Date |
Report No. |
Title |
Date Sept. 19, 2011 |
Report No. GAO-11-806 |
Title
United States Government Accountability Office GAO
September 2011 Report to the Committee on Armed Services, U.S. Senate WEAPONS ACQUISITION REFORM Actions Needed to Address Systems Engineering and Developmental Testing Challenges GAO-11-806 September 2011 WEAPONS ACQUISITION REFORM
Actions Needed to Address Systems Engineering and Developmental Testing Challenges
Highlights of GAO-11-806, a repor... |
Date Nov. 5, 2010 |
Report No. GAO-11-83 |
Title
United States Government Accountability Office GAO
November 2010 Report to Congressional Committees DEFENSE ACQUISITIONS Issues to Be Considered as DOD Modernizes Its Fleet of Tactical Wheeled Vehicles GAO-11-83 November 2010 DEFENSE ACQUISITIONS
Accountability • Integrity • Reliability Issues to Be Considered as DOD Modernizes Its Fleet of Tactical Wheeled Vehicles Highlights of GAO-11-83, a ... |
Date July 29, 2010 |
Report No. GAO-10-774 |
Title
United States Government Accountability Office GAO
July 2010 Report to the Committee on Armed Services, U.S. Senate DEFENSE ACQUISITIONS DOD Needs to Develop Performance Criteria to Gauge Impact of Reform Act Changes and Address Workforce Issues GAO-10-774 July 2010 DEFENSE ACQUISITIONS Highlights
Highlights of GAO-10-774, a report to the Committee on Armed Services, U.S. Senate Accountability Int... |
Date July 2, 2010 |
Report No. GAO-10-758R |
Title
United States Government Accountability Office Washington, DC 20548 July 2, 2010 The Honorable Norman D. Dicks Chairman Subcommittee on Defense Committee on Appropriations House of Representatives Subject: Expeditionary Fighting Vehicle (EFV) Program Faces Cost, Schedule, and Performance Risks This letter formally transmits the attached briefing (see encl. I) in response to your May 4, 2009, reque... |
Date June 17, 2010 |
Report No. GAO-10-840T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 10:00 a.m. EST Thursday, June 17, 2010 Testimony Before the Subcommittees on Management, Investigations, and Oversight; and Border, Maritime, and Global Counterterrorism; Committee on Homeland Security, House of Representatives SECURE BORDER INITIATIVE DHS Needs to Follow Through on Plans to Reassess and Better ... |
Date May 5, 2010 |
Report No. GAO-10-340 |
Title
United States Government Accountability Office GAO
May 2010 Report to Congressional Requesters SECURE BORDER INITIATIVE DHS Needs to Reconsider Its Proposed Investment in Key Technology Program GAO-10-340 May 2010 SECURE BORDER INITIATIVE Highlights
Highlights of GAO-10-340, a report to congressional requesters Accountability Integrity Reliability DHS Needs to Reconsider Its Proposed Investment in... |
Date March 18, 2010 |
Report No. GAO-10-511T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 10:00 a.m. EDT, Thursday, March 18, 2010 Testimony Before the Committee on Homeland Security's Subcommittees on Management, Investigations, and Oversight; and Border, Maritime, and Global Counterterrorism SECURE BORDER INITIATIVE Testing and Problem Resolution Challenges Put Delivery of Technology Program at Ris... |
Date Jan. 29, 2010 |
Report No. GAO-10-158 |
Title
United States Government Accountability Office GAO
January 2010 Report to Congressional Requesters SECURE BORDER INITIATIVE DHS Needs to Address Testing and Performance Limitations That Place Key Technology Program at Risk GAO-10-158 January 2010 SECURE BORDER INITIATIVE Highlights
Highlights of GAO-10-158, a report to congressional requesters Accountability Integrity Reliability DHS Needs to Addr... |
Date Sept. 15, 2009 |
Report No. GAO-09-841 |
Title
United States Government Accountability Office GAO
September 2009 Report to Congressional Requesters DOD BUSINESS SYSTEMS MODERNIZATION Navy Implementing a Number of Key Management Controls on Enterprise Resource Planning System, but Improvements Still Needed GAO-09-841 September 2009 DOD BUSINESS SYSTEMS MODERNIZATION Highlights
Highlights of GAO-09-841, a report to congressional requesters Accou... |
Date April 1, 2009 |
Report No. GAO-09-543T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 7:30 a.m. EDT Wednesday April 1, 2009 Testimony Before the Panel on Defense Acquisition Reform, Committee on Armed Services, House of Representatives DEFENSE ACQUISITIONS Measuring the Value of DOD's Weapon Programs Requires Starting with Realistic Baselines
Statement of Michael J. Sullivan, Director Acquisition... |
Date March 3, 2009 |
Report No. GAO-09-431T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 9:30 a.m. EST Tuesday, March 3, 2009 Testimony Before the Committee on Armed Services, U.S. Senate DEFENSE ACQUISITIONS DOD Must Balance Its Needs with Available Resources and Follow an Incremental Approach to Acquiring Weapon Systems
Statement of Michael J. Sullivan, Director Acquisition and Sourcing Management... |
Date Feb. 25, 2009 |
Report No. GAO-09-403T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 1:00 p.m. EDT Wednesday, February 25, 2009 Testimony Before the Subcommittee on Strategic Forces, Committee on Armed Services, House of Representatives DEFENSE ACQUISITIONS Charting a Course for Improved Missile Defense Testing
Statement of Paul Francis, Director, Acquisition and Sourcing Management GAO-09-403T ... |
Date Nov. 18, 2008 |
Report No. GAO-09-189R |
Title
United States Government Accountability Office Washington, DC 20548 November 18, 2008 The Honorable Carl Levin Chairman Committee on Armed Services United States Senate Subject: Defense Acquisitions: Status of the Safety, Performance, and Reliability of the Expeditionary Fire Support System The Expeditionary Fire Support System (EFSS)—which consists of two kinds of motorized vehicles, a 120-mm m... |
Date Sept. 30, 2008 |
Report No. GAO-08-979 |
Title
United States Government Accountability Office GAO
September 2008 Report to Congressional Committees COMBATING NUCLEAR SMUGGLING DHS’s Phase 3 Test Report on Advanced Portal Monitors Does Not Fully Disclose the Limitations of the Test Results GAO-08-979 September 2008 COMBATING NUCLEAR SMUGGLING Highlights
Highlights of GAO-08-979, a report to congressional committees Accountability Integrity Re... |
Date Sept. 16, 2008 |
Report No. GAO-08-814 |
Title
United States Government Accountability Office GAO
September 2008 Report to the Chairman, Committee on House Administration, House of Representatives ELECTIONS Federal Program for Certifying Voting Systems Needs to Be Further Defined, Fully Implemented, and Expanded GAO-08-814 September 2008 ELECTIONS Highlights
Highlights of GAO-08-814, a report to the Chairman, Committee on House Administration,... |
Date July 16, 2008 |
Report No. GAO-08-960T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 2:00 p.m. EDT Wednesday, July 16, 2008 Testimony Before the Subcommittee on Emerging Threats, Cybersecurity, and Science and Technology, Committee on Homeland Security, House of Representatives BIOSURVEILLANCE Preliminary Observations on Department of Homeland Security’s Biosurveillance Initiatives
Statement o... |
Date April 10, 2008 |
Report No. GAO-08-638T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 2:00 p.m. EDT Thursday, April 10, 2008 Testimony Before the Subcommittee on Air and Land Forces, Committee on Armed Services, House of Representatives DEFENSE ACQUISITIONS 2009 Review of Future Combat System Is Critical to Program's Direction
Statement of Paul L. Francis, Director Acquisition and Sourcing Manage... |
Date March 7, 2008 |
Report No. GAO-08-408 |
Title
United States Government Accountability Office GAO
March 2008 Report to Congressional Committees DEFENSE ACQUISITIONS 2009 Is a Critical Juncture for the Army’s Future Combat System GAO-08-408 March 2008 DEFENSE ACQUISITIONS Highlights
Highlights of GAO-08-408, a report to congressional committees Accountability Integrity Reliability 2009 Is a Critical Juncture for the Army's Future Combat Syste... |
Date March 7, 2008 |
Report No. GAO-08-409 |
Title
United States Government Accountability Office GAO
March 2008 Report to Congressional Committees DEFENSE ACQUISITIONS Significant Challenges Ahead in Developing and Demonstrating Future Combat System’s Network and Software GAO-08-409 March 2008 DEFENSE ACQUISITIONS Highlights
Highlights of GAO-08-409, a report to Congressional Committees Accountability Integrity Reliability Significant Challenge... |
Date June 8, 2007 |
Report No. GAO-07-650 |
Title
United States Government Accountability Office GAO
June 2007 Report to Congressional Requesters WEATHER FORECASTING National Weather Service’s Operations Prototype Needs More Rigorous Planning GAO-07-650 June 2007 WEATHER FORECASTING Highlights
Highlights of GAO-07-650, a report to congressional requesters Accountability Integrity Reliability National Weather Service’s Operations Prototype Nee... |
Date March 15, 2007 |
Report No. GAO-07-376 |
Title
United States Government Accountability Office GAO
March 2007 Report to Congressional Committees DEFENSE ACQUISITIONS Key Decisions to Be Made on Future Combat System GAO-07-376 March 2007 DEFENSE ACQUISITIONS Highlights
Highlights of GAO-07-376, a report to congressional committees Accountability Integrity Reliability Key Decisions to Be Made on Future Combat System Why GAO Did This Study
The Fut... |
Date March 15, 2007 |
Report No. GAO-07-360 |
Title
United States Government Accountability Office GAO
March 2007 Report to Congressional Committees JOINT STRIKE FIGHTER Progress Made and Challenges Remain GAO-07-360 March 2007 JOINT STRIKE FIGHTER Highlights
Highlights of GAO-07-360, a report to congressional committees Accountability Integrity Reliability Progress Made and Challenges Remain Why GAO Did This Study
The Joint Strike Fighter (JSF) pr... |
Date May 1, 2006 |
Report No. GAO-06-349 |
Title
United States Government Accountability Office GAO
May 2006 Report to Congressional Committees DEFENSE ACQUISITIONS The Expeditionary Fighting Vehicle Encountered Difficulties in Design Demonstration and Faces Future Risks GAO-06-349 May 2006 DEFENSE ACQUISITIONS Highlights
Highlights of GAO-06-349, a report to Congressional Committees Accountability Integrity Reliability The Expeditionary Fightin... |
Date July 19, 2005 |
Report No. GAO-05-924T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 3:30 p.m. EDT Tuesday, July 19, 2005 Testimony Before the Subcommittee on Projection Forces, Committee on Armed Services, House of Representatives DEFENSE ACQUISITIONS Progress and Challenges Facing the DD(X) Surface Combatant Program Statement of Paul L. Francis, Director Acquisition and Sourcing Management GAO... |
Date Aug. 12, 2004 |
Report No. GAO-04-925 |
Title
United States Government Accountability Office GAO
August 2004 Report to Congressional Requesters MILITARY TRANSFORMATION Fielding of Army’s Stryker Vehicles Is Well Under Way, but Expectations for Their Transportability by C-130 Aircraft Need to Be Clarified GAO-04-925 a August 2004 MILITARY TRANSFORMATION Fielding of Army’s Stryker Vehicles Is Well Under Way, but Expectations for Their Trans... |
Date Feb. 26, 2004 |
Report No. GAO-04-254 |
Title
United States General Accounting Office GAO
February 2004 Report to Congressional Requesters MISSILE DEFENSE Actions Being Taken to Address Testing Recommendations, but Updated Assessment Needed GAO-04-254 February 2004 MISSILE DEFENSE: Actions Being Taken to Address Testing Recommendations, but Updated Assessment Needed Highlights of GAO-04-254, a report to Congressional Requesters In August 2000... |
Date March 5, 2002 |
Report No. GAO-02-298 |
Title
United States General Accounting Office GAO
March 2002 Report to Congressional Committees TACTICAL AIRCRAFT F-22 Delays Indicate Initial Production Rates Should Be Lower to Reduce Risks GAO-02-298 Contents Letter
Results in Brief Background F-22 Development Program Continues to Experience Delays and Risks in Meeting Key Schedule Goals F-22 Development Costs Likely to Increase More Testing Needed t... |
Date Feb. 25, 2002 |
Report No. GAO-02-201 |
Title
United States General Accounting Office GAO
February 2002 Report to Congressional Committees DEFENSE ACQUISITIONS Steps to Improve the Crusader Program’s Investment Decisions GAO-02-201 a Contents Letter Results in Brief Background Critical Technologies Need Additional Maturity to Better Assure Low-risk Product Development Lighter-weight Crusader May Not Significantly Improve Strategic Deployabi... |
Date June 7, 2001 |
Report No. GAO-01-450 |
Title
United States General Accounting Office GAO
June 2001 Report to the Honorable Peter A. DeFazio, House of Representatives DEFENSE ACQUISITION Comanche Program Objectives Need to Be Revised to More Achievable Levels GAO-01-450 Contents Letter
Results in Brief Background The Comanche Program Continues to Experience Cost Increases, Schedule Delays, and Performance Shortfalls The Army Plans to Begin Co... |
Date April 30, 2001 |
Report No. GAO-01-448 |
Title
United States General Accounting Office GAO
April 2001 Report to the Secretary of Defense ELECTRONIC WARFARE The Army Can Reduce Its Risks in Developing New Radar Countermeasures System GAO-01-448 Contents Letter Appendix I Comments from the Department of Defense 1 13 Figures
Figure 1: Suite of Radio Frequency Countermeasures Components Figure 2: Contractor Plans to Replace Current Analog Receiver... |
Date Feb. 20, 2001 |
Report No. GAO-01-369R |
Title
United States General Accounting Office Washington, DC 20548 February 20, 2001 The Honorable Donald H. Rumsfeld The Secretary of Defense Subject: Defense Acquisitions: Readiness of the Marine Corps’ V-22 Aircraft for Full-Rate Production Dear Mr. Secretary: In a letter to Secretary of Defense Cohen, dated December 15, 2000, we stated that the Marine Corps’ V-22 aircraft1 was not ready for full... |
Date March 17, 1997 |
Report No. NSIAD-97-116R |
Title
GAFUJ _;;General United 3tates Accounting Offiee
Washington, D.C. 20658 National Security and International Affairs Division B-275841 March 17, 1997 The Honorable Sheila E. Widnall The Secretary of the Air Force Subject: Joint Direct Attack Munition: Low-Rate Initial Production Decision Dear: Mdam Secretay.W ::: :: :: During our review of the Joint Direct Attack Munition's (JDAM) readiness to begi... |
Date Aug. 28, 1996 |
Report No. NSIAD-96-198 |
Title
United States General Accounting Office GAO
August 1996 Report to the Ranking Minority Member, House Committee on International Relations MINE DETECTION Army Detector’s Ability to Find Low-Metal Mines Not Clearly Demonstrated G A O years
1921 - 1996 GAO/NSIAD-96-198 GAO United States General Accounting Office Washington, D.C. 20548 National Security and International Affairs Division B-272391 Au... |
Date Jan. 8, 1996 |
Report No. NSIAD-96-4 |
Title
United States General Accounting Office GAO
January 1996 Report to the Honorable William V. Roth, Jr., U.S. Senate ARMY ACQUISITION Medium Trucks Passed Key Operational and Technical Tests GAO/NSIAD-96-4 GAO United States General Accounting Office Washington, D.C. 20548 National Security and International Affairs Division B-266242 January 8, 1996 The Honorable William V. Roth, Jr. United States Se... |
Date Nov. 23, 1993 |
Report No. NSIAD-94-59 |
Title
GAO United States General Accounting Office Washington, D.C. 20548 National Security and International Affairs Division B-241 179 November 23,1993 The Honorable Daniel K. Inouye Chairman The Honorable Ted Stevens Ranking Minority Member Subcommittee on Defense Committee on Appropriations United States Senate The Honorable John P. Murtha Chairman The Honorable Joseph M. McDade &king Minority Membe... |
Date July 30, 1993 |
Report No. NSIAD-93-175 |
Title
GAO
Julvu 1993 BATTLEFIELD AUTOMATION More Testing and Analysis Needed Before Production of Air Defense Radar i GAWNSIAD-93-175 GAO United States General Accounting Office Washington, D.C. 20648 National Security and International Affairs Division B-242246 July 30,1993 The Honorable Les Aspin The Secretary of Defense Dear Mr. Secretary: This report addresses the Army’ strategy for acquiring a gr... |
Date Jan. 25, 1993 |
Report No. NSIAD-93-14 |
Title
GAO
vJ;ttIttitry I !J!JY Iit~port t,c.) Secretary of Defense the ELECTRONIC Laser Warning System Production Should Be Limited 148274 GAWNSIAD-93-14 - -. GAO United States General Accounting OfTice Washington, D.C. 20648 National Security and International Affairs Division B-260666 January 25, 1993 The Honorable Richard B. Cheney The Secretaryof Defense Dear Mr. Secretary: We have evaluatedthe Army... |
Date Jan. 31, 1992 |
Report No. NSIAD-92-50 |
Title
Development of the ANBSY- 1 Combat System tL -.-_----- -.l_---.-.-__-...l-l---- __--._“.1...” -.-...-.. 111 --. __. .-... -~l.l-” ^.-_l-_._“_l.l--_--- United States General Accounting Office Washington, D.C. 20548 National Security and International Affairs Division B-220298 January 31,1992 The Honorable John Conyers Chairman, Legislation and National Security Subcommittee Committee on Gov... |
Date Sept. 28, 1990 |
Report No. NSIAD-90-267 |
Title
SPECIAL OPERATIONS FORCES Army Plans Highly Concurrent Acquisition Strategy for Costly Helicopters w‘ HllllllllI II ll
142536 *
^_... _. ..-... __,._“_.l.“. ..__ ___-“_“.--__--.--.----- E f ^. .._. I ..__ ____ _( ..- --ll..--“-.. ._ .._.l..~l.---l-l--l United States General Accounting Office Washington, D.C. 20648 National Security and International Affairs Division B-240262 September ... |
Date May 31, 1990 |
Report No. IMTEC-90-54 |
Title
United States General Accounting Office GAO
May 1990 Report to Congressional Requesters EMBEDDED COMPUTERS Navy Not Ready to Buy Avionics Computers for Its LAMPS Mk I Helicopters
.. RESTRICTED --Not to be released outside the General Accounting office unless speciik&y approved by the Offlee of Congressional Relations. GAO General Accounthg Office Wwhingtan, D.C. 20648 Information Technology Manage... |
Date May 11, 1990 |
Report No. T-NSIAD-90-40 |
Title
United States General Accounting Office /v/ bTq 3 Testimony llllllllll IIll
141343 For Release on Delivery Ex ected at 9: 5 0 a.m. EDT Friday, May 11, 1990 Circumstances Surrounding Production Decision the ASPJ Limited Statement of Louis J. Rodrigues, Director, Command, Control, Communications, and Intelligence Issues National Security and International Affairs Division Before the Subcommittee on ... |
Date Sept. 1, 1988 |
Report No. NSIAD-88-233BR |
Title
United States General Accounting Office GAO
September 1988 Briefing Report to the Chairman, Committee on Appropriations, U.S. Senate .. PROCUREMENT Assessment of DOD’s Multiyear Contract Candidates GAO/NSIAlM8-233BR owrn GAO L’nited States General Accounting Office Washington, D.C. 20548 National Security and International Mail-s Division a-215825 September 1, 1988 The Honorable John C. Stenni... |
Date July 7, 1988 |
Report No. NSIAD-88-186 |
Title
United States General Accounting Office GAO
July 1988 Report to the Honorable Denny Smith, House of Representatives MISSILE DEVELOPMENT AMRAAM’s Combat Effectiveness at Production Not Fully Tested .’ National Security and International Affairs Division B-221734 July 7, 1988 The Honorable Denny Smith House of Representatives Dear Mr. Smith: This report, prepared at your request, addresses devel... |
Date May 4, 1988 |
Report No. NSIAD-88-149FS |
Title
.: I 13gy$4
/ -I*-- United States General Accounting O ffice _ GAO Report to the Chairman, Subcommitteeon Oversight and Investigations, Committee on Energy and Commerce,House of Representatives BRADLEY VEHICLE 0 Status of Transmission’ s Reliability I
,d ‘ 1 I - United States General Accounting Office Washington, D.C. 20648 National Security and International Affairs Division B-221733 May 4,19... |