Date |
Report No. |
Title |
Date Sept. 29, 1995 |
Report No. GGD-95-204 |
Title
United States General Accounting Office GAO
September 1995 Report to Congressional Requesters PUBLIC-PRIVATE MIX Effectiveness and Performance of GSA’s In-House and Contracted Services GAO/GGD-95-204 GAO United States General Accounting Office Washington, D.C. 20548 General Government Division B-260097 September 29, 1995 The Honorable Wayne T. Gilchrest Chairman The Honorable Bob Wise Ranking Mi... |
Date Feb. 1, 1995 |
Report No. HR-95-4 |
Title
United States General Accounting Office GAO High-Risk Series February 1995 Defense Weapons Systems Acquisition GAO/HR-95-4 GAO United States General Accounting Office Washington, D.C. 20548 Comptroller General of the United States February 1995 The President of the Senate The Speaker of the House of Representatives In 1990, the General Accounting Office began a special effort to review and report ... |
Date Dec. 23, 1994 |
Report No. RCED-95-27 |
Title
ment on ofthe GAO United States General Accounting Office Washington, D.C. 20548
Resources, Community, Economic Development and Division B-258135 December 23,1994 The Honorable James A. Hayes Chairman, Subcommittee on Investigations and Oversight Committee on Science, Space, and Technology House of Representatives Dear Mr. Chairman: In February 1991, the Department of Energy (DOE) hired a manageme... |
Date Nov. 22, 1994 |
Report No. NSIAD-95-47 |
Title
United States General Accounting Office GAO
November 1994 Report to Congressional Requesters ELECTRONIC WARFARE Most Air Force ALQ-135 Jammers Procured Without Operational Testing GAO/NSIAD-95-47 GAO United States General Accounting Office Washington, D.C. 20548 National Security and International Affairs Division B-257415.2 November 22, 1994 The Honorable William V. Roth, Jr. Ranking Minority Mem... |
Date Nov. 21, 1994 |
Report No. NSIAD-95-9 |
Title
United States General Accounting Office GAO
November 1994 Report to Congressional Requesters ARMY AVIATION Modernization Strategy Needs to Be Reassessed GAO/NSIAD-95-9 GAO United States General Accounting Office Washington, D.C. 20548 National Security and International Affairs Division B-257915 November 21, 1994 The Honorable Norman Sisisky Chairman The Honorable James B. Hansen Ranking Minority ... |
Date Sept. 26, 1994 |
Report No. NSIAD-94-240 |
Title
r GAO/N$LAD-94-240 GAO United States General Accounting Office Washington, D.C. 20548 National Security and International Affairs Division B-257903 September 26, 1994 The Honorable William V. Roth, Jr. Ranking Minority Member Committee on Governmental Affairs United States Senate Dear Senator Roth: In response to your request, we reviewed the Army’ use of commercial s technology in tactical truc... |
Date May 16, 1994 |
Report No. GGD-94-126BR |
Title
United States General Accounting Offke I
May 1994 Briefmgj Report to the Ranking Minority Member, Subcommittee on I Investigations and Oversight, Committee on Public Works and Transportation, IH&e 6f Representatives PUBLIC-PRIVATE MIX I Extent of Contracting Out for Red Property ’ Management Serwces in GSA GAO/GGD-94-126BR United states General Accounting Offke Washington, D.C. 20548 General Gov... |
Date May 3, 1994 |
Report No. T-AIMD-94-114 |
Title
United States Qneral Accounting Office GAO
For Release on Delivery Expectedal lo:00 am. EDT Tuesday May 3.1994 Testimony
Before the Committee on Governmental Affairs United States Senate GOVEFCNMENTWIDE INITIATIVES Critical Issues Facing the Next Federal Telecomnmnications System
Statement by Jack L. Brock, Director Information ResourcesManagement/ Policies and Issues Group Accounting and Informat... |
Date June 23, 1993 |
Report No. RCED-93-143 |
Title
linittttl States General Accounting Office Report to t/he Secretary of Energy ENERGY MANAGEMENT Systems Contracting Weaknesses Continue II .*_.“... _. ..“.I ._-... I” . . . . I. “._.” _...” . ..I... ..1-11 .._ _II ._ ,‘_ I .-.. _..- .._. I_...-- -.-. -I~ . ..- m-v..-- --- l_l.._“-ll-l--.- ..- “- GAO United States General Accounting Office Washington, D.C. 20648 Resources, Communi... |
Date Dec. 1, 1992 |
Report No. IMTEC-8.1.4 |
Title
IJnited States General Acrounling Offic*r GAO Information Managernerd and Technology Division Information Technology: An Audit Guide for Assessing Acquisition Risks I;AO/lMTE(:-8.1.4 Preface ~~._ .--. --.~ The federal government depends heavily on a variety of information technology products and services to serve the public. Each year the government spends billions of dollars on computer equipment... |
Date Dec. 1, 1992 |
Report No. NSIAD-93-15 |
Title
1% WI&NW, 9 GAO Comptroller General of the United States s WEAPONS ACQUISITION A Rare Opportunity for Lasting Change 148208 I GAO/NSIAD-93-lS/December 199‘ 2 Preface The United States today is in a position of unprecedented military strength and national security. Its strategic nuclear forces, together with its conventional forces numbering over 400 battle force ships, 5,000 combat aircraft, 10,... |
Date Dec. 1, 1992 |
Report No. IMTEC-8.1.4SW |
Title
United States General Accounting Office GAO Information Management and Technology Division Automated Guide Audit I GAOAMTEC-8.1.4SW i Automated Audit Guide (Quick Reference)
Purpose
To provide instructions for installing and operating the automated version of our audit guide, Information Technology: An Audit Guide for Assessing Acquisition Risks (GAO/IMTECB.1.4,, December 1!%2). MS-DOSbased person... |
Date May 21, 1992 |
Report No. RCED-92-207R |
Title
1 GAO United States General Accounting Office Washington, D.C. 20548 Resources, Community, and Economic Development Division B-248720 M ay21,1992 146993 The Honorable United States Dear Senator Alfonse Senate D'Amato: M . D'Amato This letter is in reply to your M arch 23, 1992, letter requesting us to investigate certain U.S. Departm ent of Agriculture (USDA) procurem ent practices regarding the p... |
Date March 2, 1992 |
Report No. NSIAD-92-87 |
Title
II nited States General -_ Accounting Office GAO Report to the Chairman, Subcommittee on Investigations and Oversight, Committee on Science, Space, and Technology, House of Representatives NASA PROCUREMENT Ageneywide Action Needed to Improve Management of Contract Modifications 11% IllI II II
146540 RES’ RICTED-Not I’ to be released outside the General Accounting Offme, unless specifically app... |
Date July 9, 1991 |
Report No. IMTEC-91-36BR |
Title
IJnitrd States General Accounting Office GAO
--m-.“-. July 1991 Mefing Report to the Chairmen, Committees on Armed Services, U.S. Senate and House of Representatives DEFENSE PROCUREMENTS Two ADP Solicitations Unnecessarily Restrict Competition -----~ -___I---- --- - GAO United States General Accounting Office Washington, D.C. 20648 Information Management and Technology Division B-243181 July 9, ... |
Date May 23, 1991 |
Report No. IMTEC-91-33 |
Title
Al.>l)r~c,l>Y’ ia~,ions, Senate 17,s.
._..-_.... .1__-_..l.._-.-.--------_ II ..^ -_I__~ Ma v 199 I ADP ACQUISITION Defense Logistics Agency Has Not Justified Need for Additional Computer 144211 I (;A( ,/I M’ IW :-!) I -:N . I united states General Accounting Of’ fke Washington, D.C. 20548 Information Management and Technology Division B-243182 May 23,199l The Honorable Daniel K. Inouye Chai... |
Date May 7, 1991 |
Report No. OGC-91-8 |
Title
Comptroller General of the United States
Washington, D.C. 20548 B-241514.5 May 7, 1991 The President of the Senate and the Speaker of the House of Representatives llllllllllllll Ill
144013 This letter reports a deferral of Department of Defense (Department) budget authority that should have been, but was to the Congress by the President under the not, reported Section 1015(a) of the Impoundment Co... |
Date Jan. 7, 1991 |
Report No. IMTEC-91-16 |
Title
._* ,_.” .__I .._ .__ _......_____...._.___.__ “.--- .----.- ____ -,_ .,_~_ ._--..-.,. -____ -. ..__ I._-__-._._ .I;lllrl;lr’ y I!)!) I MAJOR ADP SYSTEMS DOD Does Not Always Comply With Statutory Restridon on Obligations llllllll llllllllll
143091 RESTRICTED --Not to be released outside the General Accounting Office unless specifically approved by the Offlce of Congressional
Relations. RELEA... |
Date Dec. 5, 1990 |
Report No. NSIAD-91-15 |
Title
GAO
-“-,__*L_I.._“----_-..- Ih~ |
Date May 18, 1990 |
Report No. NSIAD-90-78 |
Title
,. .. _ ” ~ _.I. . . : ‘., .~, : ‘: : ‘.. _. -, ._ ~. . . . :. : National Security and International Affairs Division B-238716 May l&l990 The Honorable Les Aspin Chairman, Committee on Armed Services House of Representatives Dear Mr. Chairman: In response to discussions with your office, we reviewed the Navy’ process for determining s procurement leadtime requirements. We found that the... |
Date May 3, 1990 |
Report No. NSIAD-90-165 |
Title
.I 1.. - .._... -------I._.-.-.- L ii I~nilcvl States (;c~tlc~ral Ac~v~r~rrlir~g . _._.. .. ‘__. .._ -. I”“...“__ll”-ll.ll”-... ------._---- ----------~ Ol’l’iw --.---_ .--.. -.-.--- -. ___. _. .._ ._
Ma,, l!NO ..^_” - ._...__^..._._- _-..---____ -_.. .__-__-_ ARMY PROCUREMENT Status of Commercial Activities Study at White Sands Missile Range
-. --.. a I UI
141273 _,--.---~-1---~... |
Date May 2, 1990 |
Report No. NSIAD-90-124 |
Title
United States General Accounting Office Report to Congressional Requesters . ! May 1990 DEFENSE INVENTORY Defense Logistics Agency Needs to Better Manage Procurement Leadtimes . : Im3TmcTED --Not to be reieased outsic.b the General Acmnnting Office unless tqxciflw approved by the Off’ice of Congtwdmml Relations. :.. . *. . GAiO/NSIAD-90-124 GAO United States General Accounting Office Washington,... |
Date April 16, 1990 |
Report No. IMTEC-90-36 |
Title
Defense’s Oversight Process Should l3e Improved
--..- !I 141220 Information Technology Management Division and B-238775 April 16,199O The Honorable John Conyers Chairman, Legislation and National Security Subcommittee Committee on Government Operations House of Representatives The Honorable Frank Horton Ranking Minority Member, Legislation and National Security Subcommittee Committee on Governme... |
Date Dec. 14, 1989 |
Report No. NSIAD-90-30 |
Title
1h”(‘~‘1111)P1’ !I!+!) I DEFENSE ACQUISITION PROGRAMS Status of Selected Systems Unifpd States General Accounting Off& Washington, D.C. 20648 National Security and International Affairs Division B-226470 December 14,1989 The Honorable Sam Nunn Chairman, Committee on Armed Services United States Senate Dear Mr. Chairman: In response to your request, we reviewed the requirements, schedule, p... |
Date Aug. 2, 1989 |
Report No. T-NSIAD-89-46 |
Title
United States General Accounting Offke / 3 ‘ Lf 73 ? Testimony For Release on Deliverv Expected ai 1:30 p.m. Wednesday, August 2, 1989 Defense Process Management: Streamlining the Acquisition Statement of Frank C. Conahan Assistant Comptroller General National Security and International Affairs Division Before the Congress'ional Military Reform Caucus GAO/T-NSIAD-89-46
GAO Form 160 (12/87) Membe... |
Date June 20, 1989 |
Report No. RCED-89-118 |
Title
United States General Accounting Office GAO
June 1989 8 Report to the Chairman, Environment, Energy, and Natural Resources Subcommittee, Committee on Government Operations, House of Representatives ENERGY MANAGEMENT DOE Has Not Shown Systems Contracting to Be in Government’s Best Interest GAO/RCED-89-118 GAO United States General Accounting Office Washington, D.C. 20648 Resources, Community, Eco... |
Date Feb. 23, 1989 |
Report No. T-RCED-89-8 |
Title
United !States General Accounting Of&e Testimony For Release on Delivery Expected at 9:130 a.m. EDT Thursday, February 23, 1989 Sound Contract Needed at the Environmental Management Protection Agency Statement of Richard L. Hembra, Associate Director Environmental Protection Issues, Resources, Community, and Economic Development Before the Subcommittee on Civil Service Committee on Post Office and... |
Date May 12, 1988 |
Report No. GGD-88-65 |
Title
. United States Gemyal Accounting Office I WI 3 I ilr;ll a GAO
- . .I T 1leiss Report to CongressionalRequesters POSTAL PROCUREMENT: llllllll llllll ll
135785 H-2268 17 May 12,1988 The Honorable William D. Ford Chairman, Committee on Post Office and Civil Service House of Representatives The Honorable Frank McCloskey Chairman, Subcommittee on Postal Personnel and Modernization Committee on Post Of... |
Date May 12, 1988 |
Report No. T-PEMD-88-6 |
Title
United States General Accounting Office / 55 Testimony For Release on Delivery Expected at 1O:OO a.m. EDT Thursday May 12, 1988 Technology Selection at INS Needs Improvement Statement of Eleanor Chelimsky, Director Program Evaluation and Methodology Division Before the. Subcommittee on Government Information, and Agriculture Justice, Committee on Government Operations House of Representatives II ... |
Date Aug. 31, 1987 |
Report No. NSIAD-87-202BR |
Title
United States General Accounting Offke 1338LpI - Briefing Report to the Chairman, Subcommittee on Defense, Committee on Appropriations, U.S. Senate August 1987 PROCUREMENT Assessment of DOD’ s Multiyear Contract Candidates 133841 c;s=-ifyT 7
GAO/NSIAD-87-202BR , GAO ITnited States General Accounting Office Washington, D.C. 20548 National Security and International .WaiIs Di\isiou B-215825 August... |
Date July 1, 1986 |
Report No. 130485 |
Title
United States General Accounting Office GAO Information Management and Technology Division July lYS6 Evaluating the Acquisition and Operation of Information Systems Technical Guideline 2 Preface The federal government is becoming increasin ly dependent on information technology to meet its mission an cf program goals, presentin new challenges for the audit community. Collective 7 y, the government... |
Date Oct. 25, 1984 |
Report No. NSIAD-85-9 |
Title
/arusQ REPORTBY THEUS General Accounting Office
Analysis Of DOD’s Fiscal Year 1985 Multiyear Procurement Candidates
Public Law 97-86 established criteria which must be met by DOD multiyear contract candidates. The criteria are that the multiy:ear contracts will benefit the government by saving money and improving contractors’ droductivity, and that the estimated contract c~ost and savings be r... |
Date Oct. 26, 1983 |
Report No. 122681 |
Title
U.S. GENERALACCOUNTING OFFICE WASEINGTON,D.C.
20548 FOR RELEASE ON DELIVERY EXPECTEDAT 10:00 A.M. +UESDAY. OCTOBER26, 1983 STATEMENTOF WARREN REED G. DIRECTOR INFORMATION MANAGEMENT AND TECHNOLOGY DIVISION UNITED STATES GENERALACCOUNTINGOFFICE BEFORETHE COMMITTEEON ARMEDSERVICES, UNITED STATES SENATE, ON DEPARTMENT DEFENSE SPARE PARTS OF PROCUREMENT PRACTICES us. - 11111 Ill
122681 Mr. Chairman an... |
Date Sept. 26, 1983 |
Report No. 122487 |
Title
i UNITED STATES-GENERALACCOUNTING -QFFIC-E - --- - ------ ----.-. Washington, D.C. 20548" FOR RELEASE ON DELIVERY Expected at 1:00 p.m. Monday, September 26, 1983 SUMMARY STATEMENT OF F. KEVIN BOLAND SENIOR ASSOCIATE DIRECTOR, RESOURCES,COMMUNITY AND ECONOMIC DEVELOPMENT DIVISION HOUSEENERGY AND COMMERCE COMMITTEE ON CERTAIN DEPARTMENT ENERGYPROCUREMENT OF PRACTICES AND THE RESIDENTIAL CONSERVATIO... |
Date Sept. 15, 1983 |
Report No. RCED-83-234 |
Title
REPORT THEUS. RELEASED BY General Accounting Office
I Procurement Practices In DOE’s Office Of The Assistant Secretary For Conservation And Renewable Energy
Delays have been occurring in processing procurement requests for building energy conservation research and development projects and activities in the Department of Energy’s Office of the Assistant Secretary for Conservation and Renewable ... |
Date June 17, 1983 |
Report No. PLRD-83-88 |
Title
REPORT BY THE Comptroller General
OF THE UNITEDSTATES
Progress Of Federal Procurement Reform Under Executive Order 12352
The President issued Executive Order 12352 in March 1982 to reform Federal procurement by --establishing to manage --simplifying --developing and --increasing
A comerehensive a system in each agency procurement, the procurement a professional process, work force, use of cqmpetit... |
Date March 15, 1983 |
Report No. RCED-83-66 |
Title
Selected Aspects Of The D,,~p~ryye~~nt *;O.f Energy’ Operating Contract For The s Solar Energy Research Institute
Since 1977 the Department of Energy has had a contract with the Midwest Research Institute for operating and managing the Solar Energy Research lnstitute (SERI) in Golden, Colorado. The Department extended the contract for 15 months to June 1983 and, after recompetition, recently sel... |
Date Sept. 2, 1982 |
Report No. GGD-82-67 |
Title
*u UNI'I"EDSTATESGE~NERALACC~UNTINGOF~I~~
WASHINGTON, D.C. 20548 GWeRIl GOVERNMENT DIVt310N H-114874 The Honorable William F. Bolger Postmaster General United States Postal Service Dear Mr. Bolger: Subject: SEPTEMBER2.1382 IllIII1 w IIII
119345 ,d' An Opportunity to Continue Increasing Competition and Saving Money on Large Postal Service Procurements'(GAO/GGD-82-67) This report summarices our revi... |
Date July 15, 1982 |
Report No. HRD-82-101 |
Title
UNLTED STATES GENERAL
WASHINGTON,
HUMAN RESOURCES DIVISION ACCOUNTING
D.C. 20548 OFFICE
L. July 15, 1982 B-208239 The Honorable Joseph Addabbo Chairman, Subcommittee on Defense Committee on Appropriations House of Representatives Dear Mr. Chairman: Subject: Variations in the Military Services' Contingency Hospital Programs2 Concerns Remain (GAG/HRD-82-101) In December 1981, the work we had underta... |
Date Oct. 6, 1981 |
Report No. 116596 |
Title
UNITED STATES GENERAL ACCOUNTING OFFICE WASHINGTON, D.C. 20548 FOR RELEASE ON DELIVERY Expected at 1O:OO a.m. October 6, 1981 Tuesday, Statement Samuel Associate Director, before Subcommittee On Legislation of House Government the Operations on AID Operations Mr. Chairman and Members of the the Subcommittee: to provide relative today, to the the Subcommittee foreign emphasizing Committee of W. Bow... |
Date Sept. 17, 1981 |
Report No. 116448 |
Title
UNITED STATES GENERAL ACCOUNTING OFFICE 20548 WASHINGTON, D.C. FOR RELEASE ON DELIVERY Expected at 9:30 a.m. September 17, Thursday, 1981 STATEMENT OF
116448 I. GOULD DIRECTOR FEDERAL PERSONNEL AND COMPENSATION DIVISION CLIFFORD BEFORE THE SUBCOMMITTEE ON FEDERAL EXPENDITURES, RESEARCH, AND RULES SENATE COMMITTEE ON GOVERNMENTAL AFFAIRS
ON s. 719, THE CONSULTANT REFORM AND DISCLOSURE ACT OF 1981 a... |
Date Jan. 8, 1981 |
Report No. PSAD-81-18 |
Title
, BY THE US GENtRAL ACCOUNTI Report To The Administrator, National Aeronautics And . Space Administration NASA’s Standard Parts ProgramAre The Objectives Being Accomplished?
I n 1974 NASA initiated its Standard Parts Program to increase the availability of reliable electronic parts meeting the minimum requirements of its programs and projects, reduce overall costs to NASA by standardization, and... |
Date June 30, 1980 |
Report No. LCD-80-22A |
Title
Report ToThe Congress
OF THEUNITEDSTATES The World Wide Military Command And Control SystemEvaluation Of Vendor And Department Of Defense Comments
On December 14, 1979, GAO issued a report to the Congress entitled “The World Wide Military Command and Control System--Major Changes Needed In Its Automated Data Processing Management and Direction ” (LCD-80-22). Comments from the Department of Def... |
Date Jan. 14, 1980 |
Report No. PSAD-80-13 |
Title
BY THE COMPTROLLER GENERAL
OF THE UNITED STATES I I A7*'- Report To The Congress
Implementation Of Federal Policy On Acquiring And Distributing Commercial Products IsFaltering Badly
Federal policy requires agencies to rely on commercial products and distribution channels to meet their needs for products and services. The policy, established by the Office of Federal Procurement Policy in May 1976, ... |
Date Sept. 21, 1979 |
Report No. PSAD-79-102 |
Title
n ffice ’ GSA Nee s To Strengthen Its Inspection And Testing To Make Sure The Government Gets The Quality It Pays For
The General (GSA’s) quality lrttle assurance by Government flcatlons or user Services Admrnlstration’s control program provides that goods purchased for use agencies meet contract spew needs To Improve the program, GAO recommends that GSA (1) emphasize testing the quality of ... |
Date Aug. 24, 1979 |
Report No. GGD-79-93 |
Title
* , r .. L i REPORT THEUS. * BY ' ha llllllllllelllllluulllll~ll
LM115797 115797 AUGUST GGD-79-93 24, 1979 ~ENERAI,aCCOUNTINGOFFlCE
WA§#INCT0N, D.C. 20548 GENERAL GOVERNMENT DIVISION B-133223 Mr. Norman A. Carlson, Director Federal Prison System Washington, D.C. 20534 Dear Mr. Carlson: This report details the problems we found during our examination of the management of procurement activi ie five... |
Date May 31, 1979 |
Report No. PSAD-79-80 |
Title
BY THECOMPTROLLERGENERAL Report To The Congress
OF THEUNITEDSTATES + Recommendations Of The Commission On Government Procurement: A Final Assessment
Important structural changes are now in place on procurement reforms first proposed in 1972, but the program is far from complete and momentum is slowing. The outlook for at least half of the reforms is not encouraging. Renewed dedication in the execu... |
Date Sept. 29, 1978 |
Report No. LCD-77-231 |
Title
DOCUMENT RESUME 07622 - [C27879101 (Restricted) [Negotiation of Freight Rates by the Department of Defense]. LCD-77-231. September 29, 1978. 4 pp. Report to Maj. Gen. H. R. Del art, Commander, Department of Defense: Military Traffic Management Command; by Henry W. Connor, Associate Director, Logistics and Communications Div. Contact: Logistics and Communications Div. Organization Concerned: Depart... |
Date Aug. 1, 1978 |
Report No. PSAD-78-95 |
Title
Checklist An i:;:S : ; : t
~ : Guidelie Evauiatitng Prou rem Systems' opportunities for i mprovem:ent in local government purchasing
United States General Accounting Office Part 2 PSAD-78-95 AUGUST, 1978 lG`7,$~~~ Contents Page
FOREWORD NATIONAL INSTITUTE OF GOVERNMENTAL PURCHASING ENDORSEMENT CHECKLIST FOR EVALUATING PROCUREMENT OF SUPPLIES, MATERIALS, EQUIPMENT, AND SERVICES BY LOCAL GOVERNMENTS... |
Date May 24, 1978 |
Report No. PSAD-78-110 |
Title
|