Date |
Report No. |
Title |
Date Nov. 17, 2011 |
Report No. GAO-12-236T |
Title
GAO
For Release on Delivery Expected at 2:00 p.m. EST Thursday, November 17, 2011 United States Government Accountability Office Testimony Before the Subcommittee on Energy and the Environment, Committee on Science, Space, and Technology, House of Representatives ENVIRONMENTAL PROTECTION AGENCY Actions Needed to Improve Planning, Coordination, and Leadership of EPA Laboratories
Statement of David ... |
Date Nov. 8, 2011 |
Report No. GAO-12-96 |
Title
United States Government Accountability Office GAO
November 2011 Report to Congressional Committees FEDERAL BUREAU OF INVESTIGATION Actions Needed to Document Security Decisions and Address Issues with Condition of Headquarters Buildings GAO-12-96 November 2011 FEDERAL BUREAU OF INVESTIGATION
Accountability • Integrity • Reliability Highlights of GAO-12-96, a report to congressional committees... |
Date Nov. 8, 2011 |
Report No. GAO-12-73 |
Title
United States Government Accountability Office GAO
November 2011 Report to Congressional Requesters ARIZONA BORDER REGION Federal Agencies Could Better Utilize Law Enforcement Resources in Support of Wildland Fire Management Activities GAO-12-73 November 2011 ARIZONA BORDER REGION
Federal Agencies Could Better Utilize Law Enforcement Resources in Support of Wildland Fire Management Activities High... |
Date Oct. 12, 2011 |
Report No. GAO-12-149T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 10:30 a.m. EDT Wednesday, October 12, 2011 Testimony Before the Subcommittee on Oversight and Investigations, Committee on Energy and Commerce, House of Representatives ENVIRONMENTAL PROTECTION AGENCY Management Challenges and Budget Observations
Statement of David C. Trimble, Director Natural Resources and Envi... |
Date Sept. 29, 2011 |
Report No. GAO-11-766 |
Title
United States Government Accountability Office GAO
September 2011 Report to Congressional Addressees WARFIGHTER SUPPORT Improved Cost Analysis and Better Oversight Needed over Army Nonstandard Equipment GAO-11-766 September 2011 WARFIGHTER SUPPORT
Improved Cost Analysis and Better Oversight Needed over Army Nonstandard Equipment
Highlights of GAO-11-766, a report to congressional addressees Why GA... |
Date Sept. 19, 2011 |
Report No. GAO-11-814 |
Title
United States Government Accountability Office GAO
September 2011 Report to Congressional Committees EXCESS FACILITIES DOD Needs More Complete Information and a Strategy to Guide Its Future Disposal Efforts GAO-11-814 September 2011 EXCESS FACILITIES
DOD Needs More Complete Information and a Strategy to Guide Its Future Disposal Efforts
Highlights of GAO-11-814, a report to congressional committee... |
Date Sept. 6, 2011 |
Report No. GAO-11-794 |
Title
United States Government Accountability Office GAO
September 2011 Report to the Ranking Member, Committee on the Judiciary, U.S. Senate FEDERAL BUREAU OF INVESTIGATION Actions Taken to Address Most Procurement Recommendations GAO-11-794 September 2011 FEDERAL BUREAU OF INVESTIGATION
Actions Taken to Address Most Procurement Recommendations
Highlights of GAO-11-794, a report to the Ranking Member, ... |
Date Aug. 4, 2011 |
Report No. GAO-11-879T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 2:30 p.m. EDT Thursday, August 4, 2011 Testimony
Before the Subcommittee on Federal Financial Management, Government Information, Federal Services, and International Security, Committee on Homeland Security and Government Affairs, U.S. Senate FEDERAL REAL PROPERTY Overreliance on Leasing Contributed to High-Risk... |
Date July 25, 2011 |
Report No. GAO-11-347 |
Title
United States Government Accountability Office GAO
July 2011 Report to the Ranking Member, Subcommittee on Energy and Environment, Committee on Science, Space, and Technology, House of Representatives ENVIRONMENTAL PROTECTION AGENCY To Better Fulfill Its Mission, EPA Needs a More Coordinated Approach to Managing Its Laboratories GAO-11-347 July 2011 ENVIRONMENTAL PROTECTION AGENCY
Accountability â... |
Date July 14, 2011 |
Report No. GAO-11-834T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 2:00 p.m. EST Thursday, July 14, 2011 Testimony Before the Subcommittee on Energy and Mineral Resources, Committee on Natural Resources, House of Representatives ABANDONED MINES Information on the Number of Hardrock Mines, Cost of Cleanup, and Value of Financial Assurances
Statement of Anu K. Mittal, Director Na... |
Date June 30, 2011 |
Report No. GAO-11-574 |
Title
United States Government Accountability Office GAO
June 2011 Report to Congressional Committees DEFENSE INFRASTRUCTURE The Enhanced Use Lease Program Requires Management Attention GAO-11-574 June 2011 DEFENSE INFRASTRUCTURE
Accountability • Integrity • Reliability The Enhanced Use Lease Program Requires Management Attention
Highlights of GAO-11-574, a report to congressional committees Why GAO... |
Date June 9, 2011 |
Report No. GAO-11-704T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 2:00 p.m. EDT Thursday, June 9, 2011 Testimony
Before the Subcommittee on Federal Financial Management, Government Information, Federal Services, and International Security, Committee on Homeland Security and Governmental Affairs, U.S. Senate FEDERAL REAL PROPERTY Proposed Civilian Board Could Address Disposal o... |
Date June 2, 2011 |
Report No. GAO-11-734T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 9:30 a.m. EDT June 2, 2011 Testimony Before the Committee on Oversight and Government Reform, House of Representatives OIL AND GAS Interior’s Restructuring Challenges in the Aftermath of the Gulf Oil Spill
Statement of Frank Rusco, Director Natural Resources and Environment GAO-11-734T June 2, 2011 OIL AND GAS... |
Date April 20, 2011 |
Report No. GAO-11-377 |
Title
United States Government Accountability Office GAO
April 2011 Report to Congressional Requesters FEDERAL LAND MANAGEMENT Availability and Potential Reliability of Selected Data Elements at Five Agencies GAO-11-377 April 2011 FEDERAL LAND MANAGEMENT
Accountability • Integrity • Reliability Availability and Potential Reliability of Selected Data Elements at Five Agencies
Highlights of GAO-11-377... |
Date April 6, 2011 |
Report No. GAO-11-520T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 10:00 a.m. EDT Wednesday, April 6, 2011 Testimony
Before the Subcommittee on Economic Development, Public Buildings and Emergency Management, Committee on Transportation and Infrastructure, House of Representatives FEDERAL REAL PROPERTY Progress Made on Planning and Data, but Unneeded Owned and Leased Facilities... |
Date March 1, 2011 |
Report No. GAO-11-424T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 9:30 a.m. EST Tuesday, March 1, 2011 Testimony Before the Subcommittee on Interior, Environment, and Related Agencies, Committee on Appropriations, House of Representatives DEPARTMENT OF THE INTERIOR Major Management Challenges
Statement of Anu K. Mittal, Director Natural Resources and Environment Frank Rusco, D... |
Date Feb. 17, 2011 |
Report No. GAO-11-394T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 9:30 a.m. EST Thursday, February 17, 2011 Testimony Before the House Committee on Oversight and Government Reform GAO’S 2011 HIGH-RISK SERIES An Update
Statement of Gene L. Dodaro Comptroller General of the United States GAO-11-394T February 17, 2011 GAO’S 2011 HIGH-RISK SERIES
Accountability • Integrity â... |
Date Feb. 16, 2011 |
Report No. GAO-11-278 |
Title
United States Government Accountability Office GAO
February 2011 Report to Congressional Committees HIGH-RISK SERIES An Update GAO-11-278 February 2011 HIGH-RISK SERIES
Accountability • Integrity • Reliability An Update
Highlights of GAO-11-278, a report to congressional committees on GAO's HighRisk Series Why GAO Did This Study
The federal government is the world’s largest and most complex ... |
Date Feb. 10, 2011 |
Report No. GAO-11-370T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 10:00 a.m. EDT Thursday, February 10, 2011 Testimony
Before the Subcommittee on Economic Development, Public Buildings and Emergency Management, Committee on Transportation and Infrastructure, House of Representative FEDERAL REAL PROPERTY The Government Faces Challenges to Disposing of Unneeded Buildings
Stateme... |
Date Dec. 17, 2010 |
Report No. GAO-11-144 |
Title
United States Government Accountability Office GAO
December 2010 Report to the Chairman, Committee on Natural Resources, House of Representatives FEDERAL LANDS Adopting a Formal, Risk-Based Approach Could Help Land Management Agencies Better Manage Their Law Enforcement Resources GAO-11-144 December 2010 FEDERAL LANDS
Accountability • Integrity • Reliability Adopting a Formal, Risk-Based Appro... |
Date Nov. 16, 2010 |
Report No. GAO-11-7 |
Title
United States Government Accountability Office GAO
November 2010 Report to Congressional Requesters DEFENSE INFRASTRUCTURE Actions Needed to Improve the Navy’s Processes for Managing Public Shipyards’ Restoration and Modernization Needs Page i GAO-11-7 November 2010 DEFENSE INFRASTRUCTURE
Accountability • Integrity • Reliability Actions Needed to Improve the Navy's Processes for Managing P... |
Date Sept. 22, 2010 |
Report No. GAO-10-873 |
Title
United States Government Accountability Office GAO
September 2010 Report to the Subcommittee on Financial Services and General Government, Committee on Appropriations, House of Representatives BUILDING SECURITY New Federal Standards Hold Promise, But Could Be Strengthened to Better Protect Leased Space GAO-10-873 September 2010 BUILDING SECURITY
Accountability • Integrity • Reliability New Fed... |
Date July 26, 2010 |
Report No. GAO-10-695 |
Title
United States Government Accountability Office GAO
July 2010 Report to Congressional Committees DEPARTMENT OF DEFENSE Additional Actions Needed to Improve Financial Management of Military Equipment GAO-10-695 July 2010 DEPARTMENT OF DEFENSE Highlights
Highlights of GAO-10-695, a report to congressional committees Accountability Integrity Reliability Additional Actions Needed to Improve Financial M... |
Date July 22, 2010 |
Report No. GAO-10-888T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 10:00 a.m. EDT Thursday, July 22, 2010 Testimony Before the Committee on Oversight and Government Reform, House of Representatives OIL AND GAS MANAGEMENT Past Work Offers Insights to Consider in Restructuring Interior's Oversight
Statement of Frank Rusco, Director Natural Resources and Environment GAO-10-888T Ju... |
Date June 16, 2010 |
Report No. GAO-10-630 |
Title
United States Government Accountability Office GAO
June 2010 Report to the Subcommittee on Financial Services and General Government, Committee on Appropriations, U.S. Senate FEDERAL ENERGY MANAGEMENT GSA’s Recovery Act Program Is on Track, but Opportunities Exist to Improve Transparency, Performance Criteria, and Risk Management GAO-10-630 June 2010 FEDERAL ENERGY MANAGEMENT Highlights
Highligh... |
Date May 13, 2010 |
Report No. GAO-10-700T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 10:00 a.m. EDT Thursday, May 13, 2010 Testimony Before the Subcommittee on Energy and Mineral Resources, Committee on Natural Resources, House of Representatives HELIUM PROGRAM Key Developments Since the Early 1990s and Future Considerations
Statement of Anu K. Mittal, Director Natural Resources and Environment ... |
Date March 16, 2010 |
Report No. GAO-10-506T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 2:00 p.m. EDT Tuesday, March 16, 2010 Testimony
Before the Subcommittee on Federal Workforce, Postal Service and the District of Columbia, Committee on Oversight and Government Reform, House of Representatives HOMELAND SECURITY Ongoing Challenges Impact the Federal Protective Service’s Ability to Protect Feder... |
Date Nov. 18, 2009 |
Report No. GAO-10-236T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 10:00 a.m. EST Wednesday, November 18, 2009 Testimony Before the House Committee on Homeland Security HOMELAND SECURITY Greater Attention to Key Practices Would Help Address Security Vulnerabilities at Federal Buildings
Statement of Mark L. Goldstein, Director Physical Infrastructure Issues GAO-10-236T November ... |
Date Nov. 13, 2009 |
Report No. GAO-10-15R |
Title
United States Government Accountability Office Washington, DC 20548 November 13, 2009 The Honorable Patrick Leahy Chairman Committee on the Judiciary United States Senate Subject: U.S. Marshals: Qualifications and Comparison of Demographic Characteristics to Their Counterparts in Selected Federal Law Enforcement Agencies Dear Mr. Chairman: The U.S. Marshals Service (USMS), a component within the D... |
Date Oct. 30, 2009 |
Report No. GAO-10-84 |
Title
United States Government Accountability Office GAO
October 2009 Report to Congressional Committees VALLES CALDERA The Trust Has Made Progress but Faces Significant Challenges to Achieve Goals of the Preservation Act GAO-10-84 October 2009 VALLES CALDERA Highlights
Highlights of GAO-10-84, a report to congressional committees Accountability Integrity Reliability The Trust Has Made Progress but Face... |
Date Oct. 23, 2009 |
Report No. GAO-10-142 |
Title
United States Government Accountability Office GAO
October 2009 Report to the Chairman, Committee on Homeland Security, House of Representatives HOMELAND SECURITY Greater Attention to Key Practices Would Improve the Federal Protective Service’s Approach to Facility Protection GAO-10-142 October 2009 HOMELAND SECURITY Highlights
Highlights of GAO-10-142, a report to the Chairman, Committee on Hom... |
Date Sept. 9, 2009 |
Report No. GAO-09-877 |
Title
United States Government Accountability Office GAO
September 2009 Report to Congressional Addressees WILDLAND FIRE MANAGEMENT Federal Agencies Have Taken Important Steps Forward, but Additional, Strategic Action Is Needed to Capitalize on Those Steps GAO-09-877 September 2009 WILDLAND FIRE MANAGEMENT Highlights
Highlights of GAO-09-877, a report to congressional addressees Accountability Integrity... |
Date July 21, 2009 |
Report No. GAO-09-906T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 10:00 a.m. EDT Tuesday, July 21, 2009 Testimony Before the Committee on Energy and Natural Resources, U.S. Senate WILDLAND FIRE MANAGEMENT Federal Agencies Have Taken Important Steps Forward, but Additional Action Is Needed to Address Remaining Challenges
Statement of Patricia Dalton, Managing Director Natural R... |
Date July 15, 2009 |
Report No. GAO-09-801T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 10:00 a.m. EDT Wednesday, July 15, 2009 Testimony
Before the Subcommittee on Economic Development, Public Buildings, and Emergency Management, Committee on Transportation and Infrastructure, House of Representatives FEDERAL REAL PROPERTY An Update on High Risk Issues
Statement of Mark L. Goldstein, Director Phys... |
Date June 30, 2009 |
Report No. GAO-09-509 |
Title
United States Government Accountability Office GAO
June 2009 Report to the Subcommittee on National Parks, Forests and Public Lands, Committee on Natural Resources, House of Representatives FEDERAL LANDS Enhanced Planning Could Assist Agencies in Managing Increased Use of Off-Highway Vehicles GAO-09-509 June 2009 FEDERAL LANDS Highlights
Highlights of GAO-09-509, a report to the Subcommittee on Na... |
Date June 30, 2009 |
Report No. GAO-09-547SP |
Title
|
Date June 12, 2009 |
Report No. GAO-09-611 |
Title
United States Government Accountability Office GAO
June 2009 Report to the Subcommittee on Interior, Environment, and Related Agencies, Committee on Appropriations, House of Representatives FEDERAL LAND MANAGEMENT BLM and the Forest Service Have Improved Oversight of the Land Exchange Process, but Additional Actions Are Needed GAO-09-611 June 2009 FEDERAL LAND MANAGEMENT Highlights
Highlights of G... |
Date June 10, 2009 |
Report No. GAO-09-776T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 9:30 a.m. EDT June 10, 2009 Testimony Before the Senate Committee on Veterans’ Affairs VA REAL PROPERTY VA Emphasizes EnhancedUse Leases to Manage Its Real Property Portfolio
Statement of David Wise, Director Physical Infrastructure Issues GAO-09-776T June 10, 2009 VA REAL PROPERTY Highlights
Highlights of GAO... |
Date June 2, 2009 |
Report No. GAO-09-450 |
Title
United States Government Accountability Office GAO
June 2009 Report to Congressional Requesters INDIAN HEALTH SERVICE Millions of Dollars in Property and Equipment Continue to Be Lost or Stolen GAO-09-450 June 2009 INDIAN HEALTH SERVICE Highlights
Highlights of GAO-09-450, a report to congressional requesters Accountability Integrity Reliability Millions of Dollars in Property and Equipment Contin... |
Date March 25, 2009 |
Report No. GAO-09-534T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 9:30 a.m. EDT Wednesday, March 25, 2009 Testimony Before the Subcommittee on Energy and Environment, Committee on Energy and Commerce, House of Representatives CLIMATE CHANGE Observations on Federal Efforts to Adapt to a Changing Climate
Statement of John Stephenson, Director Natural Resources & Environment GAO-... |
Date March 3, 2009 |
Report No. GAO-09-425T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 9:30 a.m. EST Tuesday, March 3, 2009 Testimony Before the Subcommittee on Interior, Environment, and Related Agencies, Committee on Appropriations, House of Representatives DEPARTMENT OF THE INTERIOR Major Management Challenges
Statement of Robin M. Nazzaro, Director Natural Resources and Environment Frank Rusco... |
Date Feb. 24, 2009 |
Report No. GAO-09-412T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 9:30 a.m. EST Tuesday, February 24, 2009 Testimony Before the Subcommittee on Interior, Environment, and Related Agencies, Committee on Appropriations, House of Representatives FEDERAL LAND MANAGEMENT Potential Effects and Factors to Consider in a Move of the Forest Service into the Department of the Interior
St... |
Date Feb. 17, 2009 |
Report No. GAO-09-283R |
Title
United States Government Accountability Office Washington, DC 20548 February 17, 2009 The Honorable Edolphus Towns Chairman Committee on Oversight and Government Reform House of Representatives The Honorable Darrell Issa Ranking Member Committee on Oversight and Government Reform House of Representatives Subject: Federal Real Property: Authorities and Actions Regarding Enhanced Use Leases and Sale... |
Date Feb. 11, 2009 |
Report No. GAO-09-223 |
Title
United States Government Accountability Office GAO
February 2009 Report to Congressional Requesters FEDERAL LAND MANAGEMENT Observations on a Possible Move of the Forest Service into the Department of the Interior GAO-09-223 February 2009 FEDERAL LAND MANAGEMENT Highlights
Highlights of GAO-09-223, a report to congressional requesters Accountability Integrity Reliability Observations on a Possible... |
Date Jan. 22, 2009 |
Report No. GAO-09-271 |
Title
United States Government Accountability Office GAO
January 2009 Report to the Congress HIGH-RISK SERIES An Update GAO-09-271 January 2009 HIGH-RISK SERIES Highlights
Highlights of GAO-09-271, a report to Congress on GAO’s High-Risk Series Accountability Integrity Reliability An Update Why GAO Did This Report
The federal government is the world’s largest and most complex entity, with about $3 t... |
Date Jan. 22, 2009 |
Report No. GAO-09-324T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 10:00 a.m. EST Thursday, January 22, 2009 Testimony Before the Committee on Transportation and Infrastructure, House of Representatives REAL PROPERTY Infrastructure Investment Presents Opportunities to Address Long-standing Real Property Backlogs and Reduce Energy Consumption
Statement of Terrell G. Dorn, Direct... |
Date Oct. 31, 2008 |
Report No. GAO-09-111R |
Title
United States Government Accountability Office Washington, DC 20548 October 31, 2008 The Honorable Barbara Boxer Chairman The Honorable James M. Inhofe Ranking Member Committee on Environment and Public Works United States Senate The Honorable John D. Dingell Chairman The Honorable Joe L. Barton Ranking Member Committee on Energy and Commerce House of Representatives Subject: Status of GSA’s Imp... |
Date Oct. 16, 2008 |
Report No. GAO-09-10 |
Title
United States Government Accountability Office GAO
October 2008 Report to the Committee on Oversight and Government Reform, House of Representatives FEDERAL REAL PROPERTY Government’s Fiscal Exposure from Repair and Maintenance Backlogs Is Unclear GAO-09-10 October 2008 FEDERAL REAL PROPERTY Highlights
Highlights of GAO-09-10, a report to the Committee on Oversight and Government Reform, House o... |
Date Sept. 10, 2008 |
Report No. GAO-08-939 |
Title
United States Government Accountability Office GAO
September 2008 Report to the Ranking Member, Committee on Veterans’ Affairs, House of Representatives FEDERAL REAL PROPERTY Progress Made in Reducing Unneeded Property, but VA Needs Better Information to Make Further Reductions GAO-08-939 September 2008 FEDERAL REAL PROPERTY Highlights
Highlights of GAO-08-939, a report to the Ranking Member, Co... |
Date July 31, 2008 |
Report No. GAO-08-918 |
Title
United States Government Accountability Office GAO
July 2008 Report to the Subcommittee on Oversight and Investigations, Committee on Veterans’ Affairs, House of Representatives VETERANS AFFAIRS Continued Action Needed to Reduce IT Equipment Losses and Correct Control Weaknesses GAO-08-918 July 2008 VETERANS AFFAIRS Highlights
Highlights of GAO-08-918, a report to the Subcommittee on Oversight a... |