Date Report No. Title
Date April 21, 2010 Report No. GAO-10-650T Title

Surface Transportation Security: TSA Has Taken Actions to Manage Risk, Improve Coordination, and Measure Performance, but Additional Actions Would Enhance Its Efforts

United States Government Accountability Office GAO For Release on Delivery Expected at 2:30 p.m. EDT April 21, 2010 Testimony Before the Committee on Commerce, Science, and Transportation, U.S. Senate SURFACE TRANSPORTATION SECURITY TSA Has Taken Actions to Manage Risk, Improve Coordination, and Measure Performance, but Additional Actions Would Enhance Its Efforts Statement of Stephen M. Lord, Dir...
Date Dec. 31, 2007 Report No. GAO-08-288 Title

Army Corps of Engineers: Known Performance Issues with New Orleans Drainage Canal Pumps Have Been Addressed, but Guidance on Future Contracts Is Needed

United States Government Accountability Office GAO December 2007 Report to the Chairman, Ad Hoc Subcommittee on Disaster Recovery, Committee on Homeland Security and Governmental Affairs, U.S. Senate ARMY CORPS OF ENGINEERS Known Performance Issues with New Orleans Drainage Canal Pumps Have Been Addressed, but Guidance on Future Contracts Is Needed GAO-08-288 December 2007 ARMY CORPS OF ENGINEERS ...
Date Sept. 8, 2006 Report No. GAO-06-946 Title

Natural Gas Pipeline Safety: Integrity Management Benefits Public Safety, but Consistency of Performance Measures Should be Improved

United States Government Accountability Office GAO September 2006 Report to Congressional Committees NATURAL GAS PIPELINE SAFETY Integrity Management Benefits Public Safety, but Consistency of Performance Measures Should Be Improved GAO-06-946 a September 2006 GAS PIPELINE SAFETY Highlights Highlights of GAO-06-946, a report to congressional committees Accountability Integrity Reliability Integrit...
Date April 27, 2006 Report No. GAO-06-588T Title

Gas Pipeline Safety: Preliminary Observations on the Implementation of the Integrity Management Program

United States Government Accountability Office GAO For Release on Delivery Expected at 10:00 a.m. EST Thursday, April 27, 2006 Testimony Before the Subcommittee on Energy and Air Quality, Committee on Energy and Commerce, House of Representatives GAS PIPELINE SAFETY Preliminary Observations on the Implementation of the Integrity Management Program Statement of Katherine Siggerud, Director Physical...
Date March 16, 2006 Report No. GAO-06-474T Title

Gas Pipeline Safety: Preliminary Observations on the Integrity Management Program and 7-Year Reassessment Requirement

United States Government Accountability Office GAO For Release on Delivery Expected at 10:00 a.m. EST Thursday, March 16, 2006 Testimony Before the Subcommittee on Highways, Transit and Pipelines, Committee on Transportation and Infrastructure, House of Representatives GAS PIPELINE SAFETY Preliminary Observations on the Integrity Management Program and 7-Year Reassessment Requirement Statement of ...
Date July 23, 2004 Report No. GAO-04-801 Title

Pipeline Safety: Management of the Office of Pipeline Safety's Enforcement Program Needs Further Strengthening

United States Government Accountability Office GAO July 2004 Report to Congressional Recipients PIPELINE SAFETY Management of the Office of Pipeline Safety’s Enforcement Program Needs Further Strengthening GAO-04-801 a July 2004 PIPELINE SAFETY Management of the Office of Pipeline Safety’s Enforcement Program Needs Further Strengthening Highlights of GAO-04-801, a report to congressional recip...
Date July 20, 2004 Report No. GAO-04-985T Title

Pipeline Safety: Preliminary Information on the Office of Pipeline Safety's Actions to Strengthen Its Enforcement Program

United States Government Accountability Office GAO For Release on Delivery Expected at 11:00 a.m. EDT Tuesday, July 20, 2004 Testimony Before the Subcommittee on Energy and Air Quality, Committee on Energy and Commerce, House of Representatives PIPELINE SAFETY Preliminary Information on the Office of Pipeline Safety’s Actions to Strengthen Its Enforcement Program Statement of Katherine Siggerud,...
Date June 16, 2004 Report No. GAO-04-875T Title

Pipeline Safety: Preliminary Information on the Office of Pipeline Safety's Efforts to Strengthen Its Enforcement Activities

United States General Accounting Office GAO For Release on Delivery Expected at 10:00 a.m. EDT Wednesday, June 16, 2004 Testimony Before the Subcommittee on Highways, Transit and Pipelines, Committee on Transportation and Infrastructure, House of Representatives PIPELINE SAFETY Preliminary Information on the Office of Pipeline Safety's Efforts to Strengthen Its Enforcement Activities Statement of ...
Date June 15, 2004 Report No. GAO-04-826T Title

Pipeline Safety: Preliminary Information on the Office of Pipeline Safety's Enforcement Activities

United States General Accounting Office GAO For Release on Delivery Expected at 9:30 a.m. EDT Tuesday, June 15, 2004 Testimony Before the Committee on Commerce, Science and Transportation, U.S. Senate PIPELINE SAFETY Preliminary Information on the Office of Pipeline Safety's Enforcement Activities Statement of Katherine Siggerud, Director Physical Infrastructure Issues GAO-04-826T June 15, 2004 PI...
Date Oct. 30, 2003 Report No. GAO-04-192T Title

National Wildlife Refuges: Improvement Needed in the Management and Oversight of Oil and Gas Activities on Federal Lands

United States General Accounting Office GAO For Release on Delivery Expected at 9:30 a.m. EST Thursday, October 30, 2003 Testimony Before the Subcommittee on Fisheries Conservation, Wildlife, and Oceans, Committee on Resources, House of Representatives NATIONAL WILDLIFE REFUGES Improvement Needed in the Management and Oversight of Oil and Gas Activities on Federal Lands Statement of Barry T. Hill,...
Date June 30, 2003 Report No. GAO-03-746 Title

Pipeline Safety: Systematic Process Needed to Evaluate Outcomes of Research and Development Program

United States General Accounting Office GAO June 2003 Report to Congressional Subcommittees PIPELINE SAFETY Systematic Process Needed to Evaluate Outcomes of Research and Development Program GAO-03-746 a June 2003 PIPELINE SAFETY Systematic Process Needed to Evaluate Outcomes of Research and Development Program Highlights of GAO-03-746, a report to congressional subcommittees From 1998 through 200...
Date Aug. 26, 2002 Report No. GAO-02-785 Title

Pipeline Safety and Security: Improved Workforce Planning and Communication Needed

United States General Accounting Office GAO August 2002 Report to the Ranking Minority Member, Committee on Energy and Commerce, House of Representatives PIPELINE SAFETY AND SECURITY Improved Workforce Planning and Communication Needed GAO-02-785 Contents Letter Results in Brief Background OPS Has Set an Ambitious Schedule for Implementing Integrity Management OPS Faces Additional Challenges in Im...
Date March 19, 2002 Report No. GAO-02-517T Title

Pipeline Safety: Status of Improving Oversight of the Pipeline Industry

United States General Accounting Office GAO Testimony Before the Subcommittee on Energy and Air Quality Committee on Energy and Commerce House of Representatives For Release on Delivery Expected at 2:00 p.m. EST, Tuesday, March 19, 2002 PIPELINE SAFETY Status of Improving Oversight of the Pipeline Industry Statement of Peter F. Guerrero Director, Physical Infrastructure Issues GAO-02-517T Mr. Chai...
Date Sept. 28, 2001 Report No. GAO-01-1075 Title

Pipeline Safety: Progress Made, but Significant Requirements and Recommendations Not Yet Complete

United States General Accounting Office GAO September 2001 Report to Congressional Requesters PIPELINE SAFETY Progress Made, but Significant Requirements and Recommendations Not Yet Complete GAO-01-1075 Contents Letter Results in Brief Background OPS Has Completed Some Statutory Requirements, but Other Important Requirements Remain Uncompleted The Safety Board Is Encouraged by OPS’ Efforts to Im...
Date May 15, 2000 Report No. RCED-00-128 Title

Pipeline Safety: The Office of Pipeline Safety Is Changing How It Oversees the Pipeline Industry

United States General Accounting Office GAO May 2000 Report to the Ranking Minority Member, Committee on Commerce, House of Representatives PIPELINE SAFETY The Office of Pipeline Safety Is Changing How It Oversees the Pipeline Industry GAO/RCED-00-128 Contents Letter Appendixes Appendix I: The Bellingham, Washington, Pipeline Accident 3 40 47 49 51 61 Appendix II: Maps of Natural Gas Transmission ...
Date April 21, 1998 Report No. RCED-98-99 Title

Surface Transportation: Issues Associated With Pipeline Regulation by the Surface Transportation Board

United States General Accounting Office GAO April 1998 Report to Congressional Committees SURFACE TRANSPORTATION Issues Associated With Pipeline Regulation by the Surface Transportation Board GAO/RCED-98-99 GAO United States General Accounting Office Washington, D.C. 20548 Resources, Community, and Economic Development Division B-277480 April 21, 1998 The Honorable John McCain Chairman The Honorab...
Date March 31, 1998 Report No. T-RCED-98-127 Title

Surface Transportation: Issues Associated With Pipeline Regulation by the Surface Transportation Board

United States General Accounting Office GAO Not to Be Released Before 2:30 p.m. EST Tuesday March 31, 1998 Testimony Before the Subcommittee on Surface Transportation and Merchant Marine, Committee on Commerce, Science, and Transportation, U.S. Senate SURFACE TRANSPORTATION Issues Associated With Pipeline Regulation by the Surface Transportation Board Statement for the Record by Phyllis F. Scheinb...
Date April 22, 1996 Report No. RCED-96-84 Title

U.S. Forest Service: Fee System for Rights-of-Way Program Needs Revision

United States General Accounting Office GAO April 1996 Report to the Chairman, Subcommittee on Oversight of Government Management and the District of Columbia, Committee on Governmental Affairs, U.S. Senate U.S. FOREST SERVICE Fee System for Rights-of-Way Program Needs Revision G A O years 1921 - 1996 GAO/RCED-96-84 GAO United States General Accounting Office Washington, D.C. 20548 Resources, Comm...
Date May 18, 1993 Report No. T-RCED-93-41 Title

Pipeline Safety: Use of Instrumented Technology to Inspect Pipelines

United States General Accounting Office GAO Testimony Before the Subcommittee on Investigations, and Oversight Committee on Public Works U.S. House of Representatives Dclivq PIPELINE SAFETY Use of Instrumented Technology to Inspect Pipelines Statement of Allen Li Associate Director, Transportation Issues Resources, Community, and Economic Development Division 149236 f .- Mr. Chairman and Members o...
Date Sept. 28, 1992 Report No. RCED-92-237 Title

Natural Gas Pipelines: Greater Use of Instrumented Inspection Technology Can Improve Safety

GAO I Report to Congressional Committees NATURAL GAS PIPELINES Greater Use of Instrumented Inspection Technology Can Improve Safety 147632 . ., ,. RESTRICTED--Not to be released outside the General Accounting Office unless specificallj+ approved by the Office of Congressional Relations. GAO/RCElD-92-237 Besources, Community, and Economic Development Division B-249333 September 28, 1992 The Honorab...
Date May 8, 1990 Report No. RCED-90-124 Title

Water Pollution: Alyeska's Efforts to Comply With Reissued Ballast Water Treatment Permit

United States General Accounting Office GAO May 1990 Report to the Chairman, Subcommittee on Oversight and Investigations, Committee on Energy and Commerce, House of Representatives WATER POLLUTION Alyeska’s Efforts to Comply With Reissued Ballast Water Treatment Permit : RESTRICTED --Not to be released outside the General Accounting Office unless speckfically approved by the Office of Congressi...
Date March 9, 1989 Report No. T-RCED-89-15 Title

Transportation: Pipeline Safety Risk Assessment Program Could Help Evaluate Inspection Cycle

The Comptroller General of the United States Washington, D.C. 20548 Decision Matterof: File: Chesapeake B-224228, February and Potomac Telephone B-224228.2 5, 1987 Company Date: DIGEST A protest filed with the General Accounting Office more 1. than 10 working days after the contracting agency denied the firm's agency-level protest is untimely and will not be considered. 3 GAO will not consider the...
Date March 7, 1989 Report No. RCED-89-107 Title

Pipeline Safety: New Risk Assessment Program Could Help Evaluate Inspection Cycle

’ .I : -I GAO United States General Accounting Office Washington, D.C. 20548 Resources, Community, Economic Development and Division B-214352.2 March 7, 1989 The Honorable Frank R. Lautenberg Chairman, Subcommittee on Transportation and Related Agencies Committee on Appropriations United States Senate The Honorable William Lehman Chairman, Subcommittee on Transportation and Related Agencies Comm...
Date July 13, 1988 Report No. RCED-88-125 Title

Water Resources: Costs of the Fountain Valley Authority Pipeline

United States General Accounting Office Report to Congressional Requesters , July 1988 WATER RESOURCES Costs of the Fountain Valley Authority Pipeline 136316 c2YGxPcII \I GAO,‘RCED-88425 GAO United States General Accounting Office / Denver Regional Office B-227258 July 13, 1988 The Honorable William Armstrong United States Senate The Honorable Timothy Wirth United States Senate Suite 300-D 2420 ...
Date June 18, 1987 Report No. RCED-87-118 Title

Water Pollution: EPA Controls Over Ballast Water at Trans-Alaska Pipeline Marine Terminal

United States General Accounting GAO Office Report to the Chairman, Subcommittee on Oversight and Investigations, Committee ’* on Energy and Commerce, House of Representatives 33533 * . June 1987 WATER POLLUTION EPA Controls Over Ballast Water at TransAlaska Pipeline Marine Terminal I I Ill1 133533 GAO,‘ RCED-87-118 I GAO United States General Accounting Office Washington, D.C. 20648 Resources...
Date May 5, 1987 Report No. T-RCED-87-22 Title

Transportation: The Department of Transportation's Recent Efforts To Strengthen Pipeline Safety

United States General Accounting Offke GAO Testimony For Release on Delivery Expected at 1O:OO a.m. DST Tuesday May 5, 1987 The Department to Strengthen of Transportation's Pipeline Safety Recent Efforts Statement of Kenneth M. Mead, Associate Director Resources, Community, and Economic Division Before the Subcommittee on Investigations the House Committee on Public Transportation Development and ...
Date April 16, 1985 Report No. 126707 Title

Transportation: GAO's Views on Selected Aspects of the Department of Transportation's Pipeline Safety Program

.. . ’ .6 ?8 UNITED STATES GENERAL ACCOUNTING OFFICE WASHINGTON, D.C. 20548 126’ 70, 126707 FOR RELEASE ON DELIVERY Expected at 10:00 a.m. APRIL 16, 1985 STATEMENT OF OLIVER W. KRUEGER, ASSOCIATE DIRECTOR RESOURCES, COMMUNITY, AND ECONOMIC DEVELOPMENTDIVISION BEFORE THE SUBCOMMITTEE ON FOSSIL AND SYNTHETIC FUELS COMMITTEE ON ENERGY AND COMMERCE HOUSE OF REPRESENTATIVES ON GAO'S VIEWS bN SELECT...
Date March 13, 1984 Report No. 123592 Title

Transportation: GAO Review of the Department of Transportation's Pipeline Safety Program

1 : 9 If& Qb”cJl I## IT.’ UNITED STATES GENERALACCOUNTING OFFICE ' 'WASBINGTON,D.C. 20548 ' j i FOR RELEASE ON DELIVERY: Expected at 10:00 a.m. Tuesday, March 13, 1984 STATEMENTOF OLIVER W. KRUEGER, ASSOCIATE DIRECTOR RESOURCES,COMMUNITY, AND ECONOMICDEVELOPMENT DIVISION BEFORE THE . SUBCOMMITTEE FOSSIL AND SYNTHETIC FUELS ON COMMITTEEON ENERGYAND COMMERCE HOUSEOF REPRESENTATIVES ON . GAO'S RE...
Date Sept. 30, 1982 Report No. EMD-82-130 Title

Energy: FERC's Proposed 1983 Budget for the Trans-Alaska Pipeline System Case

UN& STATES GENERAL ACCOUNTING OFFICE WASHINGI’ON, D.C. 20546 / PG‘f7 September 30, 1982 B-208038 Chairman, The Honorable Tom Bevill Subcommittee on Energy and Water Development Committee on Appropriations House of Representatives 119647 Dear Mr. Chairmanr Subject: FERC's Proposed 1983 Budget For the Trans Pipeline System Case (GAO/EMD-82-130) Alaska This report is the result of our review and ...
Date May 6, 1981 Report No. EMD-81-79 Title

Energy: Constituent's Concerns Over Stipulations for the Trans-Alaska Pipeline

UNITED STATES GENERAL ACCOUNTING WASHINGTON, D.C. 20548 ENERGY AND MINERALS DIVISION OFFICE B-203005 MAY 8,198.l The Honorable Richard C. white House of Representatives Dear Mr. White: Subject: Concerns Over S ipulations L onstituent's For The Trans-Alaska Pipeline 3 (END-81-79) As requested in your March 25, 1981, letter, I would like to offer some comments regarding concerns mentioned in Mr . Bo...
Date Oct. 8, 1980 Report No. LCD-80-116 Title

National Defense: Opportunity To Improve the Army's Stock Distribution Practices

UNITED STATES GENERAL ACCOUNTING OFFICE WASHINGTON, D.C. 20548 m@ LO01BTICS AND COilMUNlCATlONS DIVISION OCT 8 I980 General John R. Guthrie Commanding General Army Materiel Development Readiness Command Dear General Subject; Guthrie: Opportunity rDistribution and Ill II 113590 to Improve he Army's Stock This letter is to advise you of the results of our survey of shipments from Army supply depots ...
Date March 21, 1980 Report No. B-197687 Title

Transportation: Transportation of Government-Owned Jet Fuel by Pipeline

Date Nov. 8, 1979 Report No. ID-80-2 Title

Energy: Prospects for Cooperation and Trade of Energy Resources Between the United States and Canada

BY THE COMPTROLLER GENERAL Report To The Congress OF THE UNITED STATES Prospects For Cooperation And Trade Of Energy Resources Between The United States And Canada The future of the United States and Canada is closely linked by these countries' economic, security, and political interdependencies which have expanded into the area of energy. Canada now supplies the United States with about 5 percent...
Date Sept. 14, 1979 Report No. LCD-79-223 Title

National Defense: Army Management Controls Over Bulk Fuel in Germany and Italy

UNITED STATES GENERAL ACCOUNTING OFFICE INTERNATIONAL DIVISION EUROPEAN BRANCH %AMERICAN APO CONSULATE NEW YORK GENERAL 09757 IN REPLY REFER Tot OFFICE OF THE DIRECZTOR B-163928 September 14, 1979 General Frederick J Kroesen Commander in Chief United States Army, Europe, and Seventh Army APO U S Forces 09403 over bulk fuel in Li-rmy management controls Germany and Italy (LCD-79-223) J This report ...
Date July 13, 1979 Report No. EMD-79-31 Title

Energy: Petroleum Pipeline Rates and Competition--Issues Long Neglected By Federal Regulators and in Need of Attention

Report ToThe Congre OF THEUNITEDSTATES Petroleum PiReline Rates And CompetitionIssues Long Neglected By Federal Regulators And In Need Of Attention Regulators have not developed criteria for determining whether pipeline rates are reasonable and making sure that pipeline operators comply with the Interstate Commerce Act. In the absence of such criteria, GAO could not determine the extent to which c...
Date July 10, 1978 Report No. EMD-78-47 Title

The Advance Payment Program: An Uncontrolled Experiment

DOCUMENT C6487 - IB19469601 RESUME The Advance Payment Program: An Uncontrolled Experilent. EMD-78-47; 8-181503. July 10, 1978. Feleased July 17, 1978. PP. 22 feport to Rep. Harl-y O. Staggers, Chairman, House Committee on Interstate and 'oreiqn Commerce; Hep. John E. Moss, Chairman, House Committee on Interstate and Fcreign Ccmmerce: Cversigit and InvestiqatioLs Subcommittee; by Elmer E. Staats, ...
Date Jan. 14, 1977 Report No. EMD-77-11 Title

Energy: Survey of Publications on Exploration, Development and Delivery of Alaskan Oil Market

DOCUSENT RESUME 00166 - [AC590984] Survey of Publications on Exploration, Development and Delivery of Alaskan Oil arket. B-174944; EMD-77-11. January 14, 1977. Released January 17, 1977. 40 pp. Report to Sen. Henry B. Jackscn, Chairman, Senate Committee on Interior and Insular Affairs; by Elmer B. Staats, Comptroller General. Issue Area: Energy: Executive Branch Organization and Processes for Deal...
Date May 9, 1972 Report No. B-174944 Title

Energy: Costs Associated With the Development of the Environmental Impact Statement on the Proposed Alaskan Pipeline

B-174944 Dear Mr. Aspin: I / Reference is made to your request of January 3, 1972, that we conduct an examination into and report on (1) the costs associated with the development of the environmental impzct.statement on the proposed-&lss.kan -pi-peline -‘and (2) the Department of the Interior’s study of alternatives to the proposed pipeline, including who selected the alternatives and who fina...