Date June 27, 2011 Report No. GAO-11-459R Title

Military Buildup on Guam: Costs and Challenges in Meeting Construction Timelines

United States Government Accountability Office Washington, DC 20548 June 27, 2011 The Honorable Tim Johnson Chairman The Honorable Mark Kirk Ranking Member Subcommittee on Military Construction, Veterans Affairs, and Related Agencies Committee on Appropriations United States Senate Subject: Military Buildup on Guam: Costs and Challenges in Meeting Construction Timelines In 2004, the bilateral U.S....
Date Nov. 19, 2010 Report No. GAO-11-103 Title

Nuclear Weapons: National Nuclear Security Administration's Plans for Its Uranium Processing Facility Should Better Reflect Funding Estimates and Technology Readiness

United States Government Accountability Office GAO November 2010 Report to the Subcommittee on Energy and Water Development, Committee on Appropriations, U.S. Senate NUCLEAR WEAPONS National Nuclear Security Administration’s Plans for Its Uranium Processing Facility Should Better Reflect Funding Estimates and Technology Readiness GAO-11-103 November 2010 NUCLEAR WEAPONS Accountability • Integr...
Date Sept. 29, 2010 Report No. GAO-10-1068T Title

Federal Courthouse Construction: Better Planning, Oversight, and Courtroom Sharing Needed to Address Future Costs

United States Government Accountability Office GAO For Release on Delivery Expected at 3:00 p.m. EST Wednesday, September 29, 2010 Testimony Before the Subcommittee on Courts and Competition Policy, Committee on the Judiciary, House of Representatives FEDERAL COURTHOUSE CONSTRUCTION Better Planning, Oversight, and Courtroom Sharing Needed to Address Future Costs Statement of Mark L. Goldstein, Dir...
Date July 26, 2010 Report No. GAO-10-686 Title

Defense Acquisitions: Guidance Needed on Navy's Use of Investment Incentives at Private Shipyards

United States Government Accountability Office GAO July 2010 Report to the Chairman, Subcommittee on Defense, Committee on Appropriations, House of Representatives DEFENSE ACQUISITIONS Guidance Needed on Navy’s Use of Investment Incentives at Private Shipyards GAO-10-686 July 2010 DEFENSE ACQUISITIONS Highlights Highlights of GAO-10-686, a report to the Chairman, Subcommittee on Defense, Committ...
Date June 21, 2010 Report No. GAO-10-417 Title

Federal Courthouse Construction: Better Planning, Oversight, and Courtroom Sharing Needed to Address Future Costs

United States Government Accountability Office GAO June 2010 Report to Congressional Requesters FEDERAL COURTHOUSE CONSTRUCTION Better Planning, Oversight, and Courtroom Sharing Needed to Address Future Costs GAO-10-417 June 2010 FEDERAL COURTHOUSE CONSTRUCTION Highlights Highlights of GAO-10-417, a report to congressional requesters Accountability Integrity Reliability Better Planning, Oversight,...
Date May 25, 2010 Report No. GAO-10-753T Title

Federal Courthouse Construction: Preliminary Results Show Better Planning, Oversight, and Courtroom Sharing Could Help Control Future Costs

United States Government Accountability Office GAO For Release on Delivery Expected at 10:00 a.m. EDT Tuesday, May 25, 2010 Testimony Before the Subcommittee on Economic Development, Public Buildings, and Emergency Management, Committee on Transportation and Infrastructure, House of Representatives FEDERAL COURTHOUSE CONSTRUCTION Preliminary Results Show Better Planning, Oversight, and Courtroom S...
Date May 6, 2010 Report No. GAO-10-380 Title

Superfund: EPA's Estimated Costs to Remediate Existing Sites Exceed Current Funding Levels, and More Sites Are Expected to Be Added to the National Priorities List

United States Government Accountability Office GAO May 2010 Report to Congressional Requesters SUPERFUND EPA’s Estimated Costs to Remediate Existing Sites Exceed Current Funding Levels, and More Sites Are Expected to Be Added to the National Priorities List GAO-10-380 May 2010 SUPERFUND Highlights Highlights of GAO-10-380, a report to congressional requesters Accountability Integrity Reliability...
Date April 30, 2010 Report No. GAO-10-436 Title

Defense Infrastructure: DOD Needs to Determine and Use the Most Economical Building Materials and Methods When Acquiring New Permanent Facilities

United States Government Accountability Office GAO April 2010 Report to the Subcommittee on Readiness, Committee on Armed Services, House of Representatives DEFENSE INFRASTRUCTURE DOD Needs to Determine and Use the Most Economical Building Materials and Methods When Acquiring New Permanent Facilities GAO-10-436 April 2010 DEFENSE INFRASTRUCTURE Highlights Highlights of GAO-10-436, a report to the ...
Date Feb. 25, 2010 Report No. GAO-10-277 Title

Superfund: Information on Cost and Other Issues Related to the Cleanup of the Federal Creosote Site

United States Government Accountability Office GAO February 2010 Report to Congressional Requesters SUPERFUND Information on Cost and Other Issues Related to the Cleanup of the Federal Creosote Site GAO-10-277 February 2010 SUPERFUND Highlights Highlights of GAO-10-277, a report to congressional requesters Accountability Integrity Reliability Information on Cost and Other Issues Related to the Cle...
Date Dec. 14, 2009 Report No. GAO-10-189 Title

VA Construction: VA Is Working to Improve Initial Project Cost Estimates, but Should Analyze Cost and Schedule Risks

United States Government Accountability Office GAO December 2009 Report to the Ranking Member, Committee on Veterans’ Affairs, House of Representatives VA CONSTRUCTION VA Is Working to Improve Initial Project Cost Estimates, but Should Analyze Cost and Schedule Risks GAO-10-189 December 2009 VA CONSTRUCTION Highlights Highlights of GAO-10-189, a report to the Ranking Member, Committee on Veteran...
Date Aug. 6, 2009 Report No. GAO-09-771 Title

Ballistic Missile Defense: Actions Needed to Improve Planning and Information on Construction and Support Costs for Proposed European Sites

United States Government Accountability Office GAO August 2009 Report to Congressional Requesters BALLISTIC MISSILE DEFENSE Actions Needed to Improve Planning and Information on Construction and Support Costs for Proposed European Sites GAO-09-771 August 2009 BALLISTIC MISSILE DEFENSE Highlights Highlights of GAO-09-771, a report to congressional requesters Accountability Integrity Reliability Act...
Date June 30, 2009 Report No. GAO-09-729R Title

Financial Institutions: Highway Trust Fund Expenditures on Purposes Other than Construction and Maintenance of Highways and Bridges during Fiscal Years 2004-2008

United States Government Accountability Office Washington, DC 20548 June 30, 2009 The Honorable John McCain Acting Ranking Member Subcommittee on Federal Financial Management, Government Information, Federal Services, and International Security Committee on Homeland Security and Governmental Affairs United States Senate The Honorable Tom Coburn United States Senate Subject: Highway Trust Fund Expe...
Date May 6, 2009 Report No. GAO-09-673T Title

Architect of the Capitol: Plans for Renovating the Cannon House Office Building and Garages

United States Government Accountability Office GAO For Release on Delivery Expected at 11:00 a.m. EDT May 6, 2009 Testimony before the Committee on House Administration, House of Representatives ARCHITECT OF THE CAPITOL Plans for Renovating the Cannon House Office Building and Garages Statement of Terrell G. Dorn, Director Physical Infrastructure Issues GAO-09-673T Mr. Chairman and Members of the ...
Date Jan. 30, 2009 Report No. GAO-09-217 Title

Military Base Realignments and Closures: DOD Faces Challenges in Implementing Recommendations on Time and Is Not Consistently Updating Savings Estimates

United States Government Accountability Office GAO January 2009 Report to Congressional Committees MILITARY BASE REALIGNMENTS AND CLOSURES DOD Faces Challenges in Implementing Recommendations on Time and Is Not Consistently Updating Savings Estimates GAO-09-217 January 2009 Highlights Highlights of GAO-09-217, a report to congressional committees Accountability Integrity Reliability MILITARY BASE ...
Date Jan. 29, 2009 Report No. GAO-09-244R Title

Homeland Security: Secure Border Initiative Fence Construction Costs

United States Government Accountability Office Washington, DC 20548 January 29, 2009 Congressional Committees Subject: Secure Border Initiative Fence Construction Costs Much of the United States’ 6,000 miles of international borders with Canada and Mexico remains vulnerable to illegal entry of aliens, criminals, and cargo. The Department of Homeland Security (DHS) apprehends hundreds of thousand...
Date Jan. 16, 2009 Report No. GAO-09-48 Title

Embassy Construction: Additional Actions Are Needed to Address Contractor Participation

United States Government Accountability Office GAO January 2009 Report to Congressional Committees EMBASSY CONSTRUCTION Additional Actions Are Needed to Address Contractor Participation GAO-09-48 January 2009 EMBASSY CONSTRUCTION Highlights Highlights of GAO-09-48, a report to congressional committees Accountability Integrity Reliability Additional Actions Are Needed to Address Contractor Particip...
Date Jan. 16, 2009 Report No. GAO-09-47SP Title

New Embassy Construction: Structured Interviews with Construction Firms (GAO-09-47SP, January 2009), an E-supplement to GAO-09-48

Date Oct. 16, 2008 Report No. GAO-09-10 Title

Federal Real Property: Government's Fiscal Exposure from Repair and Maintenance Backlogs Is Unclear

United States Government Accountability Office GAO October 2008 Report to the Committee on Oversight and Government Reform, House of Representatives FEDERAL REAL PROPERTY Government’s Fiscal Exposure from Repair and Maintenance Backlogs Is Unclear GAO-09-10 October 2008 FEDERAL REAL PROPERTY Highlights Highlights of GAO-09-10, a report to the Committee on Oversight and Government Reform, House o...
Date Sept. 12, 2008 Report No. GAO-08-889 Title

Federal Courthouse Construction: Estimated Costs to House the L.A. District Court Have Tripled and There Is No Consensus on How to Proceed

United States Government Accountability Office GAO September 2008 Report to Congressional Requesters FEDERAL COURTHOUSE CONSTRUCTION Estimated Costs to House the L.A. District Court Have Tripled and There Is No Consensus on How to Proceed GAO-08-889 September 2008 FEDERAL COURTHOUSE CONSTRUCTION Highlights Highlights of GAO-08-889, a report to congressional requesters Accountability Integrity Reli...
Date Sept. 10, 2008 Report No. GAO-08-1141T Title

Secure Border Initiative: Observations on Deployment Challenges

United States Government Accountability Office GAO For Release on Delivery Expected at 10:00 a.m. EDT Wednesday, September 10, 2008 Testimony Before the Committee on Homeland Security, House of Representatives SECURE BORDER INITIATIVE Observations on Deployment Challenges Statement of Richard M. Stana, Director Homeland Security and Justice Issues GAO-08-1141T September 10, 2008 SECURE BORDER INIT...
Date July 31, 2008 Report No. GAO-08-804 Title

Defense Acquisitions: Cost to Deliver Zumwalt-Class Destroyers Likely to Exceed Budget

United States Government Accountability Office GAO July 2008 Report to the Subcommittee on Seapower, Committee on Armed Services, U.S. Senate DEFENSE ACQUISITIONS Cost to Deliver Zumwalt-Class Destroyers Likely to Exceed Budget GAO-08-804 July 2008 DEFENSE ACQUISITIONS Highlights Highlights of GAO-08-804, a report to Subcommittee on Seapower, Committee on Armed Services, U.S. Senate Accountability...
Date July 31, 2008 Report No. GAO-08-1061T Title

Defense Acquisitions: Zumwalt-Class Destroyer Program Emblematic of Challenges Facing Navy Shipbuilding

United States Government Accountability Office GAO For Release on Delivery Expected at 10:00 a.m. EDT Thursday, July 31, 2008 Testimony Before the Subcommittee on Seapower and Expeditionary Forces, Committee on Armed Services, House of Representatives DEFENSE ACQUISITIONS Zumwalt-Class Destroyer Program Emblematic of Challenges Facing Navy Shipbuilding Statement of Paul L. Francis, Director Acquis...
Date July 8, 2008 Report No. GAO-08-689 Title

Afghanistan Reconstruction: Progress Made in Constructing Roads, but Assessments for Determining Impact and a Sustainable Maintenance Program Are Needed

United States Government Accountability Office GAO July 2008 Report to Congressional Committees AFGHANISTAN RECONSTRUCTION Progress Made in Constructing Roads, but Assessments for Determining Impact and a Sustainable Maintenance Program Are Needed GAO-08-689 July 2008 AFGHANISTAN RECONSTRUCTION Highlights Highlights of GAO-08-689, a report to congressional committees Accountability Integrity Relia...
Date June 25, 2008 Report No. GAO-08-923T Title

Military Construction: Kaiserslautern Military Community Center Project Continues to Experience Problems

United States Government Accountability Office GAO For Release on Delivery Expected at 10:00 a.m. EDT Wednesday, June 25, 2008 Testimony Before the Committee on Oversight and Government Reform, House of Representatives MILITARY CONSTRUCTION Kaiserslautern Military Community Center Project Continues to Experience Problems Statement of Gregory D. Kutz, Managing Director Forensic Audits and Special I...
Date June 23, 2008 Report No. GAO-08-736R Title

Military Operations: Actions Needed to Better Guide Project Selection for Commander's Emergency Response Program and Improve Oversight in Iraq

United States Government Accountability Office Washington, DC 20548 June 23, 2008 Congressional Committees Subject: Military Operations: Actions Needed to Better Guide Project Selection for Commander’s Emergency Response Program and Improve Oversight in Iraq Since fiscal year 2003, Congress has appropriated more than $46 billion dollars for relief and reconstruction efforts in Iraq. The Departme...
Date May 29, 2008 Report No. GAO-08-634 Title

Prison Construction: Clear Communication on the Accuracy of Cost Estimates and Project Changes is Needed

United States Government Accountability Office GAO May 2008 Report to the Subcommittee on Commerce, Justice, Science, and Related Agencies, Committee on Appropriations, U.S. Senate PRISON CONSTRUCTION Clear Communication on the Accuracy of Cost Estimates and Project Changes Is Needed GAO-08-634 May 2008 PRISON CONSTRUCTION Highlights Highlights of GAO-08-634, a report to the Subcommittee on Commer...
Date May 22, 2008 Report No. GAO-08-811T Title

Capitol Visitor Center: Update on Status of Project's Schedule and Cost as of May 22, 2008

United States Government Accountability Office GAO For Release on Delivery Expected at 10:00 a.m. EDT Thursday, May 22, 2008 Testimony before the Subcommittee on the Legislative Branch, Committee on Appropriations, House of Representatives CAPITOL VISITOR CENTER Update on Status of Project’s Schedule and Cost as of May 22, 2008 Statement of Terrell G. Dorn, Director, Physical Infrastructure Issu...
Date April 24, 2008 Report No. GAO-08-581T Title

NASA: Challenges in Completing and Sustaining the International Space Station

United States Government Accountability Office GAO For Release on Delivery Expected at 10:30 a.m. EDT Thursday, April 24, 2008 Testimony Before the Subcommittee on Space and Aeronautics, Committee on Science and Technology, House of Representatives NASA Challenges in Completing and Sustaining the International Space Station Statement of Cristina T. Chaplain, Director Acquisition and Sourcing Manag...
Date April 9, 2008 Report No. GAO-08-513R Title

United Nations: Renovation Schedule Accelerated after Delays, but Risks Remain in Key Areas

United States Government Accountability Office GAO April 2008 Correspondence to the Committee on Foreign Relations, U.S. Senate UNITED NATIONS Renovation Schedule Accelerated after Delays, but Risks Remain in Key Areas GAO-08-513R April 2008 UNITED NATIONS Highlights Highlights of GAO-08-513R, a correspondence to the Committee on Foreign Relations, U.S. Senate Accountability Integrity Reliability ...
Date July 24, 2007 Report No. GAO-07-943T Title

Defense Acquisitions: Realistic Business Cases Needed to Execute Navy Shipbuilding Programs

United States Government Accountability Office GAO For Release on Delivery Expected at 2:00 p.m. EDT Tuesday, July 24, 2007 Testimony Before the Subcommittee on Seapower and Expeditionary Forces, Committee on Armed Services, House of Representatives DEFENSE ACQUISITIONS Realistic Business Cases Needed to Execute Navy Shipbuilding Programs Statement of Paul L. Francis, Director Acquisition and Sour...
Date Feb. 28, 2007 Report No. GAO-07-357 Title

Foreign Assistance: USAID Signature Tsunami Reconstruction Efforts in Indonesia and Sri Lanka Exceed Initial Cost and Schedule Estimates, and Face Further Risks

United States Government Accountability Office GAO February 2007 Report to Congressional Committees FOREIGN ASSISTANCE USAID Signature Tsunami Reconstruction Efforts in Indonesia and Sri Lanka Exceed Initial Cost and Schedule Estimates, and Face Further Risks GAO-07-357 February 2007 FOREIGN ASSISTANCE Highlights Highlights of GAO-07-357, a report to congressional committees Accountability Integri...
Date Feb. 15, 2007 Report No. GAO-07-414R Title

International Affairs: Update on the United Nations' Capital Master Plan

United States Government Accountability Office Washington, DC 20548 February 15, 2007 The Honorable Richard G. Lugar Ranking Minority Member Committee on Foreign Relations United States Senate Subject: Update on the United Nations’ Capital Master Plan Dear Senator Lugar: Since 2000, the United Nations (UN) has been developing a Capital Master Plan (CMP) to renovate its headquarters complex in Ne...
Date Sept. 15, 2006 Report No. GAO-06-1025 Title

Kennedy Center: Progress Made on GAO Recommendations, but Oversight Challenges Still Exist

United States Government Accountability Office GAO September 2006 Report to the Subcommittee on Interior, Environment, and Related Agencies, Committee on Appropriations, House of Representatives KENNEDY CENTER Progress Made on GAO Recommendations, but Oversight Challenges Still Exist GAO-06-1025 a September 2006 KENNEDY CENTER Highlights Highlights of GAO-06-1025, a report to the Subcommittee on I...
Date Aug. 22, 2006 Report No. GAO-06-913R Title

National Defense: DOD's Overseas Infrastructure Master Plans Continue to Evolve

United States Government Accountability Office Washington, DC 20548 August 22, 2006 Congressional Committees Subject: DOD’s Overseas Infrastructure Master Plans Continue to Evolve In 2004, President Bush announced what was described as the most comprehensive restructuring of U.S. military forces overseas since the end of the Korean War. Soon thereafter, the Department of Defense (DOD) issued a r...
Date June 30, 2006 Report No. GAO-06-641 Title

Embassy Construction: State Has Made Progress Constructing New Embassies, but Better Planning Is Needed for Operations and Maintenance Requirements

United States Government Accountability Office GAO June 2006 Report to the Chairman, Committee on Foreign Relations, U.S. Senate EMBASSY CONSTRUCTION State Has Made Progress Constructing New Embassies, but Better Planning Is Needed for Operations and Maintenance Requirements GAO-06-641 June 2006 EMBASSY CONSTRUCTION Highlights Highlights of GAO-06-641, a report to the Chairman, Committee on Foreig...
Date May 31, 2006 Report No. GAO-06-692 Title

Cooperative Threat Reduction: DOD Needs More Reliable Data to Better Estimate the Cost and Schedule of the Shchuch'ye Facility

United States Government Accountability Office GAO May 2006 Report to the Chairman, Subcommittee on Federal Financial Management, Government Information, and International Security, Committee on Homeland Security and Governmental Affairs, U.S. Senate COOPERATIVE THREAT REDUCTION DOD Needs More Reliable Data to Better Estimate the Cost and Schedule of the Shchuch’ye Facility GAO-06-692 May 2006 C...
Date May 19, 2006 Report No. GAO-06-571 Title

Commercial Aviation: Costs and Major Factors Influencing Infrastructure Changes at U.S. Airports to Accomodate the New A380 Aircraft

United States Government Accountability Office GAO May 2006 Report to the Chairman, Subcommittee on Aviation, Committee on Transportation and Infrastructure, House of Representatives COMMERCIAL AVIATION Costs and Major Factors Influencing Infrastructure Changes at U.S. Airports to Accommodate the New A380 Aircraft GAO-06-571 May 2006 COMMERCIAL AVIATION Highlights Highlights of GAO-06-571, a repor...
Date May 19, 2006 Report No. GAO-06-736R Title

National Defense: Limitations in the Air Force's Proposed Housing Plan for Spangdahlem Air Base, Germany

United States Government Accountability Office Washington, DC 20548 May 19, 2006 The Honorable Kay Bailey Hutchison Chair Subcommittee on Military Construction and Veterans’ Affairs, and Related Agencies Committee on Appropriations United States Senate Dear Senator Hutchison: Subject: Limitations in the Air Force’s Proposed Housing Plan for Spangdahlem Air Base, Germany The Air Force plans to ...
Date Nov. 9, 2005 Report No. GAO-06-244T Title

Army Corps of Engineers: History of the Lake Pontchartrain and Vicinity Hurricane Protection Project

United States Government Accountability Office GAO For Release on Delivery Expected at 9:30 a.m. EST Wednesday, November 9, 2005 Testimony Before the Committee on Environment and Public Works, U.S. Senate ARMY CORPS OF ENGINEERS History of the Lake Pontchartrain and Vincinity Hurricane Protection Project Statement of Anu Mittal, Director Natural Resources and Environment GAO-06-244T November 2005 ...
Date Oct. 20, 2005 Report No. GAO-06-61R Title

U.S. Securities and Exchange Commission: Building Project Management and Related Budget Planning

United States Government Accountability Office Washington, DC 20548 October 20, 2005 The Honorable Frank R. Wolf Chairman Subcommittee on Science, the Departments of State, Justice, and Commerce, and Related Agencies Committee on Appropriations House of Representatives Subject: U.S. Securities and Exchange Commission: Building Project Management and Related Budget Planning Dear Mr. Wolf: You asked...
Date Oct. 18, 2005 Report No. GAO-06-180T Title

Capitol Visitor Center: Status of Schedule, Fire Protection, Cost, and Related Issues

United States Government Accountability Office GAO For Release on Delivery Expected at 10:30 a.m. EDT Tuesday, October 18, 2005 Testimony Before the Subcommittee on the Legislative Branch, Committee on Appropriations, U.S. Senate CAPITOL VISITOR CENTER Status of Schedule, Fire Protection, Cost, and Related Issues Statement of Bernard L. Ungar, Director Terrell Dorn, Assistant Director Physical Inf...
Date Sept. 28, 2005 Report No. GAO-05-1050T Title

Army Corps of Engineers: Lake Pontchartrain and Vicinity Hurricane Protection Project

United States Government Accountability Office GAO For Release on Delivery Expected at 2:00 p.m. EDT September 28, 2005 Testimony Before the Subcommittee on Energy and Water Development, Committee on Appropriations, House of Representatives ARMY CORPS OF ENGINEERS Lake Pontchartrain and Vicinity Hurricane Protection Project Statement of Anu Mittal, Director Natural Resources and Environment GAO-05...
Date Sept. 15, 2005 Report No. GAO-05-1037T Title

Capitol Visitor Center: Schedule Delays Continue; Reassessment Underway

United States Government Accountability Office GAO For Release on Delivery Expected at 10:30 a.m. EDT Thursday, September 15, 2005 Testimony Before the Subcommittee on the Legislative Branch, Committee on Appropriations, U.S. Senate CAPITOL VISITOR CENTER Schedule Delays Continue; Reassessment Underway Statement of Bernard L. Ungar, Director Terrell Dorn, Assistant Director Physical Infrastructure...
Date July 27, 2005 Report No. GAO-05-941R Title

Questions for the Record: Hearing on the Judiciary's Ability to Pay for Current and Future Space Needs

United States Government Accountability Office Washington, DC 20548 July 27, 2005 The Honorable Bill Shuster Chairman The Honorable Eleanor Holmes Norton Ranking Democratic Member Subcommittee on Economic Development, Public Buildings, and Emergency Management Committee on Transportation and Infrastructure House of Representatives Subject: Questions for the Record: Hearing on the Judiciary’s Abi...
Date June 30, 2005 Report No. GAO-05-673 Title

Courthouse Construction: Information on Project Cost and Size Changes Would Help to Enhance Oversight

United States Government Accountability Office GAO June 2005 Report to Congressional Requesters COURTHOUSE CONSTRUCTION Information on Project Cost and Size Changes Would Help to Enhance Oversight GAO-05-673 a June 2005 COURTHOUSE CONSTRUCTION Highlights Highlights of GAO-05-673, a report to congressional requesters Accountability Integrity Reliability Information on Project Cost and Size Changes ...
Date May 17, 2005 Report No. GAO-05-714T Title

Capitol Visitor Center: Priority Attention Needed to Manage Schedules and Contracts

United States Government Accountability Office GAO For Release on Delivery Expected at 10:30 a.m. EDT Tuesday, May 17, 2005 Testimony Before the Subcommittee on the Legislative Branch, Committee on Appropriations, U.S. Senate CAPITOL VISITOR CENTER Priority Attention Needed to Manage Schedules and Contracts Statement of David M. Walker Comptroller General of the United States GAO-05-714T Mr. Chair...
Date April 22, 2005 Report No. GAO-05-334 Title

Kennedy Center: Stronger Oversight of Fire Safety Issues, Construction Projects, and Financial Management Needed

United States Government Accountability Office GAO April 2005 Report to the Chairman, Subcommittee on Interior, Environment, and Related Agencies, Committee on Appropriations, House of Representatives KENNEDY CENTER Stronger Oversight of Fire Safety Issues, Construction Projects, and Financial Management Needed GAO-05-334 a April 2005 KENNEDY CENTER Highlights Highlights of GAO-05-334, a report to...
Date April 6, 2005 Report No. GAO-05-516T Title

Kennedy Center: Stronger Oversight of Fire Safety Issues, Construction Projects, and Financial Management Needed

United States Government Accountability Office GAO For Release on Delivery Expected at 10:00 a.m. EDT Wednesday, April 6, 2005 Testimony Before the Chairman, Subcommittee on Interior, Environment, and Related Agencies, Committee on Appropriations, House of Representatives KENNEDY CENTER Stronger Oversight of Fire Safety Issues, Construction Projects, and Financial Management Needed Statement of Ma...
Date Feb. 28, 2005 Report No. GAO-05-183 Title

Defense Acquisitions: Improved Management Practices Could Help Minimize Cost Growth in Navy Shipbuilding Programs

United States Government Accountability Office GAO February 2005 Report to the Chairman, Subcommittee on Defense, Committee on Appropriations, House of Representatives DEFENSE ACQUISITIONS Improved Management Practices Could Help Minimize Cost Growth in Navy Shipbuilding Programs GAO-05-183 a February 2005 DEFENSE ACQUISITIONS Highlights Highlights of GAO-05-183, a report to the Chairman, Subcommi...
Date Dec. 20, 2004 Report No. GAO-05-158 Title

L.A. Federal Courthouse Project: Current Proposal Addresses Space Needs, but Some Security and Operational Concerns Would Remain

United States Government Accountability Office GAO December 2004 Report to the Chairmen, Committee on Environment and Public Works and Subcommittee on Transportation and Infrastructure, U.S. Senate L.A. FEDERAL COURTHOUSE PROJECT Current Proposal Addresses Space Needs, but Some Security and Operational Concerns Would Remain GAO-05-158 a December 2004 L.A. FEDERAL COURTHOUSE PROJECT Highlights High...