Date |
Report No. |
Title |
Date Aug. 17, 2005 |
Report No. GAO-05-873 |
Title
United States Government Accountability Office GAO
August 2005 Report to Congressional Committees MEDICARE CONTRACTING REFORM CMS’s Plan Has Gaps and Its Anticipated Savings Are Uncertain GAO-05-873 August 2005 MEDICARE CONTRACTING REFORM Highlights
Highlights of GAO-05-873, a report to congressional committees Accountability Integrity Reliability CMS’s Plan Has Gaps and Its Anticipated Saving... |
Date July 29, 2005 |
Report No. GAO-05-479 |
Title
United States Government Accountability Office GAO
July 2005 Report to Congressional Committees FEDERAL PROCUREMENT Additional Data Reporting Could Improve the Suspension and Debarment Process GAO-05-479 July 2005 FEDERAL PROCUREMENT Highlights
Highlights of GAO-05-479, a report to congressional committees Accountability Integrity Reliability Additional Data Reporting Could Improve the Suspension ... |
Date July 29, 2005 |
Report No. GAO-05-456 |
Title
United States Government Accountability Office GAO
July 2005 Report to Congressional Committees INTERAGENCY CONTRACTING Franchise Funds Provide Convenience, but Value to DOD is Not Demonstrated GAO-05-456 July 2005 INTERAGENCY CONTRACTING Highlights
Highlights of GAO-05-456, a report to congressional committees Accountability Integrity Reliability Franchise Funds Provide Convenience, but Value to ... |
Date July 26, 2005 |
Report No. GAO-05-736 |
Title
United States Government Accountability Office GAO
July 2005 Report to Congressional Committees FEDERAL CONTRACTING Share-in-Savings Initiative Not Yet Tested GAO-05-736 July 2005 FEDERAL CONTRACTING Highlights
Highlights of GAO-05-736, a report to congressional committees Accountability Integrity Reliability Share-in-Savings Initiative Not Yet Tested Why GAO Did This Study
Federal agencies spend ... |
Date July 14, 2005 |
Report No. GAO-05-910T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 10:30 a.m. EDT Thursday, July 14, 2005 Testimony Before the Subcommittee on the Legislative Branch, Committee on Appropriations, U.S. Senate CAPITOL VISITOR CENTER Update on Status of Project’s Schedule and Costs
Statement of Bernard L. Ungar, Director Terrell Dorn, Assistant Director Physical Infrastructure I... |
Date June 30, 2005 |
Report No. GAO-05-526 |
Title
United States Government Accountability Office GAO
June 2005 Report to Congressional Requesters IMMIGRATION SERVICES Better Contracting Practices Needed at Call Centers GAO-05-526 June 2005 IMMIGRATION SERVICES Highlights
Highlights of GAO-05-526, a report to congressional requesters Accountability Integrity Reliability Better Contracting Practices Needed at Call Centers Why GAO Did This Study
The... |
Date June 14, 2005 |
Report No. GAO-05-811T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 10:30 a.m. EDT Tuesday, June 14, 2005 Testimony Before the Subcommittee on the Legislative Branch, Committee on Appropriations, U.S. Senate CAPITOL VISITOR CENTER Effective Schedule Management and Updated Cost Information Are Needed
Statement of Bernard L. Ungar, Director Terrell Dorn, Assistant Director Physica... |
Date June 9, 2005 |
Report No. GAO-05-761T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 9:30 a.m. EDT Thursday, June 9, 2005 Testimony Before the Subcommittee on Railroads, Committee on Transportation and Infrastructure, House of Representatives AMTRAK Management and Accountability Issues Contribute to Unprofitability of Food and Beverage Service
Statement of JayEtta Hecker, Director Physical Infra... |
Date May 17, 2005 |
Report No. GAO-05-714T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 10:30 a.m. EDT Tuesday, May 17, 2005 Testimony Before the Subcommittee on the Legislative Branch, Committee on Appropriations, U.S. Senate CAPITOL VISITOR CENTER Priority Attention Needed to Manage Schedules and Contracts
Statement of David M. Walker Comptroller General of the United States GAO-05-714T Mr. Chair... |
Date May 13, 2005 |
Report No. GAO-05-459 |
Title
United States Government Accountability Office GAO
May 2005 Report to Congressional Committees DEPARTMENT OF ENERGY Improved Oversight Could Better Ensure Opportunities for Small Business Subcontracting GAO-05-459 May 2005 DEPARTMENT OF ENERGY Highlights
Highlights of GAO-05-459, a report to congressional committees Accountability Integrity Reliability Improved Oversight Could Better Ensure Opport... |
Date April 29, 2005 |
Report No. GAO-05-341 |
Title
United States Government Accountability Office GAO
April 2005 Report to Congressional Requesters DEFENSE ETHICS PROGRAM Opportunities Exist to Strengthen Safeguards for Procurement Integrity GAO-05-341 April 2005 DEFENSE ETHICS PROGRAM Highlights
Highlights of GAO-05-341, a report to congressional requesters Accountability Integrity Reliability Opportunities Exist to Strengthen Safeguards for Proc... |
Date April 29, 2005 |
Report No. GAO-05-201 |
Title
United States Government Accountability Office GAO
April 2005 Report to Congressional Committees INTERAGENCY CONTRACTING Problems with DOD’s and Interior’s Orders to Support Military Operations GAO-05-201 April 2005 INTERAGENCY CONTRACTING Highlights
Highlights of GAO-05-201, a report to congressional committees Accountability Integrity Reliability Problems with DOD’s and Interior’s Orders... |
Date April 13, 2005 |
Report No. GAO-05-520T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 10:00 a.m. EDT Wednesday, April 13, 2005 Testimony
Before the Subcommittee on Readiness and Management Support, Committee on Armed Services, U.S. Senate DOD’S HIGH-RISK AREAS Successful Business Transformation Requires Sound Strategic Planning and Sustained Leadership
Statement of David M. Walker Comptroller G... |
Date March 21, 2005 |
Report No. GAO-05-328 |
Title
United States Government Accountability Office GAO
March 2005 Report to the Secretary of Defense DEFENSE LOGISTICS High-Level DOD Coordination Is Needed to Further Improve the Management of the Army’s LOGCAP Contract GAO-05-328 a March 2005 DEFENSE LOGISTICS Highlights
Highlights of GAO-05-328, a report to the Secretary of Defense Accountability Integrity Reliability High-Level DOD Coordination ... |
Date March 18, 2005 |
Report No. GAO-05-123 |
Title
United States Government Accountability Office GAO
March 2005 Report to the Committee on Government Reform, House of Representatives DEPARTMENT OF ENERGY Further Actions Are Needed to Strengthen Contract Management for Major Projects GAO-05-123 a March 2005 DEPARTMENT OF ENERGY Further Actions Are Needed to Strengthen Contract Management for Major Projects Highlights of GAO-05-123, a report to the... |
Date March 17, 2005 |
Report No. GAO-05-274 |
Title
United States Government Accountability Office GAO
March 2005 Report to the Secretary of Defense CONTRACT MANAGEMENT Opportunities to Improve Surveillance on Department of Defense Service Contracts GAO-05-274 a March 2005 CONTRACT MANAGEMENT Highlights
Highlights of GAO-05-274, a report to the Secretary of Defense Accountability Integrity Reliability Opportunities to Improve Surveillance on Depart... |
Date March 7, 2005 |
Report No. GAO-05-264 |
Title
United States Government Accountability Office GAO
March 2005 Report to the Ranking Minority Member, Subcommittee on Readiness, Committee on Armed Services, House of Representatives MARITIME ADMINISTRATION Improved Program Management Needed to Address Timely Disposal of Obsolete Ships GAO-05-264 a March 2005 MARITIME ADMINISTRATION Highlights
Highlights of GAO-05-264, a report to the Ranking Minor... |
Date March 3, 2005 |
Report No. GAO-05-361T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 10 a.m. EST March 3, 2005 Testimony Before the Committee on Government Reform, House of Representatives TELECOMMUNICATIONS GSA Has Made Progress Planning for a New Governmentwide Program, But Critical Issues Remain
Statement of Linda D. Koontz, Director Information Management Issues GAO-05-361T March 3, 2005 TEL... |
Date Dec. 20, 2004 |
Report No. GAO-05-73 |
Title
United States Government Accountability Office GAO
December 2004 Report to the Senate and House Subcommittees on Defense, Committees on Appropriations DEFENSE INVENTORY DOD and Prime Contractors Adhered to Requirements in Selected Contracts for Overseeing Spare Parts Quality GAO-05-73 a December 2004 DEFENSE INVENTORY Highlights
Highlights of GAO-05-73, a report to the Senate and House Subcommitte... |
Date July 30, 2004 |
Report No. GAO-04-874 |
Title
United States Government Accountability Office GAO
July 2004 Report to Congressional Committees CONTRACT MANAGEMENT Guidance Needed to Promote Competition for Defense Task Orders GAO-04-874 a July 2004 CONTRACT MANAGEMENT Guidance Needed to Promote Competition for Defense Task Orders Highlights of GAO-04-874, a report to congressional committees The Department of Defense (DOD) spends billions of d... |
Date July 19, 2004 |
Report No. GAO-04-854 |
Title
United States Government Accountability Office GAO
July 2004 Report to Congressional Requesters MILITARY OPERATIONS DOD’s Extensive Use of Logistics Support Contracts Requires Strengthened Oversight GAO-04-854 July 2004 MILITARY OPERATIONS DOD's Extensive Use of Logistics Support Contracts Requires Strengthened Oversight Highlights of GAO-04-854, a report to the Ranking Minority Member, House Co... |
Date July 8, 2004 |
Report No. GAO-04-953T |
Title
United States General Accounting Office GAO
For Release on Delivery Expected at 9:30 a.m., EDT Thursday, July 8, 2004 Testimony before the Committee on Energy and Commerce, Subcommittee on Energy and Air Quality, House of Representatives UNITED NATIONS Observations on the Oil for Food Program and Areas for Further Investigation
Statement of Joseph A. Christoff, Director International Affairs and T... |
Date June 22, 2004 |
Report No. GAO-04-718 |
Title
United States General Accounting Office GAO
June 2004 Report to the Committee on Government Reform, House of Representatives CONTRACT MANAGEMENT Further Efforts Needed to Sustain VA’s Progress in Purchasing Medical Products and Services GAO-04-718 a June 2004 CONTRACT MANAGEMENT Further Efforts Needed to Sustain VA’s Progress in Purchasing Medical Products and Services Highlights of GAO-04-718... |
Date June 16, 2004 |
Report No. GAO-04-880T |
Title
United States General Accounting Office GAO
For Release on Delivery Expected at 10:00 a.m., EDT Wednesday, June 16, 2004 Testimony before the Committee on Agriculture, House of Representatives UNITED NATIONS Observations on the Oil for Food Program and Iraq’s Food Security
Statement of Joseph A. Christoff, Director International Affairs and Trade GAO-04-880T Wednesday, June 16, 2004 UNITED NATIO... |
Date June 15, 2004 |
Report No. GAO-04-869T |
Title
United States General Accounting Office GAO
For Release on Delivery Expected at 11:00 a.m. EDT June 15, 2004 Testimony Before the Committee on Government Reform, House of Representatives CONTRACT MANAGEMENT Contracting for Iraq Reconstruction and for Global Logistics Support
Statement of David M. Walker Comptroller General of the United States GAO-04-869T Chairman Davis, Ranking Member Waxman, and... |
Date June 14, 2004 |
Report No. GAO-04-652 |
Title
United States General Accounting Office GAO
June 2004 Report to Congressional Requesters FEDERAL LAND MANAGEMENT Additional Guidance on Community Involvement Could Enhance Effectiveness of Stewardship Contracting GAO-04-652 a June 2004 FEDERAL LAND MANAGEMENT Additional Guidance on Community Involvement Could Enhance Effectiveness of Stewardship Contracting Highlights of GAO-04-652, a report to co... |
Date June 9, 2004 |
Report No. GAO-04-611 |
Title
United States General Accounting Office GAO
June 2004 Report to the Committee on Government Reform, House of Representatives NUCLEAR WASTE Absence of Key Management Reforms on Hanford’s Cleanup Project Adds to Challenges of Achieving Cost and Schedule Goals GAO-04-611 a June 2004 NUCLEAR WASTE Absence of Key Management Reforms on Hanford's Cleanup Project Adds to Challenges of Achieving Cost and... |
Date June 1, 2004 |
Report No. GAO-04-605 |
Title
United States General Accounting Office GAO
June 2004 Report to Congressional Committees REBUILDING IRAQ Fiscal Year 2003 Contract Award Procedures and Management Challenges GAO-04-605 a June 2004 REBUILDING IRAQ Fiscal Year 2003 Contract Award Procedures and Management Challenges Highlights of GAO-04-605, a report to congressional committees. Congress has appropriated more than $20 billion since ... |
Date May 28, 2004 |
Report No. GAO-04-642 |
Title
United States General Accounting Office GAO
May 2004 Report to the Committee on Science, House of Representatives NASA Lack of Disciplined Cost-Estimating Processes Hinders Effective Program Management GAO-04-642 a May 2004 NASA Lack of Disciplined Cost-Estimating Processes Hinders Effective Program Management Highlights of GAO-04-642, a report to the Committee on Science, House of Representatives... |
Date May 27, 2004 |
Report No. GAO-04-454 |
Title
United States General Accounting Office GAO
May 2004 Report to the Chairman and Ranking Minority Member, Committee on Small Business, House of Representatives CONTRACT MANAGEMENT Impact of Strategy to Mitigate Effects of Contract Bundling on Small Business Is Uncertain GAO-04-454 a May 2004 CONTRACT MANAGEMENT Impact of Strategy to Mitigate Effects of Contract Bundling Strategy on Small Business I... |
Date May 19, 2004 |
Report No. GAO-04-754T |
Title
United States General Accounting Office GAO
For Release on Delivery Expected at 2:00 p.m. EDT Wednesday, May 19, 2004 Testimony
Before the Subcommittee on Government Efficiency, Financial Management, and Intergovernmental Relations, Committee on Government Reform, House of Representatives NATIONAL AERONAUTICS AND SPACE ADMINISTRATION Significant Actions Needed to Address Long-standing Financial Ma... |
Date May 18, 2004 |
Report No. GAO-04-738T |
Title
United States General Accounting Office GAO
For Release on Delivery Expected at 10:00 a.m. EDT Tuesday, May 18, 2004 Testimony Before the Committee on Energy and Natural Resources, U.S. Senate DEPARTMENT OF ENERGY Achieving Small Business Prime Contracting Goals Involves Both Potential Benefits and Risks
Statement of Robin M. Nazzaro, Director Natural Resources and Environment GAO-04-738T May 18, ... |
Date April 28, 2004 |
Report No. GAO-04-730T |
Title
United States General Accounting Office GAO
For Release on Delivery Expected at 10:30 a.m., EDT Wednesday, April 28, 2004 Testimony before the Committee on International Relations, House of Representatives UNITED NATIONS Observations on the Management and Oversight of the Oil for Food Program
Statement of Joseph A. Christoff, Director International Affairs and Trade GAO-04-730T Wednesday, April 28... |
Date April 7, 2004 |
Report No. GAO-04-651T |
Title
United States General Accounting Office GAO
For Release on Delivery Expected at 9:30 a.m. EDT Wednesday, April 7, 2004 Testimony Before the Committee on Foreign Relations, U.S. Senate UNITED NATIONS Observations on the Oil for Food Program
Statement of Joseph A. Christoff, Director International Affairs and Trade GAO-04-651T Wednesday, April 7, 2004 UNITED NATIONS Observations on the Oil for Food ... |
Date March 31, 2004 |
Report No. GAO-04-459 |
Title
United States General Accounting Office GAO
March 2004 Report to the Chairman, Committee on Transportation and Infrastructure, House of Representatives GRANTS MANAGEMENT EPA Needs to Better Document Its Decisions for Choosing between Grants and Contracts GAO-04-459 a March 2004 GRANTS MANAGEMENT EPA Needs to Better Document Its Decisions for Choosing between Grants and Contracts Highlights of GAO-... |
Date March 9, 2004 |
Report No. GAO-04-380 |
Title
United States General Accounting Office GAO
March 2004 Report to the Ranking Minority Member, Committee on Commerce, Science, and Transportation, U.S. Senate CONTRACT MANAGEMENT Coast Guard’s Deepwater Program Needs Increased Attention to Management and Contractor Oversight GAO-04-380 March 2004 CONTRACT MANAGEMENT Coast Guard's Deepwater Program Needs Increased Attention to Management and Contr... |
Date March 3, 2004 |
Report No. GAO-04-390 |
Title
United States General Accounting Office GAO
March 2004 Report to the Chairman, Committee on Government Reform, House of Representatives HUD SINGLE-FAMILY AND MULTIFAMILY PROPERTY PROGRAMS Inadequate Controls Resulted in Questionable Payments and Potential Fraud GAO-04-390 a March 2004 HUD SINGLE-FAMILY AND MULTIFAMILY PROPERTY PROGRAMS
Highlights of GAO-04-390, a report to the Honorable Tom Davis,... |
Date Nov. 21, 2003 |
Report No. GAO-04-255 |
Title
United States General Accounting Office GAO
November 2003 Summary Report to the Committee on Commerce, Science, and Transportation, U.S. Senate, and the Committee on Science, House of Representatives BUSINESS MODERNIZATION NASA’s Challenges in Managing Its Integrated Financial Management Program GAO-04-255 November 2003 BUSINESS MODERNIZATION NASA’s Challenges in Managing Its Integrated Financ... |
Date Oct. 31, 2003 |
Report No. GAO-04-18 |
Title
United States General Accounting Office GAO
October 2003 Report to the Chairman, Subcommittee on the Constitution, Committee on the Judiciary, House of Representatives U.S. COMMISSION ON CIVIL RIGHTS More Operational and Financial Oversight Needed GAO-04-18 October 2003 U.S. COMMISSION ON CIVIL RIGHTS More Operational and Financial Oversight Needed Highlights of GAO-04-18, a report to the Chairman... |
Date Aug. 29, 2003 |
Report No. GAO-03-983 |
Title
United States General Accounting Office GAO
August 2003 Report to Congressional Committees CONTRACT MANAGEMENT Civilian Agency Compliance with Revised Task and Delivery Order Regulations GAO-03-983 a August 2003 CONTRACT MANAGEMENT Civilian Agency Compliance with Revised Task and Delivery Order Regulations Highlights of GAO-03-983, a report to Congressional Committees Multiple-award task and deliv... |
Date July 25, 2003 |
Report No. GAO-03-799 |
Title
United States General Accounting Office GAO
July 2003 Report to the Committee on Government Reform, House of Representatives CONTRACT MANAGEMENT INS Contracting Weaknesses Need Attention from the Department of Homeland Security GAO-03-799 July 2003 CONTRACT MANAGEMENT INS Contracting Weaknesses Need Attention from the Department of Homeland Security Highlights of GAO-03-799, a report to House Gove... |
Date July 10, 2003 |
Report No. GAO-03-932T |
Title
United States General Accounting Office GAO
For Release on Delivery Expected at 10:00 a.m. EDT Thursday, July 10, 2003 Testimony Before the Subcommittee on Energy, Committee on Science, House of Representatives CONTRACT REFORM DOE’s Policies and Practices in Competing Research Laboratory Contracts
Statement of Robin M. Nazzaro, Director, Natural Resources and Environment GAO-03-932T July 10, 200... |
Date July 10, 2003 |
Report No. GAO-03-832R |
Title
Enclosure United States General Accounting Office Washington, DC 20548 July 10, 2003 The Honorable Christopher S. Bond Chairman, Subcommittee on VA, HUD, and Independent Agencies Committee on Appropriations United States Senate Subject: National Science Foundation: Status of the Business Analysis Plan Contract Dear Mr. Chairman: In June 2002, the National Science Foundation (NSF) awarded a 3-year,... |
Date July 8, 2003 |
Report No. GAO-03-842 |
Title
United States General Accounting Office GAO
July 2003 Report to the Chairman, Committee on Finance, U.S. Senate CMS CONTRACTING Issues Concerning Administrator’s Decision to Exclude Subcontractor GAO-03-842 a July 2003 CMS CONTRACTING Issues Concerning Administrator’s Decision to Exclude Subcontractor Highlights of GAO-03-842, a report to the Chairman, Committee on Finance, U.S. Senate In Sept... |
Date June 24, 2003 |
Report No. GAO-03-695 |
Title
United States General Accounting Office GAO
June 2003 Report to the Subcommittee on Readiness and Management Support, Committee on Armed Services, U.S. Senate MILITARY OPERATIONS Contractors Provide Vital Services to Deployed Forces but Are Not Adequately Addressed in DOD Plans GAO-03-695 June 2003 MILITARY OPERATIONS
Highlights of GAO-03-695, a report to the Subcommittee on Readiness and Manageme... |
Date May 9, 2003 |
Report No. GAO-03-596R |
Title
United States General Accounting Office Washington, DC 20548 May 9, 2003 Congressional Committees Subject: Natural Resources: Status of Merchantable Material Contracting Pilot Program Authorized by the Secure Rural Schools and Community Self-Determination Act of 2000 The Secure Rural Schools and Community Self-Determination Act of 2000, enacted October 30, 2000,1 mandated that we assess a merchant... |
Date May 7, 2003 |
Report No. GAO-03-704T |
Title
United States General Accounting Office GAO
For Release on Delivery Expected at 2:00 p.m. EDT Wednesday, May 7, 2003 Testimony Before the Committee on Small Business, House of Representatives CONTRACT MANAGEMENT Reporting of Small Business Contract Awards Does Not Reflect Current Business Size
Statement of David E. Cooper Director Acquisition and Sourcing Management GAO-03-704T May 7, 2003 CONTRAC... |
Date May 7, 2003 |
Report No. GAO-03-776R |
Title
United States General Accounting Office Washington, DC 20548 May 7, 2003 The Honorable Olympia J. Snowe Chair, Committee on Small Business and Entrepreneurship United States Senate Subject: Reporting of Small Business Contract Awards Does Not Reflect Current Business Size Dear Madam Chair: We have prepared this report in response to your concerns about whether large companies are receiving federal... |
Date March 31, 2003 |
Report No. GAO-03-504SP |
Title
United States General Accounting Office Washington, DC 20548 March 31, 2003 Subject: Catalogue of GAO and Inspectors General Reports on Contracting Issues for Fiscal Years 1997 through 2002 Dear User: The federal government spent more than $230 billion through contracts with private industry in fiscal year 2001. Ten Executive Branch agencies1 account for almost 95 percent of this spending. Past re... |
Date March 20, 2003 |
Report No. GAO-03-570T |
Title
United States General Accounting Office GAO
For Release on Delivery Expected at 10:00 a.m. Thursday, March 20, 2003 Testimony Before the Committee on Government Reform, House of Representatives DEPARTMENT OF ENERGY Status of Contract and Project Management Reforms
Statement of Robin M. Nazzaro, Director Natural Resources and Environment GAO-03-570T This is a work of the U.S. government and is not ... |