Date |
Report No. |
Title |
Date July 12, 2011 |
Report No. GAO-11-609R |
Title
United States Government Accountability Office Washington, DC 20548 July 12, 2011 The Honorable Kay Bailey Hutchison Ranking Member Committee on Commerce, Science, and Transportation United States Senate The Honorable Ralph M. Hall Chairman The Honorable Eddie Bernice Johnson Ranking Member Committee on Science, Space, and Technology House of Representatives The Honorable Bill Nelson Chairman Subc... |
Date May 25, 2011 |
Report No. GAO-11-68 |
Title
United States Government Accountability Office GAO
May 2011 Report to Congressional Requesters SECURE BORDER INITIATIVE Controls over Contractor Payments for the Technology Component Need Improvement GAO-11-68 May 2011
Accountability • Integrity • Reliability SECURE BORDER INITIATIVE
Controls over Contractor Payments for the Technology Component Need Improvement Highlights of GAO-11-68, a repo... |
Date Oct. 28, 2010 |
Report No. GAO-11-8 |
Title
United States Government Accountability Office GAO
October 2010 Report to Congressional Committees DEFENSE CONTRACTING Enhanced Training Could Strengthen DOD’s Best Value Tradeoff Decisions GAO-11-8 October 2010 DEFENSE CONTRACTING
Accountability • Integrity • Reliability Enhanced Training Could Strengthen DOD’s Best Value Tradeoff Decisions
Highlights of GAO-11-8, a report to congressiona... |
Date Oct. 18, 2010 |
Report No. GAO-11-6 |
Title
United States Government Accountability Office GAO
October 2010 Report to Congressional Requesters SECURE BORDER INITIATIVE DHS Needs to Strengthen Management and Oversight of Its Prime Contractor GAO-11-6 October 2010 SECURE BORDER INITIATIVE
Accountability • Integrity • Reliability DHS Needs to Strengthen Management and Oversight of Its Prime Contractor
Highlights of GAO-11-6, a report to co... |
Date Sept. 14, 2010 |
Report No. GAO-10-816 |
Title
United States Government Accountability Office GAO
September 2010 Report to the Subcommittee on Energy and Water Development, Committee on Appropriations, House of Representatives NUCLEAR WASTE Actions Needed to Address Persistent Concerns with Efforts to Close Underground Radioactive Waste Tanks at DOE’s Savannah River Site GAO-10-816 September 2010 NUCLEAR WASTE
Accountability • Integrity â€... |
Date March 4, 2010 |
Report No. GAO-10-266R |
Title
United States Government Accountability Office Washington, DC 20548 March 4, 2010 Congressional Committees Warfighter Support: A Cost Comparison of Using State Department Employees versus Contractors for Security Services in Iraq The U.S. government’s reliance on contractors, including the State Department’s and Department of Defense’s (DOD) use of private security contractors in Iraq, has b... |
Date Nov. 2, 2009 |
Report No. GAO-10-179 |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 9:30 a.m. EST November 2, 2009 Statement Before the Commission on Wartime Contracting in Iraq and Afghanistan OPERATION IRAQI FREEDOM Preliminary Observations on DOD Planning for the Drawdown of U.S. Forces from Iraq
Statement of William M. Solis, Director Defense Capabilities and Management GAO-10-179 November ... |
Date Sept. 24, 2009 |
Report No. GAO-09-1040T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 9:30 a.m. EDT Thursday, September 24, 2009 Testimony Before the Defense Acquisition Reform Panel, Committee on Armed Services, House of Representatives DEFENSE ACQUISITIONS Sound Practices Critical to Ensuring Value for the Defense Logistics Agency’s Acquisitions
Statement of William M. Solis, Director Defense... |
Date July 14, 2009 |
Report No. GAO-09-682 |
Title
United States Government Accountability Office GAO
July 2009 Report to Congressional Committees COAST GUARD As Deepwater Systems Integrator, Coast Guard Is Reassessing Costs and Capabilities but Lags in Applying Its Disciplined Acquisition Approach GAO-09-682 July 2009 COAST GUARD Highlights
Highlights of GAO-09-682, a report to congressional committees Accountability Integrity Reliability As Deep... |
Date July 8, 2009 |
Report No. GAO-09-830SP |
Title
United States Government Accountability Office GAO
July 2009 Report to Congressional Committees RECOVERY ACT States’ and Localities’ Current and Planned Uses of Funds While Facing Fiscal Stresses (Appendixes) GAO-09-830SP Contents Contents Appendix I: Arizona Appendix II: California Appendix III: Colorado Appendix IV: Florida Appendix V: Georgia Appendix VI: Illinois Appendix VII: Iowa Appendi... |
Date April 22, 2009 |
Report No. GAO-09-620T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 10:00 a.m. EDT Wednesday, April 22, 2009 Testimony Before the Subcommittee on Homeland Security, Committee on Appropriations, House of Representatives COAST GUARD Update on Deepwater Program Management, Cost, and Acquisition Workforce
Statement of John P. Hutton, Director Acquisition and Sourcing Management GAO-... |
Date March 13, 2009 |
Report No. GAO-09-338 |
Title
United States Government Accountability Office GAO
March 2009 Report to Congressional Committees DEFENSE ACQUISITIONS Production and Fielding of Missile Defense Components Continue with Less Testing and Validation Than Planned GAO-09-338 March 2009 DEFENSE ACQUISITIONS Highlights
Highlights of GAO-09-338, a report to Congressional Committees Accountability Integrity Reliability Production and Fiel... |
Date March 5, 2009 |
Report No. GAO-09-436T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 10:00 a.m. EST Thursday, March 5, 2009 Testimony Before the Subcommittee on Space and Aeronautics, Committee on Science and Technology, House of Representatives NASA Projects Need More Disciplined Oversight and Management to Address Key Challenges
Statement of Cristina Chaplain, Director Acquisition and Sourcing... |
Date Feb. 25, 2009 |
Report No. GAO-09-403T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 1:00 p.m. EDT Wednesday, February 25, 2009 Testimony Before the Subcommittee on Strategic Forces, Committee on Armed Services, House of Representatives DEFENSE ACQUISITIONS Charting a Course for Improved Missile Defense Testing
Statement of Paul Francis, Director, Acquisition and Sourcing Management GAO-09-403T ... |
Date Sept. 26, 2008 |
Report No. GAO-08-1087 |
Title
United States Government Accountability Office GAO
September 2008 Report to Congressional Committees MILITARY OPERATIONS DOD Needs to Address Contract Oversight and Quality Assurance Issues for Contracts Used to Support Contingency Operations GAO-08-1087 September 2008 MILITARY OPERATIONS Highlights
Highlights of GAO-08-1087, a report to congressional committees Accountability Integrity Reliabilit... |
Date July 31, 2008 |
Report No. GAO-08-938R |
Title
United States Government Accountability Office Washington, DC 20548 July 31, 2008 Congressional Requesters Subject: United States Postal Service: Information on the Irradiation of Federal Mail in the Washington, D.C., Area. In October 2001, spores of the deadly bacterium anthrax were found in mail sent to members of the news media and congressional leaders. In all, 22 people were infected with ant... |
Date July 17, 2008 |
Report No. GAO-08-964T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 10:00 a.m. EST Thursday, July 17, 2008 Testimony Before the Committee on Small Business, House of Representatives HUBZONE PROGRAM SBA’s Control Weaknesses Exposed the Government to Fraud and Abuse
Statement of Gregory D. Kutz, Managing Director Forensic Audits and Special Investigations Bruce A. Causseaux, Sen... |
Date May 8, 2008 |
Report No. GAO-08-765T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 10:00 a.m. EDT Thursday, May 8, 2008 Testimony Before the Committee on Homeland Security, House of Representatives DEPARTMENT OF HOMELAND SECURITY Better Planning and Oversight Needed to Improve Complex Service Acquisition Outcomes
Statement of John P. Hutton, Director Acquisition and Sourcing Management GAO-08-... |
Date April 22, 2008 |
Report No. GAO-08-263 |
Title
United States Government Accountability Office GAO
April 2008 Report to Congressional Requesters DEPARTMENT OF HOMELAND SECURITY
Better Planning and Assessment Needed to Improve Outcomes for Complex Service Acquisitions GAO-08-263 April 2008 DEPARTMENT OF HOMELAND SECURITY Highlights
Highlights of GAO-08-263, a report to congressional requesters Accountability Integrity Reliability Better Planning... |
Date March 26, 2008 |
Report No. GAO-08-360 |
Title
United States Government Accountability Office GAO
March 2008 Report to Congressional Committees DEFENSE CONTRACTING Army Case Study Delineates Concerns with Use of Contractors as Contract Specialists GAO-08-360 March 2008 DEFENSE CONTRACTING Highlights
Highlights of GAO-08-360, a report to congressional committees Accountability Integrity Reliability Army Case Study Delineates Concerns with Use o... |
Date March 14, 2008 |
Report No. GAO-08-379 |
Title
United States Government Accountability Office GAO
March 2008 Report to Congressional Committees DEFENSE ACQUISITIONS Termination Costs Are Generally Not a Compelling Reason to Continue Programs or Contracts That Otherwise Warrant Ending GAO-08-379 March 2008 DEFENSE ACQUISITIONS Highlights
Highlights of GAO-08-379, a report to congressional committees Accountability Integrity Reliability Terminat... |
Date March 7, 2008 |
Report No. GAO-08-169 |
Title
United States Government Accountability Office GAO
March 2008 Report to the Committee on Armed Services, U. S. Senate DEFENSE CONTRACTING Additional Personal Conflict of Interest Safeguards Needed for Certain DOD Contractor Employees GAO-08-169 March 2008 DEFENSE CONTRACTING Highlights
Highlights of GAO-08-169, a report to the Committee on Armed Services, U.S. Senate Accountability Integrity Relia... |
Date March 5, 2008 |
Report No. GAO-08-550T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 9:30 a.m. EST Wednesday, March 5, 2008 Testimony
Before the Committee on Homeland Security and Governmental Affairs, U.S. Senate INFORMATION TECHNOLOGY Significant Problems of Critical Automation Program Contribute to Risks Facing 2010 Census
Statement of David A. Powner Director, Information Technology Manageme... |
Date Feb. 7, 2008 |
Report No. GAO-08-298 |
Title
United States Government Accountability Office GAO
February 2008 Report to the Committee on Armed Services, U.S. Senate DEFENSE ACQUISITIONS DOD’s Practices and Processes for Multiyear Procurement Should Be Improved GAO-08-298 February 2008 DEFENSE ACQUISITIONS Highlights
Highlights of GAO-08-298, a report to the Committee on Armed Services, U.S. Senate Accountability Integrity Reliability DOD's... |
Date Jan. 25, 2008 |
Report No. GAO-08-269 |
Title
United States Government Accountability Office GAO
January 2008 Report to Congressional Committees DEFENSE CONTRACTING Contract Risk a Key Factor in Assessing Excessive Pass-Through Charges GAO-08-269 January 2008 DEFENSE CONTRACTING Highlights
Highlights of GAO-08-269, a report to congressional committees Accountability Integrity Reliability Contract Risk a Key Factor in Assessing Excessive Pass-... |
Date July 20, 2007 |
Report No. GAO-07-888 |
Title
United States Government Accountability Office GAO
July 2007 Report to the Subcommittee on Energy and Water Development, Committee on Appropriations, House of Representatives HANFORD WASTE TREATMENT PLANT Department of Energy Needs to Strengthen Controls over Contractor Payments and Project Assets GAO-07-888 July 2007 HANFORD WASTE TREATMENT PLANT Highlights
Highlights of GAO-07-888, a report to t... |
Date May 18, 2007 |
Report No. GAO-07-631 |
Title
United States Government Accountability Office GAO
May 2007 Report to Congressional Committees DEFENSE BUDGET Trends in Operation and Maintenance Costs and Support Services Contracting GAO-07-631 May 2007 DEFENSE BUDGET Highlights
Highlights of GAO-07-631, a report to congressional committees Accountability Integrity Reliability Trends in Operation and Maintenance Costs and Support Services Contra... |
Date Sept. 25, 2006 |
Report No. GAO-06-1132 |
Title
United States Government Accountability Office GAO
September 2006 Report to Congressional Committees IRAQ CONTRACT COSTS DOD Consideration of Defense Contract Audit Agency’s Findings GAO-06-1132 September 2006 IRAQ CONTRACT COSTS Highlights
Highlights of GAO-06-1132, a report to Congressional Committees Accountability Integrity Reliability DOD Consideration of Defense Contract Audit Agency's Fin... |
Date July 27, 2006 |
Report No. GAO-06-1009T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 9:30 a.m. EDT Thursday, July 27, 2006 Testimony Before the Subcommittee on Science, the
Departments of State, Justice, and Commerce, and Related Agencies, Committee on Appropriations, U.S. House of Representatives 2010 CENSUS Redesigned Approach Holds Promise, but Census Bureau Needs to Annually Develop and Prov... |
Date May 31, 2006 |
Report No. GAO-06-547 |
Title
United States Government Accountability Office GAO
May 2006 Report to Congressional Requesters DEPARTMENT OF ENERGY, OFFICE OF WORKER ADVOCACY Deficient Controls Led to Millions of Dollars in Improper and Questionable Payments to Contractors GAO-06-547 a Ma 2006 May Highlights
Highlights of GAO-06-547, a report to congressional requesters Accountability Integrity Reliability DEPARTMENT OF ENERGY, ... |
Date March 28, 2006 |
Report No. GAO-06-342 |
Title
United States Government Accountability Office GAO
March 2006 Report to Congressional Committees OFFSHORING IN SIX HUMAN SERVICES PROGRAMS Offshoring Occurs in Most States, Primarily in Customer Service and Software Development This report was revised on May 25, 2006, to correct errors in data reported to us on the occurrence of offshoring in two state programs and make resulting corrections to ce... |
Date July 27, 2005 |
Report No. GAO-05-773 |
Title
United States Government Accountability Office GAO
July 2005 Report to the Committees on Armed Services, U.S. Senate and House of Representatives DEFENSE HEALTH CARE Implementation Issues for New TRICARE Contracts and Regional Structure GAO-05-773 July 2005 DEFENSE HEALTH CARE Highlights
Highlights of GAO-05-773, a report to Committees on Armed Services, U.S. Senate and House of Representatives Ac... |
Date July 26, 2005 |
Report No. GAO-05-911T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 2:30 a.m. EDT Tuesday, July 26, 2005 Testimony Before the Subcommittee on Federal Financial Management, Government Information, and International Security, Committee on Homeland Security and Governmental Affairs, U.S. Senate CONTRACT MANAGEMENT Opportunities Continue for GSA to Improve Pricing of Multiple Award ... |
Date March 1, 2005 |
Report No. GAO-05-255 |
Title
United States Government Accountability Office GAO
March 2005 Report to Congressional Committees DEFENSE ACQUISITIONS Plans Need to Allow Enough Time to Demonstrate Capability of First Littoral Combat Ships GAO-05-255 March 2005 DEFENSE ACQUISITIONS Highlights
Highlights of GAO-05-255, a report to congressional committees Accountability Integrity Reliability Plans Need to Allow Enough Time to Demo... |
Date Feb. 11, 2005 |
Report No. GAO-05-229 |
Title
United States Government Accountability Office GAO
February 2005 Report to the Chairman, Committee on Homeland Security and Governmental Affairs, U.S. Senate CONTRACT MANAGEMENT Opportunities to Improve Pricing of GSA Multiple Award Schedules Contracts GAO-05-229 a February 2005 CONTRACT MANAGEMENT Highlights
Highlights of GAO-05-229, a report to Chairman, Senate Homeland Security and Governmental... |
Date July 19, 2004 |
Report No. GAO-04-854 |
Title
United States Government Accountability Office GAO
July 2004 Report to Congressional Requesters MILITARY OPERATIONS DOD’s Extensive Use of Logistics Support Contracts Requires Strengthened Oversight GAO-04-854 July 2004 MILITARY OPERATIONS DOD's Extensive Use of Logistics Support Contracts Requires Strengthened Oversight Highlights of GAO-04-854, a report to the Ranking Minority Member, House Co... |
Date June 22, 2004 |
Report No. GAO-04-718 |
Title
United States General Accounting Office GAO
June 2004 Report to the Committee on Government Reform, House of Representatives CONTRACT MANAGEMENT Further Efforts Needed to Sustain VA’s Progress in Purchasing Medical Products and Services GAO-04-718 a June 2004 CONTRACT MANAGEMENT Further Efforts Needed to Sustain VA’s Progress in Purchasing Medical Products and Services Highlights of GAO-04-718... |
Date Oct. 14, 2003 |
Report No. GAO-04-164R |
Title
United States General Accounting Office Washington, DC 20548 October 14, 2003 The Honorable John Warner Chairman The Honorable Carl Levin Ranking Member Committee on Armed Services United States Senate Subject: Military Aircraft: Institute for Defense Analyses Purchase Price Estimate for the Air Force’s Aerial Refueling Aircraft Leasing Proposal On September 4, 2003, we provided the Senate Commi... |
Date Oct. 14, 2003 |
Report No. GAO-04-169R |
Title
United States General Accounting Office Washington, DC 20548 October 14, 2003 The Honorable John Warner Chairman The Honorable Carl Levin Ranking Member Committee on Armed Services United States Senate Subject: Military Aircraft: Observations on DOD’s Aerial Refueling Aircraft Acquisition Options During the Senate Armed Services Committee’s September 4, 2003 hearing on the Department of Defens... |
Date Oct. 9, 2003 |
Report No. GAO-04-111 |
Title
United States General Accounting Office GAO October 2003 Report to the Subcommittee on Military Construction, Committee on Appropriations, House of Representatives MILITARY HOUSING Better Reporting Needed on the Status of the Privatization Program and the Costs of Its Consultants GAO-04-111 October 2003 MILITARY HOUSING Better Reporting Needed on the Status of the Privatization Program and the Cos... |
Date Sept. 10, 2003 |
Report No. GAO-03-935 |
Title
United States General Accounting Office GAO
September 2003 Report to Congressional Committees CONTRACT MANAGEMENT High-Level Attention Needed to Transform DOD Services Acquisition GAO-03-935 September 2003 CONTRACT MANAGEMENT High-Level Attention Needed to Transform DOD Services Acquisition Highlights of GAO-03-935, a report to congressional committees The Department of Defense’s (DOD) spending ... |
Date Aug. 8, 2003 |
Report No. GAO-03-727 |
Title
United States General Accounting Office GAO
August 2003 Report to the Chairman, Committee on the Budget, House of Representatives DOD CONTRACT PAYMENTS Management Action Needed to Reduce Billions in Adjustments to Contract Payment Records GAO-03-727 a August 2003 DOD CONTRACT PAYMENTS Management Action Needed to Reduce Billions in Adjustments to Contract Payment Records Highlights of GAO-03-727, a... |
Date July 10, 2003 |
Report No. GAO-03-932T |
Title
United States General Accounting Office GAO
For Release on Delivery Expected at 10:00 a.m. EDT Thursday, July 10, 2003 Testimony Before the Subcommittee on Energy, Committee on Science, House of Representatives CONTRACT REFORM DOE’s Policies and Practices in Competing Research Laboratory Contracts
Statement of Robin M. Nazzaro, Director, Natural Resources and Environment GAO-03-932T July 10, 200... |
Date July 10, 2003 |
Report No. GAO-03-832R |
Title
Enclosure United States General Accounting Office Washington, DC 20548 July 10, 2003 The Honorable Christopher S. Bond Chairman, Subcommittee on VA, HUD, and Independent Agencies Committee on Appropriations United States Senate Subject: National Science Foundation: Status of the Business Analysis Plan Contract Dear Mr. Chairman: In June 2002, the National Science Foundation (NSF) awarded a 3-year,... |
Date Jan. 15, 2003 |
Report No. GAO-03-299 |
Title
United States General Accounting Office GAO
January 2003 Report to Chairman and Ranking Minority Member, Committee on Finance, U.S. Senate IRS LOCKBOX BANKS More Effective Oversight, Stronger Controls, and Further Study of Costs and Benefits Are Needed GAO-03-299 a January 2003 IRS LOCKBOX BANKS More Effective Oversight, Stronger Controls, and Further Study of Costs and Benefits Are Needed Highlig... |
Date March 7, 2002 |
Report No. GAO-02-499T |
Title
United States General Accounting Office GAO Testimony
Before the Subcommittee on Technology and Procurement Policy, Committee on Government Reform, House of Representatives For Release on Delivery Expected at 2:00 p.m., Thursday, March 7, 2002 CONTRACT MANAGEMENT Taking a Strategic Approach to Improving Service Acquisitions
Statement of William T. Woods, Acting Director, Acquisition and Sourcing M... |
Date Aug. 13, 2001 |
Report No. GAO-01-1041R |
Title
United States General Accounting Office Washington, DC 20548 August 13, 2001 The Honorable Dana Rohrabacher Chairman, Subcommittee on Space and Aeronautics Committee on Science House of Representatives Subject: NASA’s X-33 and X-34 Programs Dear Mr. Chairman: On June 29, 2001, you asked me to provide additional comments on several issues that I raised in my June 20, 2001, testimony before your S... |
Date Aug. 1, 2001 |
Report No. GAO-01-1017T |
Title
United States General Accounting Office GAO Testimony
Before the Subcommittee on Criminal Justice, Drug Policy and Human Resources Committee on Government Reform House of Representatives For Release on Delivery Expected at 10 a.m. EDT Wednesday August, 1, 2001 ANTI-DRUG MEDIA CAMPAIGN Aspects of Advertising Contract Mismanaged by the Government; Contractor Improperly Charged Some Costs
Statement o... |
Date June 25, 2001 |
Report No. GAO-01-623 |
Title
United States General Accounting Office GAO
June 2001 Report to the Chairman, Subcommittee on Treasury, Postal Service, and General Government, Committee on Appropriations, House of Representatives ANTI-DRUG MEDIA CAMPAIGN Aspects of Advertising Contract Mismanaged by the Government; Contractor Improperly Charged Some Costs GAO-01-623 Contents Letter
Results in Brief Background Ogilvy’s Labor Co... |
Date May 3, 2001 |
Report No. GAO-01-659T |
Title
United States General Accounting Office GAO
For Release on Delivery Expected at 10:00 a.m. EST Thursday May 3, 2001 Testimony
Before the Subcommittee on Coast Guard and Maritime Transportation, Committee on Transportation and Infrastructure, House of Representatives COAST GUARD Actions Needed to Mitigate Deepwater Project Risks
Statement of JayEtta Hecker, Director, Physical Infrastructure GAO-01-... |