-08-889, a report to congressional requesters Accountability Integrity Reli...
Date Sept. 11, 2008 Report No. GAO-08-1154T Title

Next Generation Air Transportation System: Status of Key Issues Associated with the Transition to NextGen

United States Government Accountability Office GAO For Release on Delivery Expected at 10:00 a.m. EDT Thursday, September 11, 2008 Testimony Before the Committee on Science and Technology, House of Representatives NEXT GENERATION AIR TRANSPORTATION SYSTEM Status of Key Issues Associated with the Transition to NextGen Statement of Gerald L. Dillingham, Ph.D. Director, Physical Infrastructure Issues...
Date Sept. 11, 2008 Report No. GAO-08-1078 Title

Next Generation Air Transportation System: Status of Systems Acquisition and the Transition to the Next Generation Air Transportation System

United States Government Accountability Office GAO September 2008 Report to Congressional Requesters NEXT GENERATION AIR TRANSPORTATION SYSTEM Status of Systems Acquisition and the Transition to the Next Generation Air Transportation System GAO-08-1078 September 2008 Highlights Highlights of GAO-08-1078, a report to congressional requesters Accountability Integrity Reliability NEXT GENERATION AIR ...
Date Sept. 10, 2008 Report No. GAO-08-1148T Title

Secure Border Initiative: DHS Needs to Address Significant Risks in Delivering Key Technology Investment

United States Government Accountability Office GAO For Release on Delivery Expected at 10:00 a.m. EDT Wednesday, September 10, 2008 Testimony Before the Committee on Homeland Security, House of Representatives SECURE BORDER INITIATIVE DHS Needs to Address Significant Risks in Delivering Key Technology Investment Statement of Randolph C. Hite, Director Information Technology Architecture and System...
Date Sept. 10, 2008 Report No. GAO-08-1141T Title

Secure Border Initiative: Observations on Deployment Challenges

United States Government Accountability Office GAO For Release on Delivery Expected at 10:00 a.m. EDT Wednesday, September 10, 2008 Testimony Before the Committee on Homeland Security, House of Representatives SECURE BORDER INITIATIVE Observations on Deployment Challenges Statement of Richard M. Stana, Director Homeland Security and Justice Issues GAO-08-1141T September 10, 2008 SECURE BORDER INIT...
Date Sept. 9, 2008 Report No. GAO-08-992 Title

Aviation Security: TSA Is Enhancing Its Oversight of Air Carrier Efforts to Identify Passengers on the No Fly and Selectee Lists, but Expects Ultimate Solution to Be Implementation of Secure Flight

United States Government Accountability Office GAO September 2008 Report to Congressional Committees AVIATION SECURITY TSA Is Enhancing Its Oversight of Air Carrier Efforts to Identify Passengers on the No Fly and Selectee Lists, but Expects Ultimate Solution to Be Implementation of Secure Flight GAO-08-992 September 2008 AVIATION SECURITY Highlights Highlights of GAO-08-992, a report to congressi...
Date Sept. 9, 2008 Report No. GAO-08-1136T Title

Aviation Security: TSA Is Enhancing Its Oversight of Air Carrier Efforts to Screen Passengers against Terrorist Watch-List Records, but Expects Ultimate Solution to Be Implementation of Secure Flight

United States Government Accountability Office GAO For Release on Delivery Expected at 2:00 p.m. EDT September 9, 2008 Testimony Before the Subcommittee on Transportation Security and Infrastructure Protection, Committee on Homeland Security, House of Representatives AVIATION SECURITY TSA Is Enhancing Its Oversight of Air Carrier Efforts to Screen Passengers against Terrorist Watch-List Records, b...
Date Sept. 8, 2008 Report No. GAO-08-896 Title

DOD Business Systems Modernization: Important Management Controls Being Implemented on Major Navy Program, but Improvements Needed in Key Areas

United States Government Accountability Office GAO September 2008 Report to the Subcommittee on Readiness and Management Support, Committee on Armed Services, U.S. Senate DOD BUSINESS SYSTEMS MODERNIZATION Important Management Controls Being Implemented on Major Navy Program, but Improvements Needed in Key Areas GAO-08-896 September 2008 DOD BUSINESS SYSTEMS MODERNIZATION Highlights Highlights of ...
Date Sept. 8, 2008 Report No. GAO-08-922 Title

DOD Business Systems Modernization: Planned Investment in Navy Program to Create Cashless Shipboard Environment Needs to Be Justified and Better Managed

United States Government Accountability Office GAO September 2008 Report to the Subcommittee on Readiness and Management Support, Committee on Armed Services, U.S. Senate DOD BUSINESS SYSTEMS MODERNIZATION Planned Investment in Navy Program to Create Cashless Shipboard Environment Needs to Be Justified and Better Managed GAO-08-922 September 2008 DOD BUSINESS SYSTEMS MODERNIZATION Highlights Highl...
Date July 31, 2008 Report No. GAO-08-925 Title

Information Technology: Agencies Need to Establish Comprehensive Policies to Address Changes to Projects' Cost, Schedule, and Performance Goals

United States Government Accountability Office GAO July 2008 Report to Congressional Requesters INFORMATION TECHNOLOGY Agencies Need to Establish Comprehensive Policies to Address Changes to Projects’ Cost, Schedule, and Performance Goals GAO-08-925 July 2008 INFORMATION TECHNOLOGY Highlights Highlights of GAO-08-925, a report to congressional requesters Accountability Integrity Reliability Agen...
Date July 31, 2008 Report No. GAO-08-786 Title

FAA Airspace Redesign: An Analysis of the New York/New Jersey/Philadelphia Project

United States Government Accountability Office GAO July 2008 Report to the Congressional Requesters FAA AIRSPACE REDESIGN An Analysis of the New York/New Jersey/Philadelphia Project GAO-08-786 July 2008 FAA AIRSPACE REDESIGN Highlights Highlights of GAO-08-786, a report to congressional requesters Accountability Integrity Reliability An Analysis of the New York/New Jersey/Philadelphia Project Why ...
Date July 31, 2008 Report No. GAO-08-804 Title

Defense Acquisitions: Cost to Deliver Zumwalt-Class Destroyers Likely to Exceed Budget

United States Government Accountability Office GAO July 2008 Report to the Subcommittee on Seapower, Committee on Armed Services, U.S. Senate DEFENSE ACQUISITIONS Cost to Deliver Zumwalt-Class Destroyers Likely to Exceed Budget GAO-08-804 July 2008 DEFENSE ACQUISITIONS Highlights Highlights of GAO-08-804, a report to Subcommittee on Seapower, Committee on Armed Services, U.S. Senate Accountability...
Date July 31, 2008 Report No. GAO-08-938R Title

United States Postal Service: Information on the Irradiation of Federal Mail in the Washington, D.C., Area

United States Government Accountability Office Washington, DC 20548 July 31, 2008 Congressional Requesters Subject: United States Postal Service: Information on the Irradiation of Federal Mail in the Washington, D.C., Area. In October 2001, spores of the deadly bacterium anthrax were found in mail sent to members of the news media and congressional leaders. In all, 22 people were infected with ant...