Date |
Report No. |
Title |
Date Dec. 9, 2011 |
Report No. GAO-12-41 |
Title
GAO
December 2011 United States Government Accountability Office Report to Congressional Requesters MISSISSIPPI RIVER Actions Are Needed to Help Resolve Environmental and Flooding Concerns about the Use of River Training Structures GAO-12-41 December 2011 MISSISSIPPI RIVER
Actions Are Needed to Help Resolve Environmental and Flooding Concerns about the Use of River Training Structures Highlights o... |
Date Sept. 14, 2010 |
Report No. GAO-10-816 |
Title
United States Government Accountability Office GAO
September 2010 Report to the Subcommittee on Energy and Water Development, Committee on Appropriations, House of Representatives NUCLEAR WASTE Actions Needed to Address Persistent Concerns with Efforts to Close Underground Radioactive Waste Tanks at DOE’s Savannah River Site GAO-10-816 September 2010 NUCLEAR WASTE
Accountability • Integrity ... |
Date April 2, 2010 |
Report No. GAO-10-453 |
Title
United States Government Accountability Office GAO
April 2010 Report to the Subcommittee on Energy and Water Development, Committee on Appropriations, House of Representatives ARMY CORPS OF ENGINEERS Budget Formulation Process Emphasizes Agencywide Priorities, but Transparency of Budget Presentation Could Be Improved GAO-10-453 April 2010 ARMY CORPS OF ENGINEERS Highlights
Highlights of GAO-10-453... |
Date March 31, 2010 |
Report No. GAO-10-420 |
Title
United States Government Accountability Office GAO
March 2010 Report to the Chairman, Subcommittee on Surface Transportation and Merchant Marine Infrastructure, Safety, and Security, Committee on Commerce, Science, and Transportation, U.S. Senate DELAWARE RIVER DEEPENING PROJECT Comprehensive Reanalysis Corrected Errors, but Several Issues Still Need to Be Addressed GAO-10-420 March 2010 DELAWARE ... |
Date Jan. 14, 2010 |
Report No. GAO-10-199 |
Title
United States Government Accountability Office GAO
January 2010 Report to the Subcommittee on Energy and Water Development, Committee on Appropriations, House of Representatives DEPARTMENT OF ENERGY Actions Needed to Develop High-Quality Cost Estimates for Construction and Environmental Cleanup Projects GAO-10-199 January 2010 DEPARTMENT OF ENERGY Highlights
Highlights of GAO-10-199, a report to t... |
Date Oct. 14, 2009 |
Report No. GAO-10-72 |
Title
United States Government Accountability Office GAO
October 2009 Report to the Chairwoman, Subcommittee on Insular Affairs, Oceans and Wildlife, Committee on Natural Resources, House of Representatives DEFENSE INFRASTRUCTURE DOD Needs to Provide Updated Labor Requirements to Help Guam Adequately Develop Its Labor Force for the Military Buildup GAO-10-72 October 2009 DEFENSE INFRASTRUCTURE Highlight... |
Date Sept. 15, 2006 |
Report No. GAO-06-1025 |
Title
United States Government Accountability Office GAO
September 2006 Report to the Subcommittee on Interior, Environment, and Related Agencies, Committee on Appropriations, House of Representatives KENNEDY CENTER Progress Made on GAO Recommendations, but Oversight Challenges Still Exist GAO-06-1025 a September 2006 KENNEDY CENTER Highlights
Highlights of GAO-06-1025, a report to the Subcommittee on I... |
Date Oct. 18, 2005 |
Report No. GAO-06-180T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 10:30 a.m. EDT Tuesday, October 18, 2005 Testimony Before the Subcommittee on the Legislative Branch, Committee on Appropriations, U.S. Senate CAPITOL VISITOR CENTER Status of Schedule, Fire Protection, Cost, and Related Issues
Statement of Bernard L. Ungar, Director Terrell Dorn, Assistant Director Physical Inf... |
Date Sept. 15, 2005 |
Report No. GAO-05-1037T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 10:30 a.m. EDT Thursday, September 15, 2005 Testimony Before the Subcommittee on the Legislative Branch, Committee on Appropriations, U.S. Senate CAPITOL VISITOR CENTER Schedule Delays Continue; Reassessment Underway
Statement of Bernard L. Ungar, Director Terrell Dorn, Assistant Director Physical Infrastructure... |
Date Aug. 4, 2005 |
Report No. GAO-05-860R |
Title
United States Government Accountability Office Washington, DC 20548 August 4, 2005 The Honorable Thad Cochran Chairman The Honorable Robert C. Byrd Ranking Minority Member Committee on Appropriations United States Senate The Honorable Jerry Lewis Chairman The Honorable David R. Obey Ranking Minority Member Committee on Appropriations House of Representatives The Honorable Ted Stevens Committee on ... |
Date May 17, 2005 |
Report No. GAO-05-714T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 10:30 a.m. EDT Tuesday, May 17, 2005 Testimony Before the Subcommittee on the Legislative Branch, Committee on Appropriations, U.S. Senate CAPITOL VISITOR CENTER Priority Attention Needed to Manage Schedules and Contracts
Statement of David M. Walker Comptroller General of the United States GAO-05-714T Mr. Chair... |
Date April 22, 2005 |
Report No. GAO-05-334 |
Title
United States Government Accountability Office GAO
April 2005 Report to the Chairman, Subcommittee on Interior, Environment, and Related Agencies, Committee on Appropriations, House of Representatives KENNEDY CENTER Stronger Oversight of Fire Safety Issues, Construction Projects, and Financial Management Needed GAO-05-334 a April 2005 KENNEDY CENTER Highlights
Highlights of GAO-05-334, a report to... |
Date April 6, 2005 |
Report No. GAO-05-516T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 10:00 a.m. EDT Wednesday, April 6, 2005 Testimony Before the Chairman, Subcommittee on Interior, Environment, and Related Agencies, Committee on Appropriations, House of Representatives KENNEDY CENTER Stronger Oversight of Fire Safety Issues, Construction Projects, and Financial Management Needed
Statement of Ma... |
Date Feb. 9, 2005 |
Report No. GAO-05-240 |
Title
United States Government Accountability Office GAO
February 2005 Report to Congressional Requesters STORM WATER POLLUTION Information Needed on the Implications of Permitting Oil and Gas Construction Activities GAO-05-240 a February 2005 STORM WATER POLLUTION Highlights
Highlights of GAO-05-240, a report to congressional requesters Accountability Integrity Reliability Information Needed on the Imp... |
Date Sept. 28, 2004 |
Report No. GAO-04-952 |
Title
United States Government Accountability Office GAO
September 2004 Report to the Chairman, Subcommittee on National Security, Emerging Threats, and International Relations, Committee on Government Reform, House of Representatives EMBASSY CONSTRUCTION Achieving Concurrent Construction Would Help Reduce Costs and Meet Security Goals GAO-04-952 a September 2004 EMBASSY CONSTRUCTION Highlights
Highligh... |
Date July 15, 2003 |
Report No. GAO-03-643 |
Title
United States General Accounting Office GAO
July 2003 Report to Congressional Committees DEFENSE INFRASTRUCTURE Basing Uncertainties Necessitate Reevaluation of U.S. Construction Plans in South Korea GAO-03-643 July 2003 DEFENSE INFRASTRUCTURE Basing Uncertainties Necessitate Reevaluation of U.S. Construction Plans in South Korea Highlights of GAO-03-643, a report to congressional committees The U... |
Date July 15, 2003 |
Report No. GAO-03-1014T |
Title
United States General Accounting Office GAO
For Release on Delivery Expected at 1:30 p.m. EDT Tuesday, July 15, 2003 Testimony Before the Subcommittee on Legislative, Committee on Appropriations, House of Representatives CAPITOL VISITOR CENTER Current Status of Schedule and Estimated Cost
Statement of David M. Walker, Comptroller General of the United States GAO-03-1014T This is a work of the U.S.... |
Date Jan. 30, 2003 |
Report No. GAO-03-164 |
Title
United States General Accounting Office GAO
January 2003 Report to the Subcommittee on Aviation, House Committee on Transportation and Infrastructure AVIATION INFRASTRUCTURE Challenges Related to Building Runways and Actions to Address Them GAO-03-164 a January 2003 AVIATION INFRASTRUCTURE Challenges Related to Building Runways and Actions to Address Them Highlights of GAO-03-164, a report to the ... |
Date Dec. 8, 1997 |
Report No. NSIAD-98-33 |
Title
United States General Accounting Office GAO
December 1997 Report to Congressional Committees ENVIRONMENTAL COMPLIANCE Reporting on DOD Military Construction and Repair Projects Can Be Improved GAO/NSIAD-98-33 GAO United States General Accounting Office Washington, D.C. 20548 National Security and International Affairs Division B-277673 December 8, 1997 The Honorable Conrad Burns Chairman The Honor... |
Date June 21, 1996 |
Report No. NSIAD-96-134 |
Title
United States General Accounting Office GAO
June 1996 Report to the Chairman, Subcommittee on Military Construction, Committee on Appropriations, U.S. Senate ENVIRONMENTAL COMPLIANCE Continued Need for Guidance in Programming Defense Construction Projects G A O years
1921 - 1996 GAO/NSIAD-96-134 GAO United States General Accounting Office Washington, D.C. 20548 National Security and International ... |
Date Oct. 20, 1994 |
Report No. NSIAD-95-4 |
Title
United States General Accounting Office GAO
October 1994 Report to Congressional Requesters NAVY SHIPS Lessons of Prior Programs May Reduce New Attack Submarine Cost Increases and Delays GAO/NSIAD-95-4 GAO United States General Accounting Office Washington, D.C. 20548 National Security and International Affairs Division B-257866 October 20, 1994 The Honorable Edward M. Kennedy Chairman, Subcommitt... |
Date May 27, 1993 |
Report No. RCED-93-122 |
Title
United States General Accounting Office GAO
May 1993 Report to the Chairman, Environment, Energy, and Natural Resources Subcommittee, Committee on Government Operations, House of Representatives NATURAL GAS FERC’ Compliance s and Enforcement Programs Could Be Further Enhanced Resources, Community, Economic Development and Division B-252344 May 27,1993 The Honorable Mike Synar Chairman, Environme... |
Date Sept. 24, 1992 |
Report No. RCED-92-262 |
Title
IJnited States General Accounting Of9cti GAO
September 1992 Report to the Chairman, Subcommittee on Nuclear Regulation, Committee on Environment and Public Works, U.S. Senate NUCLEAR SAFETY Concerns About the Nuclear Power Reactors in Cuba . .,-- RESTRICTED--Not to be released outside the General Accounting Office unless specifically approved by the Office of Congressi Relations. SSSWO/ . MEAbm -C... |
Date July 31, 1992 |
Report No. GGD-92-22R |
Title
GAO United States General Accounting Of’ flce Washington. D.C. 20548 General Government Division ‘ . B-248842 July 31, 1992 The Honorable Frank McCloskey Chairman, Subcommittee on Postal Operations and Services Committee on Post Office and Civil Service House of Representatives Dear Mr. Chairman: 111111
147227 This is in response to your request made on behalf of Representative Joseph P. Kenne... |
Date Feb. 26, 1992 |
Report No. RCED-92-100 |
Title
i 1FGKwaryI!)!)2 NATURAL GAS Factors Affecting Approval Times for Construction of Natural Gas Pipelines IllI Ill
146363 RESTRICTED--Not to be release ou SI e General Accounting Office unless specifically approved by the Office of Congressional Relations. I$ELgAjE&, 1 _,_ .__..._ ..--_.ll--. ~...” “.._-_ -..--. ..-_____-.._ _-.-.I-.--_-.------. ‘ GAO United States General Accounting OfXlce Wa... |
Date Feb. 25, 1992 |
Report No. RCED-92-83 |
Title
_.--111 .“.. ,.,_I, “,. . ._.. _ .” -..II I _. _ .,, .“. ._ GAO ASBESTOS REMOVAL AND DISPOSAL EPA Needs to Improve Compliance W ith Its Regulations
.. .-146240 RESTRICTED--Not to be release P outside the General Accounting Office unless specifically approved by the Office of Congressional Relations. ELEASED'
i United States General Accounting Office Washington, D.C. 20648 kaourcee, Communi... |
Date Aug. 16, 1991 |
Report No. T-HRD-91-45 |
Title
UnitedSt&esGenemlAccountingOfTice /t'ch9/ J * Testimony Ill lull lllllIll
145061 For Release on Delivery Expected at 9:00 a.m. Friday August 16, 1991 Health Care for Hawaii Veterans ' Statement of David P. Baine, Director Federal Health Care Delivery Human Resources Division Issues Before the Subcommittee on Oversight and Investigations Committee on Veterans' Affairs House of Representatives GAO/T... |
Date June 27, 1991 |
Report No. T-RCED-91-73 |
Title
United States General Accounting Office GAO Testimony .ro; Release on Delivery
Expected at 9:30 EDT Thursday June 27, I991 NATURAL GAS Factors Affecting the Time It Takes to Approve Construction of Natural Gas Pipelines Statement of Victor S. Rezendes Director, Energy Issues Resources, Community, and Economic Development Division
wore the Subcommittee on Environment, Energy, and Natural Resources ... |
Date April 19, 1990 |
Report No. NSIAD-90-163 |
Title
United n States General Accounting Office . a- A0
1990 Unclassified Version of a November 1989 Report to Congressional Requesters - April NAVY SHIPS Status of SSN-21 Ship Construction Program GAO/NSIAD-90-163 GAO United States General Accounting Office Washington, D.C. 20648 National Security and International Affairs Division B-236761 April 19,199O The Honorable Edward M. Kennedy Chairman, Subcom... |
Date March 29, 1988 |
Report No. RCED-88-96 |
Title
United Sltatee Geneml Accounting Ofilce Report to the Honorable Bill Schuette, House of Representatives March l#M BRIDGE SAFETY Structural Soundness
of the Zilwaukee Bridge GAO United States General Accounting Office
~- Detroit Regional Office Room 866 Patrick V. McNamara Federal Building 477 Michigan Avenue Detroit, MI 48226 B-215223 March 29, 1988 The Honorable Bill Schuette House of Representat... |
Date July 15, 1985 |
Report No. RCED-85-149 |
Title
General Accounting Office
Status Of Strategic Petroleum Reserve Activities As Of he 30, 1985
T!he Department of Energy reported that the Strategic Petroleum Reserve contained 476.6 million barrelsof oil on June30,1985. Cjuring the third quarter of fiscal year 1985, about 15 million barrels of oil were added, for a fill rate of 164,000 barrels per day. fhis report discusses the progress being ade i... |
Date May 28, 1985 |
Report No. RCED-85-92 |
Title
BY THE COMPTROLLER GENERAL Report ToThe Congress
OF THEUNITEDSTATES Status Of The Great Plains Coal Gasification Project--December 31, 1984
The Department of Energy (DOE)-sponsored construction of the Great Plains coal gasification project--designed to produce synthetic natural gas from coal in North Dakota--was completed in December 1984 on schedule. jiowever, technical problems prevented Great P... |
Date May 17, 1985 |
Report No. HRD-85-70 |
Title
UNITED STATES GENERALACCOUNTING OFFICE
WASHINGTON, D.C. 20548 HUMAN RCSOURCES DIVISION May 17, 1985 B-218854 The Honorable Frank H. Murkowski Chairman, Committee on Veterans' Affairs United States Senate Dear Mr. Chairman: Subject: VA's Methodology for Setting Priorities Nursing Home Care Construction Projects for Fiscal Year 1986 (GAO/HRD-85-70) I#llllI ull
127003 for On November 7, 1984, the Com... |
Date Sept. 18, 1984 |
Report No. RCED-84-85 |
Title
B\/ ;%-IE COMPTROLLERGENERAL (?qmrt ToThe Congress
QF THEUNITED STATES
Status Of The Great Plains Coal Gasification Project--May 31, 1984
The Great Plains coal gasification project in t$lorth Dakota was 99 percent complete and ssentially on schedule on May 31, 1984. d umulative project costs were $164 million I’ ss than originally estimated for this date, rimarily due to reduced material, intere... |
Date July 31, 1984 |
Report No. HRD-84-84 |
Title
UNITED STATES GENERAL ACCOUNTING OFFICE
WASHINGTON, D.C. 20548 HUMAN RWURCU DIVISION JULY 31, 1984 B-211565 The Honorable Jake Garn Subcommittee on Chairman, HUD-Independent Agencies Committee on Appropriations United States Senate The Honorable Alan K. Simpson Committee on Veterans' Chairman, Affairs United States Senate Subject: I I 124788 VA Justification for Construction of Nursing Home Care F... |
Date July 19, 1984 |
Report No. RCED-84-165 |
Title
UNITED STATES GENERAL
WASHINGTON. ACCOUNTING
D C 20548 OFFICE JULY 19, 1984 B-215618 The Honorable Don J. Pease House of Representatives Dear Mr. Pease:
Subject: 124699 to Combat (GAO/RCED-84-165) Use of Cathodic Protection Corrosion of Bridge Decks At your request, we are providing you information on the protection of reinforced concrete bridge roadway surfaces (decks) and the Federal Highway Adm... |
Date June 27, 1984 |
Report No. RCED-84-144 |
Title
BY THEU.S.GENERALACCOUNTING OFFICE
! Report To Senator Donald W. Riegle, Jr. Delays And Increased Cost Result From The Zilwaukee, Michigan, Bridge Project Mishap
In August 1982 the Zilwaukee Bridge under construction on Interstate 75 near Sagmaw, Mrchrgan, experrenced a near collapse caused by the farlure of an expansion joint to withstand the loading stresses Imposed by construction actrvitres ju... |
Date March 22, 1984 |
Report No. RCED-84-113 |
Title
k % ’ ‘. D3 355 BY THECOMPTROLLERGENERAL Report ToThe Congress
OF THEUNITED STATES
Status Of The Great Plains Coal Gasification Project
Construction of the Great Plains coal gasification plant in North Dakota was 95 percent complete and only about 2 weeks behind schedule as of November 30, 1983. Cumulative project costs were less than originally estimated for this date. Due to a drop in foreca... |
Date Feb. 17, 1984 |
Report No. RCED-84-87 |
Title
UNITED STATES GENERAL ACCOUNTING WASHINOTON, D.C. 20648 OFFICE RESOURCES, COMMUNITY. AN0 ECONOMIC DEVELOPMENT DIVISION B-214229 FEBRUARY 17, 1984 123436 The Honorable The Secretary John 0. Marsh, of the Army Jr. Dear Mr. Secretary: Subject: Thermal Analysis of Mass Concrete Structures: Lock 6 Dam No. 26 (Replacement) Project (GAO/RCED-84-87) our survey of the U.S. Army Corps of Engineers Lock 26 (... |
Date Oct. 25, 1983 |
Report No. RCED-84-4 |
Title
. n\ I 7-1 orI In II (PAoruar ou(oIHI Report To The Chairman, Committee On Interior And Insular Affairs, House Of Representatives Archeological Studies At New Melones Dam In California
In/December 1979, the Corps of Engineers transferred the eration of the New Melones Dam to Interior along with a .2 million contract for archeological work and 5560,000 unspent funds. Interior’ Park Service reallo... |
Date Sept. 20, 1983 |
Report No. RCED-83-212 |
Title
c mPwcl * BY THE CC)MPTROLLER GENERAL Report ToThe Congress
OF THE UNITEDSTATES
Status Of The Great Plains Coal Gasification Project--Summer 1983
Construction of the Great Plains coal gasification plant in North Dakota was 3 weeks behind schedule as of May 31, 1983, but cumulative project costs were less than originally estimated. A March 1983 analysis by Great Plains raised questions about the pr... |
Date May 12, 1983 |
Report No. RCED-83-102 |
Title
Issues Facing The Future Use Of Alaskan North Slope Natural Gas
The North Slope of Alaska contains over 26 trillion cubic feet of natural gas. In 1977, the President and the Congress approved construction of a 4,800-mile gas pipeline to bring this gas to U.S. consumers by 1983. However, completion of the project is not now expected until late 1989 at the earliest. This report examines the status a... |
Date April 8, 1983 |
Report No. RCED-83-112 |
Title
Ei’ Ti-lECOMPTROLLEkGENERAL Report To The Congress
OF THEUNITED STATES
Status Of The Great Plains Coal Gasif ication Project
Construction of the Great Plains coal gasification plant in North Dakota was 4 weeks behind schedule as of December 31, 1982, but cumulative project costs were less than originally estimated as of that date. The Great Plains project administrator established an extensive o... |
Date Feb. 1, 1983 |
Report No. MASAD-83-11 |
Title
BY THEUS GENERALACCOUNTING OFFICE
Report To The Administrator, Environmental Protection Agency San Francisco’s Wastewater Treatment Program Needs Reexamination And Better Management
When the initial phase of San Francisco’s $3 billion Wastewater Treatment Program becomes operational, it should significantly reduce the pollution of the San Francisco Bay and the Pacific Ocean. However, increased... |
Date Sept. 21, 1982 |
Report No. OGC-82-22 |
Title
CO-OLLER OF THE UNITED WASHINGTON~0.C. 20648 GENERAL STATES B-205053 III1Ill IIR II11
119497 September 21, 1982 To the President of the Senate and the Speaker of the House of Representatives the President's sixteenth special On July 28, 1982, message for fiscal year 1982 was transmitted to the Congress The pursuant to the Impoundment Control Act of 1974. special message proposed one rescission of ... |
Date April 13, 1982 |
Report No. CED-82-64 |
Title
April B-198221 Honorable George Miller House of Representatives
The 13, 1982 I Ill1
118122 Dear Mr. Miller: Subject: Information on Federal Funding of Portions of Central the San Luis Unit of the California Valley Project (CED-82-64) In your letter of November 10, 1981, and our subsequent discussions with your office, you expressed concern about the Federal funding of the San Luis Unit of the Cent... |
Date March 30, 1982 |
Report No. CED-82-60 |
Title
eneral Accounting Off-key
Nausing Block Grant Activity ‘ Seattle: A Case Study In ,/ iMany cities have used Community Oevelopment Block Grant funds to develop and 1 implement a wide variety of housing activitiltss. This case study af experience in one city--Seattle, Washington--provides insight i af the kind end extent of housing activity i under the Cammunity Developmsnt Block / Grant Program. ... |
Date March 22, 1982 |
Report No. PLRD-82-63 |
Title
UNITED STATE GENERAL ACCOUNTINGOFFICE
WASHINGTON, D.C. 20548 PmocuRLMewr.UMI~lC1, AND WINES8 DIVI8ION B-206761 March 22, 1982 The Honorable Robert T. Stafford Chairman, Committee on Environment and Public Works United States Senate Dear
M r. Chairman: !Status of Selected GSA Repair “and Alteration Projects Relating to the Omnibus Judgeship Act[ (PLRD-82-63) Subject: Services Administration In Fe... |
Date March 6, 1982 |
Report No. EMD-82-55 |
Title
4’ r’ COMf=fRDLLER GENERAL
WASHINGTON OF THE
DC. ama UNITED STATES B-206514 MARCH 6,1982 President of the Senate and the Speaker of the House of Representatives Subject: Status of the Great Plains Coal Gasification Loan Guarantee--February 1982 (EKD-82-55) Project This report is in the Energy Act of 1978~-Civilian response toto95-238,Department25,6ofmonths which date Applications (P.L. Feb. 19... |
Date Feb. 10, 1982 |
Report No. MASAD-82-17 |
Title
WTED STATESGEMRAL ACCOUNTING OFFICE WASWINGTON, DC. 20548
MISSION ANALYSIS AND SYSTEMS ACQUlSlTlON DIVISION B-196893 FEBRUARY IO, 1982 The Honorable The Secretary Attention: Dear Mr. Caspar W. Weinberger of Defense Director, GAO Affairs Secretary: MX Program Cost and Schedule Adversely Impacted If Certain Resolved (MASAD-82-17) Milestones Matters Could Are Not Be Subject: We recently completed our... |