Date |
Report No. |
Title |
Date Oct. 19, 2011 |
Report No. GAO-12-13R |
Title
United States Government Accountability Office Washington, DC 20548 October 19, 2011 Congressional Committees Subject: Military Training: DOD’s Report on the Sustainability of Training Ranges Meets Annual Reporting Requirements but Could Be Improved Realistic training ranges are one of the most valued assets the military has in preparing its personnel for their missions. Realistic training requi... |
Date Sept. 19, 2011 |
Report No. GAO-11-814 |
Title
United States Government Accountability Office GAO
September 2011 Report to Congressional Committees EXCESS FACILITIES DOD Needs More Complete Information and a Strategy to Guide Its Future Disposal Efforts GAO-11-814 September 2011 EXCESS FACILITIES
DOD Needs More Complete Information and a Strategy to Guide Its Future Disposal Efforts
Highlights of GAO-11-814, a report to congressional committee... |
Date June 30, 2011 |
Report No. GAO-11-568R |
Title
United States Government Accountability Office Washington, DC 20548 June 30, 2011 The Honorable Carl Levin Chairman The Honorable John McCain Ranking Member Committee on Armed Services United States Senate The Honorable Howard P. McKeon Chairman The Honorable Adam Smith Ranking Member Committee on Armed Services House of Representatives Subject: Defense Logistics: DOD Input Needed on Implementing ... |
Date June 30, 2011 |
Report No. GAO-11-574 |
Title
United States Government Accountability Office GAO
June 2011 Report to Congressional Committees DEFENSE INFRASTRUCTURE The Enhanced Use Lease Program Requires Management Attention GAO-11-574 June 2011 DEFENSE INFRASTRUCTURE
Accountability • Integrity • Reliability The Enhanced Use Lease Program Requires Management Attention
Highlights of GAO-11-574, a report to congressional committees Why GAO... |
Date June 27, 2011 |
Report No. GAO-11-459R |
Title
United States Government Accountability Office Washington, DC 20548 June 27, 2011 The Honorable Tim Johnson Chairman The Honorable Mark Kirk Ranking Member Subcommittee on Military Construction, Veterans Affairs, and Related Agencies Committee on Appropriations United States Senate Subject: Military Buildup on Guam: Costs and Challenges in Meeting Construction Timelines In 2004, the bilateral U.S.... |
Date May 25, 2011 |
Report No. GAO-11-316 |
Title
United States Government Accountability Office GAO
May 2011 Report to the Subcommittee on Military Construction, Veterans Affairs, and Related Agencies, Committee on Appropriations, U.S. Senate DEFENSE MANAGEMENT Comprehensive Cost Information and Analysis of Alternatives Needed to Assess Military Posture in Asia GAO-11-316 May 2011 DEFENSE MANAGEMENT
Accountability • Integrity • Reliability C... |
Date May 4, 2011 |
Report No. GAO-11-633T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 9:30 a.m. EDT Wednesday, May 4, 2011 Testimony Before the Subcommittee on National Security, Homeland Defense, and Foreign Operations, Committee on Oversight and Government Reform, House of Representatives MILITARY AND VETERANS DISABILITY SYSTEM Worldwide Deployment of Integrated System Warrants Careful Monitori... |
Date April 6, 2011 |
Report No. GAO-11-520T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 10:00 a.m. EDT Wednesday, April 6, 2011 Testimony
Before the Subcommittee on Economic Development, Public Buildings and Emergency Management, Committee on Transportation and Infrastructure, House of Representatives FEDERAL REAL PROPERTY Progress Made on Planning and Data, but Unneeded Owned and Leased Facilities... |
Date April 5, 2011 |
Report No. GAO-11-206 |
Title
United States Government Accountability Office GAO
April 2011 Report to Congressional Committees DEFENSE INFRASTRUCTURE The Navy Needs Better Documentation to Support Its Proposed Military Treatment Facilities on Guam GAO-11-206 April 2011 DEFENSE INFRASTRUCTURE
Accountability • Integrity • Reliability The Navy Needs Better Documentation to Support Its Proposed Military Treatment Facilities on... |
Date April 1, 2011 |
Report No. GAO-11-488R |
Title
United States Government Accountability Office Washington, DC 20548 April 1, 2011 The Honorable Daniel K. Inouye Chairman The Honorable Thad Cochran Ranking Member Subcommittee on Defense Committee on Appropriations United States Senate The Honorable C.W. Bill Young Chairman The Honorable Norman D. Dicks Ranking Member Subcommittee on Defense Committee on Appropriations House of Representatives Su... |
Date Feb. 3, 2011 |
Report No. GAO-11-131 |
Title
United States Government Accountability Office GAO
February 2011 Report to Congressional Requesters DEFENSE MANAGEMENT Additional Cost Information and Stakeholder Input Needed to Assess Military Posture in Europe GAO-11-131 February 2011 DEFENSE MANAGEMENT
Accountability • Integrity • Reliability Additional Cost Information and Stakeholder Input Needed to Assess Military Posture in Europe
High... |
Date Jan. 26, 2011 |
Report No. GAO-11-165 |
Title
United States Government Accountability Office GAO
January 2011 Report to the Subcommittee on Military Construction and Veterans Affairs, Committee on Appropriations, House of Representatives DEFENSE INFRASTRUCTURE High-Level Federal Interagency Coordination Is Warranted to Address Transportation Needs beyond the Scope of the Defense Access Roads Program GAO-11-165 January 2011 DEFENSE INFRASTRUCT... |
Date Dec. 6, 2010 |
Report No. GAO-11-69 |
Title
United States Government Accountability Office GAO
December 2010 Report to Congressional Committees MILITARY AND VETERANS DISABILITY SYSTEM Pilot Has Achieved Some Goals, but Further Planning and Monitoring Needed GAO-11-69 December 2010 Accountability • Integrity • Reliability MILITARY AND VETERANS DISABILITY SYSTEM
Pilot Has Achieved Some Goals, but Further Planning and Monitoring Needed Hig... |
Date Nov. 18, 2010 |
Report No. GAO-11-191T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 10:00 a.m. EST Thursday, November 18, 2010 Testimony Before the Committee on Veterans’ Affairs, U.S. Senate MILITARY AND VETERANS DISABILITY SYSTEM Preliminary Observations on Evaluation and Planned Expansion of DOD/VA Pilot
Statement of Daniel Bertoni, Director Education, Workforce, and Income Security Issues... |
Date Nov. 16, 2010 |
Report No. GAO-11-7 |
Title
United States Government Accountability Office GAO
November 2010 Report to Congressional Requesters DEFENSE INFRASTRUCTURE Actions Needed to Improve the Navy’s Processes for Managing Public Shipyards’ Restoration and Modernization Needs Page i GAO-11-7 November 2010 DEFENSE INFRASTRUCTURE
Accountability • Integrity • Reliability Actions Needed to Improve the Navy's Processes for Managing P... |
Date Oct. 28, 2010 |
Report No. GAO-11-60 |
Title
United States Government Accountability Office GAO
October 2010 Report to Congressional Committees MILITARY HOUSING Installations Need to Share Information on Their Section 801 On-Base Housing Contracts GAO-11-60 October 2010 MILITARY HOUSING
Accountability • Integrity • Reliability Installations Need to Share Information on Their Section 801 On-Base Housing Contracts
Highlights of GAO-11-60, ... |
Date Oct. 15, 2010 |
Report No. GAO-11-63 |
Title
United States Government Accountability Office GAO
October 2010 Report to Congressional Requesters AFGHANISTAN AND IRAQ DOD Should Improve Adherence to Its Guidance on Open Pit Burning and Solid Waste Management GAO-11-63 October 2010 Accountability • Integrity • Reliability AFGHANISTAN AND IRAQ
DOD Should Improve Adherence to Its Guidance on Open Pit Burning and Solid Waste Management Highlig... |
Date Sept. 13, 2010 |
Report No. GAO-10-745R |
Title
United States Government Accountability Office Washington, DC 20548 September 13, 2010 The Honorable Daniel K. Inouye Chairman Committee on Appropriations United States Senate The Honorable Tim Johnson Chairman Subcommittee on Military Construction, Veterans Affairs, and Related Agencies Committee on Appropriations United States Senate Subject: Defense Planning: DOD Needs to Review the Costs and B... |
Date July 30, 2010 |
Report No. GAO-10-771 |
Title
United States Government Accountability Office GAO
July 2010 Report to Congressional Committees DEFENSE INFRASTRUCTURE Army’s Privatized Lodging Program Could Benefit from More Effective Planning GAO-10-771 July 2010 DEFENSE INFRASTRUCTURE Highlights
Highlights of GAO-10-771, a report to congressional committees Accountability Integrity Reliability Army’s Privatized Lodging Program Could Benef... |
Date July 21, 2010 |
Report No. GAO-10-725R |
Title
United States Government Accountability Office Washington, DC 20548 July 21, 2010 Congressional Committees Subject: Military Base Realignments and Closures: DOD Is Taking Steps to Mitigate Challenges but Is Not Fully Reporting Some Additional Costs The 2005 Base Realignment and Closure (BRAC) round is the fifth such round undertaken by DOD since 1988 and is the biggest, most complex, and costliest... |
Date July 16, 2010 |
Report No. GAO-10-720 |
Title
United States Government Accountability Office GAO
July 2010 Report to Congressional Committees MILITARY TRAINING Army and Marine Corps Face Challenges to Address Projected Future Requirements GAO-10-720 July 2010 MILITARY TRAINING Highlights
Highlights of GAO-10-720, a report to congressional committees Accountability Integrity Reliability Army and Marine Corps Face Challenges to Address Projecte... |
Date July 15, 2010 |
Report No. GAO-10-348 |
Title
United States Government Accountability Office GAO
July 2010 Report to Congressional Requesters SUPERFUND Interagency Agreements and Improved Project Management Needed to Achieve Cleanup Progress at Key Defense Installations GAO-10-348 July 2010 SUPERFUND Highlights
Highlights of GAO-10-348, a report to congressional requesters Accountability Integrity Reliability Interagency Agreements and Improv... |
Date June 24, 2010 |
Report No. GAO-10-602 |
Title
United States Government Accountability Office GAO
June 2010 Report to the Subcommittee on Readiness, Committee on Armed Services, House of Representatives DEFENSE INFRASTRUCTURE Army Needs to Improve Its Facility Planning Systems to Better Support Installations Experiencing Significant Growth GAO-10-602 June 2010 DEFENSE INFRASTRUCTURE Highlights
Highlights of GAO-10-602, a report to the Subcommi... |
Date May 28, 2010 |
Report No. GAO-10-563R |
Title
United States Government Accountability Office Washington, DC 20548 May 28, 2010 The Honorable Carl Levin Chairman The Honorable John McCain Ranking Member Committee on Armed Services United States Senate The Honorable Ike Skelton Chairman The Honorable Howard P. McKeon Ranking Member Committee on Armed Services House of Representatives Subject: DEFENSE INFRASTRUCTURE: Impact of Purchasing from Lo... |
Date May 14, 2010 |
Report No. GAO-10-526 |
Title
United States Government Accountability Office GAO
May 2010 Report to the Subcommittee on Readiness, Committee on Armed Services, House of Representatives DEPOT MAINTENANCE Improved Strategic Planning Needed to Ensure That Air Force Depots Can Meet Future Maintenance Requirements GAO-10-526 May 2010 DEPOT MAINTENANCE Highlights
Highlights of GAO-10-526, a report to the Subcommittee on Readiness, C... |
Date May 11, 2010 |
Report No. GAO-10-482 |
Title
United States Government Accountability Office GAO
May 2010 Report to Congressional Committees DEFENSE INFRASTRUCTURE Opportunities Exist to Improve the Navy’s Basing Decision Process and DOD Oversight GAO-10-482 May 2010 DEFENSE INFRASTRUCTURE Highlights
Highlights of GAO-10-482, a report to congressional committees Accountability Integrity Reliability Opportunities Exist to Improve the Navy's ... |
Date April 26, 2010 |
Report No. GAO-10-681R |
Title
United States Government Accountability Office Washington, DC 20548 April 26, 2010 Congressional Committees Subject: Defense Infrastructure: Department of Defense Renewable Energy Initiatives This letter formally transmits the enclosed briefing in response to section 2846 of the National Defense Authorization Act for Fiscal Year 2010. The act required the Comptroller General to report on the Depar... |
Date March 17, 2010 |
Report No. GAO-10-547T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 10:00 a.m. EDT Wednesday, March 17, 2010 Testimony Before the Subcommittee on Military Construction, Veterans Affairs, and Related Agencies, Committee on Appropriations, House of Representatives ENVIRONMENTAL CONTAMINATION Information on the Funding and Cleanup Status of Defense Sites
Statement of Anu Mittal, Di... |
Date Nov. 13, 2009 |
Report No. GAO-10-90R |
Title
United States Government Accountability Office Washington, DC 20548 November 13, 2009 The Honorable Jeff Bingaman Chairman The Honorable Lisa Murkowski Ranking Member Committee on Energy and Natural Resources United States Senate The Honorable Daniel K. Akaka United States Senate Subject: Defense Infrastructure: Guam Needs Timely Information from DOD to Meet Challenges in Planning and Financing Of... |
Date Nov. 5, 2009 |
Report No. GAO-10-167R |
Title
United States Government Accountability Office Washington, DC 20548 November 5, 2009 The Honorable Carl Levin Chairman The Honorable John McCain Ranking Member Committee on Armed Services United States Senate The Honorable Ike Skelton Chairman The Honorable Howard McKeon Ranking Member Committee on Armed Services House of Representatives Subject: DEFENSE INFRASTRUCTURE: The Army Needs to Establish... |
Date Oct. 14, 2009 |
Report No. GAO-10-72 |
Title
United States Government Accountability Office GAO
October 2009 Report to the Chairwoman, Subcommittee on Insular Affairs, Oceans and Wildlife, Committee on Natural Resources, House of Representatives DEFENSE INFRASTRUCTURE DOD Needs to Provide Updated Labor Requirements to Help Guam Adequately Develop Its Labor Force for the Military Buildup GAO-10-72 October 2009 DEFENSE INFRASTRUCTURE Highlight... |
Date Sept. 9, 2009 |
Report No. GAO-09-750 |
Title
United States Government Accountability Office GAO
September 2009 Report to Congressional Committees MILITARY BASE REALIGNMENTS AND CLOSURES Transportation Impact of Personnel Increases Will Be Significant, but Long-Term Costs Are Uncertain and Direct Federal Support Is Limited GAO-09-750 September 2009 Highlights
Highlights of GAO-09-750, a report to congressional committees Accountability Integr... |
Date Aug. 6, 2009 |
Report No. GAO-09-771 |
Title
United States Government Accountability Office GAO
August 2009 Report to Congressional Requesters BALLISTIC MISSILE DEFENSE Actions Needed to Improve Planning and Information on Construction and Support Costs for Proposed European Sites GAO-09-771 August 2009 BALLISTIC MISSILE DEFENSE Highlights
Highlights of GAO-09-771, a report to congressional requesters Accountability Integrity Reliability Act... |
Date July 16, 2009 |
Report No. GAO-09-899T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 10:00 a.m. EDT Thursday, July 16, 2009 Testimony Before the Subcommittees on Disability Assistance and Memorial Affairs and Health, Committee on Veterans’ Affairs, House of Representatives VA HEALTH CARE Preliminary Findings on VA’s Provision of Health Care Services to Women Veterans
Statement of Randall B. ... |
Date July 14, 2009 |
Report No. GAO-09-884T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 9:30 a.m. EDT Tuesday, July 14, 2009 Testimony Before the Committee on Veterans’ Affairs, U.S. Senate VA HEALTH CARE Preliminary Findings on VA’s Provision of Health Care Services to Women Veterans
Statement of Randall B. Williamson Director, Health Care GAO-09-884T July 14, 2009 VA HEALTH CARE Highlights
Hi... |
Date July 2, 2009 |
Report No. GAO-09-706R |
Title
July 2, 2009 The Honorable Tim Johnson Chairman The Honorable Kay Bailey Hutchison Ranking Member Subcommittee on Military Construction, Veterans’ Affairs, and Related Agencies Committee on Appropriations United States Senate The Honorable Chet Edwards Chairman The Honorable Zach Wamp Ranking Member Subcommittee on Military Construction, Veterans’ Affairs, and Related Agencies Committee on App... |
Date June 30, 2009 |
Report No. GAO-09-653 |
Title
United States Government Accountability Office GAO
June 2009 Report to Congressional Requesters DEFENSE INFRASTRUCTURE Planning Challenges Could Increase Risks for DOD in Providing Utility Services When Needed to Support the Military Buildup on Guam GAO-09-653 June 2009 DEFENSE INFRASTRUCTURE Highlights
Highlights of GAO-09-653, a report to congressional requesters Accountability Integrity Reliabi... |
Date May 29, 2009 |
Report No. GAO-09-452 |
Title
United States Government Accountability Office GAO
May 2009 Report to Congressional Requesters INSURANCE SALES TO MILITARY PERSONNEL Additional Actions Needed to Prevent Improper Life Insurance Sales and Pay Allotment Transactions GAO-09-452 May 2009 INSURANCE SALES TO MILITARY PERSONNEL Highlights
Highlights of GAO-09-452, a report to congressional requesters Accountability Integrity Reliability ... |
Date May 15, 2009 |
Report No. GAO-09-352 |
Title
United States Government Accountability Office GAO
May 2009 Report to Congressional Committees FOREIGN ASSISTANCE Measures to Prevent Inadvertent Payments to Terrorists under Palestinian Aid Programs Have Been Strengthened, but Some Weaknesses Remain GAO-09-622 May 2009 FOREIGN ASSISTANCE Highlights
Highlights of GAO-09-622, a report to congressional committees Accountability Integrity Reliability... |
Date May 14, 2009 |
Report No. GAO-09-83 |
Title
United States Government Accountability Office GAO
May 2009 Report to the Subcommittee on Readiness, Committee on Armed Services, House of Representatives DEPOT MAINTENANCE Actions Needed to Identify and Establish Core Capability at Military Depots GAO-09-83 May 2009 DEPOT MAINTENANCE Highlights
Highlights of GAO-09-83, a report to the Subcommittee on Readiness, Committee on Armed Services, House ... |
Date April 20, 2009 |
Report No. GAO-09-357 |
Title
United States Government Accountability Office GAO
April 2009 Report to Congressional Requesters ARMY HEALTH CARE Progress Made in Staffing and Monitoring Units that Provide Outpatient Case Management, but Additional Steps Needed GAO-09-357 April 2009 ARMY HEALTH CARE Highlights
Highlights of GAO-09-357, a report to congressional requesters Accountability Integrity Reliability Progress Made in Sta... |
Date April 9, 2009 |
Report No. GAO-09-500R |
Title
United States Government Accountability Office Washington, DC 20548 April 9, 2009 Congressional Committees Subject: High-Level Leadership Needed to Help Guam Address Challenges Caused by DODRelated Growth In an effort to improve the U.S. military’s flexibility to address conventional and terrorist threats worldwide, the Department of Defense (DOD) plans to relocate more than 8,000 Marines and an... |
Date March 30, 2009 |
Report No. GAO-09-336 |
Title
United States Government Accountability Office GAO
March 2009 Report to Congressional Committees DEFENSE INFRASTRUCTURE DOD Needs to Periodically Review Support Standards and Costs at Joint Bases and Better Inform Congress of Facility Sustainment Funding Uses GAO-09-336 March 2009 DEFENSE INFRASTRUCTURE Highlights
Highlights of GAO-09-336, a report to congressional committees Accountability Integr... |
Date March 3, 2009 |
Report No. GAO-09-388T |
Title
United States Government Accountability Office GAO
For Release on Delivery Expected at 1:00 p.m. EST Tuesday, March 3, 2009 Testimony Before the Subcommittee on Readiness, Committee on Armed Services, House of Representatives DEFENSE MANAGEMENT Increased Attention on Fuel Demand Management at DOD’s Forward-Deployed Locations Could Reduce Operational Risks and Costs
Statement of William M. Solis,... |
Date Feb. 20, 2009 |
Report No. GAO-09-181 |
Title
United States Government Accountability Office GAO
February 2009 Report to the Subcommittee on National Security and Foreign Affairs, Committee on Oversight and Government Reform, House of Representatives DEFENSE MANAGEMENT Actions Needed to Address Stakeholder Concerns, Improve Interagency Collaboration, and Determine Full Costs Associated with the U.S. Africa Command GAO-09-181 February 2009 DEF... |
Date Feb. 20, 2009 |
Report No. GAO-09-300 |
Title
United States Government Accountability Office GAO
February 2009 Report to the Subcommittee on Readiness, Committee on Armed Services, House of Representatives DEFENSE MANAGEMENT DOD Needs to Increase Attention on Fuel Demand Management at Forward-Deployed Locations GAO-09-300 a February 2009 DEFENSE MANAGEMENT Highlights
Highlights of GAO-09-300, a report to the Subcommittee on Readiness, Committ... |
Date Jan. 30, 2009 |
Report No. GAO-09-217 |
Title
United States Government Accountability Office GAO
January 2009 Report to Congressional Committees MILITARY BASE REALIGNMENTS AND CLOSURES DOD Faces Challenges in Implementing Recommendations on Time and Is Not Consistently Updating Savings Estimates GAO-09-217 January 2009 Highlights
Highlights of GAO-09-217, a report to congressional committees Accountability Integrity Reliability MILITARY BASE ... |
Date Jan. 13, 2009 |
Report No. GAO-09-171 |
Title
United States Government Accountability Office GAO
January 2009 Report to Congressional Committees DEFENSE INFRASTRUCTURE Additional Information Is Needed to Better Explain the Proposed 100,000Acre Expansion of the Piñon Canyon Maneuver Site GAO-09-171 January 2009 DEFENSE INFRASTRUCTURE Highlights
Highlights of GAO-09-171, a report to congressional committees Accountability Integrity Reliability... |
Date Jan. 13, 2009 |
Report No. GAO-09-32 |
Title
United States Government Accountability Office GAO
January 2009 Report to Congressional Requesters DEFENSE INFRASTRUCTURE Army’s Approach for Acquiring Land Is Not Guided by Up-to-Date Strategic Plan or Always Communicated Effectively GAO-09-32 January 2009 DEFENSE INFRASTRUCTURE Highlights
Highlights of GAO-09-32, a report to congressional requesters Accountability Integrity Reliability Army’... |
Date Sept. 18, 2008 |
Report No. GAO-08-1054R |
Title
United States Government Accountability Office Washington, DC 20548 September 18, 2008 Congressional Committees Subject: Defense Infrastructure: NORAD and USNORTHCOM Need to Reevaluate Vulnerabilities Associated with Moving the NORAD Command Center from Cheyenne Mountain to Peterson Air Force Base, and to Acknowledge Acceptance of the Risks In July 2006, the former Commander of North American Aero... |