Date Report No. Title
Date April 9, 1982 Report No. MASAD-82-30 Title

National Defense: Opportunities To Reduce the Cost of Some B-52 Modifications

UNITED STATESGENERALACCOUNTINGOFFICE WASHINGTON, D.C. 20549 MISSION ANALYSIS IIIYWLMS ACOUllllflON AND DIVI5ION E-207025 APRlL9,1982 The Honorable The Secretary Attention: Caspar W . Weinberger of Defense Director, G A O Affairs Dear Mr. Secretary: Subject: Opportunities Modifications to Reduce the Cost of Some B-52 (MASAD-82-30) Following Presidential approval of the B-1B program, the Air Force r...
Date Feb. 17, 1981 Report No. MASAD-81-1 Title

The MX Weapon System: Issues and Challenges

f?fsport To The Congress OF THEUNITEDSTATES TideMX Weapon System: IsduesAnd Challenges The MX weapon system is 1 year into full-scale dev lopment. Progress has been made, but the Dep rtment of Defense still faces major challeng s in achieving cost, schedule, and perfor ante goals. i The MX weapon system is designed to be able to r spond to an increased threat. The system can : be expanded by addin...
Date Nov. 12, 1980 Report No. C-PSAD-81-2 Title

National Defense: Potential of LoAD Ballistic Missile Defense System for Protecting the MX Missile System

‘. - _ REPORT BY THE COMPTROLLER GENERAL-OF THE UNITED STATES . c POTENTIAL OF .T&'LoAD BALLISTIC MISSILE DEFENSE SYSTEM FOR PROTECTING THE MX MISSILE SYSTEMM DIGEST -----An objective of U.S. national defense policy is to maintain.a force of land-based intercontinental ballistic missiles (ICBMS) capable of surviving a Soviet attack in numbers adequate for a retaliatory strike. Because of concern...
Date Feb. 29, 1980 Report No. PSAD-80-29 Title

National Defense: The MX Weapon System--A Program With Cost and Schedule Uncertainties

Development has begun on tha MX, even though many uncertainties exist: --P&posed method of survivable basing. --Availability of land and other resources for the construction and operation d’f the system. --Attainment of cost, schedule, and performance goals. --Survivability of the system if arms contpal agreements do not exist. ‘Bb e&i-mated Cost is about $33 billion (1978 do(ilws 1. With infl...
Date Aug. 27, 1979 Report No. ID-79-50 Title

International Affairs: Cost of Administration's Public Affairs Activities Relating to SALT II

Dear Senator Goldwater: In response to your letter of May 23, 1979, we have obtained updated information on the costs of the administration's efforts to inform the public on the Strategic Arms In an earlier report to you Limitation Talks (SALT II). (=-March' 16, 1979), we explained that the admini,stration's public information activities r 1 were centered in the Department of StatMB& Ebb ~~n&%!OoV...
Date March 16, 1979 Report No. ID-79-24 Title

International Affairs: Administration's Public Affairs Activities Relating to SALT II

I. . UNITEDSTATESGENERALACCOUNTING OFFICE RELf The Honorable United States Dear Senator Barry Goldwater Senate Goldwater: 108981 In;response to your letter of December 19, 1978, we have obtained >information on the costs of the administration's efforts to inform the public on the Strategic Arms Limitation Public information Talks (SALT II) with the Soviet Union. activities relating to SALT II are ...